SlideShare una empresa de Scribd logo
1 de 5
Descargar para leer sin conexión
DIPECHO Brief
N                         E                           P                          A                                               L
                                      NUMBER 2         JUNE 2008
NEPAL DIPECHO BRIEF – The “Nepal DIPECHO               background on the seven DIPECHO projects active
Brief” is a periodic newsletter of the seven           in Nepal. This second edition hopes to show some
organizations currently carrying out DIPECHO           of the initiatives currently being carried out in the
funded projects in Nepal. It aims to give regular      area of early warning, particularly where partners
updates on project’s progress, with periodic themed    are collectively contributing to greater awareness,
editions. While the work of the projects is            understanding and promotion of this key issue.
supported by the European Commission, through          Future additions of this brief will focus on other
its Humanitarian Aid department, the views             issues and themes central to the promotion of
expressed in the brief are those of the partner        community based approaches to disaster risk
organizations alone.                                   reduction in Nepal, but as these briefs can only
                                                       cover our work in the broadest brush strokes please
“Early Warnings: Saving Lives” The first               feel free to contact partners directly for more
edition of “Nepal DIPECHO Brief” gave some basic       information. Please read on……………..




                          COMPLEMENTING COMMUNITY
                          INITIATIVES THROUGH CREATING
                          EWS LINKAGES

ActionAid is working with 14 communities in five districts, helping
people to reduce their vulnerabilities to flood, earthquake, landslide,
fire and other forms of natural calamity. Within the project small
scale early warning systems have been designed to inform people in
advance where ever possible, with such advance warning, along with
the life skill training and improved organizational capacity, expected
to reduce disaster impacts among vulnerable communities.
       In each of the communities, a public address system is being
provided, connected to radio. DMCs (Disaster Management
Committees) in each community will listen to the news and weather
forecasts through local radio stations, getting regular information       Rai tole, Hetauda: The flag in the background is to
on impending concerns and calamities. These radio broadcasts,             show direction of wind… small steps to control fire…

through the public address system, will be linked to listener’s clubs -
dedicated teams from within the communities - who are responsible                ActionAid      also   has
for both gathering and disseminating information. The portable            provision to support Disaster
public address systems will allow the DMC members to immediately          Information Centres at district
move around their respective areas, announcing news on the                level, in collaboration with the
environmental conditions and enabling communities to take advance         district administration offices,
measures, depending upon the likely severity of the impending             with these centres expected to
disaster. In fire prone areas, small measures such as erecting wind-      receive, analyse and disseminate
flags are expected to help communities to better identify the direction   advance information on disaster
of the wind and hence take the necessary measures needed to prevent       situations, particularly during
and stop the spread of fire.                                              the periodic ‘disaster seasons’
                                                                          such as the monsoon.
EUROPEAN COMMISSION




  HUMANITARIAN AID
SAMADHAN-II                                                   either sitting in a community
                                                                           gathering place or sometimes
             While putting effort into enhancing the capacities of         walking      throughout        the
             vulnerable communities, through implementing                  community. This practice has
             Community Based Disaster Risk Management                      existed in the communities for
             approaches (CBDRM) Care’s SAMADHAN-II project is              generations, with people attuned
             also emphasizing the importance of early warning.             to the sound of Narasingha and
       The communities CARE Nepal works with in Doti and Kailali           its importance.
are particularly poor and marginalized and as such capacity building,             The Narasingha man is paid
be it through training, awareness raising, carrying out mitigation         in either food or money and the
measures or enabling communities to establish early warning system         communities plan to link this to
(EWS) has been prioritised.                                                a Community Emergency Fund,
       In the far west while Kailali suffers most from floods and          a monthly saving activity to meet
inundation, Doti faces landslide and flash floods. In both project         any costs incurred due to disaster
districts Disaster Risk Reduction Committees (DRRC) have been              or to meet the unmet needs of
formed, trained in CBDRM with defined roles and responsibilities. A        the communities during a post
total of 328 DRRC members have already been trained and equipped           disaster situations.
with basic knowledge on preparedness, with importance being given                 The Narasingha man is
to the issue of EWS. Under a Schools Education Programme 57                now a members of the DRRC,
teachers have also been trained, with these now taking class room          playing his age old role, but now
sessions on preparedness covering 4,740 students in 19 schools.            conveying added information on
       CSSD (Conscious Society for Social Development) & EDC               disaster preparedness and Early
(Equality Development Centre), CARE’s implementing partners in             Warning Systems.
Kailali & Doti have been instrumental in broadcasting Radio
programmes on CBDRM, with the programmes covering important
preparedness and awareness messages, seasonal disaster news, and
views of community members on disaster preparedness.
       While trying to improvise and systematise the coping
mechanisms of communities the thrust of the programme has been
to promote and use indigenous mechanism for EWS where ever
possible. The Use of Narasingha (a local musical instrument) is a
popular way to disseminate messages across communities, with the
practice being that whenever there is an urgent message to be
disseminated the designated person plays the Narasingha repeatedly,        Narasingha man playing the indigenous instrument,
                                                                           Narasingha)


