SlideShare una empresa de Scribd logo
1 de 6
Green building
Introduction
The Corporate office of V-Guard Industries Ltd at Vennala, Kochi-682028, Kerala is a twelve
storied magnificent structure designed with the objective of creating an environment –friendly
building, employing green building principles from concept to commissioning. This office
presently houses, besides the corporate office of V-Guard, its Research & development Wing,
Various product groups and the marketing team. Work stations are provided for about 400
employees in the Building. It also has a cafeteria that can accommodate 200 people, 4
conference Halls of varying capacities from 20 to 200 persons and a roof top meeting place that
can accommodate about 500 people. The Building has a roof garden, fitness centre, recreation
room, library etc besides extensive open area in all floors, retiring rooms for visitors and guests
and a 2 meter wide open verandah on the periphery of each floor which itself occupies 20% of
the total construction area. The building site is a 1.5 acre plot with greenery all around.
The Corporate Office of V-GUARD INDUSTRIES LTD, at Vennala, Kochi- 682028

Though the building may not comply fully with the Green Building requirements, it has many
unique features that are environment friendly and comparable to green buildings. This building
is unique in many respects. The uniqueness of the design is that it has an outer shell that
protects the core of the building that houses the work areas and meeting rooms from direct
sunlight and heat, while allowing free flow of air and unhindered access to natural light. The
outer shell is separated by a verandah and planter trough of 2 meterwidth from the core
building and surrounds the building on all the four sides. The plan of the building is square
shaped with an aesthetic elevation from all the four sides, that blends with the external
environment.

Salient features of the Building
The basic objective while making the design was to reduce the overall impact of the building
on human health and the natural environment by:
o Efficiently using energy, water, and other resources
E Protecting occupant health and improving employee productivity
P Reducing waste, pollution and environmental degradation.

The fundamental principles we have kept in mind while designing and construction were:
T Siting and structure Design efficiency
T Energy Efficiency
T Water Efficiency
T Materials efficiency
T Indoor environmental Quality enhancement
T Operations and maintenance optimisation and
T Waste and Toxics reduction
The essence of the building design was to optimize one or more of the above principles. On
the aesthetic side of the architecture, the consideration was to have a sustainable design
that is in harmony with the natural features and resources surrounding the site. These
issues are discussed in detail below:

i Siting and structure design efficiency
The site has been selected considering its closeness to the seaport- airport road and
convenience of employees who come to work in the office and customers who visit our
premises.. It is away from the crowded city, yet accessible to all important destinations
through connecting roads. All aspects of efficiency and economy coupled with a
comfortable working environment were considered in the design and its impact on cost and
performance. In designing such an environmentally optimal building, the main objective was
to minimize the total environmental impact associated with all life-cycle stages of the
building project.

b Energy efficiency
To increase the energy efficiency of the building, we have provided a roof overhang of 2
metre all around the building. This area, besides providing a free and open veranda, allow
maximum day light to enter the building. The 2 meter width verandha area is utilised as a
planter trough andas garden with all types of flowering plants. The building is designed in
such a way that the sunlight will not fall directly on the inner walls. To reduce the sunlight
falling on the inner walls and to minimize heat , a roof overhang is also provided. With
glazed windows on all sides, there is enough daylight in all rooms which makes artificial
lighting unnecessary during normal sunny days. There will be huge savings in electricity bill
due to this. The same way, the design allows free flow of air all through the floors thus
minimizing the use of electric fans. All these features add to the energy efficiency of the
building.
To supplement the lighting needs, we have used maximum of CFL fittings to save energy.
Provision of solar energy for lighting is also provided which will be an additional advantage
for meeting our future requirements
Solar Water heating systems are also provided in the building to further reduce energy loads.
We have provided a solar water heating system of 1500 LPD which can be used for hot
water requirements in our building.
The requirement of usage of fans and Air conditioners are very less in view of the special
design that allows good air flow in all rooms. Though fans are provided for use when
needed, A/Cs are limited to meeting rooms and server room which is a technical
requirement.

