SlideShare una empresa de Scribd logo
1 de 37
Renovation for Education Willingboro Public Schools 2010 School Referendum
What We’ll Cover Referendum Facts What is a referendum? Why is the district choosing to go to referendum? Why now? Classification of Projects Level One, Two and Three Project descriptions Scope of Project (according to school) Cost Summary Frequently Asked Questions Voter Information
What is a bond referendum? ,[object Object]
The Willingboro Schools’ referendum will ask voters to fund only 40 percent (local share) of all needed renovations and upgrades.Delete text and place photo here.
Why is the referendum being held? Delete text and place photo here. The Board of Education has chosen to move forward for the following reasons: ,[object Object]
To improve the safety and security of our students;
To improve facilities for ADA (Americans With Disabilities Act) Accessibility
To provide for normal life-cycle replacement of specified building systems or elements; and
To improve the efficiency and effectiveness of our learning environment.,[object Object]
Eligibility & Prioritization: LEVEL ONEPROJECTS Level One Projects are classified as critical operational needs and program mandates. Level One Projects Include: Emergent Projects Essential Building Upgrades Building Skin Building Code Issues ADA Upgrades Hazardous Material Abatement Security and Communications Systems Site Drainage Elementary School Playgrounds Renovated/New Early Childhood Classrooms Special Population Needs All projects included in this referendum are classified as Level One Projects! Delete text and place photo here. Delete text and place photo here.
Willingboro High School   Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: Willingboro High School All Projects at Willingboro High School are classified as “Level One” projects. WHS Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Locker Room Renovations Educational Upgrades in Existing Science Rooms Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades Delete text and place photo here. Delete text and place photo here.
WHS Renovation Project: Funding Facts: Estimated WHS Project Cost: $18,190,647.00 State Share (59.6%) $10,842,044.00 Local Share (40.4%) $7,348,603.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
Levitt Middle School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: Levitt Middle School All Projects at Levitt Middle School are classified as “Level One” projects. LMS Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades Telephone System Replacement Delete text and place photo here.
LMS Renovation Project: Funding Facts: Estimated LMS Project Cost:  $8,080,182.00 State Share (59.6%) $4,815,974.00 Local Share (40.4%) $3,264,208.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
MemorialUpperElementary School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: Memorial Upper Elementary School All Projects at Memorial Upper Elementary School are classified as “Level One” projects. MUES Projects Include: Window Replacement Exterior Door Replacement Restroom Renovations Locker Room Renovations Educational Upgrades to Existing Science Rooms Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades Delete text and place photo here.
MUES Renovation Project: Funding Facts: Estimated MUES Project Cost:  $13,105,268.00 State Share (59.6%) $7,811,041.00 Local Share (40.4%) $5,294,208.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
Garfield East Elementary School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: Garfield East Elementary School All Projects at Garfield East Elementary School are classified as “Level One” projects. GE Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Multi-Purpose Room Air Conditioning Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Fire Alarm System Replacement Delete text and place photo here.
GE Elem. Renovation Project: Funding Facts: Estimated GE Elem. Project Cost:  $5,448,957.00 State Share (59.6%) $3,247,704.00 Local Share (40.4%) $2,201,253.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
HawthorneElementary School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: Hawthorne Elementary School All Projects at Hawthorne Elementary School are classified as “Level One” projects. Hawthorne Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Multi-Purpose Room Air Conditioning Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Delete text and place photo here.
Hawthorne Renovation Project: Funding Facts: Estimated Hawthorne Project Cost:  $5,581,721.00 State Share (59.6%) $3,326,834.00 Local Share (40.4%) $2,254,887.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
J.C. StuartElementary School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: J.C. Stuart Elementary School All Projects at J.C. Stuart Elementary School are classified as “Level One” projects. Stuart Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Telephone System Replacement
J.C. Stuart Renovation Project: Funding Facts: Estimated Stuart Project Cost:  $5,967,181.00 State Share (59.6%) $3,556,577.00 Local Share (40.4%) $2,410,604.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
TwinHillsElementary School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: Twin Hills Elementary School All Projects at Twin HillsElementary School are classified as “Level One” projects. TH Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Multi-Purpose Room Floor Replacement Boiler Replacement Unit Ventilator Replacement Multi-Purpose Room Air Conditioning Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Fire Alarm System Replacement
Twin Hills Renovation Project: Funding Facts: Estimated TH Project Cost:  $5,587,360.00 State Share (59.6%) $3,330,195.00 Local Share (40.4%) $2,257,165.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
W.R. JamesElementary School  Proposed Improvements Included in the 2010 Referendum
Proposed Renovations: W.R. James Elementary School All Projects at W.R. JamesElementary School are classified as “Level One” projects. WRJ Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System
James Renovation Project: Funding Facts: Estimated WRJ Project Cost:  $5,395,711.00 State Share (59.6%) $3,215,968.00 Local Share (40.4%) $2,179,743.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
Total Project Funding Facts: Estimated Total Project Cost: $67,357,027.00 State Share (59.6%) $40,146,337.00 Local Share (40.4%) $27,210,690.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
Frequently Asked Questions Will the district incur additional staffing and operating costs if this referendum is approved? No. No additional staff and/or operating costs  will be incurred, but our facilities will be safer, more comfortable, more accessible and improved systems will operate more efficiently and last longer. Are the improvements really necessary? Can’t we just wait for better economic times?  All the proposed improvements are emergent, mandated or timely, meaning they are necessary. While we understand that taxpayers are experiencing financial difficulties, there will not be a better time to take advantage of reduced construction costs, the state grant and favorable bond financing.
Frequently Asked Questions How will the State pay the 60 percent of funds that have been allocated to the project? The district has secured $40.1 million in a State grant. Grant funds reduce the referendum-related indebtedness of the district.  What happened to all the money we pay in taxes to maintain the school? Why can’t the regular budget pay for all of this? The Facilities budget has been set at minimal increases for multiple years – the result of a cap on budget increases mandated by the NJ Department of Education. The administration and the Board of Education work tirelessly to minimize the annual school budget. In addition, repeated budget vote defeats have caused further cutbacks.