           UNDP/DRRNLN –              involved in Early Warning            disasters through all available
           II: HOW A FEW              Systems as such, but rather tries    media, be this radio, television or
           SECONDS CAN                to highlight their importance,       other sources and, accordingly,
           SAVE YOUR LIFE             thus reducing risk through           take adequate and appropriate
           BEFORE A                   increasing general awareness.        measures such as moving to
           DISASTER!                  Accordingly, in all its mass media   higher ground and/or other
                                      awareness              generation    places of safety.
            The fact that an          campaigns, the project has made            What it boils down to in
effective Early Warning System,       it a point, especially with regard   the end is that what ever kind of
especially in areas that are prone    to floods, to draw attention to      disaster is faced, if an Early
to natural hazards, can save          the fact that people need to get     Warning System is to save lives,
precious lives is irrefutable. With   early warning and improved           it should be efficient and fully
an efficient EWS in place, and        information about forthcoming        known         to      vulnerable
vulnerable          communities                                                           communities
adequately sensitized about its                                                           through adequate
operation and the measures they                                                           sensitization and
need to take before, say, an                                                              capacity building
imminent flood, a huge                                                                    in the areas of
difference can be made. The                                                               timely response
difference between saving or                                                              and evacuation.
losing a life.                                                                                 Those      few
       Having said this, UNDP/                                                            precious seconds
Disaster Risk Reduction at the                                                            before a disaster
National Level in Nepal                                                                   can make all the
(DRRNLN) – II is not directly                                                             difference !
NOTHING ABOUT US WITHOUT                          partners and wider stakeholders,
                           US……                                              and other more general
                                                                             recommendations                on
                           Early warnings allow communities to               inclusiveness for use in project
identify and recognize the first signs of a risk event, identify actions     implementation and community
that can mitigate the negative impacts of an event, avoid unpleasant         mobilization activities. The
surprises and reactive decision-making, help to plan appropriate             guiding principals behind these
programme strategies for different scenarios, and assist people in           are that;
making the right decisions in reacting to an emergency situation.              People with disabilities should
       Early warning systems are an important part of DRR, ensuring            be        encouraged          to
community safety and preparedness. But who are the most vulnerable             participate.People         with
groups at the community level ? Sure, the answer will be pregnant              disabilities should be consulted
women, children, senior elders and people with disabilities, but it is         while preparing evacuation/
often seen that PwDs (People with Disabilities) are missed from the            early warning systems, to make
list. They are less visible, often have additional, complicated,               sure that their specific needs
individual needs and when considered are often regarded as merely              are addressed.
passive beneficiaries or recipients. But EWS need to be inclusive if we
                                                                               People with disabilities are
want to achieve comprehensive coverage and awareness and be better
                                                                               Involved in early warning task
prepared for emergencies. It is critical that PwDs themselves are asked
                                                                               forces.
their opinions and needs, and about the best ways for them to hear,
see and understand early warnings.                                             Early warning systems and
       The Handicap International, Nepal DIPECHO Project is                    plans must be developed which
developing recommendations on inclusive EWS for DIPECHO                        meet the diverse needs of
                                                                               different categories of people
                                                                               with disabilities within the
                                                                               community.

                                                                             Hall marks of an inclusive
                                                                             Early Warning System ?
                                                                             An auditory signal system/
                                                                             alarms; Posters written with large
                                                                             characters and color contrasts;
                                                                             visual signal systems to back up
                                                                             auditory ones – i.e. use of bright
                                                                             flags, large symbols, turning
                                                                             warning lights off-on frequently,
                                                                             big pictures, clear and brief
                                                                             announcements by identified
                                                                             workers and volunteers.




                           EARLY WARNING - AN INTEGRATED
                           APPROACH
                                                                             Corps’ approach is to build an
Mercy Corps’s operational sites lie along the Mohana River where             effective, integrated system that
floods represent one of the greatest hazards to the population. The          includes a) knowledge of risks
Mohana River and its 3 tributaries have a total catchments area of           faced, b) technical monitoring
approximately 1400 km2, and regularly flood the adjacent areas and           and warning, c) building an
erode river banks. These cause immense losses every two or three             information dissemination
years, significantly affecting the livelihoods of households in the area     system, and d) increasing public
and occasionally forcing entire villages to relocate to safer areas. Prior   awareness.
to the project intervention no systematized flood warning existed
and people relied on their ‘instincts”, visible storms up stream, and        Knowledge of risk: Disaster
smells and sounds related to their experiences of floods in earlier          Preparedness Committees (DPC),
years.                                                                       community         stakeholders,
       Early warning systems (EWS) are one of the key tools the project      teachers, partner staff, and VDC
is using to reduce the vulnerability of communities, equipping               level stake holders have already
individuals and communities so that they can act in sufficient time          attended       disaster       risk
and in an appropriate manner to avoid flood related risks. Mercy             management trainings.
Technical monitoring and warning service/Method:                          The project is being implemented
a) To determine critical rainfall indicators, historic data from the      in close coordination and with
   Department of Hydrology and Metrology (DH&M) is being                  contribution from district and
   correlated with past years’ flood records;                             local level stakeholders and in
b) Calculation of Lag time (Time to reach a certain point) of flood is    coordination with DH&M to
   being analysed to assure timely evacuation                             ensure effectiveness and
c) Real time monitoring of water levels will be used, using local         sustainability. The project also
   recording stations (rainfall and staff gauge) upgraded by the          aims to link the systems
   project. Upstream recorders will measure rainfall and water levels     established with the DH&M
   every 3 hours. When the river surpasses its critical flood level the   forecasting division, mainly so
   recorders will notify the local emergency committee.                   information can be shared on
                                                                          issues such as the arrival date of
Dissemination of warning: Flood warnings will be transmitted in the       the monsoon, duration of rain,
local language via local radio stations, telephone and/or security        flood estimates, etc. Most of the
networks. Focal people in the communities will then sound sirens          existing hydrological (4) and
and drums to further alert people, with the estimated total reach of      metrological (6) stations in the
the early warning system being up to 130,000 inhabitants.                 project area will be incorporated
                                                                          into the EWS, with some (4) new
Public awareness and preparedness: ongoing awareness campaigns in         locations needing to be
schools, households and via radio programmes, combined with               established for the monitoring of
community disaster management plans and EWS test simulations              water levels. Ultimately Mercy
will make people aware of the EWS and the proper responses advised        Corps hopes to expand the
when the system is sounded.                                               system, through a local network,
                                                                          to cover the entire watershed.


