Lean Six Sigma Improving FTX/STX2 Tank Draw Quality SFC Henry, Don H. II Project Initiation Date: 31/03/08 Analyze Tollgate Date: 03/07/08
Agenda ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Analyze – Executive Summary ,[object Object],[object Object],[object Object],[object Object]
Project Charter Review ,[object Object],[object Object],Problem/Goal Statement Tollgate Review Schedule Business Impact Core Team ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tollgate Scheduled Revised   Complete Define: 04/30/08 -  04/29/08 Measure: 05/14/08 04/06/08   04/06/08 Analyze: 06/13/08 07/13/08  XX/XX/08 Improve:   07/18/08 08/13/08  XX/XX/08 Control: 08/23/08 09/13/08  XX/XX/08 ,[object Object],[object Object],[object Object],Problem Statement  Soldiers of 1/16 express dissatisfaction with the Unit Maintenance Activities M1 series tank quality prior to mission support. Currently, 90% of the tanks drawn require maintenance for mission readiness.  Approximately 10% of faults listed on the 5988-E ‘s completed by soldiers are tracked by UMA.  Lastly, tank bumper number accuracy during T-2 is currently at 10% which causes excess work in the last days of the mission support draw.
Baseline Data ,[object Object],[object Object],[object Object],[object Object],The average Tank Draw Time is 34 minutes +/- 24 minutes.
Baseline Data Cont. ,[object Object],[object Object],[object Object],These numbers take into account vehicles presented to draw but never actually drawn or PMCSed. These numbers represent what was actually given, PMCS’ed, and drawn.
Critical X’s:  Cause  and Effect  Matrix Cause and Effect Matrix Key Process Output Variables Customer Importance 10 9 2 6 8                     Customer Rank 1 2 3 4 5                     1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Process Step KPIV accurate tank list 5988-E QA/QC DA Form 2062 Dispatch                     Rank Rating Total Process Steps &  Key Process Input Variables 1 T-1 RATSS 1 9 9 9 1                     2 7.533 171 2 PMCS Technical Manual 9 1 1 9 9                     1 10 227 3 QA/QC UMA inspector 9 1 1 3 3                     3 6.3 143 4 tank sign over DA 2062 9 1 1 1 3                     4 5.771 131 5 tank dispatch 5987-E 9 1 1 1 1                     5 5.066 115 ###                                     #####  
Potential Root Causes:  C & E Diagram Effect: The tank draw takes too long. Man Machine Material Method Spread thinly across multiple tasks Shortage of UMA maintenance personnel Deadlines, AOAP, Service Schedule, affect # of tanks available Tanks already in use by other units/missions BII draw uses excessive people and excess time RATTS request is not referenced by UMA to assign accurate bumper number list Tanks are PMCS’d Tanks are QA/QC’d Tanks are dispatched Excessive delays from lack of UMA personnel 5988-E not updated by UMA
Potential Root Causes:  FMEA Process Step / Input Potential Failure Mode Potential Failure Effects SEVERITY Potential Causes OCCURRENCE Current Controls DETECTION RPN   What is the process step and Input under investiga-tion? In what ways does the Key Input go wrong? What is the impact on the Key Output Variables (Customer Requirements)? What causes the Key Input to go wrong? What are the existing controls and procedures (inspection and test) that prevent either the cause or the Failure Mode? T-1 bumper number list not accurate excessive delays 7 lack of organization 7 none 7 343 PMCS not updated rework 7 lack of personnel 6 Army Policy 5 210 QA/QC not timely rework 4 lack of maintenance 4 EXSOP/Army policy 4 64 tank sign over already issued rework 7 lack of organization 2 Army Policy/EXSOP 2 28 tank dispatch does not go wrong no problems 1 no problems 1 EXSOP 5 5
Reducing List of Root Causes:  Pareto Analysis Track able causes contained over 90% of the Defects.  Our project will focus on tracking vehicle maintenance status.
Root Cause Analysis:  Non-Value Add Analysis QAQC Maintenance leader Dispatch Soldier Issues bumper number list to soldier Maintenance leader checks 5988-E and verifies faults/makes repairs if needed  Hand receipt Vehicle signed over to soldier Avg. Delay 2 hours Avg.Delay 15 min Avg. Delay 90 min Soldier conducts PMCS and completes 5988-E, turns it in to maintenance leader  Passes QAQC Receives signed QAQC sheet Vehicle dispatched to soldier YES NO NVA time is in dark blue Total delay time is 3.75 hours Retrieves info from RATSS system Notify UMA of the # of tanks needed
Root Cause Analysis: Histogram The outlier was a vehicle issued that was actually NMC and required 90 minutes to repair. The vehicle that required 60 minutes was actually dispatched to another unit. Two of the five that required 45 minutes of work were deadline with a third needing a QAQC from UMA 5.25 hours were spent doing rework that is non value added
One-Way ANOVA of Time and Defects ,[object Object],[object Object]
