Did You Know?




    •   15-20% of the world’s total electricity consumption is for refrigeration
        and air-conditioning

    •   Electricity cost for cooling often represents 40-60% of the total
        energy consumed in a building in the cooling seasons

    •   The majority of cooling systems don’t work as efficiently as they could




2
                            Property of Renteknik Group Inc.  All rights reserved
Background

•   Chilled Water and Cooling Systems can be costly to operate and
    maintain
•   There is the misconception that operating = efficient
•   Without an effective method and efficient tool, these system
    normally operate inefficiently
•   ClimaCheck allows you to see into the ‘black box’ on system
    performance and realize significant energy savings through
    optimization
•   Renteknik is the North American Technology Integration Partner for
    ClimaCheck AB from Sweden

                       Property of Renteknik Group Inc.  All rights reserved
•   Portable Analyzer originally developed in Sweden 1986

    •   Fixed Analyzer developed 2004

    •   Web based monitoring launch 2008

    •   Used by notable European companies in commercial, industrial,
        institutional and retail facilities

    •   Standard for commissioning and re-commissioning of systems
        throughout the world




                                                                            World Wildlife Fund estimate global CO2
                                                                         reduction in 2020 to 72 million tons from 50% of
4                                                                            market implementing improved service
                              Property of Renteknik Group Inc.  All rights reserved
The Principle Behind ClimaCheck

    •   Base on the First Law of Thermodynamics – energy can neither be
        created nor destroyed, it can only be changed from one form to
        another

                                 Mass flow = (electrical input-heat losses)                                  (1)
                                                    Enthalpy difference




                                 Cooling Capacity = Mass flow * (h2 – h3)                                    (2)

                                 Heating Capacity = Mass flow * (h1 – h3)                                    (3)

                                 Isentropic Efficiency =                  (hs – h2) * (1 – rel. heat loss)   (4)
                                                                                    (h1 – h2)




5
                          Property of Renteknik Group Inc.  All rights reserved
Accuracy

•   Accuracy of Calculated Data
    – Coefficient of Performance (COP) - ±5%
    – Cooling and heating capacity (±7%)
    – Power input (±2%)
    – Compressor isentropic efficiency (±3%)
•   Sensors
    – Pressure sensor (±1% FS - Full Scale)
    – Temperature sensor PT1000 Class A
    – Electrical Energy power meter ClimaCheck EP Pro, Class B
    – Current Transformers - 20-120% of rating (±2%)

                     Property of Renteknik Group Inc.  All rights reserved
How Does ClimaCheck Work?

•   Non-Invasive Sensors are attached to Equipment points

•   Basic setup of 7 temperature sensors, 2 pressure sensors and 1
    active power sensor

•   Set-up by a qualified Technician

•   30 minutes/piece of Equipment
                                                                    2 Pressure Sensors connected
     7 Surface Temperature                                                 at service ports
            Sensors




                                                              1 Electrical Input Sensor

                       Property of Renteknik Group Inc.  All rights reserved
Thermodynamic Model


                                                                         • 2 pressures sensors
                                                                         • 7 temperatures sensors
                                                                         • 1 power input sensor




    • A thermodynamic evaluation produces an unbiased analysis
      with no information about the system or compressor
      required


8
                     Property of Renteknik Group Inc.  All rights reserved
Quick Non-Invasive Sensor Attachment




9
              Property of Renteknik Group Inc.  All rights reserved
Sample Applications




10
       Property of Renteknik Group Inc.  All rights reserved
ClimaCheck Performance Analyzer




     •   Optimization increases energy efficiency

     •   Estimated 10-40% Energy Savings

     •   Increases reliability, reduced equipment wear

     •   Alerts and alarms to changes effecting operating efficiency

     •   Lowers operating and maintenance expenses

     •   Reduces CO² emissions

     •   Benefits the owner and the environment!