                         READING THE SIGNS, ENSURING THE
                         CRITICAL “LAST MILE” ...
                                                                          whereby villagers take turns in
                         How early does early warning come about ?        watching the flow and depth of
                         Can it be calculated by the tick of the clock,   the river during the monsoon
                         the passing of days, or the waxing of the        and warn other by using a brass
                         moon ?                                           trumpet).
                                                                                 Through the VCA process
                         In disaster risk reduction, early warning        and     community        disaster
                         comes not as a prophecy but as something         preparedness          planning,
succinct based on the patterns of the weather, knowledge of the events    communities examine the
of the past, and qualified by scientific data; all supported by relay     patterns of hazard events and
mechanisms on the ground.                                                 identify hazard areas. This
      Early warning requires not only the ‘gadgets’ but also the          enables them to create a blue
organic system that is needed to ensure that messages get through         print of events and scenarios to
and are understood. They also require the disaster preparedness plans     prepare for, and ways of
that enable orderly evacuation to safety.                                 responding to hazard events.
      Through the Community Based Multi-Hazard Risk Reduction             Structural mitigation projects
(CBMHRR) Programme, the Danish Red Cross (DRC) provides                   form part of this, while
technical support to the Nepal Red Cross Society (NRCS) to capture        Information,         Education,
and enhance best practices at the community level. The experience         Communication (IEC) materials
of DRC interventions in the eastern coast of Sri Lanka, where CDRTs       and       public      awareness
(Community Disaster Response Teams) form the human link between           programmes in the communities
high-tech gadgetry and community level early warning mechanisms,          provide basic knowledge of the
affirms the need for a localized and practical approach in early          characteristics of the hazards
warning.                                                                  prevalent in their areas.
      Although the CBMHRR Programme in Nepal does not have a                     All these programme
direct focus on achieving early warning set-up, the Programme             activities contribute towards
nevertheless ensures that mechanisms are in place in target               enhancing            indigenous
communities. These include the organizing of DP (Disaster                 knowledge and ensuring early
Preparedness) units to function as the critical “last mile” link in the   warning messages are relayed
early warning relay. This role requires constant monitoring of news,      and understood – reading the
through transistor radios, and utilising existing indigenous warning      signs and ensuring the critical
systems - the Katuwal (Kutuwal is a local system of early warning         ‘last mile’.
CLOSING THE CIRCLE: MAKING
                                                    THE LINKS                               lack of equipment) or structural
                                                                                            issues (such as bureaucratic
                                While a lot of interest has been shown                      impasses) impede progress. By
                                in the technologies Practical Action                        involving the media in all of
intends to use in their EWS the organisation has been keen to                               these activities, full transparency
emphasise that these are secondary considerations which will actually                       has been achieved, with the
have a minor influence on whether systems succeed or fail.                                  added benefit that major
       In fact Practical Action has discovered that in Banke and Bardia                     contributors to the project can
many of the components of the system exist already, the various                             not renege on commitments !
elements merely needing to be joined up for the links to be                                        Having now over come
established. In upstream locations DH&M (Department of Hydrology                            most of the bureaucratic and
& Meteorology) stations already exist, logging river levels and                             technical barriers the same
reporting by HF radio to regional and national DH&M stations; at                            approach is being used to link all
district level emergency services are committed to supporting EWS                           the key individuals in the system,
activities, with the resources necessary to mobilise large scale                            bringing together community
evacuations when required; at the community level individuals are                           representatives, DH&M gauge
crying out for information, with the ability and willingness to                             reading staff, emergency services
organise collectively for swift and coordinated response.                                   staff and “emergency room”
       With this in mind Practical Action has been concentrating on                         personnel at both district, gauge
bringing the various stakeholders together, in as many forums as                            station and community level. By
possible. To this end coordinated upstream visits have been made, in                        making these contacts personal
both districts, by teams representing the police, army, Red Cross,                          it is hoped it will build a greater
district authorities, DH&M and, critically, the media. These have taken                     degree of human responsibility
place so collective understanding can be created on what resources                          into the system, which Practical
already exist, where gaps exist, who is in the best place to plug these                     Action sees as critical.
and where bottlenecks, either in terms of physical impediments (i.e.




Kadga Bahadur Rawat Chhetri, gauge reader at Bagasoti, interacting with local media staff




This information bulletin has been produced by DIPECHO project in Nepal with support from European Commission under
 its Humanitarian Aid department The contents and information has been provided by Peter Crawford (Practical Action
                         department.                                                                  Practical Action);
    Ulla Dons (Mercy Corps Rene Jinon (Danish Red Cross Sanjukta Sahany (CARE Nepal Irina Ulmasova (Handicap
                Mer Corps);
                Mercy                       Danish    Cross);               CARE Nepal);                   Handicap
International and P. V. Krishnan (ActionAid To know more about individual projects, contact respective project managers
International)                       ActionAid).
                                     ActionAid
     at peterc@practicalaction.org; ulla@mos.com.np (Mercy Corps); drcdm@mos.com.np (Red Cross);dppm@hi-nepal.org
           (Handicap International); sanjukta@carenepal.org, om.mulmi@undp.org and Krishnan.pv@actionaid.org

Más contenido relacionado

La actualidad más candente

Dipecho5 news letter 2nd edition- oct 09 aa
Dipecho5 news letter  2nd edition- oct 09 aaDipecho5 news letter  2nd edition- oct 09 aa
Dipecho5 news letter 2nd edition- oct 09 aaDIPECHO Nepal
 
Dipecho nepal newsletter issue 9 july 2010
Dipecho nepal newsletter issue 9 july 2010Dipecho nepal newsletter issue 9 july 2010
Dipecho nepal newsletter issue 9 july 2010DIPECHO Nepal
 
Dipecho v aan prlm report july 2010
Dipecho v aan prlm report july 2010Dipecho v aan prlm report july 2010
Dipecho v aan prlm report july 2010edmnepal
 
La città resiliente nell'era post-Gutenberg
La città resiliente nell'era post-Gutenberg La città resiliente nell'era post-Gutenberg
La città resiliente nell'era post-Gutenberg Elena Rapisardi
 
Our Planet:Living Legacy - The future of forests
Our Planet:Living Legacy - The future of forestsOur Planet:Living Legacy - The future of forests
Our Planet:Living Legacy - The future of forestsAndy Dabydeen
 