One-Way ANOVA of Time and Defects Data ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],The R-squared value of 48.59% is statistically significant meaning the model predicts nearly half of the variation causing increased tank draw times as being caused by defects. Therefore we reject the null hypothesis.
Mood’s Median Test ,[object Object],[object Object],Mood Median Test: TIME versus DEFECT  Mood median test for TIME Chi-Square = 13.37  DF = 1  P = 0.000 Individual 95.0% CIs DEFECT  N<=  N>  Median  Q3-Q1  -----+---------+---------+---------+- D  0  4  45  56  *------------------------) I  0  1  60  Not Used N  13  1  30  15  (----* Q  0  1  45  Not Used  -----+---------+---------+---------+- 30  60  90  120 Overall median = 30 * NOTE * Levels with < 6 observations have confidence < 95.0%
Tukey’s Pairwise Comparison One-way ANOVA: TIME versus DEFECT  Tukey 95% Simultaneous Confidence Intervals All Pairwise Comparisons among Levels of DEFECT Individual confidence level = 98.87% DEFECT = D subtracted from: DEFECT  Lower  Center  Upper  --------+---------+---------+---------+- I  -61.47  -3.75  53.97  (----------*-----------) N  -66.23  -36.96  -7.70  (-----*----) Q  -76.47  -18.75  38.97  (----------*-----------) --------+---------+---------+---------+- -50  0  50  100 DEFECT = I subtracted from: DEFECT  Lower  Center  Upper  --------+---------+---------+---------+- N  -86.65  -33.21  20.22  (---------*----------) Q  -88.01  -15.00  58.01  (--------------*--------------) --------+---------+---------+---------+- -50  0  50  100 DEFECT = N subtracted from: DEFECT  Lower  Center  Upper  --------+---------+---------+---------+- Q  -35.22  18.21  71.65  (----------*---------) --------+---------+---------+---------+- -50  0  50  100 Statistically significant factors are in RED legend I= issued already N= no defects Q= need QAQC D=deadlined Deadlined tanks are statistically significantly different in terms of time and defects Tanks with no defects are statistically significantly different in terms of time and defects
Current Process Capability ,[object Object],[object Object],[object Object],[object Object]
One-Way ANOVA Boxplot ,[object Object],[object Object],[object Object]
A Different View ,[object Object],[object Object],[object Object],[object Object]
DELETE ME after tollgate review N= no defect  D= deadlined Q=need qa/qc I=issued already ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Data used in minitab to get calculations, I later changed the D,Q, & I variables into Defects to create different comparisons of defects vs no defects
Impact of Root Causes on Y
Prioritized Root Causes 1  In team’s Control = 9; In team’s sphere of influence = 3; Out of team’s control = 1 2  High impact = 9; Medium impact = 3; Low impact = 1 Effect (Y) Root Cause (X) Hypothesis for Relationship In/Out of Team’s Control 1 Impact 2 Score (Control x Impact) Priority of Effort rework In-accurate bumper numbers Accurate bumper numbers will increase throughput 3 9 27 2 Poor tank maintenance PMCS not completed correctly Correctly performed PMCS will improve tank draw quality 9 9 81 1 Poor tank maintenance  5988-E’s are not regularly updated Regularly update 5988-E’s will improve tank draw quality 3 9 27 3 rework Tanks are issued that are not ready for issue Rework will be reduced if the tanks are ready for issue at the time they are to be issued to units 3 3 9 4
Analyze Summary Impact of Root Causes:  Hypothesis Tests Tools Used Reducing List of Root Causes Prioritized Root Causes / Effects ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lessons Learned ,[object Object],[object Object],[object Object],[object Object],[object Object]
Barriers/Issues/Project Action Log ,[object Object],[object Object],[object Object],[object Object],[object Object],Lean Six Sigma Project Action Log         Last Revised: 10/15/2007   No Description/ Recommendation Status  Open/Closed/Hold Due Date Revised Due Date Resp. Comments / Resolution 1 Leave of critical team member     14 May   4 May     2           3           4           5          
Next Steps ,[object Object],[object Object],[object Object]
Analyze Storyboard Define Project Charter T-6  IPR T2T RATSS T-5 T2T T-4 T2T T-3 T2T T-2 IPR  vehicle Bumper #s Given to unit T-1 Tank draw, HETT, 5988-E update Measure BII draw measured Tank draw measured 5988-E updates measured RIE Baselines  collected Critical X’s Identified Potential Root Causes Identified Root Causes Prioritized Analyze Problem: Poor tank quality at issue Goal: Improve tank quality at issue,  Reduce rework, improve fault tracking Non-quantifiable Benefits Morale, tank maintenance, fault tracking
Sign Off ,[object Object],[object Object],CW4 David Lucy Resource Manager/Finance COL Leopoldo Quintas  Deployment Director  SFC Don H. Henry II  Black Belt Nathan Sprague Master Black Belt MAJ Andre L. Mackey  Sponsor / Process Owner
Analyze  Tollgate Checklist ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Has the team identified the key  factors (critical X’s) that have the biggest impact on process performance?  Have they validated the root causes? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Tollgate Review Stop
 