r Water efficiency
Reducing water consumption and protecting water quality are key objectives of our design
of this sustainable building. One critical issue of water consumption is that in many areas in
our locality, the supply from the Municipal corporation is inadequate to meet the increasing
requirements. Hence, the approach adopted was that, to the maximum extent feasible,
facilities should increase their dependence on water that is collected, used, purified, and
reused on-site. The protection and conservation of water is accomplished by designing for
dual plumbing that recycles water in toilet flushing. Waste-water has been minimized by
utilizing water conserving fixtures such as ultra-low flush toilets and low-flow shower heads.
Rain Water harvesting has been effectively implemented in our building. We Have a Rain
Water harvesting tank of 3,30,000 litre capacity and all rain water that falls on the roof is
being collected to this tank which can be treated and used for drinking/domestic purpose,
irrigation etc. The additional source of water is a well in the compound and water from the
well is treated through various process for drinking and domestic purposes. The water used
for washing and flushing are collected and recycled/treated properly in a sewage treatment
plant. This water is used for irrigation for gardens in all the 12 floors and for landscaping at
the ground. It is an automated irrigation system by which wastage of water is minimized.
We are maintaining “Zero Discharge” policy as per Pollution Control Norms. Other Solid
wastes are disposed through “Kudumbasree” units During rains, the storm water is
permitted to percolate to ground. To facilitate this, we have selected pavers/blocks that
enable that the entire rain water to percolate to the ground. Roof water is collected directly
to the RWH tank and recycled.

t Materials efficiency
The building materials used have been selected carefully to minimise the impact on
environment. The use of natural wood has been avoided and all windows are made of
Aluminium shutters All handrails are of steel and all furniture used in the building is made of
PVC and Steel.
Partitioning for cabins have been made with fibre boards and room partitioning inside each
floor has been made with gypsum boards, which is manufactured with waste gypsum from
fertiliserfactories.other products that are non-toxic, reusable, renewable, and/or recyclable
(e.g. Trass, Linoleum,

( Indoor environmental quality enhancement
Environmental Quality (IEQ) category as specified in LEED standards, one of the five
environmental categories, is intended to provide comfort, well-being, and productivity of
occupants. The LEED IEQ category addresses design and construction guidelines especially:
indoor air quality (IAQ), thermal quality, and lighting quality.
For this building indoor air quality is ensured with adequate ventilation from all the four
sides of the building. In the cafeteria also, food is not prepared, but is prepared elsewhere
and brought for serving. This avoids emission of smoke and gases while cooking, that has an
impact on a clean and comfortable working environment. Coupled with this, the unique
design with an outer shell surrounding the building also aid in increasing the building's
thermal quality. Creating a high performance luminous environment through the careful
integration of natural and artificial light sources has improved the lighting quality of the
structure. The Fully ventilating system adopted in this building is more efficient and it helps
to minimize usage of lights and fan in the office area. As the half height partitions are used,
air circulation is also most efficient in office area.

a Operations and maintenance optimization
While designing the building itself, all the activities that are required to ensure an eco-
friendly maintenance and operations of all facilities have been planned. Adequate operating
and maintenance personnel are provided to ensure that this building and the premises
including the gardens are operated responsibly and maintained properly, so as to retain the
green criteria designed at the onset of the project. The addition of new green technologies
such as future generation of power from wind/solar energy to meet the requirements of
this building is also under the scope of the operation and the maintenance programme. As
already mentioned, the systems of Zero effluent discharge and recycling of water etc has
reduced wastes and improved the air and water quality in the environment.

r Waste reduction
Green architecture also seeks to reduce waste of energy, water and materials used during
construction and also during the operation and maintenance of the building As already
mentioned, wastewater from sources such as washing areas is used for subsurface irrigation
after treatment and to flush toilets and wash floors etc.. Rainwater collectors are used for
similar purposes. As regards solid waste, since the quantity does not justify putting up of
waste treatment system, the same is disposed through the “Kudumbasree” units. These
wastes are later used for treatment in the Corporation’s solid waste treatment facility for
conversion as fertilisers.