Outreach Magazine: May UN meetings day 8
Outreach Magazine: May UN meetings day 8Outreach Magazine: May UN meetings day 8
Outreach Magazine: May UN meetings day 8Stakeholder_Forum
 
An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...
An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...
An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...Global Risk Forum GRFDavos
 
DISASTER MANAGEMENT
DISASTER MANAGEMENTDISASTER MANAGEMENT
DISASTER MANAGEMENTmonaps1
 
Integrating Gender Into C B D R M Training Manual
Integrating  Gender Into  C B D R M   Training  ManualIntegrating  Gender Into  C B D R M   Training  Manual
Integrating Gender Into C B D R M Training ManualPsdmn Phil
 
T L C Phil Newsletter
T L C  Phil  NewsletterT L C  Phil  Newsletter
T L C Phil NewsletterPsdmn Phil
 
Sahana General 2009 Community And System
Sahana General 2009 Community And SystemSahana General 2009 Community And System
Sahana General 2009 Community And SystemTalkSahana
 
Unicef Cbdp Final Report 2008 09
Unicef   Cbdp Final Report 2008 09Unicef   Cbdp Final Report 2008 09
Unicef Cbdp Final Report 2008 09Murshid Alam Sheikh
 
Dipecho5 news letter 3rd edition- nov 2009
Dipecho5 news letter  3rd edition- nov 2009Dipecho5 news letter  3rd edition- nov 2009
Dipecho5 news letter 3rd edition- nov 2009DIPECHO Nepal
 
Concern_Universal_DRR_policy_note_V1.1_oct10
Concern_Universal_DRR_policy_note_V1.1_oct10Concern_Universal_DRR_policy_note_V1.1_oct10
Concern_Universal_DRR_policy_note_V1.1_oct10James Treasure-Evans
 

La actualidad más candente (18)

Dipecho5 news letter 2nd edition- oct 09 aa
Dipecho5 news letter  2nd edition- oct 09 aaDipecho5 news letter  2nd edition- oct 09 aa
Dipecho5 news letter 2nd edition- oct 09 aa
 
Dipecho nepal newsletter issue 9 july 2010
Dipecho nepal newsletter issue 9 july 2010Dipecho nepal newsletter issue 9 july 2010
Dipecho nepal newsletter issue 9 july 2010
 
Dipecho v aan prlm report july 2010
Dipecho v aan prlm report july 2010Dipecho v aan prlm report july 2010
Dipecho v aan prlm report july 2010
 
La città resiliente nell'era post-Gutenberg
La città resiliente nell'era post-Gutenberg La città resiliente nell'era post-Gutenberg
La città resiliente nell'era post-Gutenberg
 
Our Planet:Living Legacy - The future of forests
Our Planet:Living Legacy - The future of forestsOur Planet:Living Legacy - The future of forests
Our Planet:Living Legacy - The future of forests
 
Emergency Preparedness - State of the Art
Emergency Preparedness - State of the ArtEmergency Preparedness - State of the Art
Emergency Preparedness - State of the Art
 
Outreach Magazine: May UN meetings day 8
Outreach Magazine: May UN meetings day 8Outreach Magazine: May UN meetings day 8
Outreach Magazine: May UN meetings day 8
 
An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...
An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...
An Intergrated Framework and Tools for Better Disaster Risk Governance to Inn...
 
DISASTER MANAGEMENT
DISASTER MANAGEMENTDISASTER MANAGEMENT
DISASTER MANAGEMENT
 
Integrating Gender Into C B D R M Training Manual
Integrating  Gender Into  C B D R M   Training  ManualIntegrating  Gender Into  C B D R M   Training  Manual
Integrating Gender Into C B D R M Training Manual
 
Danube floodrisk i
Danube floodrisk iDanube floodrisk i
Danube floodrisk i
 
Landslide risk management issues in SafeLand
Landslide risk management issues in SafeLandLandslide risk management issues in SafeLand
Landslide risk management issues in SafeLand
 
I resilience
I resilienceI resilience
I resilience
 
T L C Phil Newsletter
T L C  Phil  NewsletterT L C  Phil  Newsletter
T L C Phil Newsletter
 
Sahana General 2009 Community And System
Sahana General 2009 Community And SystemSahana General 2009 Community And System
Sahana General 2009 Community And System
 
Unicef Cbdp Final Report 2008 09
Unicef   Cbdp Final Report 2008 09Unicef   Cbdp Final Report 2008 09
Unicef Cbdp Final Report 2008 09
 
Dipecho5 news letter 3rd edition- nov 2009
Dipecho5 news letter  3rd edition- nov 2009Dipecho5 news letter  3rd edition- nov 2009
Dipecho5 news letter 3rd edition- nov 2009
 
Concern_Universal_DRR_policy_note_V1.1_oct10
Concern_Universal_DRR_policy_note_V1.1_oct10Concern_Universal_DRR_policy_note_V1.1_oct10
Concern_Universal_DRR_policy_note_V1.1_oct10
 

Destacado

Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion reportDIPECHO Nepal
 
Ew by practical action nepal
Ew by practical action   nepalEw by practical action   nepal
Ew by practical action nepalDIPECHO Nepal
 
Dipecho5 program schedule for launching of drr tool kit
Dipecho5 program schedule for launching of drr tool kitDipecho5 program schedule for launching of drr tool kit
Dipecho5 program schedule for launching of drr tool kitDIPECHO Nepal
 
Humanitarian reform cluster_appraoch
Humanitarian reform cluster_appraochHumanitarian reform cluster_appraoch
Humanitarian reform cluster_appraochDIPECHO Nepal
 
School safety nepal 2k7
School safety nepal 2k7School safety nepal 2k7
School safety nepal 2k7DIPECHO Nepal
 

Destacado (8)

Drr focal person workshop completion report
Drr focal person workshop completion reportDrr focal person workshop completion report
Drr focal person workshop completion report
 
Ew by practical action nepal
Ew by practical action   nepalEw by practical action   nepal
Ew by practical action nepal
 