11
                            Property of Renteknik Group Inc.  All rights reserved
ClimaCheck PA Pro Portable

     •   In field measurements for
         commissioning, service or inspections

     •   Documentation and analysis of the
         equipment’s actual performance

     •   Immediate and precise answers on
         heat pump, cooling and air conditioning
         unit operations




12
                           Property of Renteknik Group Inc.  All rights reserved
ClimaCheck PA Pro Fixed

     •   Continuous monitoring of energy
         consumption and performance

     •   Access to real time data via the
         internet

     •   Predefined Energy Reports provide
         continuous information about the
         equipment’s energy consumption




13
                           Property of Renteknik Group Inc.  All rights reserved
The Benefits of a Fixed Installation
     •   Knowing how a system is performing allows continuous monitoring
         of energy efficiency

     •   If a compressor or heat exchanger performance fails, refrigerant
         leaks, or if the equipment’s “energy profile” changes adversely, the
         system automatically sends an alarm (email or SMS) regarding
         the changes

     •   Detailed information about the problem is available via email or text
         messages anywhere, anytime




14
                            Property of Renteknik Group Inc.  All rights reserved
Sample Installations




     Pressure and temperature sensors                                     Temperature sensor

15
                       Property of Renteknik Group Inc.  All rights reserved
Sample Installations




          Current Transformers




                                                                          Custom ClimaCheck System
                                                                                  Installed

     Pressure sensor on service port
16
                          Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–System Flow Chart




17
               Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–System Table




18
             Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–System Graphic




19
              Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–User Settings




20
             Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–Flag Settings




21
             Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–Logic Settings




22
             Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–Alarm Settings




23
             Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–Power Profile




24
             Property of Renteknik Group Inc.  All rights reserved
Web Portal Sample–Energy Statistics




25
               Property of Renteknik Group Inc.  All rights reserved
Applications

     •   Product and Systems Development                               •       Troubleshooting

         Leading manufacturers of systems for                                  ClimaCheck provides fast
         cooling and heating use ClimaCheck’s                                  troubleshooting to minimize energy
         solutions for quality assurance of                                    consumption costs, repair time and
         products and solutions                                                down time



     •   Commissioning and Inspections                                 •       Preventive Maintenance and
         When new equipment is being used for                                  Service
         the first time or when the warranty                                   Predefined performance reports can
         period is coming to an end,                                           alert to possible imminent fails and
         ClimaCheck’s solutions provides                                       breakdowns making service and
         assurance that equipment is operating                                 maintenance easier and more
         efficiently                                                           effective. Analysis of Performance
                                                                               based maintenance vs. passage of
                                                                               time
26
                                  Property of Renteknik Group Inc.  All rights reserved
Multiple Uses


     •Commissioning new systems

     •Continuous monitoring

     •Preventive maintenance

     •Trouble shooting

     •Decision support

     •Real Time Performance inspection




27
                         Property of Renteknik Group Inc.  All rights reserved
Objective of Performance Analysis

•   The objective of performing an analysis of a Chilled Water System is
    initially to improve the System’s performance through optimization

•   Adjusting settings or controls

•   Identify defective or inefficient system components that may require
    immediate or future capital replacement

•   After optimization establish a new base line for performance

•   Continue to monitor the system and alert to deviations from optimum
    energy efficiency




                        Property of Renteknik Group Inc.  All rights reserved
What is the Process?
                                                                                     E N   E R




     •   Step 1: Get a clear picture of how it is currently working by installing a
         ClimaCheck Performance Analyzer

     •   Step 2: Monitor and analyze the equipment operation and
         performance (energy efficiency)

     •   Step 3: Identify areas that require adjustment, upgrading or
         replacement

     •   Step 4: Optimize the system and monitor ongoing efficiency to ensure
         maximum is maintained
29
                             Property of Renteknik Group Inc.  All rights reserved
What Does ClimaCheck Provide?

•   Enables Engineers and Refrigeration Technicians to:

    – Perform cost effective real-time analysis

    – Evaluate system performance

    – See real-time COP, capacity, compressor efficiency and other
       vital performance parameters without tedious calculations

    – Data is presented dynamically in charts and tables providing an
       immediate picture of actual performance




                      Property of Renteknik Group Inc.  All rights reserved
Practical Benefits of ClimaCheck

     •   All data is available as soon as sensors are connected - most of the
         time without need to stop the system

     •   ClimaCheck identifies irregularities in compressor and component
         performance enabling pre-emptive maintenance and energy
         optimization

     •   Without an effective method and an efficient tool, these problems
         normally go unrealized, with the plant continuing to perform
         inefficiently, or eventually breaking down

     •   Prevents potentially catastrophic consequences from refrigerant loss
         and stock damage
31
                            Property of Renteknik Group Inc.  All rights reserved
Typical Findings

                        Common Identified Problems
     Refrigerant shortage or over-charge
     Compressor damage or wear
     Fan/pump under performance
     Fouling of heat exchangers
     Flow problems on secondary media (air/water/brine)
     Control problems
     Incorrect superheat setting