Cost
The construction of environmentally friendly buildings involves additional cost initially, but
it is expected that in the long run there will be savings that justify the additional up - front
cost involved. The total cost for the building is around 13 crores for 1,20,000 sq. feet built
up area, of which about 20% built up area has been utilised for providing green building
features. This would mean that if conventional building architecture were used, there would
have been saving in the built up area to the extent. However, the recurring cost of operating
and maintaining the building has been reduced significantly by adopting the green building
practices.
Details of savings:
1. Power Saving by use of natural ventillation supplemented by Electric Fans in areas that
require air conditioning in traditional building for keeping the working environment
comfortable :

The total carpet area of the building is 74,344 sq. feet, which requires air conditioning for
providing a comfortable work environment for engineers and marketing professionals. With
the eco-friendly design features, thesework areas now require only Fans to maintain a
comfortable working environment. A total of 425 fans are provided in the building.
Comparing to a conventional design, there will be an energy saving of 3250KiloUnits per
year due to the green building design. The annual saving on this account will be around Rs
126 Lakhs per year.
Details of working are shown in Annexure “A”
2. Saving due to use of CFL Lamp in place of incandescent lamps

There is a saving of 51177 Watts by using CFL lamps throughout the building. The annual
saving is calculated at Rs 1.2 lakhs per year.
Details are given in Annexure “B”
3. Energy Saving due to Computers

The office has 210 computers, all of which use TFT monitors in place of CRT monitors. It is
estimated that there is an energy saving of Rs 1.7 lakhs per year due to this change.
Details are given in Annexure “C”
4. Energy saving due to Solar Water Heater

We have installed a 1500 ltr solar water heater for our hot water requirements instead of
using electric water heater or other means of heating. There is a saving of approxRs 1 lakh
per year due to this.
Details are provided in Annexure “D”

The total saving due to all the above energy saving measures is Rs 130
lakhs per annum
Annexure “A”
Energy Conservation
FANS
By using Ceiling FAN
Total No. of FAN = 425Nos.
Watts of 1No. Fan =75W
Total Wattage of Fans = 425 X 75 = 31875Watts = 31.875KWetails of savings are given below
While using Centralized Air conditioners
Total carpet Area = 74,344Sq. Ft
AC Tonnage = 74,344 = 619.5Ton
120
Total wattage of AC = 619.5 X 1800 =1115.10KW
Power saving by using FAN = 1115.10 – 31.875 = 1083.22 KW.
Amount saving by using FAN:
While using Centralized Air conditioners
Approximate working hour per day = 10Hrs.
Approx. working days per year = 300Days.
Energy consumed by AC for 1Year = 1115.10 X 10 X 300 (KW X Hr.X Days)
= 3345.3 Kilo Units
Unit consumed by AC for 1 Year = 3345Kilo Units
By Using Ceiling FAN
Total No. of FAN = 425Nos.
Watts of 1No. Fan =75W
Energy consumed by fans for 1Year = 425 X 75 X 10 X 300 (Nos.X Watts X Hr.X Days)
Unit consumed by AC for 1 Year = 95.625 Kilo Units
Energy Savings by using Fan = 3345 – 95.625 = 3249.37Kilo Units/Year
Rate/Unit (Average) = Rs.3.88
Amount savings = 3249.37 X 3.88 = 126 Lakh/Year

Annexure “B”
Energy saving - Light fittings
11W CFL lamp = 40W Incandescent lamp
Total Numbers of 11W CFL Fittings = 267Nos.
Total Watts by using CFL = 267 X 11 = 2937 watts
While using Incandescent lamp = 267 X 40 = 10680 watts
18W CFL lamp = 75W Incandescent lamp
Total Numbers of 18W CFL = 362Nos.
Total Watts by using CFL = 362 X 18 = 6516 watts
While using Incandescent lamp = 362 X 75 = 27150 watts
36W CFL Lamp = 150W Incandescent lamp
Total Numbers of 36W CFL = 200Nos.
Total Watts by using CFL = 200 X 36 = 7200 watts
While using Incandescent lamp = 200 X 150 = 30000 watts
Total CFL Wattage = 2937 + 6516 + 7200 = 16653 watts
Total Incandescent lamp Watts = 10680 + 27150 + 30000 = 67830 watts
Power savings by using CFL = 67830 - 16653 = 51177 watts
Amount saving by using CFL:
Energy consumed by CFL for 1Year = 51177 X 2 X 300 ( Watts X Hr.X Days)
Unit consumed by CFL for 1 Year = 30706.2KWH
Rate/Unit (Average) = Rs.3.88
Amount savings = 30706.2 X 3.88 = Rs.119140/Year