Dipecho5 program schedule for launching of drr tool kit
Dipecho5 program schedule for launching of drr tool kitDipecho5 program schedule for launching of drr tool kit
Dipecho5 program schedule for launching of drr tool kit
 
1. flipchart intro
1. flipchart intro1. flipchart intro
1. flipchart intro
 
Flip chart
Flip chartFlip chart
Flip chart
 
Humanitarian reform cluster_appraoch
Humanitarian reform cluster_appraochHumanitarian reform cluster_appraoch
Humanitarian reform cluster_appraoch
 
School safety nepal 2k7
School safety nepal 2k7School safety nepal 2k7
School safety nepal 2k7
 
Vladimir nazor, voda
Vladimir nazor, vodaVladimir nazor, voda
Vladimir nazor, voda
 

Similar a Dipecho4 newsletter2nd june08

Dipecho v news letter 4th edition- january10
Dipecho v news letter  4th edition- january10Dipecho v news letter  4th edition- january10
Dipecho v news letter 4th edition- january10edmnepal
 
Disaster Risk Reduction Management
Disaster Risk Reduction ManagementDisaster Risk Reduction Management
Disaster Risk Reduction ManagementIVAN MON PANES
 
Success & dynamics of Community Engagement : the Buklod Tao case study
Success & dynamics of Community Engagement : the Buklod Tao case studySuccess & dynamics of Community Engagement : the Buklod Tao case study
Success & dynamics of Community Engagement : the Buklod Tao case studyMavic Pineda
 
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010DIPECHO Nepal
 
DRRR – Concept of DRR and DRRM
DRRR – Concept of DRR and DRRMDRRR – Concept of DRR and DRRM
DRRR – Concept of DRR and DRRMReid Manares
 
Disaster management.pptx
Disaster management.pptxDisaster management.pptx
Disaster management.pptxGoatAmv
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Dipecho v news letter 5th edition- march10
Dipecho v news letter  5th edition- march10Dipecho v news letter  5th edition- march10
Dipecho v news letter 5th edition- march10edmnepal
 
2a EWEA - steps to make it happen.pptx
2a EWEA - steps to make it happen.pptx2a EWEA - steps to make it happen.pptx
2a EWEA - steps to make it happen.pptxCITYDISASTERRISKREDU
 
SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015
SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015
SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015Shafiqur Rahman
 
DRRR LP PDRRM law (upload).pptx
DRRR LP PDRRM law (upload).pptxDRRR LP PDRRM law (upload).pptx
DRRR LP PDRRM law (upload).pptxMariaRowenaFlores
 
Dipecho v news letter 2nd edition- oct 09 aa
Dipecho v news letter  2nd edition- oct 09 aaDipecho v news letter  2nd edition- oct 09 aa
Dipecho v news letter 2nd edition- oct 09 aaedmnepal
 
DRRR-Powerpoint.pptx
DRRR-Powerpoint.pptxDRRR-Powerpoint.pptx
DRRR-Powerpoint.pptxJezzcelPiring
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_studyDIPECHO Nepal
 
module1.disaster risk reduction and management plans and strategies
module1.disaster risk reduction and management plans and strategiesmodule1.disaster risk reduction and management plans and strategies
module1.disaster risk reduction and management plans and strategiesaldrin barnizo
 
Asgn good prac cbrrm
Asgn good prac cbrrmAsgn good prac cbrrm
Asgn good prac cbrrmasimmce
 
Disaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.pptDisaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.pptDr.Prabu Mani
 

Similar a Dipecho4 newsletter2nd june08 (20)

Dipecho v news letter 4th edition- january10
Dipecho v news letter  4th edition- january10Dipecho v news letter  4th edition- january10
Dipecho v news letter 4th edition- january10
 
Community Based Disaster Management
Community Based Disaster ManagementCommunity Based Disaster Management
Community Based Disaster Management
 
Disaster Risk Reduction Management
Disaster Risk Reduction ManagementDisaster Risk Reduction Management
Disaster Risk Reduction Management
 
Disaster management
Disaster managementDisaster management
Disaster management
 
Success & dynamics of Community Engagement : the Buklod Tao case study
Success & dynamics of Community Engagement : the Buklod Tao case studySuccess & dynamics of Community Engagement : the Buklod Tao case study
Success & dynamics of Community Engagement : the Buklod Tao case study
 
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
Dipecho in eu nepal newsletter_jul-sep09_jan-march2010
 
DRRR – Concept of DRR and DRRM
DRRR – Concept of DRR and DRRMDRRR – Concept of DRR and DRRM
DRRR – Concept of DRR and DRRM
 
Disaster management.pptx
Disaster management.pptxDisaster management.pptx
Disaster management.pptx
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
Dipecho v news letter 5th edition- march10
Dipecho v news letter  5th edition- march10Dipecho v news letter  5th edition- march10
Dipecho v news letter 5th edition- march10
 
2a EWEA - steps to make it happen.pptx
2a EWEA - steps to make it happen.pptx2a EWEA - steps to make it happen.pptx
2a EWEA - steps to make it happen.pptx
 
SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015
SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015
SHOII Slide-TOPS_Resilience Interventions_Revised 02 March 2015
 
PresentationIFRC.PPT
PresentationIFRC.PPTPresentationIFRC.PPT
PresentationIFRC.PPT
 
DRRR LP PDRRM law (upload).pptx
DRRR LP PDRRM law (upload).pptxDRRR LP PDRRM law (upload).pptx
DRRR LP PDRRM law (upload).pptx
 
Dipecho v news letter 2nd edition- oct 09 aa
Dipecho v news letter  2nd edition- oct 09 aaDipecho v news letter  2nd edition- oct 09 aa
Dipecho v news letter 2nd edition- oct 09 aa
 
DRRR-Powerpoint.pptx
DRRR-Powerpoint.pptxDRRR-Powerpoint.pptx
DRRR-Powerpoint.pptx
 
Nepal disaster risk_case_study
Nepal disaster risk_case_studyNepal disaster risk_case_study
Nepal disaster risk_case_study
 
module1.disaster risk reduction and management plans and strategies
module1.disaster risk reduction and management plans and strategiesmodule1.disaster risk reduction and management plans and strategies
module1.disaster risk reduction and management plans and strategies
 