32
                          Property of Renteknik Group Inc.  All rights reserved
Significant Savings are Achievable


       Historical savings using ClimaCheck PA
       Supermarkets                                                         20-30%
       Heat pumps                                                           10-30%
       Ice rinks                                                            20-40%
       Industry                                                             10-30%
       Air Conditioning                                                     10-30%




33
                    Property of Renteknik Group Inc.  All rights reserved
Misconception About
              ClimaCheck vs. BAS/EMS

•   ClimaCheck is Complimentary to any BAS/EMS

•   The BAS/EMS controls the functionality of the system/equipment
    and may monitor some aspects of energy use

•   The ClimaCheck system monitors the performance and ensures that
    they are operating at maximum energy efficiency




                      Property of Renteknik Group Inc.  All rights reserved
Analogy to Your Car

•   Computers in cars control the functionality of the engine, 

    improving efficiency over older cars.  In the same way many buildings

    have BAS/EMS Systems

•   These computers don’t demonstrate how efficiently the car is being 

    operated.  Same is true in buildings and building systems

•   Modern cars have advance computer technology to provide additional 

    real‐time information on efficiency (L/100kms, tire pressure, oil life etc.)

•   ClimaCheck provides this function for cooling and refrigeration systems 



                         Property of Renteknik Group Inc.  All rights reserved
Examples and Case Studies




     Property of Renteknik Group Inc.  All rights reserved
Dual Compressor Chiller Example




        Property of Renteknik Group Inc.  All rights reserved
Sample Data – Military Base
•   The system is working under slowly fluctuating conditions on condenser water side 
•   Is in a fairly stable operating condition
•   Supply chilled water is consistently slightly below 8°C.  The returning cooling water 
    is varying in temperature when entering the condenser at between 27°C and 34°C 
•   Fluctuation indicates that the system is not in a fully stable operating condition –
    Check pumps, fans and valves – possible upgrade to VFD




                           Property of Renteknik Group Inc.  All rights reserved
Sample Data – Military Base

•   Measured compressor isentropic efficiency is noted to be low compared to the 
    efficiency that would be expected from a state‐of‐the‐art compressor of this type
•   Not unexpected for a centrifugal compressor that is operating at low part load




                          Property of Renteknik Group Inc.  All rights reserved
Sample Data – Military Base

•   The subcool is lower than what is normally desired to ensure that refrigerant does not pass 
    through the condenser in an uncondensed state
•   Contributing factor is part load operation when more refrigerant will migrate to evaporator 
    resulting in a low T on the water side
•   Full load analysis would need to be carried out to validate if refrigerant charge is correct  
•   Confirm data against the recommended values for subcool at full and part load from the 
    manufacturer’s data, if available




                              Property of Renteknik Group Inc.  All rights reserved
Supermarket Case Study Results-Italy

•   Resetting of system controls                            •      Optimization and correction of
    resulted in a drastic                                          identified problems resulted in
    improvement to the COP                                         energy savings of 15-30% on
    resulting in a 27%                                             the refrigeration systems
    improvement                                                    resulting in savings of over
•   Refrigeration systems typically                                $415,000 annual electricity
    use 50% of the total electricity                               costs
    consumption of the store                                •      The cost of analyzing the
•   Total electrical consumption                                   refrigeration systems was
    of the Supermarkets was                                        recovered during the first year
    reported to have decreased                                     by the energy savings and the
    by 7 to 13%                                                    early detection of pending
                                                                   compressor problems which
                                                                   resulted in pre-emptive
                                                                   maintenance instead of costly
                                                                   failures

                       Property of Renteknik Group Inc.  All rights reserved
Case Study– Portland, Oregon, USA

•   All 14 roof top units (27 compressors) analyzed were operating
    outside of manufacturers specifications




                                                           Red = outside spec
                      Property of Renteknik Group Inc.  All rights reserved
Case Study–Ice Rink, Sweden
•     Installed ClimaCheck in 2008 to visualize and track optimization
      efforts (first trial location – now in all rinks in the Municipality
•     System optimization and installation of energy efficiency measures
      with a max. 2 year payback
•     Some of the measures included: Control and setting adjustments,
      lighting upgrade, heat recovery to heat cafeteria, installation of glass
      walls, relocation of fresh air ducts, change in arena air temperature,
      reflective cloth on ceiling
                      2008                           2011                                Change
    Air temperature   +8°C                           +5°C hockey / +6°C Figure Skating
    Days with ice     258 days                       315 days                            22% increase
    Booking hours     2,701                          3,766                               44% increase
    kWh per day       Approx. 4,100                  Approx. 2,500                       39% decrease
    Total kWh used    1,385,816                      1,263,352                           8.8% decrease


