SlideShare a Scribd company logo
1 of 42
Download to read offline
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Key
1

Loading Dock

7

Trash/Recycling

8

Drop-Off

9

Visitor's Parking Lot

10

Ampitheater

11

Ellington Lawn

12

9

Fitness Center Entrance

6

12

Small Performance Entrance

5

5

Parking Garage Entrance

4

8

Performance Entrance

3

R Street NW

Main Entrance

2

Terrace
No parking

7
6

Parking during limited hours

2

1

10

11

35th Street NW

36th Street NW

2 hour parking

WASHINGTON
INTERNATIONAL SCHOOL

4

1

3

Reservoir Road NW

PROPOSED SITE
PLAN
N

SCALE: 1" = 60'
0

10

20

30

60
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

1903 east elevation

Aerial photo 1910-1914

1900 east elevation

2
HISTORIC
LANDSCAPE
PHOTOGRAPHS

1986 west elevation

HISTORIC PHOTOGRAPHS

1915 east elevation

1929 - view through iron gate
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

179.92

N

SCALE: 1" = 40'
0

10

20

40

3
PROPOSED
LANDSCAPE
PLAN

E

E

E

E

PROPOSED LANDSCAPE PLAN | SCALE: 1”=40’
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Visitor Parking

World Lang. Classroom

World Lang. Classroom

Ghosted Lines
show Competition
Amphitheater footprint

101

Vestibule

ADA Entrance Ramp

STUDENT
Student
ENTRANCE
Entrance

AMPHITHEATER
Student Entry

Front Lawn

STUDENT ENTRY CURRENT DESIGN

Ex Ad Off
105

Office
107

Ad Wk Rm
109

4

Storage
112

Conf Rm
111

STUDENT ENTRY
REVISIONS

Toilet
114

Principal's Off

N

SCALE: 1/32" = 1'-0"
0

PLAN OF STUDENT ENTRY AREA

COMPETITION DESIGN

8

16

32
R STREET

Drop Off Zone

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Visitor/ ADA Parking

ADA Ramp
REVISED VISITOR PARKING AND DROP OFF

5
VISITOR
PARKING &
DROP OFF
REVISIONS
N

SCALE: 1/32" = 1'-0"
0

COMPETITION VISITOR PARKING AND DROP OFF

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

HISTORIC ENTRANCE STEPS - NORTH SIDE

6
HISTORIC ENTRANCE STEPS - SOUTH SIDE

ADA RAMP REVISIONS

ADA RAMP
REVISIONS/
EXISTING SIDE
ENTRANCES
N

SCALE: 1/32" = 1'-0"
0

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

TYPICAL EXISTING LIGHT WELL TREATMENT AT FRONT FACADE

CREATION OF LIGHT WELLS AT GROUND FLOOR LEVEL

7
TREATMENT OF
FRONT FACADE
WINDOW WELLS
N

SCALE: 1/32" = 1'-0"
0

AUTHOR COTTON MOORE ENTRANCE RAMPS

8

16

32
Make-Up / D Rm

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

175.92'

Stair 3

Vestibule
L05

175.92'

REVISED PARKING ENTRANCE
Underground Parking Garage:

Elevator 3

Standard Spaces: 39
Compact Spaces: 54
Accessible Spaces: 1
Van Accessible Spaces: 3
Total Spaces: 97

Rehearsal Rm / Library
L07

Studio / Theater CR

20'

Alt. Entrance
183.68'

183.95'

8'

178.43

12%

60'-6"

176.69

8'
6%

176.42'

Parking Garage

8

176.42'

UNDERGROUND
PARKING
ENTRANCE

36th Street

39'-11"

6%

L06

Reservoir Road
ALTERNATIVE PARKING ENTRANCE FROM 36TH STREET

Current Parking
Garage Entrance
COMPETITION DESIGN
L20

Stair 4

175.92'

Corridor

L22

Scene Shop St

Elev Mach. Rm

L21

Art Collection Storage

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Elevator 4

C L06

Generator Room
L19

Parking
L23

Elevator 1

176.42'

Stair 6

178.42'
175.92' Corridor
C L05

Plumbing

Corridor

L18

C L 01

Stair 7

Elevator 2

UP

175.92'

Mechanical Room
L17

Maintenance Storage

L16

Main Dist. Frame

L01

166'

176.42'

Corridor

Eng Off

176.42'

L03

Maintenance Office
L02

L15

Storage

C L04

Areaway
Women

Electric Room

L14

L04

Studio / Theater CR
L13

Corridor
Men

Office

Janitor

L10

L11

L09

L08

L12

Make-Up / D Rm

C L03

Storage

175.92'

Stair 3

Vestibule
L05

175.92'

Elevator 3

Rehearsal Rm / Library

9

L07

PROPOSED
LOWER LEVEL
FLOOR PLAN

Studio / Theater CR
L06

176.42'

176.42'

N

SCALE: 1/32" = 1'-0"

8'

179.00'

178.73'

6%

UP

12%

21'-6"

0

8

16

32
Stor
G72

Bathroom
G68

Fitness Center Entrance
PE Office
G77

193.88'

G71

Corridor

Corridor

G74

G75

Fitness Room

Men's Room

G79

G99

Conf Room

Corridor

G100

C G11

G89

Storage
G84

185.92'Stair 4

Janitor

DN

DN

G78

UP

Elec
G87

Mech.

Elec

Elevator 4

C G05

G50

G101

C G06

Corridor

Receiving

Physics Classroom

Corridor
188.42'

Loading Dock

Women's Room

G81

G88

185.42'

G52

G48

Vestibule
G102

Locker Room
Men's Room G46

G53

Stair 6
DN

Locker Room

Recycling
G51

Elevator 1

G103

Eng Off
Storage

G57

G56

Book Room

G49

G54

Mech.

Visual Arts Commons

Ware Washing

Office
Women's Room

Cust Off

Kitchen / Servery

G47

Elevator 2

G55

Window Well

DN

Servery

Storage
G45

G58

Stair 10

Student
Lockers

Point of Sale
Studio / Theater CR

50

Storage
G104

Registrar
G1035

Waiting
G106

G44

Storage

Cl Storage

Frzr / Coolr

G43

G62

G65

Central Commons Place

Cafeteria / Commons

Trap
G61

G03

Security
188.42'

Orchestra Pit

Student Lobby

Vestibule

G02

G60

G01

Student Entrance

Corridor
C G04

Studio / Theater CR

193.59'

Paper Prod Storage

Closet

G41

G42

Student
Lockers

G64

Office
G40

188.42'

Food Stor
G63

36

Point of Sale

48

50

Attendance
G06

Sec Desk

UP

G05

Sec Off
G04

188.42'

Office

Janitor

G39

DN

Stair 9

G37

UP

Make-Up / D Rm

G38

Window Well

84

Stair 1
Conf. Rm.

G36

Science CR / Lab
G07

Women's Room
G35

Chair Storage
G59

Green Room

Performing Arts Commons

G34

Stair 3

Men's Room
G15

G32

G33

185.92'

Mech.