Más contenido relacionado

Similar a March 9, 2010 Referendum Information

University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...Sightlines
 
Howard Marks, U.S. DOE
Howard Marks, U.S. DOEHoward Marks, U.S. DOE
Howard Marks, U.S. DOEguest9fb1af
 
Bpi accredited training, john jones
Bpi accredited training, john jonesBpi accredited training, john jones
Bpi accredited training, john jonesJen Boudrie
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogSightlines
 
Ocean City Board of Education finance commitee referendum presentation
Ocean City Board of Education finance commitee referendum presentationOcean City Board of Education finance commitee referendum presentation
Ocean City Board of Education finance commitee referendum presentationOceanCityGazette
 
MEDC: Remediation and Redevelopment Division
MEDC: Remediation and Redevelopment DivisionMEDC: Remediation and Redevelopment Division
MEDC: Remediation and Redevelopment DivisionSuburbs Alliance
 
Site Improvement Plan by Marilyn
Site Improvement Plan by MarilynSite Improvement Plan by Marilyn
Site Improvement Plan by MarilynMarilyn Brouette
 
Canadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USACanadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USAEliot Norman
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09msciortino
 
Rockingham 2020
Rockingham 2020Rockingham 2020
Rockingham 2020James May
 
School Facilities Funding in California - a time of transition and change
School Facilities Funding in California - a time of transition and changeSchool Facilities Funding in California - a time of transition and change
School Facilities Funding in California - a time of transition and changeCharley Cowens
 

Similar a March 9, 2010 Referendum Information (20)

University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
University of Tennessee Knoxville Facilities Exposed - The Story Behind the F...
 