                              Property of Renteknik Group Inc.  All rights reserved
Working Together

•   Renteknik has three levels of ClimaCheck Services that are offered
     – Turnkey Solution to Clients: Scoping, Investigation (incl.
       ClimaCheck system), Reporting, Project Management and Hand-off
       Report
     – Sub-consultant: Working for/with a Consultant to provide all or part
       of the services above
     – Product sales and technical support: Working with Contractors and
       Consultants to spec appropriate ClimaCheck Systems and
       providing technical support as the North American Technology
       Integration Partner for ClimaCheck



                        Property of Renteknik Group Inc.  All rights reserved
Other Services

            Renteknik Group
                         “Bridge the Road to Change”
             Energy Engineering and Energy Management Programs



•   Onsite Energy Efficiency Assessments and Energy Audits
•   Energy Efficiency and Optimization Strategy/Recommendations
•   Guidance on available funding opportunities
•   Procurement and Installation of Metering Equipment
•   Energy Management and Building Automation Systems
•   Monitoring and Analysis of implemented measures
•   Energy Engineering and Energy Optimization




                       Property of Renteknik Group Inc.  All rights reserved
For More Information Contact Us


     RenTeknik Group Inc.
     3228 South Service Road, Suite 301,

     Burlington, Ontario, L7N 3H8, Canada

     info@renteknikgroup.com

     www.renteknikgroup.com

     T: 905-634-3888 TF: 1-855-634-3888




46                Property of Renteknik Group Inc.  All rights reserved

Más contenido relacionado

La actualidad más candente

Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
michaeljmack
 
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2
Emerson Exchange
 

La actualidad más candente (20)

IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...
IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...
IRJET- Simultaneous Microgrid Voltage and Current Harmonics Compensation usin...
 
Intelligent PID Product Design
Intelligent PID Product DesignIntelligent PID Product Design
Intelligent PID Product Design
 
Solutions for LNG facilities
Solutions for LNG facilitiesSolutions for LNG facilities
Solutions for LNG facilities
 
Control using wireless measurements
Control using wireless measurementsControl using wireless measurements
Control using wireless measurements
 
How to Setup and Adjust the Dynamic Compensation of Feedforward Signals
How to Setup and Adjust the Dynamic Compensation of Feedforward SignalsHow to Setup and Adjust the Dynamic Compensation of Feedforward Signals
How to Setup and Adjust the Dynamic Compensation of Feedforward Signals
 
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control PerformanceUtilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
 
IIoT Digital Transformation for Plant Equipment Monitoring
IIoT Digital Transformation for Plant Equipment MonitoringIIoT Digital Transformation for Plant Equipment Monitoring
IIoT Digital Transformation for Plant Equipment Monitoring
 
Tech Cold Brochure
Tech Cold BrochureTech Cold Brochure
Tech Cold Brochure
 
Identifying and Overcoming Noise in Data Acquisition
Identifying and Overcoming Noise in Data AcquisitionIdentifying and Overcoming Noise in Data Acquisition
Identifying and Overcoming Noise in Data Acquisition
 
PID Control Of Sampled Measurements - Greg McMillan Deminar Series
PID Control Of Sampled Measurements - Greg McMillan Deminar SeriesPID Control Of Sampled Measurements - Greg McMillan Deminar Series
PID Control Of Sampled Measurements - Greg McMillan Deminar Series
 
Evaluation of standby power system architectures
Evaluation of standby power system architecturesEvaluation of standby power system architectures
Evaluation of standby power system architectures
 
sairam_CV
sairam_CVsairam_CV
sairam_CV
 
Isa saint-louis-exceptional-opportunities-short-course-day-3
Isa saint-louis-exceptional-opportunities-short-course-day-3Isa saint-louis-exceptional-opportunities-short-course-day-3
Isa saint-louis-exceptional-opportunities-short-course-day-3
 
Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2Maximizing the return on your control investment meet the experts sessions part2
Maximizing the return on your control investment meet the experts sessions part2
 
PID Control of Runaway Processes - Greg McMillan Deminar
PID Control of Runaway Processes - Greg McMillan DeminarPID Control of Runaway Processes - Greg McMillan Deminar
PID Control of Runaway Processes - Greg McMillan Deminar
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1
 