188.42'

Tel Data Room

Elec

Elec
G16

Mech.

DN

Staff Wk Rm

Corridor

185.92'

G08

C G03

UP

DN

Chem Stor

Toilet/Shower

Vestibule

Elevator 3

G31

G10

G19

Corridor

Green Room

C G02

5'

Toilet/Shower

15'

G30

Vestibule
G28

Control Room

UP

E
AN
PL
ND E
OU LIN
GR CUT

10

Tel Data Rm
G11

Performance Hall

G27

G29

G09

G14

G20

Men's Rm

Black Box Studio

Science Prep

Science CR / Lab

G17

DN

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Couns Off

G94

Elective/ Sp. Ed. Cr.

pac

om

hC

G98

Reception

C G09

tor

G97

G90

G66

s
Tra

Stair 5

Conf Room

Corridor

G83

G80

UP

C G10

G86

DC Cap O

G96

Couns Off
Corridor

Storage

Couns Off

UP

G93

G85

Women's Room

Health Rec

Shep Off

G92

G91

Health CR / Anat / Phys

Locker Rm/Showers

Locker Rm / Showers

G70

Cots

G69

Treatment

G67

G82

C G08

C G07

Office

Dance / Aerobics

Social Worker

GR
OU
CU ND PL
TL
INE ANE

Cots

G95

G76

Rec Stor

Toilet

G73

OT/PT/Physiologist

Stor

G18

Corridor
C G01

Stage

Science CR / Lab

Recording Studio

126 Seats
Retractable

G12

G21

Stair 8

Stair 2
UP

Women's Rm

Science CR / Lab

G26

G13

Box Off
G22

Vestibule
G25

188.42'

Closet
G23

UP
193.88'

Vestibule
G24

N

SCALE: 1/32" = 1'-0"
0

Small Performance Center
Entrance

1
3.14

PROPOSED
GROUND FLOOR
PLAN

3
3.14

8

16

32
Stor

Stair 5

Stor

163

165

2D Studio

2D Studio

162

World Lang. Classroom

172

178

Corridor

UP

C 109

158

159

168

Stor

164

Asst Off

Stor
160

Conf. Room
161

Vestibule

3D Studio

Stor

171

174

173

Storage

155

176

Printmaking Studio

VIP Holding
156

Stor

VIP Dress
157

DN

2D Studio

Digital Arts / Photo Studio

Arts Dean

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

UP

Terrace

169

179

167

Kiln

DN

UP

World Lang. Classroom

170

Off / Workroom

175

Stair 4
UP

Corridor

Corridor

C 110

C 108

Laundry

Costume Shop

154

153

Corridor
C 107

Mech.

Elec

Elevator 4

Bridge

Bridge

BR 105

BR 104

166

Elec

Women's Room

177

180

Men's Room
181

Mech.
151

152

Elevator 1

Open to below

182

Vestibule

Scene Shop

149

School Store

Paint Shop

Open to below

Shell St

Tech T Workroom

T 104

147

Vestibule
T 105

Elevator 2

Orchestra
Seating
UP

Stair T4

Tool Room

Lighting & Sound St.

145

UP

146

148

Green Room

1
3.9

Parterre
Seating

Stair T1

Stage
150

143

Bridge

Make-up / Dressing Rm

Lobby / Gallery

BR 101

141

102

Theater

101

144

Vestibule

Office

Storage

T 101

STUDENT
ENTRANCE

Tech Design & Prod CR
142

Women's Room/Shower

UP

140

Stair T3

UP

UP

Vis Waiting / Box Off

DN

103

Stair 1

Vestibule
Vestibule

T 102

T 103

DN

Open to below

Chair / Piano Stor

Corridor

137

Elec
135

Open to below

Mech.

Tel Data Room

Ex Ad Off

126

105

Elec

136

Bridge

Bridge

127

BR 102

BR 103

Rec Stor
106

Corridor

Elevator 3

Corridor

Vestibule
128

Elling Fnd Rec

C 101

118

Storage

125

C 106

Stair 8

108

Women's Room
117

115

134

107

Corridor

Mailroom

Facilities Op. Man.

Office

Conference Room

DN

Ramp

Storage
133

Bus Mgr

DN

132

129

Ctrl Rm

Open To Black Box Studio
Below

Sound

124

11

Ad Wk Rm
109

Men's Room
116

Performance Hall

Corridor

Storage

C 103

G18

PROPOSED
FIRST FLOOR
PLAN

112

Conf Rm
119

123

DN

Office
122

Corridor

Toilet
114

120

121

130

UP

DN

Office

C 104

Office

Vestibule

111

Stair 2

Storage

Office

131

UP

UP

C 105

Student Prod Off

Stair 3

110

138

Women's Room

Tel Data Room

Make-up / Dressing Rm

C 102

Mech.

104

139

St Dean

Men's Room/Shower

UP

Principal's Off
113

N

SCALE: 1/32" = 1'-0"
0

3
3.14

8

16

32
Stair 5

Stor
245

Video Prod Lab / CR

253

252

Rec/Edit Booth

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

UP

Project Lab / Classroom

250

Writing Studio

Journalism Room

243

Stor

244

247

World Lang. Classroom

World Lang. Classroom

262

263

UP

Pre Archive St.

Corridor

254

C 205

Equip Stor

DN

251

Stor

255

Stor

257

Currative Skills Lab

Office

259

241

Off / Stor
242

Graphics / Computer Lab
246

Storage

Janitor

258

Staff Wk Rm

Editing Lab / CR

Core Curriculum C/R

249

264

Comm PR
265

Elective/Museum Studies

256

261

DN

UP

238

Stair 4

UP

English Classroom

Corridor

Bridge

Corridor
Costume Shop Storage

C 203

Elec

Elevator 4

239

Small Studio

266

216.63'

C 204

Elec

BR 203

Mech.

260

248

Men's Room
267

Mech.

237

Open to below
Storage

Elevator 1

240

Academic Dir

Open to below

C 201

217.96'

Vestibule
T 203

Elevator 2

Gallery

216.46'

T 204

DN

Office

Media Center

Stair T1

Costume Room

201

235

DN

236

232

Bridge

216.63'

BR 201

Reading Room

Conf Rm / Off

203

234

Equip Stor

229

Office

231

Men's Room

233

Women's R oom

Locker Rm

216.63'

Open to below

Fly Tower

Portico Terrace

202

1
3.11

Large Studio

268

Corridor
Balcony
DN

204

230

216.46'

Gallery

DN

Locker Rm

DN

Stair 1

Vestibule

DN

Toilet
206

T 202

217.96'

Staff Br Rm
205

DN

Toilet

Open to below

Storage

Classroom Studio

207

228

227

Elec

Tel Data Room

220

219

Women's Room

Mech.

Open to below

214

Mech.