Annexure “C”
Energy saving - Computers
Computers
Total Numbers of TFT Monitors = 210 Nos.
Total Watts by using TFT monitors = 210 X 50 = 10500 watts
While using CRT Monitors = 210 X 120 = 25200 watts
Power savings by using TFT Monitor = 25200 - 10500 = 14700 watts
Amount saving by using TFT Monitor:
Energy consumed by TFT monitor for 1Year = 14700 X 10 X 300 ( Watts X Hr.X Days)
Unit consumed by TFT monitor for 1 Year = 44100 KWH
Rate/Unit (Average) = Rs.3.88
Amount savings = 44100 X 3.88 = Rs.1,71,108/Year

Annexure “D”
Energy saving - Solar Water heaters
Solar Water heater capacity = 1500 Ltr.
While working in Electricity wattage rating= 9000Watts
Time for 1Unit of consumption = 7Mins.
No. of working hours /day = 10Hrs.
Unit consumption/Day = 85 Unit
Energy consumed by W.H for 1Year = 85 X 300 (KWH/ Day X Days)
= 25500KWH
Amount saving by using Solar water Heater
Rate/Unit (Average) = Rs.3.88
Amount savings /year = 25500X 3.88 = Rs.98,940/Year

Contact Us : http://www.kochousephchittilappilly.com/

Más contenido relacionado

Más de Dreeme Kochi

Trade unions time for introspection?
Trade unions  time for introspection?Trade unions  time for introspection?
Trade unions time for introspection?Dreeme Kochi
 
Kochi Metro The Way Forward
Kochi Metro  The Way ForwardKochi Metro  The Way Forward
Kochi Metro The Way ForwardDreeme Kochi
 
Indian Railways In Need Of A Change
Indian Railways In Need Of A ChangeIndian Railways In Need Of A Change
Indian Railways In Need Of A ChangeDreeme Kochi
 
Who owns our roads
Who owns our roadsWho owns our roads
Who owns our roadsDreeme Kochi
 
DONATE ORGANS, DONATE LIFE
DONATE ORGANS, DONATE LIFEDONATE ORGANS, DONATE LIFE
DONATE ORGANS, DONATE LIFEDreeme Kochi
 
Onam offer pixetra
Onam offer pixetraOnam offer pixetra
Onam offer pixetraDreeme Kochi
 
TIPS ON BUYING A SOLAR WATER HEATER
TIPS ON BUYING A SOLAR WATER HEATERTIPS ON BUYING A SOLAR WATER HEATER
TIPS ON BUYING A SOLAR WATER HEATERDreeme Kochi
 
Solar-water-heater
Solar-water-heaterSolar-water-heater
Solar-water-heaterDreeme Kochi
 
Single phase commercial motor
Single phase commercial motorSingle phase commercial motor
Single phase commercial motorDreeme Kochi
 
Regenerative self prime_pumps
Regenerative self prime_pumpsRegenerative self prime_pumps
Regenerative self prime_pumpsDreeme Kochi
 
Prime and centrifugal_pumps
Prime and centrifugal_pumpsPrime and centrifugal_pumps
Prime and centrifugal_pumpsDreeme Kochi
 
Open well submersible_pumps
Open well submersible_pumpsOpen well submersible_pumps
Open well submersible_pumpsDreeme Kochi
 
Jet centrifugal pumps
Jet centrifugal pumpsJet centrifugal pumps
Jet centrifugal pumpsDreeme Kochi
 
Single phase motor
Single phase motorSingle phase motor
Single phase motorDreeme Kochi
 

Más de Dreeme Kochi (20)

Trade unions time for introspection?
Trade unions  time for introspection?Trade unions  time for introspection?
Trade unions time for introspection?
 