Aplication of on line data analytics to a continuous process polybetene unit
Aplication of on line data analytics to a continuous process polybetene unitAplication of on line data analytics to a continuous process polybetene unit
Aplication of on line data analytics to a continuous process polybetene unit
 
Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2
 
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
 

Similar a Renteknik Refrigeration and Cooling Systems - Know the Perfromance | Maximize the Efficiency - linkedin

EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
Dennis Cody
 
Case Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsCase Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO Operations
Alvin CJ Chin
 

Similar a Renteknik Refrigeration and Cooling Systems - Know the Perfromance | Maximize the Efficiency - linkedin (20)

CENTRALIZED MONITORED COOLING SYSTEM
CENTRALIZED MONITORED COOLING SYSTEMCENTRALIZED MONITORED COOLING SYSTEM
CENTRALIZED MONITORED COOLING SYSTEM
 
The importance of energy efficiency in RAC
The importance of energy efficiency in RAC The importance of energy efficiency in RAC
The importance of energy efficiency in RAC
 
Multi-agent Control of Thermal Systems in Buildings
Multi-agent Control of Thermal Systems in BuildingsMulti-agent Control of Thermal Systems in Buildings
Multi-agent Control of Thermal Systems in Buildings
 
Transformer Expert Overview Presentation v1.0.pptx
Transformer Expert Overview Presentation v1.0.pptxTransformer Expert Overview Presentation v1.0.pptx
Transformer Expert Overview Presentation v1.0.pptx
 
Power Generation: Combined Cycle
Power Generation: Combined CyclePower Generation: Combined Cycle
Power Generation: Combined Cycle
 
ibbr_energy_conservation_measure_slides_only.pptx
ibbr_energy_conservation_measure_slides_only.pptxibbr_energy_conservation_measure_slides_only.pptx
ibbr_energy_conservation_measure_slides_only.pptx
 
Industrial Automation
Industrial AutomationIndustrial Automation
Industrial Automation
 
EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016EIS Overview & Case Studies Presentation EIS 2016
EIS Overview & Case Studies Presentation EIS 2016
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 
Moise.pdf
Moise.pdfMoise.pdf
Moise.pdf
 
Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?Asset Management - what are some of your top priorties?
Asset Management - what are some of your top priorties?
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equation
 
ELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INCELOHIM INDUSTRIAL SALES INC
ELOHIM INDUSTRIAL SALES INC
 
Automated Thermal Imaging for Remote Substation Monitoring
Automated Thermal Imaging for Remote Substation MonitoringAutomated Thermal Imaging for Remote Substation Monitoring
Automated Thermal Imaging for Remote Substation Monitoring
 
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
Energy Grid Tie: Smart Technology, Cooling, Modularity, Monitoring | Parker H...
 
Eraring_Energy_Case_Study
Eraring_Energy_Case_StudyEraring_Energy_Case_Study
Eraring_Energy_Case_Study
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Case Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO OperationsCase Study - Safety vs Profitabilty for FPSO Operations
Case Study - Safety vs Profitabilty for FPSO Operations
 
A-ConMonIntro.ppt
A-ConMonIntro.pptA-ConMonIntro.ppt
A-ConMonIntro.ppt
 
A Smart Landfill Gas Control System Design to Optimize ROI & Performance
A Smart Landfill Gas Control System Design to Optimize ROI & PerformanceA Smart Landfill Gas Control System Design to Optimize ROI & Performance
A Smart Landfill Gas Control System Design to Optimize ROI & Performance
 

Renteknik Refrigeration and Cooling Systems - Know the Perfromance | Maximize the Efficiency - linkedin