Bridge
BR 202

Elec
215

English Classroom

Corridor

Janitor

DN

221

Vestibule
216

225

Boys Lkr Rm

223

UP

208

C 202

UP

Women's Room

Stair 3

Men's Room

English Classroom

Comm Affairs

Girls Lkr Rm

226

222

12

213

209

Large Studio
218

Large Studio

Tel Data Room

217

210

Stair 2
Large Studio
224

English Classroom

UP

DN

English Classroom

212

211

UP

PROPOSED
SECOND FLOOR
PLAN
N

SCALE: 1/32" = 1'-0"
0

8

16

32
353

Stair 11
Social Studies

Theory Classroom

Social Studies

362

352

363

Theory Classroom

Stair 5

345

Inst Stor

344

357

Staff Bath
365

Inst Library

351

8'-9"

346

DN

Orchestra Rehearsal Space

359

Less Studio

Inst Repair

Vocal Classroom / Studio

354

Staff Wk Rm

16'-3"

Uniform Stor
Women's Room

348

DN

UP

231'-5"

361

UP

350

Stair 14

Office

Janitor

Vestibule

356

UP

347

Stair 4

364

Social Studies

358

Men's Room

355

UP

Social Studies

Corridor

366

342

13'-9"

341

340

Organ Rm

Large Classroom / Studio

C 304

Music Library

Corridor
C 303

Elec

Mech.

Elec

Elevator 4

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

DN

Large Strings CR
Terrace

360

349

Men's Room

Open to below

367

Mech.

7'-6"

Costume Storage
343

Corridor

Elevator 1

368

Academic Dir

C 301

Open to below

Upper Balcony
T 301

Gallery

Elevator 2

Piano Studio

1
3.12

339

Social Studies
301

232.21'
Open to auditorium below

Fly Tower

Vestibule

Bridge

T 301

Open to below

BR 301

Piano Studio
338

Math
302

Choir Room
337

Office

Closet

Gallery

335

336

Technology CR

Vocal Classroom / Studio

Open to below

303

333

Storage
334

Open to below
Elec

Mech.

Women's Room
310

Tel Data Room

327

Mech.

326

Elec
311

Corridor
Stair 3

UP

DN

Math

C 302

UP
231'-5" Janitor
328

UP

316

Vestibule

Stair 13
Men's Room
325

Women's Room
324

304

Office
312

Math

UP

UP

P. Rm.

330

323

13'-9"

Inst Stor
331

317

13'-9"

Office
322

P. Rm.
321

Office
305

10'

P. Rm.

315

Less Studio
7'-6"

329

7'-6"

7'-6"

Jazz Ensemble Rehearsal

13

309

Inst Stor

Tel Data Room
306

12'-6"

Vestibule
318

PROPOSED
THIRD FLOOR
PLAN

Uniform Stor

8'-9"

314

Wind Band Rehearsal Space
313

Office

Stair 2

332

DN

Percussion Lab

Math

320

Math
307

308

Piano Studio
Terrace

319

Stair 12

DN

N

SCALE: 1/32" = 1'-0"
0

8

16

32
Open to below

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Open to below
Open to below

Stair 11

Less Studio

10'

428

15'

15'

7'-6"

5'

Stair 14

433

8'-9"

P. Rm.

DN

DN

Open to below

P. Rm.
5'

DN

Photovoltaic Panels

434

8'-9"

432

5'

Less Studio

426

10'

P. Rm.
12'-6"

15'

Less Studio
DN

C 405

435

431

15'

Stair 4

Balcony

P. Rm.
16'-3"

430

429

10'

10'

425

Less Studio

Storage

Less Studio

Open to below

13'-9"

Open to below

8'-9"

243'-5"
UP

DN

Corridor

11'-3"

11'-3"

ELECT/
STORAGE

6'-3"

P. Rm.

422

423

424

Elec

Elevator 4

Mechanical Enclosure

Mech.

6'-3"

P. Rm.

11'-3"

C 404

6'-3"

P. Rm.

427

Costume Storage
421

Open to below

Skylight

Corridor

254'

C 403

Elevators

Open to below

Skyview Terrace

Exterior
Mechanical
Enclosure

R102

Fly Tower

Deck

Historic
Portico Roof

Classroom / Studio

254'

Skylight

419

Stor
420

Tel Data Room

P. Rm.

Mech.

413

406

Elec

Corridor

414

C 402

DN

15'

407

Less Studio

15'

409

15'

403

11'-3"

Open to below

P. Rm.
402

11'-3"

Storage
408

P. Rm.
401

Office
418

6'-11"

5'

P. Rm.
11'-11"

10'

10'

417

14

405

P. Rm.
404

Less Studio
17'-6"

Less Studio

P. Rm.

7'-6"

6'-3"

410

15'

8'-9"

416

Less Studio

10'

Less Studio

10'

Open to below

6'-3"

DN

15'-8"

6'-3"

7'-6"

DN

Stair 13

10'

11'-3"

6'-3"

411

11'-3"

DN

7'-6"

412

6'-3"

P. Rm.

12'-6"

11'-11"

10'

415

DN

P. Rm.

10'

8'-2"

P. Rm.

10'

Stair 3

243'-5"

Stair

Balcony
C 401

254'

Open to below

DN

Green Roof

PROPOSED
FOURTH FLOOR
PLAN

Open to below

Stair 12

N

SCALE: 1/32" = 1'-0"
0

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Green Roof

Photovoltaic Panels

DN

254'

Stair 4
Mech/ Elec. Rm
ELECT/
R101
STORAGE

DN

Mechanical Enclosure
Elevator 4

Green Roof
Elevator 1

Skylight
254'

Elevators

Elevator 2

Mechanical Enclosure Well

Green Roof

Skyview Terrace
Skyview Terrace

Fly Tower
Open To
Below

R102

Deck

Historic
Portico Roof

254'

Skylight

254'

15
PROPOSED
ROOF PLAN

Stair
Green Roof

254'

Stair 2

DN

Green Roof

N

SCALE: 1/32" = 1'-0"
0

TOTAL GREEN ROOF: 18,976 sq ft

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

EXISTING EAST ELEVATION

16
EAST
ELEVATIONS
N

SCALE: 1/32" = 1'-0"
0

PROPOSED EAST ELEVATION

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

EXISTING SOUTH ELEVATION

17
SOUTH
ELEVATIONS
N

SCALE: 1/32" = 1'-0"
0

PROPOSED SOUTH ELEVATION

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

EXISTING WEST ELEVATION

18
WEST
ELEVATIONS
N

SCALE: 1/32" = 1'-0"
0

PROPOSED WEST ELEVATION

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

EXISTING NORTH ELEVATION

19
NORTH
ELEVATIONS
N

SCALE: 1/32" = 1'-0"
0

PROPSED NORTH ELEVATION

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

use

l

eve

U

om
e fr

n

t Li

h
Sig

rL
ppe

o
of H

alk

w
de

e

in

L
ht

m
fro

Si

g

Si

20
SIGHT LINES

Reservoir Road

SCALE: 1/16" = 1'-0"
0

SIGHT LINES ON RESERVOIR ROAD

4

8

16
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Sigh

t Lin

Si

gh

e fro

mU

tL

ine

fro

m

Si

ppe

r Le

vel

of H

ous

e

de

wa

lk

21
SIGHT LINES

R Street

SCALE: 1/16" = 1'-0"
0

SIGHT LINES ON R STREET

8

8

16
Si

gh

tL

in

e

fro

m

Si

de

wa

lk

DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

22
SIGHT LINES

SCALE: 1/16" = 1'-0"
0

36th Street
SIGHT LINES ON 36TH STREET

4

8

16
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

Sight

Line f

rom U

Sigh

pper

t Lin

e fro

Level

m Si

of Ho

use

dew

alk

35th Street

SIGHT LINES ON 35TH STREET

23
SIGHT LINES

SCALE: 1/32" = 1'-0"
0

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

24
LONGITUDINAL
SECTION
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

25
TRANSVERSE
SECTION
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

26
EXTERIOR
PERSPECTIVE
VIEWS

AERIAL VIEW FROM SOUTH EAST
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

