SlideShare una empresa de Scribd logo
1 de 10
Descargar para leer sin conexión
The Big Question Answered
By Dave Bertolini, People and Processes, Inc.
As a routine provider of i-Presentations and Maintenance Tips
  for Reliability Web, I have been repeatedly asked the same
  question;

                  “What’s the best CMMS?”

In an attempt to save my fingers from hundreds of individual
  email responses let me answer that for you now.
The one you will identify by conducting a needs assessment at
  your facility, understanding your operating environment, your
  equipment, and your people.

Take the time to include and survey all functional areas to
  determine additional CMMS needs. Determine who will
  provide these answers. Be cautious to not develop an
  unrealistic list of wants. Remember the MM is Maintenance
  Management do not let it become a computer system
  initiative.
The right CMMS is, the one you will fully implement and have
  integrated into everyone’s daily activities.

   Ensure everyone in all areas are aware of the time and
    resources required to fully and properly implement your
    CMMS.
   Develop a plan to implemented all functionality of the
    system. It makes no sense to buy it only to underutilize it.
   Use the information gathered during your needs assessment
    as the framework for your implementation plan to ensure all
    needs are included.
The right CMMS is, the one you develop your Standard
  Operating Procedures (SOP)document that details the
  implementation decisions you made, how you will utilize the
  system at your site, and ultimately train your personnel with.

A structured document detailing the implementation is a
  requirement for success during and following your CMMS
  implementation to ensure maximum system utilization.
The right CMMS is, the one you train your personnel in the
  utilization of the system and the resident data within it
  utilizing your Standard Operating Procedures document.

Train by defined roles and responsibilities to ensure personnel
  understand their interface with the system and are capable of
  accomplishing their tasks while entering valid and meaningful
  information. Equally important is the understanding how to
  extract and utilize information.
The right CMMS is, the one you will develop an auditing
  process to ensure valid historical data collection is occurring.

The auditing process will validate that standardized data
  collection is occurring and identify any areas of weakness or
  shortcomings to address. A collection of inaccurate or
  unstructured non-standardized data yields information of
  little value.
The right CMMS is, the one you will rely on for all maintenance,
  production, and management decisions and actions.

All the work that has been accomplished to select, implement,
  and optimize your CMMS was to create an effective
  informational infrastructure so you can make sound decisions
  based on valid information.
There really is no one “best system”, the real answer is almost
  any system will work if:
 Implemented properly

 Trained on correctly

 Utilized by all

 Audited routinely to ensure standardized data collection.



People and Processes, more than a name, it’s a way of getting
  work done through people and established processes.
www.peopleandprocesses.com
      www.RAMScenter.com
              800-930-4276

Más contenido relacionado

Similar a Choosing The Right CMMS

Increasing Facility Management Efficiency with Computerised Maintenance Manag...
Increasing Facility Management Efficiency with Computerised Maintenance Manag...Increasing Facility Management Efficiency with Computerised Maintenance Manag...
Increasing Facility Management Efficiency with Computerised Maintenance Manag...TeroTAM
 
Wasim ali .118. types of mis & advantage & disadvantage of mis
Wasim ali .118. types of mis & advantage & disadvantage of misWasim ali .118. types of mis & advantage & disadvantage of mis
Wasim ali .118. types of mis & advantage & disadvantage of misWaseemAli58
 
Computerized Maintenance Management
Computerized Maintenance Management Computerized Maintenance Management
Computerized Maintenance Management leansavant
 
Success with on line CRM
Success with on line CRMSuccess with on line CRM
Success with on line CRMJames Bogue
 
Information System within the Organization
Information System within the OrganizationInformation System within the Organization
Information System within the Organizationlearnt
 
A Best Practices Guide to Quality Management
A Best Practices Guide to Quality ManagementA Best Practices Guide to Quality Management
A Best Practices Guide to Quality ManagementVERSE Solutions
 
Automated Decision Making Comes Of Age
Automated Decision Making Comes Of AgeAutomated Decision Making Comes Of Age
Automated Decision Making Comes Of AgeThakur Shashank
 
Crm implementation strategy
Crm implementation strategyCrm implementation strategy
Crm implementation strategyFindMyCRM
 
Management information system with relevance to Nepal
Management information system with relevance to NepalManagement information system with relevance to Nepal
Management information system with relevance to NepalDarshan Bhattarai
 
IPM Individual Assignment.docx
IPM Individual Assignment.docxIPM Individual Assignment.docx
IPM Individual Assignment.docxMikealay Desta
 
Computerized Maintenance Management System.docx
Computerized Maintenance Management System.docxComputerized Maintenance Management System.docx
Computerized Maintenance Management System.docxmrigendra nath mishra
 
Maintenance cmms
Maintenance cmmsMaintenance cmms
Maintenance cmmsMuchlis -
 
Running head Key Factors in Computer Information Systems1Ke.docx
Running head Key Factors in Computer Information Systems1Ke.docxRunning head Key Factors in Computer Information Systems1Ke.docx
Running head Key Factors in Computer Information Systems1Ke.docxwlynn1
 
Crm avoiding common crm pitfalls
Crm avoiding common crm pitfallsCrm avoiding common crm pitfalls
Crm avoiding common crm pitfallsMarcus Vannini
 
What is management information systems
What is management information systemsWhat is management information systems
What is management information systemsShyam Sundar Gupta
 
Get the most out of your crm
Get the most out of your crmGet the most out of your crm
Get the most out of your crmAlan Maites
 
How to Overcome CRM User Adoption Barriers
How to Overcome CRM User Adoption BarriersHow to Overcome CRM User Adoption Barriers
How to Overcome CRM User Adoption BarriersPreact Ltd
 
Clinical Trial Management System Implementation Guide
Clinical Trial Management System Implementation GuideClinical Trial Management System Implementation Guide
Clinical Trial Management System Implementation GuidePerficient, Inc.
 