  • 1. RenTeknik Group Cooling and Refrigeration System Analyzer KNOW THE PERFORMANCE | MAXIMIZE THE EFFICIENCY 1 Property of Renteknik Group Inc.  All rights reserved
  • 2. Did You Know? • 15-20% of the world’s total electricity consumption is for refrigeration and air-conditioning • Electricity cost for cooling often represents 40-60% of the total energy consumed in a building in the cooling seasons • The majority of cooling systems don’t work as efficiently as they could 2 Property of Renteknik Group Inc.  All rights reserved
  • 3. Background • Chilled Water and Cooling Systems can be costly to operate and maintain • There is the misconception that operating = efficient • Without an effective method and efficient tool, these system normally operate inefficiently • ClimaCheck allows you to see into the ‘black box’ on system performance and realize significant energy savings through optimization • Renteknik is the North American Technology Integration Partner for ClimaCheck AB from Sweden Property of Renteknik Group Inc.  All rights reserved
  • 4. Portable Analyzer originally developed in Sweden 1986 • Fixed Analyzer developed 2004 • Web based monitoring launch 2008 • Used by notable European companies in commercial, industrial, institutional and retail facilities • Standard for commissioning and re-commissioning of systems throughout the world World Wildlife Fund estimate global CO2 reduction in 2020 to 72 million tons from 50% of 4 market implementing improved service Property of Renteknik Group Inc.  All rights reserved
  • 5. The Principle Behind ClimaCheck • Base on the First Law of Thermodynamics – energy can neither be created nor destroyed, it can only be changed from one form to another Mass flow = (electrical input-heat losses) (1) Enthalpy difference Cooling Capacity = Mass flow * (h2 – h3) (2) Heating Capacity = Mass flow * (h1 – h3) (3) Isentropic Efficiency = (hs – h2) * (1 – rel. heat loss) (4) (h1 – h2) 5 Property of Renteknik Group Inc.  All rights reserved
  • 6. Accuracy • Accuracy of Calculated Data – Coefficient of Performance (COP) - ±5% – Cooling and heating capacity (±7%) – Power input (±2%) – Compressor isentropic efficiency (±3%) • Sensors – Pressure sensor (±1% FS - Full Scale) – Temperature sensor PT1000 Class A – Electrical Energy power meter ClimaCheck EP Pro, Class B – Current Transformers - 20-120% of rating (±2%) Property of Renteknik Group Inc.  All rights reserved
  • 7. How Does ClimaCheck Work? • Non-Invasive Sensors are attached to Equipment points • Basic setup of 7 temperature sensors, 2 pressure sensors and 1 active power sensor • Set-up by a qualified Technician • 30 minutes/piece of Equipment 2 Pressure Sensors connected 7 Surface Temperature at service ports Sensors 1 Electrical Input Sensor Property of Renteknik Group Inc.  All rights reserved
  • 8. Thermodynamic Model • 2 pressures sensors • 7 temperatures sensors • 1 power input sensor • A thermodynamic evaluation produces an unbiased analysis with no information about the system or compressor required 8 Property of Renteknik Group Inc.  All rights reserved
  • 9. Quick Non-Invasive Sensor Attachment 9 Property of Renteknik Group Inc.  All rights reserved
  • 10. Sample Applications 10 Property of Renteknik Group Inc.  All rights reserved
  • 11. ClimaCheck Performance Analyzer • Optimization increases energy efficiency • Estimated 10-40% Energy Savings • Increases reliability, reduced equipment wear • Alerts and alarms to changes effecting operating efficiency • Lowers operating and maintenance expenses • Reduces CO² emissions • Benefits the owner and the environment! 11 Property of Renteknik Group Inc.  All rights reserved
  • 12. ClimaCheck PA Pro Portable • In field measurements for commissioning, service or inspections • Documentation and analysis of the equipment’s actual performance • Immediate and precise answers on heat pump, cooling and air conditioning unit operations 12 Property of Renteknik Group Inc.  All rights reserved
  • 13. ClimaCheck PA Pro Fixed • Continuous monitoring of energy consumption and performance • Access to real time data via the internet • Predefined Energy Reports provide continuous information about the equipment’s energy consumption 13 Property of Renteknik Group Inc.  All rights reserved
  • 14. The Benefits of a Fixed Installation • Knowing how a system is performing allows continuous monitoring of energy efficiency • If a compressor or heat exchanger performance fails, refrigerant leaks, or if the equipment’s “energy profile” changes adversely, the system automatically sends an alarm (email or SMS) regarding the changes • Detailed information about the problem is available via email or text messages anywhere, anytime 14 Property of Renteknik Group Inc.  All rights reserved
  • 15. Sample Installations Pressure and temperature sensors Temperature sensor 15 Property of Renteknik Group Inc.  All rights reserved
  • 16. Sample Installations Current Transformers Custom ClimaCheck System Installed Pressure sensor on service port 16 Property of Renteknik Group Inc.  All rights reserved