27
EXTERIOR
PERSPECTIVE
VIEWS

VIEW FROM RESERVOIR ROAD AND 35TH STREET
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

28
EXTERIOR
PERSPECTIVE
VIEWS

AERIAL VIEW OF FRONT OF SCHOOL
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

29
EXTERIOR
PERSPECTIVE
VIEWS

VIEW OF AMPITHEATER
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

INTERSECTION OF RESERVOIR AND 36TH STREET

R STREET ELEVATION

30
EXTERIOR
PERSPECTIVE
VIEWS

INTERSECTION OF RESERVOIR AND 36TH STREET
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

31
EXTERIOR
PERSPECTIVE
VIEWS

SOUTH ELEVATION
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

R STREET LOOKING WEST

32
EXTERIOR
PERSPECTIVE
VIEWS

R STREET LOOKING WEST
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

33
EXTERIOR
PERSPECTIVE
VIEWS

RESERVOIR ROAD LOOKING EAST
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

COMPETITION DESIGN

34
PORTICO
LANTERN
REVISIONS
N

SCALE: 1/32" = 1'-0"
0

REVISED PORTICO LANTERN

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

COMPETITION DESIGN

35
PORTICO
LANTERN
REVISIONS
N

SCALE: 1/32" = 1'-0"
0

REVISED PORTICO LANTERN

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

PREVIOUS SOUTH ELEVATION DESIGN

36
EXTERIOR
BUILDING SHELL
MATERIAL
OPTIONS
N

SCALE: 1/32" = 1'-0"
0

CURRENT SOUTH ELEVATION DESIGN

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

BUILDING SKIN ARTICULATION REVISION A

37
EXTERIOR
BUILDING SHELL
REVISIONS
N

SCALE: 1/32" = 1'-0"
0

COMPETITION DESIGN

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

CURRENT DESIGN

38
EXTERIOR
BUILDING SHELL
MATERIAL
OPTIONS
N

SCALE: 1/32" = 1'-0"
0

BUILDING SKIN ARTICULATION REVISION B

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

39
EXTERIOR
BUILDING SHELL
MATERIAL
OPTIONS
N

SCALE: 1/32" = 1'-0"
0

CURRENT DESIGN NIGHT VIEW

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

PREVIOUS WEST ELEVATION DESIGN

40
EXTERIOR
BUILDING SHELL
MATERIAL
OPTIONS
N

SCALE: 1/32" = 1'-0"
0

CURRENT WEST ELEVATION DESIGN

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

CONCEPT DESIGN

BUILDING SKIN ARTICULATION REVISION A

41
EXTERIOR
BUILDING SHELL
MATERIAL
OPTIONS
N

SCALE: 1/32" = 1'-0"
0

8

16

32
DUKE ELLINGTON
SCHOOL OF THE ARTS
MODERNIZATION

42
EXTERIOR
BUILDING SHELL
MATERIAL
OPTIONS
N

SCALE: 1/32" = 1'-0"
0

CURRENT DESIGN

8

16

32

More Related Content

Viewers also liked

School Esquisse
School EsquisseSchool Esquisse
School EsquisseRossBoyce
 
South Hadley Plains Elementary School Schematic Design presentation
South Hadley Plains Elementary School Schematic Design presentationSouth Hadley Plains Elementary School Schematic Design presentation
South Hadley Plains Elementary School Schematic Design presentationNicholas Macy, CCM, PMP
 
Primary School Architectural Design - India
Primary School Architectural Design - IndiaPrimary School Architectural Design - India
Primary School Architectural Design - IndiaShyaam Sundar
 
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame BuildingsEnergy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame BuildingsRDH Building Science
 
Duke Ellington School of the Arts Project Updates (April 7, 2016)
Duke Ellington School of the Arts Project Updates (April 7, 2016)Duke Ellington School of the Arts Project Updates (April 7, 2016)
Duke Ellington School of the Arts Project Updates (April 7, 2016)DC Department of General Services
 
Sustainable Passivhaus School Design
Sustainable Passivhaus School DesignSustainable Passivhaus School Design
Sustainable Passivhaus School DesignElrond Burrell
 
Guidelines for primary school 01
Guidelines for primary school 01Guidelines for primary school 01
Guidelines for primary school 01Dhiraj Salhotra
 
School Design: Be the Change...
School Design: Be the Change...School Design: Be the Change...
School Design: Be the Change...esltechnology
 
Lotus valley international school
Lotus valley international schoolLotus valley international school
Lotus valley international schoolFace2faithadmin
 
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)DC Department of General Services
 
School designs
School designsSchool designs
School designsLaya Hague
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfoliotb55
 
Case study/ Literature of a School
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a SchoolSarthak Kaura
 

Viewers also liked (15)

School Esquisse
School EsquisseSchool Esquisse
School Esquisse
 
South Hadley Plains Elementary School Schematic Design presentation
South Hadley Plains Elementary School Schematic Design presentationSouth Hadley Plains Elementary School Schematic Design presentation
South Hadley Plains Elementary School Schematic Design presentation
 
Primary School Architectural Design - India
Primary School Architectural Design - IndiaPrimary School Architectural Design - India
Primary School Architectural Design - India
 
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame BuildingsEnergy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
Energy Efficient Building Enclosure Design Guidelines for Wood-Frame Buildings
 
Duke Ellington School of the Arts Project Updates (April 7, 2016)
Duke Ellington School of the Arts Project Updates (April 7, 2016)Duke Ellington School of the Arts Project Updates (April 7, 2016)
Duke Ellington School of the Arts Project Updates (April 7, 2016)
 
Sustainable Passivhaus School Design
Sustainable Passivhaus School DesignSustainable Passivhaus School Design
Sustainable Passivhaus School Design
 
Guidelines for primary school 01
Guidelines for primary school 01Guidelines for primary school 01
Guidelines for primary school 01
 
Eco School Design- Ar.Suvarna lele
Eco School Design- Ar.Suvarna leleEco School Design- Ar.Suvarna lele
Eco School Design- Ar.Suvarna lele
 
School Design: Be the Change...
School Design: Be the Change...School Design: Be the Change...
School Design: Be the Change...
 