Asgn good prac cbrrm
Asgn good prac cbrrmAsgn good prac cbrrm
Asgn good prac cbrrm
 
Disaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.pptDisaster Management_UNIT.2.ppt
Disaster Management_UNIT.2.ppt
 

Más de DIPECHO Nepal

0.1 disaster development
0.1 disaster development0.1 disaster development
0.1 disaster developmentDIPECHO Nepal
 
0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011DIPECHO Nepal
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on ccaDIPECHO Nepal
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepaliDIPECHO Nepal
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programmeDIPECHO Nepal
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation reportDIPECHO Nepal
 
Early warning system
Early warning systemEarly warning system
Early warning systemDIPECHO Nepal
 
Communication channel
Communication channelCommunication channel
Communication channelDIPECHO Nepal
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upcaDIPECHO Nepal
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 englishDIPECHO Nepal
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010DIPECHO Nepal
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practiceDIPECHO Nepal
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52DIPECHO Nepal
 
Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09DIPECHO Nepal
 

Más de DIPECHO Nepal (20)

0.1 disaster development
0.1 disaster development0.1 disaster development
0.1 disaster development
 
0.01 concept of dm may 2011
0.01 concept of dm may 20110.01 concept of dm may 2011
0.01 concept of dm may 2011
 
0.0 dev and drr
0.0 dev and drr0.0 dev and drr
0.0 dev and drr
 
South asia women speak out on cca
South asia women speak out on ccaSouth asia women speak out on cca
South asia women speak out on cca
 
Ids child no bleed nepali
Ids child no bleed nepaliIds child no bleed nepali
Ids child no bleed nepali
 
Final report acorab drr programme
Final report  acorab drr programmeFinal report  acorab drr programme
Final report acorab drr programme
 
School renovation
School renovationSchool renovation
School renovation
 
Small scale mitigation report
Small scale mitigation reportSmall scale mitigation report
Small scale mitigation report
 
Rambati case
Rambati caseRambati case
Rambati case
 
Early warning system
Early warning systemEarly warning system
Early warning system
 
Communication channel
Communication channelCommunication channel
Communication channel
 
Case study dipecho v upca
Case study dipecho v upcaCase study dipecho v upca
Case study dipecho v upca
 
Biodyke
BiodykeBiodyke
Biodyke
 
11 children and drr april 2010 english
11  children and drr april 2010 english11  children and drr april 2010 english
11 children and drr april 2010 english
 
Mason ort report
Mason ort reportMason ort report
Mason ort report
 
Inee nepal
Inee nepalInee nepal
Inee nepal
 
Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010Mercy corps mc-cba-report-final-2010
Mercy corps mc-cba-report-final-2010
 
Understanding disaster-management-in-practice
Understanding disaster-management-in-practiceUnderstanding disaster-management-in-practice
Understanding disaster-management-in-practice
 
National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52National platform on drr bidhan 2065 52
National platform on drr bidhan 2065 52
 
Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09Dipecho iii final evaluation bcrd report june 09
Dipecho iii final evaluation bcrd report june 09
 

Último

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...KokoStevan
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 

Último (20)

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
SECOND SEMESTER TOPIC COVERAGE SY 2023-2024 Trends, Networks, and Critical Th...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 

