SlideShare una empresa de Scribd logo
1 de 10
Quality Center Roles and Defect Workflow
BU Admin
PERMISSIONS:
• Can modify all QC Components at the project level except Administration items reserved to the
QC Admin (specifics still TBD)
• Administer security at the QC project level
• Create QC projects and modify fields determined to be customizable at the BU Admin level
• Can delete a defect
PFG BPT
PERMISSIONS:
• Can create and modify components in Business Process Testing
RESTRICTIONS:
• View only access to other modules, can be combined with another role for additional access
PFG Business Analyst
PERMISSIONS:
• Can add, modify and delete requirements
RESTRICTIONS:
• Can’t add or remove tests from coverage
• View only access to other modules, may be combined with another security role (such as PFG
Tester)
Developer Roles (3 Levels)
PFG Developer Lead
PERMISSIONS:
• Can add, modify and delete tests in Test Plan module
• Can add, move, modify and delete folders in Test Plan module
• Can add, modify and delete test sets
• Can add and modify defects
RESTRICTIONS:
• View only access to Requirements and Business Components modules
• Defect Workflow - Cannot change defect status to CLOSED, except when Test Type selected for
the defect is UNIT
• Cannot delete a defect
PFG Developer
PERMISSIONS:
• Can add, modify and delete tests in Test Plan module
• Can run tests and modify run in Test Lab module
• Can add and modify defects
RESTRICTIONS:
• View only access to Requirements and Business Components modules
• Cannot add, move, modify or delete folders in Test Plan module
• Defect Workflow - Cannot change defect status to CLOSED, except when Test Type selected for
the defect is UNIT
• Cannot delete a defect
PFG Developer Limited
PERMISSIONS:
• Can run tests and modify run in Test Lab module
• Can add and modify defects
RESTRICTIONS:
• View only access to Requirements, Business Components and Test Plan modules
• Defect Workflow - Cannot change defect status to CLOSED, except when Test Type selected for
the defect is UNIT
• Cannot delete a defect
Tester Roles (3 Levels)
PFG Test Lead
PERMISSIONS:
• Can add, modify and delete requirements and add/remove them from test coverage
• Can add, modify and delete tests in Test Plan module
• Can add, move, modify and delete folders in Test Plan module
• Can add, modify and delete test sets
• Can add and modify defects
RESTRICTIONS:
• View only access to Business Components module
• Cannot delete a defect
PFG Tester
PERMISSIONS:
• Can add, modify and delete tests in Test Plan module
• Can add, move, modify and delete folders in Test Plan module
• Can run tests and modify run in Test Lab module
• Can add and modify defects
RESTRICTIONS:
• View only access to Requirements and Business Components modules
• Cannot delete a defect
PFG Tester Limited
PERMISSIONS:
• Can run tests and modify run in Test Lab module
• Can add and modify defects
• Defect Workflow – is allowed to change defect status from READY FOR RETEST to ASSIGNED
in the event a test of a fixed defect fails
RESTRICTIONS:
• View only access to Requirements, Business Components and Test Plan modules
• Defect Workflow - Cannot change defect status from NEW to ASSIGNED
• Defect Workflow - Cannot change defect status to CLOSED
• Cannot delete a defect
Defect Form status workflow
• When a defect transitions from NEW to ASSIGNED status the ‘Assigned to’ field is required
• When CLOSE status is selected the ‘Root Cause’ field is required.
Questions for BU Reps on Defect Form
1. Is date field required on defect form for the date a defect is closed or will defect history
be sufficient for tracking date closed? A field for this purpose would allow for filtering
by Closed Date but History does provide date/time stamps for when the defect is closed.
2. Are date fields required for tracking duration defects remain in ‘IN PROGRESS’ status
or will defect history be sufficient for tracking time it takes developer to fix defects once
they are accepted (as indicated by changing status to IN PROGRES)? We noted some
areas are currently tracking time required to fix by using date fields within their defect
form.
3. Do we need to add a field to the defect form titled Build/Version# or will the ‘Detected
In’ field provide enough flexibility in conjunction with the folder structure to track defect
detection by build and test cycle?
4. Do we want the ‘Detected By:’ field to be read only reflecting the ID of the person that
opened the defect or will we allow this field to be modified? Consideration is that a
defect may be opened by one test team member on behalf of another. History does track
ID when this field is changed.
Defect Form status workflow
• When a defect transitions from NEW to ASSIGNED status the ‘Assigned to’ field is required
• When CLOSE status is selected the ‘Root Cause’ field is required.
Questions for BU Reps on Defect Form
1. Is date field required on defect form for the date a defect is closed or will defect history
be sufficient for tracking date closed? A field for this purpose would allow for filtering
by Closed Date but History does provide date/time stamps for when the defect is closed.
2. Are date fields required for tracking duration defects remain in ‘IN PROGRESS’ status
or will defect history be sufficient for tracking time it takes developer to fix defects once
they are accepted (as indicated by changing status to IN PROGRES)? We noted some
areas are currently tracking time required to fix by using date fields within their defect
form.
3. Do we need to add a field to the defect form titled Build/Version# or will the ‘Detected
In’ field provide enough flexibility in conjunction with the folder structure to track defect
detection by build and test cycle?
4. Do we want the ‘Detected By:’ field to be read only reflecting the ID of the person that
opened the defect or will we allow this field to be modified? Consideration is that a
defect may be opened by one test team member on behalf of another. History does track
ID when this field is changed.