More Related Content

What's hot

How to implement an effective fmea process
How to implement an effective fmea processHow to implement an effective fmea process
How to implement an effective fmea processASQ Reliability Division
 
Quality control circle (qcc)
Quality control circle (qcc)Quality control circle (qcc)
Quality control circle (qcc)Fickri Hafriz
 
Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Frank-G. Adler
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate templateSteven Bonacorsi
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan Jitesh Gaurav
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Anand Subramaniam
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesTKMG, Inc.
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingOperational Excellence Consulting
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with examplebhanutomar
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.pptbowerj
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools 博行 門眞
 
Lean Six Sigma Yellow Belt Certification Brochure
Lean Six Sigma Yellow Belt Certification BrochureLean Six Sigma Yellow Belt Certification Brochure
Lean Six Sigma Yellow Belt Certification BrochurePartner
 

What's hot (20)

How to implement an effective fmea process
How to implement an effective fmea processHow to implement an effective fmea process
How to implement an effective fmea process
 
Quality control circle (qcc)
Quality control circle (qcc)Quality control circle (qcc)
Quality control circle (qcc)
 
Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module Six Sigma Process Capability Study (PCS) Training Module
Six Sigma Process Capability Study (PCS) Training Module
 
Value Stream Mapping
Value Stream MappingValue Stream Mapping
Value Stream Mapping
 
Green Belt Training
Green Belt TrainingGreen Belt Training
Green Belt Training
 
Dmaic
DmaicDmaic
Dmaic
 
Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
 
Analyze phase lean six sigma tollgate template
Analyze phase   lean six sigma tollgate templateAnalyze phase   lean six sigma tollgate template
Analyze phase lean six sigma tollgate template
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
Lean and Your Top & Bottom Lines
Lean and Your Top & Bottom LinesLean and Your Top & Bottom Lines
Lean and Your Top & Bottom Lines
 