Kochi Metro The Way Forward
Kochi Metro  The Way ForwardKochi Metro  The Way Forward
Kochi Metro The Way Forward
 
Indian Railways In Need Of A Change
Indian Railways In Need Of A ChangeIndian Railways In Need Of A Change
Indian Railways In Need Of A Change
 
HOW MANY LIVES?
HOW MANY LIVES?HOW MANY LIVES?
HOW MANY LIVES?
 
Emerging Kerala
Emerging KeralaEmerging Kerala
Emerging Kerala
 
Big idea
Big ideaBig idea
Big idea
 
Big idea
Big ideaBig idea
Big idea
 
Who owns our roads
Who owns our roadsWho owns our roads
Who owns our roads
 
DONATE ORGANS, DONATE LIFE
DONATE ORGANS, DONATE LIFEDONATE ORGANS, DONATE LIFE
DONATE ORGANS, DONATE LIFE
 
Onam offer pixetra
Onam offer pixetraOnam offer pixetra
Onam offer pixetra
 
TIPS ON BUYING A SOLAR WATER HEATER
TIPS ON BUYING A SOLAR WATER HEATERTIPS ON BUYING A SOLAR WATER HEATER
TIPS ON BUYING A SOLAR WATER HEATER
 
Solar-water-heater
Solar-water-heaterSolar-water-heater
Solar-water-heater
 
Wiring cables
Wiring cablesWiring cables
Wiring cables
 
Single phase commercial motor
Single phase commercial motorSingle phase commercial motor
Single phase commercial motor
 
Regenerative self prime_pumps
Regenerative self prime_pumpsRegenerative self prime_pumps
Regenerative self prime_pumps
 
Prime and centrifugal_pumps
Prime and centrifugal_pumpsPrime and centrifugal_pumps
Prime and centrifugal_pumps
 
Open well submersible_pumps
Open well submersible_pumpsOpen well submersible_pumps
Open well submersible_pumps
 
Jet centrifugal pumps
Jet centrifugal pumpsJet centrifugal pumps
Jet centrifugal pumps
 
Three phase motor
Three phase motorThree phase motor
Three phase motor
 
Single phase motor
Single phase motorSingle phase motor
Single phase motor
 

Último

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 

Último (20)

Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 

Green building | Kochouseph chittilappally | v-guard | indian author | Industrialist | inspirational quotes | inspirational thoughts | kidney donation | kidney donor | positive thinking | Practical Wisdom |