Lotus valley international school
Lotus valley international schoolLotus valley international school
Lotus valley international school
 
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
Garrison Elementary School Concept Design Presentation (Feb. 12, 2014)
 
School Case Study
School Case StudySchool Case Study
School Case Study
 
School designs
School designsSchool designs
School designs
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
Case study/ Literature of a School
Case study/ Literature of a SchoolCase study/ Literature of a School
Case study/ Literature of a School
 

More from DC Department of General Services

Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)DC Department of General Services
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...DC Department of General Services
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)DC Department of General Services
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)DC Department of General Services
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)DC Department of General Services
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)DC Department of General Services
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)DC Department of General Services
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)DC Department of General Services
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)DC Department of General Services
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)DC Department of General Services
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)DC Department of General Services
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)DC Department of General Services
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...DC Department of General Services
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)DC Department of General Services
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)DC Department of General Services
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)DC Department of General Services
 

More from DC Department of General Services (20)

Hearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm finalHearst community meeting 11.16.2017 430pm final
Hearst community meeting 11.16.2017 430pm final
 
Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)Marie Reed Construction Project Update (May 5, 2017)
Marie Reed Construction Project Update (May 5, 2017)
 
Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)Marie Reed School Construction Project Update (April 21, 2017)
Marie Reed School Construction Project Update (April 21, 2017)
 
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
Palisades Recreation Center - Palisades Citizens Association Meeting (April 4...
 
Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)Garrison Elementary School Community Update (March 24, 2017)
Garrison Elementary School Community Update (March 24, 2017)
 
Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)Marie Reed Elementary School Construction Project Update (March 24, 2017)
Marie Reed Elementary School Construction Project Update (March 24, 2017)
 
Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)Benning Park Recreation Center Community Meeting (March 2017)
Benning Park Recreation Center Community Meeting (March 2017)
 
Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)Marie Reed Project Update (February 24, 2017)
Marie Reed Project Update (February 24, 2017)
 
Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)Hearst Park & Pool Project Community Meeting (February 15, 2017)
Hearst Park & Pool Project Community Meeting (February 15, 2017)
 
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
McMillan Stabilization & Restoration Community Update Meeting (February 2, 2017)
 
Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)Hearst Park & Pool Community Survey Presentation (January 2017)
Hearst Park & Pool Community Survey Presentation (January 2017)
 
Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)Friendship Recreation Center - ANC Presentation (January 12, 2017)
Friendship Recreation Center - ANC Presentation (January 12, 2017)
 
Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)Edgewood Recreation Center Community Meeting (December 12, 2016)
Edgewood Recreation Center Community Meeting (December 12, 2016)
 
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
Palisades Recreation Center ANC Meeting Presentation (November 26, 2016)
 
Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)Edgewood Recreation Center Community Meeting (November 1, 2016)
Edgewood Recreation Center Community Meeting (November 1, 2016)
 
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
Lafayette Elementary School SIT Meeting Presentation (October 26, 2016)
 
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
Lafayette Elementary School: Lighting & Sound Meeting Presentation (June 7, 2...
 
Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)Bancroft School Community Meeting Presentation (July 9, 2016)
Bancroft School Community Meeting Presentation (July 9, 2016)
 
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
Hearst Park & Pool Community Meeting Presentation (September 8, 2016)
 
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)Lafayette Elementary School Playground Design Presentation (July 27, 2016)
Lafayette Elementary School Playground Design Presentation (July 27, 2016)
 

Recently uploaded

TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadershipanjanibaddipudi1
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Delhi Call girls
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeRahatulAshafeen
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...Axel Bruns
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Developmentnarsireddynannuri1
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...Diya Sharma
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.pptsammehtumblr
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...narsireddynannuri1
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceDelhi Call girls
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...srinuseo15
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)Delhi Call girls
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxlorenzodemidio01
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxjohnandrewcarlos
 

Recently uploaded (20)

TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
AI as Research Assistant: Upscaling Content Analysis to Identify Patterns of ...
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf30042024_First India Newspaper Jaipur.pdf
30042024_First India Newspaper Jaipur.pdf
 
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
₹5.5k {Cash Payment} Independent Greater Noida Call Girls In [Delhi INAYA] 🔝|...
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
Nurturing Families, Empowering Lives: TDP's Vision for Family Welfare in Andh...
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 

Duke Ellington School of the Arts Community Meeting (Feb. 18, 2014)