Dipecho4 newsletter2nd june08

  • 1. DIPECHO Brief N E P A L NUMBER 2 JUNE 2008 NEPAL DIPECHO BRIEF – The “Nepal DIPECHO background on the seven DIPECHO projects active Brief” is a periodic newsletter of the seven in Nepal. This second edition hopes to show some organizations currently carrying out DIPECHO of the initiatives currently being carried out in the funded projects in Nepal. It aims to give regular area of early warning, particularly where partners updates on project’s progress, with periodic themed are collectively contributing to greater awareness, editions. While the work of the projects is understanding and promotion of this key issue. supported by the European Commission, through Future additions of this brief will focus on other its Humanitarian Aid department, the views issues and themes central to the promotion of expressed in the brief are those of the partner community based approaches to disaster risk organizations alone. reduction in Nepal, but as these briefs can only cover our work in the broadest brush strokes please “Early Warnings: Saving Lives” The first feel free to contact partners directly for more edition of “Nepal DIPECHO Brief” gave some basic information. Please read on…………….. COMPLEMENTING COMMUNITY INITIATIVES THROUGH CREATING EWS LINKAGES ActionAid is working with 14 communities in five districts, helping people to reduce their vulnerabilities to flood, earthquake, landslide, fire and other forms of natural calamity. Within the project small scale early warning systems have been designed to inform people in advance where ever possible, with such advance warning, along with the life skill training and improved organizational capacity, expected to reduce disaster impacts among vulnerable communities. In each of the communities, a public address system is being provided, connected to radio. DMCs (Disaster Management Committees) in each community will listen to the news and weather forecasts through local radio stations, getting regular information Rai tole, Hetauda: The flag in the background is to on impending concerns and calamities. These radio broadcasts, show direction of wind… small steps to control fire… through the public address system, will be linked to listener’s clubs - dedicated teams from within the communities - who are responsible ActionAid also has for both gathering and disseminating information. The portable provision to support Disaster public address systems will allow the DMC members to immediately Information Centres at district move around their respective areas, announcing news on the level, in collaboration with the environmental conditions and enabling communities to take advance district administration offices, measures, depending upon the likely severity of the impending with these centres expected to disaster. In fire prone areas, small measures such as erecting wind- receive, analyse and disseminate flags are expected to help communities to better identify the direction advance information on disaster of the wind and hence take the necessary measures needed to prevent situations, particularly during and stop the spread of fire. the periodic ‘disaster seasons’ such as the monsoon. EUROPEAN COMMISSION HUMANITARIAN AID
  • 2. SAMADHAN-II either sitting in a community gathering place or sometimes While putting effort into enhancing the capacities of walking throughout the vulnerable communities, through implementing community. This practice has Community Based Disaster Risk Management existed in the communities for approaches (CBDRM) Care’s SAMADHAN-II project is generations, with people attuned also emphasizing the importance of early warning. to the sound of Narasingha and The communities CARE Nepal works with in Doti and Kailali its importance. are particularly poor and marginalized and as such capacity building, The Narasingha man is paid be it through training, awareness raising, carrying out mitigation in either food or money and the measures or enabling communities to establish early warning system communities plan to link this to (EWS) has been prioritised. a Community Emergency Fund, In the far west while Kailali suffers most from floods and a monthly saving activity to meet inundation, Doti faces landslide and flash floods. In both project any costs incurred due to disaster districts Disaster Risk Reduction Committees (DRRC) have been or to meet the unmet needs of formed, trained in CBDRM with defined roles and responsibilities. A the communities during a post total of 328 DRRC members have already been trained and equipped disaster situations. with basic knowledge on preparedness, with importance being given The Narasingha man is to the issue of EWS. Under a Schools Education Programme 57 now a members of the DRRC, teachers have also been trained, with these now taking class room playing his age old role, but now sessions on preparedness covering 4,740 students in 19 schools. conveying added information on CSSD (Conscious Society for Social Development) & EDC disaster preparedness and Early (Equality Development Centre), CARE’s implementing partners in Warning Systems. Kailali & Doti have been instrumental in broadcasting Radio programmes on CBDRM, with the programmes covering important preparedness and awareness messages, seasonal disaster news, and views of community members on disaster preparedness. While trying to improvise and systematise the coping mechanisms of communities the thrust of the programme has been to promote and use indigenous mechanism for EWS where ever possible. The Use of Narasingha (a local musical instrument) is a popular way to disseminate messages across communities, with the practice being that whenever there is an urgent message to be disseminated the designated person plays the Narasingha repeatedly, Narasingha man playing the indigenous instrument, Narasingha) UNDP/DRRNLN – involved in Early Warning disasters through all available II: HOW A FEW Systems as such, but rather tries media, be this radio, television or SECONDS CAN to highlight their importance, other sources and, accordingly, SAVE YOUR LIFE thus reducing risk through take adequate and appropriate BEFORE A increasing general awareness. measures such as moving to DISASTER! Accordingly, in all its mass media higher ground and/or other awareness generation places of safety. The fact that an campaigns, the project has made What it boils down to in effective Early Warning System, it a point, especially with regard the end is that what ever kind of especially in areas that are prone to floods, to draw attention to disaster is faced, if an Early to natural hazards, can save the fact that people need to get Warning System is to save lives, precious lives is irrefutable. With early warning and improved it should be efficient and fully an efficient EWS in place, and information about forthcoming known to vulnerable vulnerable communities communities adequately sensitized about its through adequate operation and the measures they sensitization and need to take before, say, an capacity building imminent flood, a huge in the areas of difference can be made. The timely response difference between saving or and evacuation. losing a life. Those few Having said this, UNDP/ precious seconds Disaster Risk Reduction at the before a disaster National Level in Nepal can make all the (DRRNLN) – II is not directly difference !
  • 3. NOTHING ABOUT US WITHOUT partners and wider stakeholders, US…… and other more general recommendations on Early warnings allow communities to inclusiveness for use in project identify and recognize the first signs of a risk event, identify actions implementation and community that can mitigate the negative impacts of an event, avoid unpleasant mobilization activities. The surprises and reactive decision-making, help to plan appropriate guiding principals behind these programme strategies for different scenarios, and assist people in are that; making the right decisions in reacting to an emergency situation. People with disabilities should Early warning systems are an important part of DRR, ensuring be encouraged to community safety and preparedness. But who are the most vulnerable participate.People with groups at the community level ? Sure, the answer will be pregnant disabilities should be consulted women, children, senior elders and people with disabilities, but it is while preparing evacuation/ often seen that PwDs (People with Disabilities) are missed from the early warning systems, to make list. They are less visible, often have additional, complicated, sure that their specific needs individual needs and when considered are often regarded as merely are addressed. passive beneficiaries or recipients. But EWS need to be inclusive if we People with disabilities are want to achieve comprehensive coverage and awareness and be better Involved in early warning task prepared for emergencies. It is critical that PwDs themselves are asked forces. their opinions and needs, and about the best ways for them to hear, see and understand early warnings. Early warning systems and The Handicap International, Nepal DIPECHO Project is plans must be developed which developing recommendations on inclusive EWS for DIPECHO meet the diverse needs of different categories of people with disabilities within the community. Hall marks of an inclusive Early Warning System ? An auditory signal system/ alarms; Posters written with large characters and color contrasts; visual signal systems to back up auditory ones – i.e. use of bright flags, large symbols, turning warning lights off-on frequently, big pictures, clear and brief announcements by identified workers and volunteers. EARLY WARNING - AN INTEGRATED APPROACH Corps’ approach is to build an Mercy Corps’s operational sites lie along the Mohana River where effective, integrated system that floods represent one of the greatest hazards to the population. The includes a) knowledge of risks Mohana River and its 3 tributaries have a total catchments area of faced, b) technical monitoring approximately 1400 km2, and regularly flood the adjacent areas and and warning, c) building an erode river banks. These cause immense losses every two or three information dissemination years, significantly affecting the livelihoods of households in the area system, and d) increasing public and occasionally forcing entire villages to relocate to safer areas. Prior awareness. to the project intervention no systematized flood warning existed and people relied on their ‘instincts”, visible storms up stream, and Knowledge of risk: Disaster smells and sounds related to their experiences of floods in earlier Preparedness Committees (DPC), years. community stakeholders, Early warning systems (EWS) are one of the key tools the project teachers, partner staff, and VDC is using to reduce the vulnerability of communities, equipping level stake holders have already individuals and communities so that they can act in sufficient time attended disaster risk and in an appropriate manner to avoid flood related risks. Mercy management trainings.
  • 4. Technical monitoring and warning service/Method: The project is being implemented a) To determine critical rainfall indicators, historic data from the in close coordination and with Department of Hydrology and Metrology (DH&M) is being contribution from district and correlated with past years’ flood records; local level stakeholders and in b) Calculation of Lag time (Time to reach a certain point) of flood is coordination with DH&M to being analysed to assure timely evacuation ensure effectiveness and c) Real time monitoring of water levels will be used, using local sustainability. The project also recording stations (rainfall and staff gauge) upgraded by the aims to link the systems project. Upstream recorders will measure rainfall and water levels established with the DH&M every 3 hours. When the river surpasses its critical flood level the forecasting division, mainly so recorders will notify the local emergency committee. information can be shared on issues such as the arrival date of Dissemination of warning: Flood warnings will be transmitted in the the monsoon, duration of rain, local language via local radio stations, telephone and/or security flood estimates, etc. Most of the networks. Focal people in the communities will then sound sirens existing hydrological (4) and and drums to further alert people, with the estimated total reach of metrological (6) stations in the the early warning system being up to 130,000 inhabitants. project area will be incorporated into the EWS, with some (4) new Public awareness and preparedness: ongoing awareness campaigns in locations needing to be schools, households and via radio programmes, combined with established for the monitoring of community disaster management plans and EWS test simulations water levels. Ultimately Mercy will make people aware of the EWS and the proper responses advised Corps hopes to expand the when the system is sounded. system, through a local network, to cover the entire watershed. READING THE SIGNS, ENSURING THE CRITICAL “LAST MILE” ... whereby villagers take turns in How early does early warning come about ? watching the flow and depth of Can it be calculated by the tick of the clock, the river during the monsoon the passing of days, or the waxing of the and warn other by using a brass moon ? trumpet). Through the VCA process In disaster risk reduction, early warning and community disaster comes not as a prophecy but as something preparedness planning, succinct based on the patterns of the weather, knowledge of the events communities examine the of the past, and qualified by scientific data; all supported by relay patterns of hazard events and mechanisms on the ground. identify hazard areas. This Early warning requires not only the ‘gadgets’ but also the enables them to create a blue organic system that is needed to ensure that messages get through print of events and scenarios to and are understood. They also require the disaster preparedness plans prepare for, and ways of that enable orderly evacuation to safety. responding to hazard events. Through the Community Based Multi-Hazard Risk Reduction Structural mitigation projects (CBMHRR) Programme, the Danish Red Cross (DRC) provides form part of this, while technical support to the Nepal Red Cross Society (NRCS) to capture Information, Education, and enhance best practices at the community level. The experience Communication (IEC) materials of DRC interventions in the eastern coast of Sri Lanka, where CDRTs and public awareness (Community Disaster Response Teams) form the human link between programmes in the communities high-tech gadgetry and community level early warning mechanisms, provide basic knowledge of the affirms the need for a localized and practical approach in early characteristics of the hazards warning. prevalent in their areas. Although the CBMHRR Programme in Nepal does not have a All these programme direct focus on achieving early warning set-up, the Programme activities contribute towards nevertheless ensures that mechanisms are in place in target enhancing indigenous communities. These include the organizing of DP (Disaster knowledge and ensuring early Preparedness) units to function as the critical “last mile” link in the warning messages are relayed early warning relay. This role requires constant monitoring of news, and understood – reading the through transistor radios, and utilising existing indigenous warning signs and ensuring the critical systems - the Katuwal (Kutuwal is a local system of early warning ‘last mile’.
  • 5. CLOSING THE CIRCLE: MAKING THE LINKS lack of equipment) or structural issues (such as bureaucratic While a lot of interest has been shown impasses) impede progress. By in the technologies Practical Action involving the media in all of intends to use in their EWS the organisation has been keen to these activities, full transparency emphasise that these are secondary considerations which will actually has been achieved, with the have a minor influence on whether systems succeed or fail. added benefit that major In fact Practical Action has discovered that in Banke and Bardia contributors to the project can many of the components of the system exist already, the various not renege on commitments ! elements merely needing to be joined up for the links to be Having now over come established. In upstream locations DH&M (Department of Hydrology most of the bureaucratic and & Meteorology) stations already exist, logging river levels and technical barriers the same reporting by HF radio to regional and national DH&M stations; at approach is being used to link all district level emergency services are committed to supporting EWS the key individuals in the system, activities, with the resources necessary to mobilise large scale bringing together community evacuations when required; at the community level individuals are representatives, DH&M gauge crying out for information, with the ability and willingness to reading staff, emergency services organise collectively for swift and coordinated response. staff and “emergency room” With this in mind Practical Action has been concentrating on personnel at both district, gauge bringing the various stakeholders together, in as many forums as station and community level. By possible. To this end coordinated upstream visits have been made, in making these contacts personal both districts, by teams representing the police, army, Red Cross, it is hoped it will build a greater district authorities, DH&M and, critically, the media. These have taken degree of human responsibility place so collective understanding can be created on what resources into the system, which Practical already exist, where gaps exist, who is in the best place to plug these Action sees as critical. and where bottlenecks, either in terms of physical impediments (i.e. Kadga Bahadur Rawat Chhetri, gauge reader at Bagasoti, interacting with local media staff This information bulletin has been produced by DIPECHO project in Nepal with support from European Commission under its Humanitarian Aid department The contents and information has been provided by Peter Crawford (Practical Action department. Practical Action); Ulla Dons (Mercy Corps Rene Jinon (Danish Red Cross Sanjukta Sahany (CARE Nepal Irina Ulmasova (Handicap Mer Corps); Mercy Danish Cross); CARE Nepal); Handicap International and P. V. Krishnan (ActionAid To know more about individual projects, contact respective project managers International) ActionAid). ActionAid at peterc@practicalaction.org; ulla@mos.com.np (Mercy Corps); drcdm@mos.com.np (Red Cross);dppm@hi-nepal.org (Handicap International); sanjukta@carenepal.org, om.mulmi@undp.org and Krishnan.pv@actionaid.org