Similar a Choosing The Right CMMS (20)

What is a CMMS?
What is a CMMS?What is a CMMS?
What is a CMMS?
 
Increasing Facility Management Efficiency with Computerised Maintenance Manag...
Increasing Facility Management Efficiency with Computerised Maintenance Manag...Increasing Facility Management Efficiency with Computerised Maintenance Manag...
Increasing Facility Management Efficiency with Computerised Maintenance Manag...
 
Wasim ali .118. types of mis & advantage & disadvantage of mis
Wasim ali .118. types of mis & advantage & disadvantage of misWasim ali .118. types of mis & advantage & disadvantage of mis
Wasim ali .118. types of mis & advantage & disadvantage of mis
 
Computerized Maintenance Management
Computerized Maintenance Management Computerized Maintenance Management
Computerized Maintenance Management
 
Success with on line CRM
Success with on line CRMSuccess with on line CRM
Success with on line CRM
 
Information System within the Organization
Information System within the OrganizationInformation System within the Organization
Information System within the Organization
 
A Best Practices Guide to Quality Management
A Best Practices Guide to Quality ManagementA Best Practices Guide to Quality Management
A Best Practices Guide to Quality Management
 
Automated Decision Making Comes Of Age
Automated Decision Making Comes Of AgeAutomated Decision Making Comes Of Age
Automated Decision Making Comes Of Age
 
Crm implementation strategy
Crm implementation strategyCrm implementation strategy
Crm implementation strategy
 
Management information system with relevance to Nepal
Management information system with relevance to NepalManagement information system with relevance to Nepal
Management information system with relevance to Nepal
 
IPM Individual Assignment.docx
IPM Individual Assignment.docxIPM Individual Assignment.docx
IPM Individual Assignment.docx
 
Computerized Maintenance Management System.docx
Computerized Maintenance Management System.docxComputerized Maintenance Management System.docx
Computerized Maintenance Management System.docx
 
Contemporary management practices
Contemporary management practicesContemporary management practices
Contemporary management practices
 
Maintenance cmms
Maintenance cmmsMaintenance cmms
Maintenance cmms
 
Running head Key Factors in Computer Information Systems1Ke.docx
Running head Key Factors in Computer Information Systems1Ke.docxRunning head Key Factors in Computer Information Systems1Ke.docx
Running head Key Factors in Computer Information Systems1Ke.docx
 
Crm avoiding common crm pitfalls
Crm avoiding common crm pitfallsCrm avoiding common crm pitfalls
Crm avoiding common crm pitfalls
 
What is management information systems
What is management information systemsWhat is management information systems
What is management information systems
 
Get the most out of your crm
Get the most out of your crmGet the most out of your crm
Get the most out of your crm
 
How to Overcome CRM User Adoption Barriers
How to Overcome CRM User Adoption BarriersHow to Overcome CRM User Adoption Barriers
How to Overcome CRM User Adoption Barriers
 
Clinical Trial Management System Implementation Guide
Clinical Trial Management System Implementation GuideClinical Trial Management System Implementation Guide
Clinical Trial Management System Implementation Guide
 

Último

International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 

Último (20)

International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 

Choosing The Right CMMS

  • 1. The Big Question Answered By Dave Bertolini, People and Processes, Inc.
  • 2. As a routine provider of i-Presentations and Maintenance Tips for Reliability Web, I have been repeatedly asked the same question; “What’s the best CMMS?” In an attempt to save my fingers from hundreds of individual email responses let me answer that for you now.
  • 3. The one you will identify by conducting a needs assessment at your facility, understanding your operating environment, your equipment, and your people. Take the time to include and survey all functional areas to determine additional CMMS needs. Determine who will provide these answers. Be cautious to not develop an unrealistic list of wants. Remember the MM is Maintenance Management do not let it become a computer system initiative.
  • 4. The right CMMS is, the one you will fully implement and have integrated into everyone’s daily activities.  Ensure everyone in all areas are aware of the time and resources required to fully and properly implement your CMMS.  Develop a plan to implemented all functionality of the system. It makes no sense to buy it only to underutilize it.  Use the information gathered during your needs assessment as the framework for your implementation plan to ensure all needs are included.
  • 5. The right CMMS is, the one you develop your Standard Operating Procedures (SOP)document that details the implementation decisions you made, how you will utilize the system at your site, and ultimately train your personnel with. A structured document detailing the implementation is a requirement for success during and following your CMMS implementation to ensure maximum system utilization.
  • 6. The right CMMS is, the one you train your personnel in the utilization of the system and the resident data within it utilizing your Standard Operating Procedures document. Train by defined roles and responsibilities to ensure personnel understand their interface with the system and are capable of accomplishing their tasks while entering valid and meaningful information. Equally important is the understanding how to extract and utilize information.
  • 7. The right CMMS is, the one you will develop an auditing process to ensure valid historical data collection is occurring. The auditing process will validate that standardized data collection is occurring and identify any areas of weakness or shortcomings to address. A collection of inaccurate or unstructured non-standardized data yields information of little value.
  • 8. The right CMMS is, the one you will rely on for all maintenance, production, and management decisions and actions. All the work that has been accomplished to select, implement, and optimize your CMMS was to create an effective informational infrastructure so you can make sound decisions based on valid information.
  • 9. There really is no one “best system”, the real answer is almost any system will work if:  Implemented properly  Trained on correctly  Utilized by all  Audited routinely to ensure standardized data collection. People and Processes, more than a name, it’s a way of getting work done through people and established processes.
  • 10. www.peopleandprocesses.com www.RAMScenter.com 800-930-4276