  • 1. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Key 1 Loading Dock 7 Trash/Recycling 8 Drop-Off 9 Visitor's Parking Lot 10 Ampitheater 11 Ellington Lawn 12 9 Fitness Center Entrance 6 12 Small Performance Entrance 5 5 Parking Garage Entrance 4 8 Performance Entrance 3 R Street NW Main Entrance 2 Terrace No parking 7 6 Parking during limited hours 2 1 10 11 35th Street NW 36th Street NW 2 hour parking WASHINGTON INTERNATIONAL SCHOOL 4 1 3 Reservoir Road NW PROPOSED SITE PLAN N SCALE: 1" = 60' 0 10 20 30 60
  • 2. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 1903 east elevation Aerial photo 1910-1914 1900 east elevation 2 HISTORIC LANDSCAPE PHOTOGRAPHS 1986 west elevation HISTORIC PHOTOGRAPHS 1915 east elevation 1929 - view through iron gate
  • 3. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 179.92 N SCALE: 1" = 40' 0 10 20 40 3 PROPOSED LANDSCAPE PLAN E E E E PROPOSED LANDSCAPE PLAN | SCALE: 1”=40’
  • 4. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Visitor Parking World Lang. Classroom World Lang. Classroom Ghosted Lines show Competition Amphitheater footprint 101 Vestibule ADA Entrance Ramp STUDENT Student ENTRANCE Entrance AMPHITHEATER Student Entry Front Lawn STUDENT ENTRY CURRENT DESIGN Ex Ad Off 105 Office 107 Ad Wk Rm 109 4 Storage 112 Conf Rm 111 STUDENT ENTRY REVISIONS Toilet 114 Principal's Off N SCALE: 1/32" = 1'-0" 0 PLAN OF STUDENT ENTRY AREA COMPETITION DESIGN 8 16 32
  • 5. R STREET Drop Off Zone DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Visitor/ ADA Parking ADA Ramp REVISED VISITOR PARKING AND DROP OFF 5 VISITOR PARKING & DROP OFF REVISIONS N SCALE: 1/32" = 1'-0" 0 COMPETITION VISITOR PARKING AND DROP OFF 8 16 32
  • 6. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION HISTORIC ENTRANCE STEPS - NORTH SIDE 6 HISTORIC ENTRANCE STEPS - SOUTH SIDE ADA RAMP REVISIONS ADA RAMP REVISIONS/ EXISTING SIDE ENTRANCES N SCALE: 1/32" = 1'-0" 0 8 16 32
  • 7. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION TYPICAL EXISTING LIGHT WELL TREATMENT AT FRONT FACADE CREATION OF LIGHT WELLS AT GROUND FLOOR LEVEL 7 TREATMENT OF FRONT FACADE WINDOW WELLS N SCALE: 1/32" = 1'-0" 0 AUTHOR COTTON MOORE ENTRANCE RAMPS 8 16 32
  • 8. Make-Up / D Rm DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 175.92' Stair 3 Vestibule L05 175.92' REVISED PARKING ENTRANCE Underground Parking Garage: Elevator 3 Standard Spaces: 39 Compact Spaces: 54 Accessible Spaces: 1 Van Accessible Spaces: 3 Total Spaces: 97 Rehearsal Rm / Library L07 Studio / Theater CR 20' Alt. Entrance 183.68' 183.95' 8' 178.43 12% 60'-6" 176.69 8' 6% 176.42' Parking Garage 8 176.42' UNDERGROUND PARKING ENTRANCE 36th Street 39'-11" 6% L06 Reservoir Road ALTERNATIVE PARKING ENTRANCE FROM 36TH STREET Current Parking Garage Entrance COMPETITION DESIGN
  • 9. L20 Stair 4 175.92' Corridor L22 Scene Shop St Elev Mach. Rm L21 Art Collection Storage DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Elevator 4 C L06 Generator Room L19 Parking L23 Elevator 1 176.42' Stair 6 178.42' 175.92' Corridor C L05 Plumbing Corridor L18 C L 01 Stair 7 Elevator 2 UP 175.92' Mechanical Room L17 Maintenance Storage L16 Main Dist. Frame L01 166' 176.42' Corridor Eng Off 176.42' L03 Maintenance Office L02 L15 Storage C L04 Areaway Women Electric Room L14 L04 Studio / Theater CR L13 Corridor Men Office Janitor L10 L11 L09 L08 L12 Make-Up / D Rm C L03 Storage 175.92' Stair 3 Vestibule L05 175.92' Elevator 3 Rehearsal Rm / Library 9 L07 PROPOSED LOWER LEVEL FLOOR PLAN Studio / Theater CR L06 176.42' 176.42' N SCALE: 1/32" = 1'-0" 8' 179.00' 178.73' 6% UP 12% 21'-6" 0 8 16 32
  • 10. Stor G72 Bathroom G68 Fitness Center Entrance PE Office G77 193.88' G71 Corridor Corridor G74 G75 Fitness Room Men's Room G79 G99 Conf Room Corridor G100 C G11 G89 Storage G84 185.92'Stair 4 Janitor DN DN G78 UP Elec G87 Mech. Elec Elevator 4 C G05 G50 G101 C G06 Corridor Receiving Physics Classroom Corridor 188.42' Loading Dock Women's Room G81 G88 185.42' G52 G48 Vestibule G102 Locker Room Men's Room G46 G53 Stair 6 DN Locker Room Recycling G51 Elevator 1 G103 Eng Off Storage G57 G56 Book Room G49 G54 Mech. Visual Arts Commons Ware Washing Office Women's Room Cust Off Kitchen / Servery G47 Elevator 2 G55 Window Well DN Servery Storage G45 G58 Stair 10 Student Lockers Point of Sale Studio / Theater CR 50 Storage G104 Registrar G1035 Waiting G106 G44 Storage Cl Storage Frzr / Coolr G43 G62 G65 Central Commons Place Cafeteria / Commons Trap G61 G03 Security 188.42' Orchestra Pit Student Lobby Vestibule G02 G60 G01 Student Entrance Corridor C G04 Studio / Theater CR 193.59' Paper Prod Storage Closet G41 G42 Student Lockers G64 Office G40 188.42' Food Stor G63 36 Point of Sale 48 50 Attendance G06 Sec Desk UP G05 Sec Off G04 188.42' Office Janitor G39 DN Stair 9 G37 UP Make-Up / D Rm G38 Window Well 84 Stair 1 Conf. Rm. G36 Science CR / Lab G07 Women's Room G35 Chair Storage G59 Green Room Performing Arts Commons G34 Stair 3 Men's Room G15 G32 G33 185.92' Mech. 188.42' Tel Data Room Elec Elec G16 Mech. DN Staff Wk Rm Corridor 185.92' G08 C G03 UP DN Chem Stor Toilet/Shower Vestibule Elevator 3 G31 G10 G19 Corridor Green Room C G02 5' Toilet/Shower 15' G30 Vestibule G28 Control Room UP E AN PL ND E OU LIN GR CUT 10 Tel Data Rm G11 Performance Hall G27 G29 G09 G14 G20 Men's Rm Black Box Studio Science Prep Science CR / Lab G17 DN DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Couns Off G94 Elective/ Sp. Ed. Cr. pac om hC G98 Reception C G09 tor G97 G90 G66 s Tra Stair 5 Conf Room Corridor G83 G80 UP C G10 G86 DC Cap O G96 Couns Off Corridor Storage Couns Off UP G93 G85 Women's Room Health Rec Shep Off G92 G91 Health CR / Anat / Phys Locker Rm/Showers Locker Rm / Showers G70 Cots G69 Treatment G67 G82 C G08 C G07 Office Dance / Aerobics Social Worker GR OU CU ND PL TL INE ANE Cots G95 G76 Rec Stor Toilet G73 OT/PT/Physiologist Stor G18 Corridor C G01 Stage Science CR / Lab Recording Studio 126 Seats Retractable G12 G21 Stair 8 Stair 2 UP Women's Rm Science CR / Lab G26 G13 Box Off G22 Vestibule G25 188.42' Closet G23 UP 193.88' Vestibule G24 N SCALE: 1/32" = 1'-0" 0 Small Performance Center Entrance 1 3.14 PROPOSED GROUND FLOOR PLAN 3 3.14 8 16 32