  • 1. Green building Introduction The Corporate office of V-Guard Industries Ltd at Vennala, Kochi-682028, Kerala is a twelve storied magnificent structure designed with the objective of creating an environment –friendly building, employing green building principles from concept to commissioning. This office presently houses, besides the corporate office of V-Guard, its Research & development Wing, Various product groups and the marketing team. Work stations are provided for about 400 employees in the Building. It also has a cafeteria that can accommodate 200 people, 4 conference Halls of varying capacities from 20 to 200 persons and a roof top meeting place that can accommodate about 500 people. The Building has a roof garden, fitness centre, recreation room, library etc besides extensive open area in all floors, retiring rooms for visitors and guests and a 2 meter wide open verandah on the periphery of each floor which itself occupies 20% of the total construction area. The building site is a 1.5 acre plot with greenery all around. The Corporate Office of V-GUARD INDUSTRIES LTD, at Vennala, Kochi- 682028 Though the building may not comply fully with the Green Building requirements, it has many unique features that are environment friendly and comparable to green buildings. This building is unique in many respects. The uniqueness of the design is that it has an outer shell that protects the core of the building that houses the work areas and meeting rooms from direct sunlight and heat, while allowing free flow of air and unhindered access to natural light. The outer shell is separated by a verandah and planter trough of 2 meterwidth from the core building and surrounds the building on all the four sides. The plan of the building is square shaped with an aesthetic elevation from all the four sides, that blends with the external environment. Salient features of the Building The basic objective while making the design was to reduce the overall impact of the building on human health and the natural environment by: o Efficiently using energy, water, and other resources E Protecting occupant health and improving employee productivity P Reducing waste, pollution and environmental degradation. The fundamental principles we have kept in mind while designing and construction were: T Siting and structure Design efficiency T Energy Efficiency T Water Efficiency T Materials efficiency T Indoor environmental Quality enhancement T Operations and maintenance optimisation and T Waste and Toxics reduction
  • 2. The essence of the building design was to optimize one or more of the above principles. On the aesthetic side of the architecture, the consideration was to have a sustainable design that is in harmony with the natural features and resources surrounding the site. These issues are discussed in detail below: i Siting and structure design efficiency The site has been selected considering its closeness to the seaport- airport road and convenience of employees who come to work in the office and customers who visit our premises.. It is away from the crowded city, yet accessible to all important destinations through connecting roads. All aspects of efficiency and economy coupled with a comfortable working environment were considered in the design and its impact on cost and performance. In designing such an environmentally optimal building, the main objective was to minimize the total environmental impact associated with all life-cycle stages of the building project. b Energy efficiency To increase the energy efficiency of the building, we have provided a roof overhang of 2 metre all around the building. This area, besides providing a free and open veranda, allow maximum day light to enter the building. The 2 meter width verandha area is utilised as a planter trough andas garden with all types of flowering plants. The building is designed in such a way that the sunlight will not fall directly on the inner walls. To reduce the sunlight falling on the inner walls and to minimize heat , a roof overhang is also provided. With glazed windows on all sides, there is enough daylight in all rooms which makes artificial lighting unnecessary during normal sunny days. There will be huge savings in electricity bill due to this. The same way, the design allows free flow of air all through the floors thus minimizing the use of electric fans. All these features add to the energy efficiency of the building. To supplement the lighting needs, we have used maximum of CFL fittings to save energy. Provision of solar energy for lighting is also provided which will be an additional advantage for meeting our future requirements Solar Water heating systems are also provided in the building to further reduce energy loads. We have provided a solar water heating system of 1500 LPD which can be used for hot water requirements in our building. The requirement of usage of fans and Air conditioners are very less in view of the special design that allows good air flow in all rooms. Though fans are provided for use when needed, A/Cs are limited to meeting rooms and server room which is a technical requirement. r Water efficiency Reducing water consumption and protecting water quality are key objectives of our design of this sustainable building. One critical issue of water consumption is that in many areas in our locality, the supply from the Municipal corporation is inadequate to meet the increasing requirements. Hence, the approach adopted was that, to the maximum extent feasible, facilities should increase their dependence on water that is collected, used, purified, and reused on-site. The protection and conservation of water is accomplished by designing for
