1. Automation
A chief responsibility during my tenure at McClain E-Z Pack was a Tandem torch welding robot. It was the first tandem
system Lincoln installed and at the time had the Largest footprint of any robot Lincoln had installed. I implemented a
system load and remove the parts safer and more efficiently, trained several operators, maintained the program files
and trouble shooted any welding issues that arose.
Welding Journal, June 2003, Welding Design and Fabrication, November 2003,
Tandem GMAW Offers Quality Weld Deposits, High
Cover Travel Speeds, Pages 28-31 (picture on page 31)