  • 11. Stor Stair 5 Stor 163 165 2D Studio 2D Studio 162 World Lang. Classroom 172 178 Corridor UP C 109 158 159 168 Stor 164 Asst Off Stor 160 Conf. Room 161 Vestibule 3D Studio Stor 171 174 173 Storage 155 176 Printmaking Studio VIP Holding 156 Stor VIP Dress 157 DN 2D Studio Digital Arts / Photo Studio Arts Dean DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION UP Terrace 169 179 167 Kiln DN UP World Lang. Classroom 170 Off / Workroom 175 Stair 4 UP Corridor Corridor C 110 C 108 Laundry Costume Shop 154 153 Corridor C 107 Mech. Elec Elevator 4 Bridge Bridge BR 105 BR 104 166 Elec Women's Room 177 180 Men's Room 181 Mech. 151 152 Elevator 1 Open to below 182 Vestibule Scene Shop 149 School Store Paint Shop Open to below Shell St Tech T Workroom T 104 147 Vestibule T 105 Elevator 2 Orchestra Seating UP Stair T4 Tool Room Lighting & Sound St. 145 UP 146 148 Green Room 1 3.9 Parterre Seating Stair T1 Stage 150 143 Bridge Make-up / Dressing Rm Lobby / Gallery BR 101 141 102 Theater 101 144 Vestibule Office Storage T 101 STUDENT ENTRANCE Tech Design & Prod CR 142 Women's Room/Shower UP 140 Stair T3 UP UP Vis Waiting / Box Off DN 103 Stair 1 Vestibule Vestibule T 102 T 103 DN Open to below Chair / Piano Stor Corridor 137 Elec 135 Open to below Mech. Tel Data Room Ex Ad Off 126 105 Elec 136 Bridge Bridge 127 BR 102 BR 103 Rec Stor 106 Corridor Elevator 3 Corridor Vestibule 128 Elling Fnd Rec C 101 118 Storage 125 C 106 Stair 8 108 Women's Room 117 115 134 107 Corridor Mailroom Facilities Op. Man. Office Conference Room DN Ramp Storage 133 Bus Mgr DN 132 129 Ctrl Rm Open To Black Box Studio Below Sound 124 11 Ad Wk Rm 109 Men's Room 116 Performance Hall Corridor Storage C 103 G18 PROPOSED FIRST FLOOR PLAN 112 Conf Rm 119 123 DN Office 122 Corridor Toilet 114 120 121 130 UP DN Office C 104 Office Vestibule 111 Stair 2 Storage Office 131 UP UP C 105 Student Prod Off Stair 3 110 138 Women's Room Tel Data Room Make-up / Dressing Rm C 102 Mech. 104 139 St Dean Men's Room/Shower UP Principal's Off 113 N SCALE: 1/32" = 1'-0" 0 3 3.14 8 16 32
  • 12. Stair 5 Stor 245 Video Prod Lab / CR 253 252 Rec/Edit Booth DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION UP Project Lab / Classroom 250 Writing Studio Journalism Room 243 Stor 244 247 World Lang. Classroom World Lang. Classroom 262 263 UP Pre Archive St. Corridor 254 C 205 Equip Stor DN 251 Stor 255 Stor 257 Currative Skills Lab Office 259 241 Off / Stor 242 Graphics / Computer Lab 246 Storage Janitor 258 Staff Wk Rm Editing Lab / CR Core Curriculum C/R 249 264 Comm PR 265 Elective/Museum Studies 256 261 DN UP 238 Stair 4 UP English Classroom Corridor Bridge Corridor Costume Shop Storage C 203 Elec Elevator 4 239 Small Studio 266 216.63' C 204 Elec BR 203 Mech. 260 248 Men's Room 267 Mech. 237 Open to below Storage Elevator 1 240 Academic Dir Open to below C 201 217.96' Vestibule T 203 Elevator 2 Gallery 216.46' T 204 DN Office Media Center Stair T1 Costume Room 201 235 DN 236 232 Bridge 216.63' BR 201 Reading Room Conf Rm / Off 203 234 Equip Stor 229 Office 231 Men's Room 233 Women's R oom Locker Rm 216.63' Open to below Fly Tower Portico Terrace 202 1 3.11 Large Studio 268 Corridor Balcony DN 204 230 216.46' Gallery DN Locker Rm DN Stair 1 Vestibule DN Toilet 206 T 202 217.96' Staff Br Rm 205 DN Toilet Open to below Storage Classroom Studio 207 228 227 Elec Tel Data Room 220 219 Women's Room Mech. Open to below 214 Mech. Bridge BR 202 Elec 215 English Classroom Corridor Janitor DN 221 Vestibule 216 225 Boys Lkr Rm 223 UP 208 C 202 UP Women's Room Stair 3 Men's Room English Classroom Comm Affairs Girls Lkr Rm 226 222 12 213 209 Large Studio 218 Large Studio Tel Data Room 217 210 Stair 2 Large Studio 224 English Classroom UP DN English Classroom 212 211 UP PROPOSED SECOND FLOOR PLAN N SCALE: 1/32" = 1'-0" 0 8 16 32
  • 13. 353 Stair 11 Social Studies Theory Classroom Social Studies 362 352 363 Theory Classroom Stair 5 345 Inst Stor 344 357 Staff Bath 365 Inst Library 351 8'-9" 346 DN Orchestra Rehearsal Space 359 Less Studio Inst Repair Vocal Classroom / Studio 354 Staff Wk Rm 16'-3" Uniform Stor Women's Room 348 DN UP 231'-5" 361 UP 350 Stair 14 Office Janitor Vestibule 356 UP 347 Stair 4 364 Social Studies 358 Men's Room 355 UP Social Studies Corridor 366 342 13'-9" 341 340 Organ Rm Large Classroom / Studio C 304 Music Library Corridor C 303 Elec Mech. Elec Elevator 4 DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION DN Large Strings CR Terrace 360 349 Men's Room Open to below 367 Mech. 7'-6" Costume Storage 343 Corridor Elevator 1 368 Academic Dir C 301 Open to below Upper Balcony T 301 Gallery Elevator 2 Piano Studio 1 3.12 339 Social Studies 301 232.21' Open to auditorium below Fly Tower Vestibule Bridge T 301 Open to below BR 301 Piano Studio 338 Math 302 Choir Room 337 Office Closet Gallery 335 336 Technology CR Vocal Classroom / Studio Open to below 303 333 Storage 334 Open to below Elec Mech. Women's Room 310 Tel Data Room 327 Mech. 326 Elec 311 Corridor Stair 3 UP DN Math C 302 UP 231'-5" Janitor 328 UP 316 Vestibule Stair 13 Men's Room 325 Women's Room 324 304 Office 312 Math UP UP P. Rm. 330 323 13'-9" Inst Stor 331 317 13'-9" Office 322 P. Rm. 321 Office 305 10' P. Rm. 315 Less Studio 7'-6" 329 7'-6" 7'-6" Jazz Ensemble Rehearsal 13 309 Inst Stor Tel Data Room 306 12'-6" Vestibule 318 PROPOSED THIRD FLOOR PLAN Uniform Stor 8'-9" 314 Wind Band Rehearsal Space 313 Office Stair 2 332 DN Percussion Lab Math 320 Math 307 308 Piano Studio Terrace 319 Stair 12 DN N SCALE: 1/32" = 1'-0" 0 8 16 32