Value Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence ConsultingValue Stream Mapping Project Template by Operational Excellence Consulting
Value Stream Mapping Project Template by Operational Excellence Consulting
 
Six sigma case study-a good approach with example
Six sigma case study-a good approach with exampleSix sigma case study-a good approach with example
Six sigma case study-a good approach with example
 
FMEA Presentation
FMEA PresentationFMEA Presentation
FMEA Presentation
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
TPM for lean manufacturing | lean tools
 TPM  for lean manufacturing |  lean tools	 TPM  for lean manufacturing |  lean tools
TPM for lean manufacturing | lean tools
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
PFMEA
PFMEA PFMEA
PFMEA
 
Fmea
FmeaFmea
Fmea
 
Lean Six Sigma Yellow Belt Certification Brochure
Lean Six Sigma Yellow Belt Certification BrochureLean Six Sigma Yellow Belt Certification Brochure
Lean Six Sigma Yellow Belt Certification Brochure
 

Viewers also liked

Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgatedonhhenry
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgatedonhhenry
 
2011 - Best Practices In Forecasting
2011 - Best Practices In Forecasting2011 - Best Practices In Forecasting
2011 - Best Practices In ForecastingProductCamp Toronto
 
Six sigma 12-21-2k[2]3
Six sigma 12-21-2k[2]3Six sigma 12-21-2k[2]3
Six sigma 12-21-2k[2]3sadegh57
 
Рептилии или пресмыкающиеся
Рептилии или пресмыкающиесяРептилии или пресмыкающиеся
Рептилии или пресмыкающиесяvolha_S
 
Six sigma final
Six sigma final Six sigma final
Six sigma final birjinia
 
Six sigma dmaic strategy
Six sigma dmaic strategySix sigma dmaic strategy
Six sigma dmaic strategyMohit Singla
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best pptRabia Sgh S
 

Viewers also liked (11)

Improve Tollgate
Improve TollgateImprove Tollgate
Improve Tollgate
 
Measure Tollgate
Measure TollgateMeasure Tollgate
Measure Tollgate
 
2011 - Best Practices In Forecasting
2011 - Best Practices In Forecasting2011 - Best Practices In Forecasting
2011 - Best Practices In Forecasting
 
Six sigma 12-21-2k[2]3
Six sigma 12-21-2k[2]3Six sigma 12-21-2k[2]3
Six sigma 12-21-2k[2]3
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Рептилии или пресмыкающиеся
Рептилии или пресмыкающиесяРептилии или пресмыкающиеся
Рептилии или пресмыкающиеся
 
Six sigma final
Six sigma final Six sigma final
Six sigma final
 
Six sigma dmaic strategy
Six sigma dmaic strategySix sigma dmaic strategy
Six sigma dmaic strategy
 
A Roadmap To World Class Forecasting Accuracy
A Roadmap To World Class Forecasting AccuracyA Roadmap To World Class Forecasting Accuracy
A Roadmap To World Class Forecasting Accuracy
 
Phase variation
Phase variationPhase variation
Phase variation
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 

Similar to Improve Tank Draw Quality by Reducing Rework

UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingLean6Sigma4all
 
Life Cycle Cost Analysis Case of Study
Life Cycle Cost Analysis Case of StudyLife Cycle Cost Analysis Case of Study
Life Cycle Cost Analysis Case of StudyLuis Khalil, CMRP
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industriesVivekSingh140912
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics ReportingTSSParatransit
 
SSGB-Loss Reduction in ATF PLT
SSGB-Loss Reduction in ATF PLTSSGB-Loss Reduction in ATF PLT
SSGB-Loss Reduction in ATF PLTNeelesh Bhagwat
 
Using Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesUsing Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesNeelesh Bhagwat
 
1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docx1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docxjackiewalcutt
 