  • 17. Web Portal Sample–System Flow Chart 17 Property of Renteknik Group Inc.  All rights reserved
  • 18. Web Portal Sample–System Table 18 Property of Renteknik Group Inc.  All rights reserved
  • 19. Web Portal Sample–System Graphic 19 Property of Renteknik Group Inc.  All rights reserved
  • 20. Web Portal Sample–User Settings 20 Property of Renteknik Group Inc.  All rights reserved
  • 21. Web Portal Sample–Flag Settings 21 Property of Renteknik Group Inc.  All rights reserved
  • 22. Web Portal Sample–Logic Settings 22 Property of Renteknik Group Inc.  All rights reserved
  • 23. Web Portal Sample–Alarm Settings 23 Property of Renteknik Group Inc.  All rights reserved
  • 24. Web Portal Sample–Power Profile 24 Property of Renteknik Group Inc.  All rights reserved
  • 25. Web Portal Sample–Energy Statistics 25 Property of Renteknik Group Inc.  All rights reserved
  • 26. Applications • Product and Systems Development • Troubleshooting Leading manufacturers of systems for ClimaCheck provides fast cooling and heating use ClimaCheck’s troubleshooting to minimize energy solutions for quality assurance of consumption costs, repair time and products and solutions down time • Commissioning and Inspections • Preventive Maintenance and When new equipment is being used for Service the first time or when the warranty Predefined performance reports can period is coming to an end, alert to possible imminent fails and ClimaCheck’s solutions provides breakdowns making service and assurance that equipment is operating maintenance easier and more efficiently effective. Analysis of Performance based maintenance vs. passage of time 26 Property of Renteknik Group Inc.  All rights reserved
  • 27. Multiple Uses •Commissioning new systems •Continuous monitoring •Preventive maintenance •Trouble shooting •Decision support •Real Time Performance inspection 27 Property of Renteknik Group Inc.  All rights reserved
  • 28. Objective of Performance Analysis • The objective of performing an analysis of a Chilled Water System is initially to improve the System’s performance through optimization • Adjusting settings or controls • Identify defective or inefficient system components that may require immediate or future capital replacement • After optimization establish a new base line for performance • Continue to monitor the system and alert to deviations from optimum energy efficiency Property of Renteknik Group Inc.  All rights reserved
  • 29. What is the Process? E N E R • Step 1: Get a clear picture of how it is currently working by installing a ClimaCheck Performance Analyzer • Step 2: Monitor and analyze the equipment operation and performance (energy efficiency) • Step 3: Identify areas that require adjustment, upgrading or replacement • Step 4: Optimize the system and monitor ongoing efficiency to ensure maximum is maintained 29 Property of Renteknik Group Inc.  All rights reserved
  • 30. What Does ClimaCheck Provide? • Enables Engineers and Refrigeration Technicians to: – Perform cost effective real-time analysis – Evaluate system performance – See real-time COP, capacity, compressor efficiency and other vital performance parameters without tedious calculations – Data is presented dynamically in charts and tables providing an immediate picture of actual performance Property of Renteknik Group Inc.  All rights reserved
  • 31. Practical Benefits of ClimaCheck • All data is available as soon as sensors are connected - most of the time without need to stop the system • ClimaCheck identifies irregularities in compressor and component performance enabling pre-emptive maintenance and energy optimization • Without an effective method and an efficient tool, these problems normally go unrealized, with the plant continuing to perform inefficiently, or eventually breaking down • Prevents potentially catastrophic consequences from refrigerant loss and stock damage 31 Property of Renteknik Group Inc.  All rights reserved
  • 32. Typical Findings Common Identified Problems Refrigerant shortage or over-charge Compressor damage or wear Fan/pump under performance Fouling of heat exchangers Flow problems on secondary media (air/water/brine) Control problems Incorrect superheat setting 32 Property of Renteknik Group Inc.  All rights reserved
  • 33. Significant Savings are Achievable Historical savings using ClimaCheck PA Supermarkets 20-30% Heat pumps 10-30% Ice rinks 20-40% Industry 10-30% Air Conditioning 10-30% 33 Property of Renteknik Group Inc.  All rights reserved
  • 34. Misconception About ClimaCheck vs. BAS/EMS • ClimaCheck is Complimentary to any BAS/EMS • The BAS/EMS controls the functionality of the system/equipment and may monitor some aspects of energy use • The ClimaCheck system monitors the performance and ensures that they are operating at maximum energy efficiency Property of Renteknik Group Inc.  All rights reserved
  • 35. Analogy to Your Car • Computers in cars control the functionality of the engine,  improving efficiency over older cars.  In the same way many buildings have BAS/EMS Systems • These computers don’t demonstrate how efficiently the car is being  operated.  Same is true in buildings and building systems • Modern cars have advance computer technology to provide additional  real‐time information on efficiency (L/100kms, tire pressure, oil life etc.) • ClimaCheck provides this function for cooling and refrigeration systems  Property of Renteknik Group Inc.  All rights reserved