Fla Green Incentives Kettles
Fla Green Incentives  KettlesFla Green Incentives  Kettles
Fla Green Incentives Kettles
 
31013 nrcsd nyssba_pres_9-6-11
31013 nrcsd nyssba_pres_9-6-1131013 nrcsd nyssba_pres_9-6-11
31013 nrcsd nyssba_pres_9-6-11
 
Howard Marks- U.S DOE
Howard Marks- U.S DOEHoward Marks- U.S DOE
Howard Marks- U.S DOE
 
Howard Marks, U.S. DOE
Howard Marks, U.S. DOEHoward Marks, U.S. DOE
Howard Marks, U.S. DOE
 
Bpi accredited training, john jones
Bpi accredited training, john jonesBpi accredited training, john jones
Bpi accredited training, john jones
 
E rate slide show
E rate slide showE rate slide show
E rate slide show
 
E rate slide show
E rate slide showE rate slide show
E rate slide show
 
How UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlogHow UMass is reducing its deferred maintenance backlog
How UMass is reducing its deferred maintenance backlog
 
Ocean City Board of Education finance commitee referendum presentation
Ocean City Board of Education finance commitee referendum presentationOcean City Board of Education finance commitee referendum presentation
Ocean City Board of Education finance commitee referendum presentation
 
MEDC: Remediation and Redevelopment Division
MEDC: Remediation and Redevelopment DivisionMEDC: Remediation and Redevelopment Division
MEDC: Remediation and Redevelopment Division
 
Site Improvement Plan by Marilyn
Site Improvement Plan by MarilynSite Improvement Plan by Marilyn
Site Improvement Plan by Marilyn
 
Canadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USACanadian Slides: Growth Opportunities in the USA
Canadian Slides: Growth Opportunities in the USA
 
Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09Allies Federal Energy Policy 7 09
Allies Federal Energy Policy 7 09
 
Rockingham 2020
Rockingham 2020Rockingham 2020
Rockingham 2020
 
Indiana 2022-23 State Budget
Indiana 2022-23 State BudgetIndiana 2022-23 State Budget
Indiana 2022-23 State Budget
 
PA DEP Solar Incentive Programs
PA DEP Solar Incentive ProgramsPA DEP Solar Incentive Programs
PA DEP Solar Incentive Programs
 
Directory of CHEA Recognized Higher Education Accrediting Organizations
Directory of CHEA Recognized Higher Education Accrediting OrganizationsDirectory of CHEA Recognized Higher Education Accrediting Organizations
Directory of CHEA Recognized Higher Education Accrediting Organizations
 
School Facilities Funding in California - a time of transition and change
School Facilities Funding in California - a time of transition and changeSchool Facilities Funding in California - a time of transition and change
School Facilities Funding in California - a time of transition and change
 
The Lending Center: Our Impact
The Lending Center: Our ImpactThe Lending Center: Our Impact
The Lending Center: Our Impact
 

Último

COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxUmeshTimilsina1
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 

Último (20)

COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 

March 9, 2010 Referendum Information

  • 1. Renovation for Education Willingboro Public Schools 2010 School Referendum
  • 2. What We’ll Cover Referendum Facts What is a referendum? Why is the district choosing to go to referendum? Why now? Classification of Projects Level One, Two and Three Project descriptions Scope of Project (according to school) Cost Summary Frequently Asked Questions Voter Information
  • 3.
  • 4. The Willingboro Schools’ referendum will ask voters to fund only 40 percent (local share) of all needed renovations and upgrades.Delete text and place photo here.
  • 5.
  • 6. To improve the safety and security of our students;
  • 7. To improve facilities for ADA (Americans With Disabilities Act) Accessibility
  • 8. To provide for normal life-cycle replacement of specified building systems or elements; and
  • 9.
  • 10. Eligibility & Prioritization: LEVEL ONEPROJECTS Level One Projects are classified as critical operational needs and program mandates. Level One Projects Include: Emergent Projects Essential Building Upgrades Building Skin Building Code Issues ADA Upgrades Hazardous Material Abatement Security and Communications Systems Site Drainage Elementary School Playgrounds Renovated/New Early Childhood Classrooms Special Population Needs All projects included in this referendum are classified as Level One Projects! Delete text and place photo here. Delete text and place photo here.
  • 11. Willingboro High School Proposed Improvements Included in the 2010 Referendum
  • 12. Proposed Renovations: Willingboro High School All Projects at Willingboro High School are classified as “Level One” projects. WHS Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Locker Room Renovations Educational Upgrades in Existing Science Rooms Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades Delete text and place photo here. Delete text and place photo here.
  • 13. WHS Renovation Project: Funding Facts: Estimated WHS Project Cost: $18,190,647.00 State Share (59.6%) $10,842,044.00 Local Share (40.4%) $7,348,603.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 14. Levitt Middle School Proposed Improvements Included in the 2010 Referendum
  • 15. Proposed Renovations: Levitt Middle School All Projects at Levitt Middle School are classified as “Level One” projects. LMS Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades Telephone System Replacement Delete text and place photo here.
  • 16. LMS Renovation Project: Funding Facts: Estimated LMS Project Cost: $8,080,182.00 State Share (59.6%) $4,815,974.00 Local Share (40.4%) $3,264,208.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 17. MemorialUpperElementary School Proposed Improvements Included in the 2010 Referendum
  • 18. Proposed Renovations: Memorial Upper Elementary School All Projects at Memorial Upper Elementary School are classified as “Level One” projects. MUES Projects Include: Window Replacement Exterior Door Replacement Restroom Renovations Locker Room Renovations Educational Upgrades to Existing Science Rooms Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades Delete text and place photo here.
  • 19. MUES Renovation Project: Funding Facts: Estimated MUES Project Cost: $13,105,268.00 State Share (59.6%) $7,811,041.00 Local Share (40.4%) $5,294,208.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 20. Garfield East Elementary School Proposed Improvements Included in the 2010 Referendum
  • 21. Proposed Renovations: Garfield East Elementary School All Projects at Garfield East Elementary School are classified as “Level One” projects. GE Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Multi-Purpose Room Air Conditioning Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Fire Alarm System Replacement Delete text and place photo here.
  • 22. GE Elem. Renovation Project: Funding Facts: Estimated GE Elem. Project Cost: $5,448,957.00 State Share (59.6%) $3,247,704.00 Local Share (40.4%) $2,201,253.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 23. HawthorneElementary School Proposed Improvements Included in the 2010 Referendum
  • 24. Proposed Renovations: Hawthorne Elementary School All Projects at Hawthorne Elementary School are classified as “Level One” projects. Hawthorne Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Multi-Purpose Room Air Conditioning Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Delete text and place photo here.
  • 25. Hawthorne Renovation Project: Funding Facts: Estimated Hawthorne Project Cost: $5,581,721.00 State Share (59.6%) $3,326,834.00 Local Share (40.4%) $2,254,887.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 26. J.C. StuartElementary School Proposed Improvements Included in the 2010 Referendum
  • 27. Proposed Renovations: J.C. Stuart Elementary School All Projects at J.C. Stuart Elementary School are classified as “Level One” projects. Stuart Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Telephone System Replacement
  • 28. J.C. Stuart Renovation Project: Funding Facts: Estimated Stuart Project Cost: $5,967,181.00 State Share (59.6%) $3,556,577.00 Local Share (40.4%) $2,410,604.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 29. TwinHillsElementary School Proposed Improvements Included in the 2010 Referendum