Test Metrics
Test MetricsTest Metrics
Test MetricsDevukjs
 
Tara institute-franchise batao
Tara institute-franchise bataoTara institute-franchise batao
Tara institute-franchise bataoFranchiseBatao
 
Tara institute-franchise
Tara institute-franchiseTara institute-franchise
Tara institute-franchiseFranchiseBatao
 
FY2009 BFCO Standardization Assessment Analysis
FY2009 BFCO Standardization Assessment AnalysisFY2009 BFCO Standardization Assessment Analysis
FY2009 BFCO Standardization Assessment AnalysisRobert Pierson
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - TrainingMohammed Feroze
 
A multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modesA multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modesASQ Reliability Division
 
Reliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel AlgorithmReliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel AlgorithmIRJET Journal
 
Dual Purpose Generator Set Maintenance Manual
Dual Purpose Generator Set Maintenance ManualDual Purpose Generator Set Maintenance Manual
Dual Purpose Generator Set Maintenance ManualRimsky Cheng
 
Flex Maint Plan C 40 A
Flex Maint Plan C 40 AFlex Maint Plan C 40 A
Flex Maint Plan C 40 Akingstonmj
 

Similar to Improve Tank Draw Quality by Reducing Rework (20)

UTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream MappingUTC Aerospace System - Value Stream Mapping
UTC Aerospace System - Value Stream Mapping
 
Life Cycle Cost Analysis Case of Study
Life Cycle Cost Analysis Case of StudyLife Cycle Cost Analysis Case of Study
Life Cycle Cost Analysis Case of Study
 
6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries6-Sigma Training-Awareness for automobile industries
6-Sigma Training-Awareness for automobile industries
 
Paratransit Service Analytics Reporting
Paratransit Service Analytics ReportingParatransit Service Analytics Reporting
Paratransit Service Analytics Reporting
 
SSGB-Loss Reduction in ATF PLT
SSGB-Loss Reduction in ATF PLTSSGB-Loss Reduction in ATF PLT
SSGB-Loss Reduction in ATF PLT
 
Using Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer lossesUsing Six Sigma to reduce ATF pipeline transfer losses
Using Six Sigma to reduce ATF pipeline transfer losses
 
1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docx1. What is operations management Why is it important Is a good k.docx
1. What is operations management Why is it important Is a good k.docx
 
Test Metrics
Test MetricsTest Metrics
Test Metrics
 
Tara institute-franchise batao
Tara institute-franchise bataoTara institute-franchise batao
Tara institute-franchise batao
 
Tara institute-franchise
Tara institute-franchiseTara institute-franchise
Tara institute-franchise
 
FY2009 BFCO Standardization Assessment Analysis
FY2009 BFCO Standardization Assessment AnalysisFY2009 BFCO Standardization Assessment Analysis
FY2009 BFCO Standardization Assessment Analysis
 
IRJET_KSK
IRJET_KSKIRJET_KSK
IRJET_KSK
 
Scheduling by Primavera - Training
Scheduling by Primavera - TrainingScheduling by Primavera - Training
Scheduling by Primavera - Training
 
A multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modesA multi phase decision on reliability growth with latent failure modes
A multi phase decision on reliability growth with latent failure modes
 
SIP PPT
SIP PPTSIP PPT
SIP PPT
 
Reliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel AlgorithmReliability Prediction using the Fussel Algorithm
Reliability Prediction using the Fussel Algorithm
 
A STUDY ON QUEUING MODEL TO REDUCE THE WAITING TIME IN FUEL STATIONS
A STUDY ON QUEUING MODEL TO REDUCE THE WAITING TIME IN FUEL STATIONS A STUDY ON QUEUING MODEL TO REDUCE THE WAITING TIME IN FUEL STATIONS
A STUDY ON QUEUING MODEL TO REDUCE THE WAITING TIME IN FUEL STATIONS
 
Dual Purpose Generator Set Maintenance Manual
Dual Purpose Generator Set Maintenance ManualDual Purpose Generator Set Maintenance Manual
Dual Purpose Generator Set Maintenance Manual
 