  • 36. Examples and Case Studies Property of Renteknik Group Inc.  All rights reserved
  • 37. Dual Compressor Chiller Example Property of Renteknik Group Inc.  All rights reserved
  • 38. Sample Data – Military Base • The system is working under slowly fluctuating conditions on condenser water side  • Is in a fairly stable operating condition • Supply chilled water is consistently slightly below 8°C.  The returning cooling water  is varying in temperature when entering the condenser at between 27°C and 34°C  • Fluctuation indicates that the system is not in a fully stable operating condition – Check pumps, fans and valves – possible upgrade to VFD Property of Renteknik Group Inc.  All rights reserved
  • 39. Sample Data – Military Base • Measured compressor isentropic efficiency is noted to be low compared to the  efficiency that would be expected from a state‐of‐the‐art compressor of this type • Not unexpected for a centrifugal compressor that is operating at low part load Property of Renteknik Group Inc.  All rights reserved
  • 40. Sample Data – Military Base • The subcool is lower than what is normally desired to ensure that refrigerant does not pass  through the condenser in an uncondensed state • Contributing factor is part load operation when more refrigerant will migrate to evaporator  resulting in a low T on the water side • Full load analysis would need to be carried out to validate if refrigerant charge is correct   • Confirm data against the recommended values for subcool at full and part load from the  manufacturer’s data, if available Property of Renteknik Group Inc.  All rights reserved
  • 41. Supermarket Case Study Results-Italy • Resetting of system controls • Optimization and correction of resulted in a drastic identified problems resulted in improvement to the COP energy savings of 15-30% on resulting in a 27% the refrigeration systems improvement resulting in savings of over • Refrigeration systems typically $415,000 annual electricity use 50% of the total electricity costs consumption of the store • The cost of analyzing the • Total electrical consumption refrigeration systems was of the Supermarkets was recovered during the first year reported to have decreased by the energy savings and the by 7 to 13% early detection of pending compressor problems which resulted in pre-emptive maintenance instead of costly failures Property of Renteknik Group Inc.  All rights reserved
  • 42. Case Study– Portland, Oregon, USA • All 14 roof top units (27 compressors) analyzed were operating outside of manufacturers specifications Red = outside spec Property of Renteknik Group Inc.  All rights reserved
  • 43. Case Study–Ice Rink, Sweden • Installed ClimaCheck in 2008 to visualize and track optimization efforts (first trial location – now in all rinks in the Municipality • System optimization and installation of energy efficiency measures with a max. 2 year payback • Some of the measures included: Control and setting adjustments, lighting upgrade, heat recovery to heat cafeteria, installation of glass walls, relocation of fresh air ducts, change in arena air temperature, reflective cloth on ceiling 2008 2011 Change Air temperature +8°C +5°C hockey / +6°C Figure Skating Days with ice 258 days 315 days 22% increase Booking hours 2,701 3,766 44% increase kWh per day Approx. 4,100 Approx. 2,500 39% decrease Total kWh used 1,385,816 1,263,352 8.8% decrease Property of Renteknik Group Inc.  All rights reserved
  • 44. Working Together • Renteknik has three levels of ClimaCheck Services that are offered – Turnkey Solution to Clients: Scoping, Investigation (incl. ClimaCheck system), Reporting, Project Management and Hand-off Report – Sub-consultant: Working for/with a Consultant to provide all or part of the services above – Product sales and technical support: Working with Contractors and Consultants to spec appropriate ClimaCheck Systems and providing technical support as the North American Technology Integration Partner for ClimaCheck Property of Renteknik Group Inc.  All rights reserved
  • 45. Other Services Renteknik Group “Bridge the Road to Change” Energy Engineering and Energy Management Programs • Onsite Energy Efficiency Assessments and Energy Audits • Energy Efficiency and Optimization Strategy/Recommendations • Guidance on available funding opportunities • Procurement and Installation of Metering Equipment • Energy Management and Building Automation Systems • Monitoring and Analysis of implemented measures • Energy Engineering and Energy Optimization Property of Renteknik Group Inc.  All rights reserved
  • 46. For More Information Contact Us RenTeknik Group Inc. 3228 South Service Road, Suite 301, Burlington, Ontario, L7N 3H8, Canada info@renteknikgroup.com www.renteknikgroup.com T: 905-634-3888 TF: 1-855-634-3888 46 Property of Renteknik Group Inc.  All rights reserved