Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Lyndale pedestrian bridge closure
1. Santa Clara Valley Water District
Neighborhood work Lyndale bridge closure
What:
As part of the Lower Silver Creek Flood
Protection Project, the Lyndale pedestrian
bridge will be replaced beginning spring
of 2012. The new bridge will be raised
higher to accommodate the new flood
walls on each creek bank.
When:
Spring through summer 2012.
Work hours are 8 a.m. to 5 p.m.
The Lyndale pedestrian bridge (shown inside the red circle)
Contact us will be replaced during the spring-summer 2012 season.
If you have specific questions or concerns about this project,
contact Ted Ibarra at (408) 265-2607, ext. 2067, or
e-mail tibarra@valleywater.org.