  • 14. Open to below DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Open to below Open to below Stair 11 Less Studio 10' 428 15' 15' 7'-6" 5' Stair 14 433 8'-9" P. Rm. DN DN Open to below P. Rm. 5' DN Photovoltaic Panels 434 8'-9" 432 5' Less Studio 426 10' P. Rm. 12'-6" 15' Less Studio DN C 405 435 431 15' Stair 4 Balcony P. Rm. 16'-3" 430 429 10' 10' 425 Less Studio Storage Less Studio Open to below 13'-9" Open to below 8'-9" 243'-5" UP DN Corridor 11'-3" 11'-3" ELECT/ STORAGE 6'-3" P. Rm. 422 423 424 Elec Elevator 4 Mechanical Enclosure Mech. 6'-3" P. Rm. 11'-3" C 404 6'-3" P. Rm. 427 Costume Storage 421 Open to below Skylight Corridor 254' C 403 Elevators Open to below Skyview Terrace Exterior Mechanical Enclosure R102 Fly Tower Deck Historic Portico Roof Classroom / Studio 254' Skylight 419 Stor 420 Tel Data Room P. Rm. Mech. 413 406 Elec Corridor 414 C 402 DN 15' 407 Less Studio 15' 409 15' 403 11'-3" Open to below P. Rm. 402 11'-3" Storage 408 P. Rm. 401 Office 418 6'-11" 5' P. Rm. 11'-11" 10' 10' 417 14 405 P. Rm. 404 Less Studio 17'-6" Less Studio P. Rm. 7'-6" 6'-3" 410 15' 8'-9" 416 Less Studio 10' Less Studio 10' Open to below 6'-3" DN 15'-8" 6'-3" 7'-6" DN Stair 13 10' 11'-3" 6'-3" 411 11'-3" DN 7'-6" 412 6'-3" P. Rm. 12'-6" 11'-11" 10' 415 DN P. Rm. 10' 8'-2" P. Rm. 10' Stair 3 243'-5" Stair Balcony C 401 254' Open to below DN Green Roof PROPOSED FOURTH FLOOR PLAN Open to below Stair 12 N SCALE: 1/32" = 1'-0" 0 8 16 32
  • 15. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Green Roof Photovoltaic Panels DN 254' Stair 4 Mech/ Elec. Rm ELECT/ R101 STORAGE DN Mechanical Enclosure Elevator 4 Green Roof Elevator 1 Skylight 254' Elevators Elevator 2 Mechanical Enclosure Well Green Roof Skyview Terrace Skyview Terrace Fly Tower Open To Below R102 Deck Historic Portico Roof 254' Skylight 254' 15 PROPOSED ROOF PLAN Stair Green Roof 254' Stair 2 DN Green Roof N SCALE: 1/32" = 1'-0" 0 TOTAL GREEN ROOF: 18,976 sq ft 8 16 32
  • 16. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION EXISTING EAST ELEVATION 16 EAST ELEVATIONS N SCALE: 1/32" = 1'-0" 0 PROPOSED EAST ELEVATION 8 16 32
  • 17. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION EXISTING SOUTH ELEVATION 17 SOUTH ELEVATIONS N SCALE: 1/32" = 1'-0" 0 PROPOSED SOUTH ELEVATION 8 16 32
  • 18. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION EXISTING WEST ELEVATION 18 WEST ELEVATIONS N SCALE: 1/32" = 1'-0" 0 PROPOSED WEST ELEVATION 8 16 32
  • 19. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION EXISTING NORTH ELEVATION 19 NORTH ELEVATIONS N SCALE: 1/32" = 1'-0" 0 PROPSED NORTH ELEVATION 8 16 32
  • 20. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION use l eve U om e fr n t Li h Sig rL ppe o of H alk w de e in L ht m fro Si g Si 20 SIGHT LINES Reservoir Road SCALE: 1/16" = 1'-0" 0 SIGHT LINES ON RESERVOIR ROAD 4 8 16
  • 21. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Sigh t Lin Si gh e fro mU tL ine fro m Si ppe r Le vel of H ous e de wa lk 21 SIGHT LINES R Street SCALE: 1/16" = 1'-0" 0 SIGHT LINES ON R STREET 8 8 16
  • 22. Si gh tL in e fro m Si de wa lk DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 22 SIGHT LINES SCALE: 1/16" = 1'-0" 0 36th Street SIGHT LINES ON 36TH STREET 4 8 16
  • 23. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION Sight Line f rom U Sigh pper t Lin e fro Level m Si of Ho use dew alk 35th Street SIGHT LINES ON 35TH STREET 23 SIGHT LINES SCALE: 1/32" = 1'-0" 0 8 16 32
  • 24. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 24 LONGITUDINAL SECTION
  • 25. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 25 TRANSVERSE SECTION
  • 26. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 26 EXTERIOR PERSPECTIVE VIEWS AERIAL VIEW FROM SOUTH EAST
  • 27. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 27 EXTERIOR PERSPECTIVE VIEWS VIEW FROM RESERVOIR ROAD AND 35TH STREET
  • 28. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 28 EXTERIOR PERSPECTIVE VIEWS AERIAL VIEW OF FRONT OF SCHOOL
  • 29. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 29 EXTERIOR PERSPECTIVE VIEWS VIEW OF AMPITHEATER
  • 30. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION INTERSECTION OF RESERVOIR AND 36TH STREET R STREET ELEVATION 30 EXTERIOR PERSPECTIVE VIEWS INTERSECTION OF RESERVOIR AND 36TH STREET
  • 31. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 31 EXTERIOR PERSPECTIVE VIEWS SOUTH ELEVATION
  • 32. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION R STREET LOOKING WEST 32 EXTERIOR PERSPECTIVE VIEWS R STREET LOOKING WEST
  • 33. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 33 EXTERIOR PERSPECTIVE VIEWS RESERVOIR ROAD LOOKING EAST
  • 34. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION COMPETITION DESIGN 34 PORTICO LANTERN REVISIONS N SCALE: 1/32" = 1'-0" 0 REVISED PORTICO LANTERN 8 16 32
  • 35. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION COMPETITION DESIGN 35 PORTICO LANTERN REVISIONS N SCALE: 1/32" = 1'-0" 0 REVISED PORTICO LANTERN 8 16 32
  • 36. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION PREVIOUS SOUTH ELEVATION DESIGN 36 EXTERIOR BUILDING SHELL MATERIAL OPTIONS N SCALE: 1/32" = 1'-0" 0 CURRENT SOUTH ELEVATION DESIGN 8 16 32
  • 37. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION BUILDING SKIN ARTICULATION REVISION A 37 EXTERIOR BUILDING SHELL REVISIONS N SCALE: 1/32" = 1'-0" 0 COMPETITION DESIGN 8 16 32
  • 38. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION CURRENT DESIGN 38 EXTERIOR BUILDING SHELL MATERIAL OPTIONS N SCALE: 1/32" = 1'-0" 0 BUILDING SKIN ARTICULATION REVISION B 8 16 32
  • 39. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 39 EXTERIOR BUILDING SHELL MATERIAL OPTIONS N SCALE: 1/32" = 1'-0" 0 CURRENT DESIGN NIGHT VIEW 8 16 32
  • 40. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION PREVIOUS WEST ELEVATION DESIGN 40 EXTERIOR BUILDING SHELL MATERIAL OPTIONS N SCALE: 1/32" = 1'-0" 0 CURRENT WEST ELEVATION DESIGN 8 16 32
  • 41. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION CONCEPT DESIGN BUILDING SKIN ARTICULATION REVISION A 41 EXTERIOR BUILDING SHELL MATERIAL OPTIONS N SCALE: 1/32" = 1'-0" 0 8 16 32
  • 42. DUKE ELLINGTON SCHOOL OF THE ARTS MODERNIZATION 42 EXTERIOR BUILDING SHELL MATERIAL OPTIONS N SCALE: 1/32" = 1'-0" 0 CURRENT DESIGN 8 16 32