Más contenido relacionado

Último

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Último (20)

Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

Destacado

Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Saba Software
 

Destacado (20)

Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them wellGood Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
Good Stuff Happens in 1:1 Meetings: Why you need them and how to do them well
 

Quality center roles and defect workflow

  • 1. Quality Center Roles and Defect Workflow BU Admin PERMISSIONS: • Can modify all QC Components at the project level except Administration items reserved to the QC Admin (specifics still TBD) • Administer security at the QC project level • Create QC projects and modify fields determined to be customizable at the BU Admin level • Can delete a defect PFG BPT PERMISSIONS: • Can create and modify components in Business Process Testing RESTRICTIONS: • View only access to other modules, can be combined with another role for additional access
  • 2. PFG Business Analyst PERMISSIONS: • Can add, modify and delete requirements RESTRICTIONS: • Can’t add or remove tests from coverage • View only access to other modules, may be combined with another security role (such as PFG Tester)
  • 3. Developer Roles (3 Levels) PFG Developer Lead PERMISSIONS: • Can add, modify and delete tests in Test Plan module • Can add, move, modify and delete folders in Test Plan module • Can add, modify and delete test sets • Can add and modify defects RESTRICTIONS: • View only access to Requirements and Business Components modules • Defect Workflow - Cannot change defect status to CLOSED, except when Test Type selected for the defect is UNIT • Cannot delete a defect
  • 4. PFG Developer PERMISSIONS: • Can add, modify and delete tests in Test Plan module • Can run tests and modify run in Test Lab module • Can add and modify defects RESTRICTIONS: • View only access to Requirements and Business Components modules • Cannot add, move, modify or delete folders in Test Plan module • Defect Workflow - Cannot change defect status to CLOSED, except when Test Type selected for the defect is UNIT • Cannot delete a defect
  • 5. PFG Developer Limited PERMISSIONS: • Can run tests and modify run in Test Lab module • Can add and modify defects RESTRICTIONS: • View only access to Requirements, Business Components and Test Plan modules • Defect Workflow - Cannot change defect status to CLOSED, except when Test Type selected for the defect is UNIT • Cannot delete a defect
  • 6. Tester Roles (3 Levels) PFG Test Lead PERMISSIONS: • Can add, modify and delete requirements and add/remove them from test coverage • Can add, modify and delete tests in Test Plan module • Can add, move, modify and delete folders in Test Plan module • Can add, modify and delete test sets • Can add and modify defects RESTRICTIONS: • View only access to Business Components module • Cannot delete a defect
  • 7. PFG Tester PERMISSIONS: • Can add, modify and delete tests in Test Plan module • Can add, move, modify and delete folders in Test Plan module • Can run tests and modify run in Test Lab module • Can add and modify defects RESTRICTIONS: • View only access to Requirements and Business Components modules • Cannot delete a defect
  • 8. PFG Tester Limited PERMISSIONS: • Can run tests and modify run in Test Lab module • Can add and modify defects • Defect Workflow – is allowed to change defect status from READY FOR RETEST to ASSIGNED in the event a test of a fixed defect fails RESTRICTIONS: • View only access to Requirements, Business Components and Test Plan modules • Defect Workflow - Cannot change defect status from NEW to ASSIGNED • Defect Workflow - Cannot change defect status to CLOSED • Cannot delete a defect
  • 9. Defect Form status workflow • When a defect transitions from NEW to ASSIGNED status the ‘Assigned to’ field is required • When CLOSE status is selected the ‘Root Cause’ field is required. Questions for BU Reps on Defect Form 1. Is date field required on defect form for the date a defect is closed or will defect history be sufficient for tracking date closed? A field for this purpose would allow for filtering by Closed Date but History does provide date/time stamps for when the defect is closed. 2. Are date fields required for tracking duration defects remain in ‘IN PROGRESS’ status or will defect history be sufficient for tracking time it takes developer to fix defects once they are accepted (as indicated by changing status to IN PROGRES)? We noted some areas are currently tracking time required to fix by using date fields within their defect form. 3. Do we need to add a field to the defect form titled Build/Version# or will the ‘Detected In’ field provide enough flexibility in conjunction with the folder structure to track defect detection by build and test cycle? 4. Do we want the ‘Detected By:’ field to be read only reflecting the ID of the person that opened the defect or will we allow this field to be modified? Consideration is that a defect may be opened by one test team member on behalf of another. History does track ID when this field is changed.
  • 10. Defect Form status workflow • When a defect transitions from NEW to ASSIGNED status the ‘Assigned to’ field is required • When CLOSE status is selected the ‘Root Cause’ field is required. Questions for BU Reps on Defect Form 1. Is date field required on defect form for the date a defect is closed or will defect history be sufficient for tracking date closed? A field for this purpose would allow for filtering by Closed Date but History does provide date/time stamps for when the defect is closed. 2. Are date fields required for tracking duration defects remain in ‘IN PROGRESS’ status or will defect history be sufficient for tracking time it takes developer to fix defects once they are accepted (as indicated by changing status to IN PROGRES)? We noted some areas are currently tracking time required to fix by using date fields within their defect form. 3. Do we need to add a field to the defect form titled Build/Version# or will the ‘Detected In’ field provide enough flexibility in conjunction with the folder structure to track defect detection by build and test cycle? 4. Do we want the ‘Detected By:’ field to be read only reflecting the ID of the person that opened the defect or will we allow this field to be modified? Consideration is that a defect may be opened by one test team member on behalf of another. History does track ID when this field is changed.