Flex Maint Plan C 40 A
Flex Maint Plan C 40 AFlex Maint Plan C 40 A
Flex Maint Plan C 40 A
 
Kaizen Event formalized post-molding
Kaizen Event formalized post-molding Kaizen Event formalized post-molding
Kaizen Event formalized post-molding
 

Recently uploaded

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxDhatriParmar
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptxJonalynLegaspi2
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 

Recently uploaded (20)

ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptxMan or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
Man or Manufactured_ Redefining Humanity Through Biopunk Narratives.pptx
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 

Improve Tank Draw Quality by Reducing Rework

  • 1. Lean Six Sigma Improving FTX/STX2 Tank Draw Quality SFC Henry, Don H. II Project Initiation Date: 31/03/08 Analyze Tollgate Date: 03/07/08
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. Critical X’s: Cause and Effect Matrix Cause and Effect Matrix Key Process Output Variables Customer Importance 10 9 2 6 8                     Customer Rank 1 2 3 4 5                     1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Process Step KPIV accurate tank list 5988-E QA/QC DA Form 2062 Dispatch                     Rank Rating Total Process Steps & Key Process Input Variables 1 T-1 RATSS 1 9 9 9 1                     2 7.533 171 2 PMCS Technical Manual 9 1 1 9 9                     1 10 227 3 QA/QC UMA inspector 9 1 1 3 3                     3 6.3 143 4 tank sign over DA 2062 9 1 1 1 3                     4 5.771 131 5 tank dispatch 5987-E 9 1 1 1 1                     5 5.066 115 ###                                     #####  
  • 8. Potential Root Causes: C & E Diagram Effect: The tank draw takes too long. Man Machine Material Method Spread thinly across multiple tasks Shortage of UMA maintenance personnel Deadlines, AOAP, Service Schedule, affect # of tanks available Tanks already in use by other units/missions BII draw uses excessive people and excess time RATTS request is not referenced by UMA to assign accurate bumper number list Tanks are PMCS’d Tanks are QA/QC’d Tanks are dispatched Excessive delays from lack of UMA personnel 5988-E not updated by UMA
  • 9. Potential Root Causes: FMEA Process Step / Input Potential Failure Mode Potential Failure Effects SEVERITY Potential Causes OCCURRENCE Current Controls DETECTION RPN   What is the process step and Input under investiga-tion? In what ways does the Key Input go wrong? What is the impact on the Key Output Variables (Customer Requirements)? What causes the Key Input to go wrong? What are the existing controls and procedures (inspection and test) that prevent either the cause or the Failure Mode? T-1 bumper number list not accurate excessive delays 7 lack of organization 7 none 7 343 PMCS not updated rework 7 lack of personnel 6 Army Policy 5 210 QA/QC not timely rework 4 lack of maintenance 4 EXSOP/Army policy 4 64 tank sign over already issued rework 7 lack of organization 2 Army Policy/EXSOP 2 28 tank dispatch does not go wrong no problems 1 no problems 1 EXSOP 5 5
  • 10. Reducing List of Root Causes: Pareto Analysis Track able causes contained over 90% of the Defects. Our project will focus on tracking vehicle maintenance status.
  • 11. Root Cause Analysis: Non-Value Add Analysis QAQC Maintenance leader Dispatch Soldier Issues bumper number list to soldier Maintenance leader checks 5988-E and verifies faults/makes repairs if needed Hand receipt Vehicle signed over to soldier Avg. Delay 2 hours Avg.Delay 15 min Avg. Delay 90 min Soldier conducts PMCS and completes 5988-E, turns it in to maintenance leader Passes QAQC Receives signed QAQC sheet Vehicle dispatched to soldier YES NO NVA time is in dark blue Total delay time is 3.75 hours Retrieves info from RATSS system Notify UMA of the # of tanks needed