  • 3. dual plumbing that recycles water in toilet flushing. Waste-water has been minimized by utilizing water conserving fixtures such as ultra-low flush toilets and low-flow shower heads. Rain Water harvesting has been effectively implemented in our building. We Have a Rain Water harvesting tank of 3,30,000 litre capacity and all rain water that falls on the roof is being collected to this tank which can be treated and used for drinking/domestic purpose, irrigation etc. The additional source of water is a well in the compound and water from the well is treated through various process for drinking and domestic purposes. The water used for washing and flushing are collected and recycled/treated properly in a sewage treatment plant. This water is used for irrigation for gardens in all the 12 floors and for landscaping at the ground. It is an automated irrigation system by which wastage of water is minimized. We are maintaining “Zero Discharge” policy as per Pollution Control Norms. Other Solid wastes are disposed through “Kudumbasree” units During rains, the storm water is permitted to percolate to ground. To facilitate this, we have selected pavers/blocks that enable that the entire rain water to percolate to the ground. Roof water is collected directly to the RWH tank and recycled. t Materials efficiency The building materials used have been selected carefully to minimise the impact on environment. The use of natural wood has been avoided and all windows are made of Aluminium shutters All handrails are of steel and all furniture used in the building is made of PVC and Steel. Partitioning for cabins have been made with fibre boards and room partitioning inside each floor has been made with gypsum boards, which is manufactured with waste gypsum from fertiliserfactories.other products that are non-toxic, reusable, renewable, and/or recyclable (e.g. Trass, Linoleum, ( Indoor environmental quality enhancement Environmental Quality (IEQ) category as specified in LEED standards, one of the five environmental categories, is intended to provide comfort, well-being, and productivity of occupants. The LEED IEQ category addresses design and construction guidelines especially: indoor air quality (IAQ), thermal quality, and lighting quality. For this building indoor air quality is ensured with adequate ventilation from all the four sides of the building. In the cafeteria also, food is not prepared, but is prepared elsewhere and brought for serving. This avoids emission of smoke and gases while cooking, that has an impact on a clean and comfortable working environment. Coupled with this, the unique design with an outer shell surrounding the building also aid in increasing the building's thermal quality. Creating a high performance luminous environment through the careful integration of natural and artificial light sources has improved the lighting quality of the structure. The Fully ventilating system adopted in this building is more efficient and it helps to minimize usage of lights and fan in the office area. As the half height partitions are used, air circulation is also most efficient in office area. a Operations and maintenance optimization While designing the building itself, all the activities that are required to ensure an eco- friendly maintenance and operations of all facilities have been planned. Adequate operating
  • 4. and maintenance personnel are provided to ensure that this building and the premises including the gardens are operated responsibly and maintained properly, so as to retain the green criteria designed at the onset of the project. The addition of new green technologies such as future generation of power from wind/solar energy to meet the requirements of this building is also under the scope of the operation and the maintenance programme. As already mentioned, the systems of Zero effluent discharge and recycling of water etc has reduced wastes and improved the air and water quality in the environment. r Waste reduction Green architecture also seeks to reduce waste of energy, water and materials used during construction and also during the operation and maintenance of the building As already mentioned, wastewater from sources such as washing areas is used for subsurface irrigation after treatment and to flush toilets and wash floors etc.. Rainwater collectors are used for similar purposes. As regards solid waste, since the quantity does not justify putting up of waste treatment system, the same is disposed through the “Kudumbasree” units. These wastes are later used for treatment in the Corporation’s solid waste treatment facility for conversion as fertilisers. Cost The construction of environmentally friendly buildings involves additional cost initially, but it is expected that in the long