  • 30. Proposed Renovations: Twin Hills Elementary School All Projects at Twin HillsElementary School are classified as “Level One” projects. TH Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Multi-Purpose Room Floor Replacement Boiler Replacement Unit Ventilator Replacement Multi-Purpose Room Air Conditioning Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System Fire Alarm System Replacement
  • 31. Twin Hills Renovation Project: Funding Facts: Estimated TH Project Cost: $5,587,360.00 State Share (59.6%) $3,330,195.00 Local Share (40.4%) $2,257,165.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 32. W.R. JamesElementary School Proposed Improvements Included in the 2010 Referendum
  • 33. Proposed Renovations: W.R. James Elementary School All Projects at W.R. JamesElementary School are classified as “Level One” projects. WRJ Elem. Projects Include: Window Replacement Exterior Door Replacement Interior Door Replacement Restroom Renovations Boiler Replacement Unit Ventilator Replacement Building Electrical Service Upgrades Electrical Distribution System Upgrades Plumbing System Upgrades New CCTV Security System
  • 34. James Renovation Project: Funding Facts: Estimated WRJ Project Cost: $5,395,711.00 State Share (59.6%) $3,215,968.00 Local Share (40.4%) $2,179,743.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 35. Total Project Funding Facts: Estimated Total Project Cost: $67,357,027.00 State Share (59.6%) $40,146,337.00 Local Share (40.4%) $27,210,690.00 The State of NJ has committed grant funds for nearly 60 percent of the total costs associated with this project.
  • 36. Frequently Asked Questions Will the district incur additional staffing and operating costs if this referendum is approved? No. No additional staff and/or operating costs will be incurred, but our facilities will be safer, more comfortable, more accessible and improved systems will operate more efficiently and last longer. Are the improvements really necessary? Can’t we just wait for better economic times? All the proposed improvements are emergent, mandated or timely, meaning they are necessary. While we understand that taxpayers are experiencing financial difficulties, there will not be a better time to take advantage of reduced construction costs, the state grant and favorable bond financing.
  • 37. Frequently Asked Questions How will the State pay the 60 percent of funds that have been allocated to the project? The district has secured $40.1 million in a State grant. Grant funds reduce the referendum-related indebtedness of the district. What happened to all the money we pay in taxes to maintain the school? Why can’t the regular budget pay for all of this? The Facilities budget has been set at minimal increases for multiple years – the result of a cap on budget increases mandated by the NJ Department of Education. The administration and the Board of Education work tirelessly to minimize the annual school budget. In addition, repeated budget vote defeats have caused further cutbacks.
  • 38. Frequently Asked Questions How will this referendum affect my property taxes? Residents with homes valued at the current average assessment will see an increase of approximately $159.00 per year as a result of the referendum. That equates to only $13.25 per month, or the cost of a pizza dinner at a local eatery. Are there programs to offset the tax increases of the proposed referendum? Yes, eligible senior citizens can apply to the NJ Property Tax Reimbursement Program. Eligibility information can be found with our referendum information on the district website.
  • 39. Frequently Asked Questions Assuming the referendum passes on March 9, when will the work begin? The most emergent problems will be addressed first, with work primarily occurring during the summer seasons so as not to disrupt learning, most likely beginning in June 2011. Will work be done anywhere other than the schools? No. There will be no work conducted at any of the closed schools, warehouse or Country Club Administration Building, as grant funds would not cover renovations at these facilities. What happens if there is a cost overrun for this project? The amount of this plan is based on estimates prepared by the district’s architect, engineers and cost estimators. The amount of the bond is expected to cover the costs of all proposed work. Contingencies and possible construction cost increases have been factored into the total cost to minimize any possibility of overruns. Most importantly, the district cannot spend any more money than the voters approve.
  • 40. Voting Information Voters will be asked to come to the polls on Tuesday, March 9, from 2:00 To 9:00 p.m. This is only one of five dates approved by the State for school district referenda. To be eligible to vote in the school referendum, you must be registered to vote at least 21 days prior to March 9, or by February 16, 2010. You can register to vote by filling out a Voter Registration Application and mailing it into the Burlington County Board of Elections. This application can also be found at our website. You can locate your polling place by using the search tool located on the referendum page of the district website. Absentee ballots can also downloaded and mailed to the Burlington County Clerk up to seven days prior to the election. Absentee ballots must be received by the County Clerk no later than 3:00 PM on election day (March 9, 2010).
  • 41. Please come out to vote Tuesday, March 9, 2010! For more voter information, please visit our website at www. willingboroschools.org.