  • 12. Root Cause Analysis: Histogram The outlier was a vehicle issued that was actually NMC and required 90 minutes to repair. The vehicle that required 60 minutes was actually dispatched to another unit. Two of the five that required 45 minutes of work were deadline with a third needing a QAQC from UMA 5.25 hours were spent doing rework that is non value added
  • 13.
  • 14.
  • 15.
  • 16. Tukey’s Pairwise Comparison One-way ANOVA: TIME versus DEFECT Tukey 95% Simultaneous Confidence Intervals All Pairwise Comparisons among Levels of DEFECT Individual confidence level = 98.87% DEFECT = D subtracted from: DEFECT Lower Center Upper --------+---------+---------+---------+- I -61.47 -3.75 53.97 (----------*-----------) N -66.23 -36.96 -7.70 (-----*----) Q -76.47 -18.75 38.97 (----------*-----------) --------+---------+---------+---------+- -50 0 50 100 DEFECT = I subtracted from: DEFECT Lower Center Upper --------+---------+---------+---------+- N -86.65 -33.21 20.22 (---------*----------) Q -88.01 -15.00 58.01 (--------------*--------------) --------+---------+---------+---------+- -50 0 50 100 DEFECT = N subtracted from: DEFECT Lower Center Upper --------+---------+---------+---------+- Q -35.22 18.21 71.65 (----------*---------) --------+---------+---------+---------+- -50 0 50 100 Statistically significant factors are in RED legend I= issued already N= no defects Q= need QAQC D=deadlined Deadlined tanks are statistically significantly different in terms of time and defects Tanks with no defects are statistically significantly different in terms of time and defects
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. Impact of Root Causes on Y
  • 22. Prioritized Root Causes 1 In team’s Control = 9; In team’s sphere of influence = 3; Out of team’s control = 1 2 High impact = 9; Medium impact = 3; Low impact = 1 Effect (Y) Root Cause (X) Hypothesis for Relationship In/Out of Team’s Control 1 Impact 2 Score (Control x Impact) Priority of Effort rework In-accurate bumper numbers Accurate bumper numbers will increase throughput 3 9 27 2 Poor tank maintenance PMCS not completed correctly Correctly performed PMCS will improve tank draw quality 9 9 81 1 Poor tank maintenance 5988-E’s are not regularly updated Regularly update 5988-E’s will improve tank draw quality 3 9 27 3 rework Tanks are issued that are not ready for issue Rework will be reduced if the tanks are ready for issue at the time they are to be issued to units 3 3 9 4
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Analyze Storyboard Define Project Charter T-6 IPR T2T RATSS T-5 T2T T-4 T2T T-3 T2T T-2 IPR vehicle Bumper #s Given to unit T-1 Tank draw, HETT, 5988-E update Measure BII draw measured Tank draw measured 5988-E updates measured RIE Baselines collected Critical X’s Identified Potential Root Causes Identified Root Causes Prioritized Analyze Problem: Poor tank quality at issue Goal: Improve tank quality at issue, Reduce rework, improve fault tracking Non-quantifiable Benefits Morale, tank maintenance, fault tracking
  • 28.
  • 29.
  • 30.  

Editor's Notes

  1. Expectations from the Measure Phase A detailed process map has been developed by the team and reflects key customer requirements and process variables. Key input, process and output metrics have been identified for data collection (potential Critical X’s) The relationship between process inputs and customer requirements has been investigated to provide a direction for the Analysis Phase. Special cause variation is reduced/removed providing an accurate picture of the process. A measurement system is in place and it’s error is understood. Baseline capability has been established and a path forward has been identified. A detailed project plan for the next phase exists, is realistic and reflects a more accurate financial impact statement. Who Should Attend Green Belt or Black Belt Required Project Leader Required Project Sponsor Required Process Owner Required (if not = Project Sponsor) Project Team Nice to have; Required for M, A, I, and C Stakeholders Required/Strongly Recommended Deployment Director Recommended Senior Management As possible or at DD request Master Black Belt Strongly Recommended (if available to attend)