run there will be savings that justify the additional up - front cost involved. The total cost for the building is around 13 crores for 1,20,000 sq. feet built up area, of which about 20% built up area has been utilised for providing green building features. This would mean that if conventional building architecture were used, there would have been saving in the built up area to the extent. However, the recurring cost of operating and maintaining the building has been reduced significantly by adopting the green building practices. Details of savings: 1. Power Saving by use of natural ventillation supplemented by Electric Fans in areas that require air conditioning in traditional building for keeping the working environment comfortable : The total carpet area of the building is 74,344 sq. feet, which requires air conditioning for providing a comfortable work environment for engineers and marketing professionals. With the eco-friendly design features, thesework areas now require only Fans to maintain a comfortable working environment. A total of 425 fans are provided in the building. Comparing to a conventional design, there will be an energy saving of 3250KiloUnits per year due to the green building design. The annual saving on this account will be around Rs 126 Lakhs per year. Details of working are shown in Annexure “A” 2. Saving due to use of CFL Lamp in place of incandescent lamps There is a saving of 51177 Watts by using CFL lamps throughout the building. The annual saving is calculated at Rs 1.2 lakhs per year. Details are given in Annexure “B”
  • 5. 3. Energy Saving due to Computers The office has 210 computers, all of which use TFT monitors in place of CRT monitors. It is estimated that there is an energy saving of Rs 1.7 lakhs per year due to this change. Details are given in Annexure “C” 4. Energy saving due to Solar Water Heater We have installed a 1500 ltr solar water heater for our hot water requirements instead of using electric water heater or other means of heating. There is a saving of approxRs 1 lakh per year due to this. Details are provided in Annexure “D” The total saving due to all the above energy saving measures is Rs 130 lakhs per annum Annexure “A” Energy Conservation FANS By using Ceiling FAN Total No. of FAN = 425Nos. Watts of 1No. Fan =75W Total Wattage of Fans = 425 X 75 = 31875Watts = 31.875KWetails of savings are given below While using Centralized Air conditioners Total carpet Area = 74,344Sq. Ft AC Tonnage = 74,344 = 619.5Ton 120 Total wattage of AC = 619.5 X 1800 =1115.10KW Power saving by using FAN = 1115.10 – 31.875 = 1083.22 KW. Amount saving by using FAN: While using Centralized Air conditioners Approximate working hour per day = 10Hrs. Approx. working days per year = 300Days. Energy consumed by AC for 1Year = 1115.10 X 10 X 300 (KW X Hr.X Days) = 3345.3 Kilo Units Unit consumed by AC for 1 Year = 3345Kilo Units By Using Ceiling FAN Total No. of FAN = 425Nos. Watts of 1No. Fan =75W Energy consumed by fans for 1Year = 425 X 75 X 10 X 300 (Nos.X Watts X Hr.X Days) Unit consumed by AC for 1 Year = 95.625 Kilo Units Energy Savings by using Fan = 3345 – 95.625 = 3249.37Kilo Units/Year Rate/Unit (Average) = Rs.3.88 Amount savings = 3249.37 X 3.88 = 126 Lakh/Year Annexure “B” Energy saving - Light fittings 11W CFL lamp = 40W Incandescent lamp
  • 6. Total Numbers of 11W CFL Fittings = 267Nos. Total Watts by using CFL = 267 X 11 = 2937 watts While using Incandescent lamp = 267 X 40 = 10680 watts 18W CFL lamp = 75W Incandescent lamp Total Numbers of 18W CFL = 362Nos. Total Watts by using CFL = 362 X 18 = 6516 watts While using Incandescent lamp = 362 X 75 = 27150 watts 36W CFL Lamp = 150W Incandescent lamp Total Numbers of 36W CFL = 200Nos. Total Watts by using CFL = 200 X 36 = 7200 watts While using Incandescent lamp = 200 X 150 = 30000 watts Total CFL Wattage = 2937 + 6516 + 7200 = 16653 watts Total Incandescent lamp Watts = 10680 + 27150 + 30000 = 67830 watts Power savings by using CFL = 67830 - 16653 = 51177 watts Amount saving by using CFL: Energy consumed by CFL for 1Year = 51177 X 2 X 300 ( Watts X Hr.X Days) Unit consumed by CFL for 1 Year = 30706.2KWH Rate/Unit (Average) = Rs.3.88 Amount savings = 30706.2 X 3.88 = Rs.119140/Year Annexure “C” Energy saving - Computers Computers Total Numbers of TFT Monitors = 210 Nos. Total Watts by using TFT monitors = 210 X 50 = 10500 watts While using CRT Monitors = 210 X 120 = 25200 watts Power savings by using TFT Monitor = 25200 - 10500 = 14700 watts Amount saving by using TFT Monitor: Energy consumed by TFT monitor for 1Year = 14700 X 10 X 300 ( Watts X Hr.X Days) Unit consumed by TFT monitor for 1 Year = 44100 KWH Rate/Unit (Average) = Rs.3.88 Amount savings = 44100 X 3.88 = Rs.1,71,108/Year Annexure “D” Energy saving - Solar Water heaters Solar Water heater capacity = 1500 Ltr. While working in Electricity wattage rating= 9000Watts Time for 1Unit of consumption = 7Mins. No. of working hours /day = 10Hrs. Unit consumption/Day = 85 Unit Energy consumed by W.H for 1Year = 85 X 300 (KWH/ Day X Days) = 25500KWH Amount saving by using Solar water Heater Rate/Unit (Average) = Rs.3.88 Amount savings /year = 25500X 3.88 = Rs.98,940/Year Contact Us : http://www.kochousephchittilappilly.com/