Summary of Feasibility Report
On
Roby Park Primary and Park View Primary
Background
The Corporate Asset Management team were asked to produce a Feasibility Report
on Roby Park Primary and Park View Primary, to see which site best fits the
requirements for a 2 Forms of Entry primary school.
Roby Park Primary is situated on a large site with extensive playing fields. The
Building has been rewired and had new windows installed in recent years.
Park View Primary is situated on a site with no grassed playing fields but has large
Hard Play Areas. The Building has been rewired and had sections of new roofing
and windows installed in recent years.
Officers from the Corporate Asset Management Team visited both Roby Park, and
Park View on the 20 July 2011. This visit enabled the Officers to assess individual
areas and structure against the DfE requirements.
Requirements for a Two Form of Entry School
Two forms of entry school require:
Building
 14 classrooms of an average size (60m2) 822m2
 1 (or 1 Large and 1 small) Assembly Hall totalling 226m2
 Staff and Admin areas totalling 114m2
 Learning Resources (Inc. Library and SEN areas) totalling 78m2 and
 Storage totalling 150m2
Site
 Pitches (Team Games) 8,400m2
 Hard Surface Games Courts at 1,440m2 and Hard Surface Informal & Social
at 1,030m2 (these areas can be combined)
 The site should be between 17,320m2 and 17,300m2
Figures above are taken from Building Bulletin 99 Minimum Standards
Roby Park
Roby Park currently has the following areas
Building
 12 Classrooms totalling 654.24m2 (average size 60m2) – 2 classrooms and
227.76m2 short of the standards
 Assembly hall measuring 204.08m2 – 21.92m2 short of the standards
 Staff and Admin totalling 65.48m2 – 48.52m2 short of the standards
 Learning Resources totalling 51.9m2 – 26.1m2 short of the standards
 Storage totalling 70.66m2 – 79.34m2 short of the standards
 Private Nursery 111.76m2
Site
 Pitches (Team Games) measuring 22,650m2 – 14,250m2 over the standards
 Hard Surface Games Courts and Hard Surface Informal & Social totalling
2470m2 (combined) – 687m2 short of the standards
 The total site is 35,220m2 – 15,920m2 over the upper standard
 Car parking – Limited Car Parking for current staff levels
Park View
Park View currently has the following areas
Building
 14 Classrooms totalling 724.21m2 (average size 45m2) – 97.79m2 short of
the standards
 Assembly hall & Gym totalling 289.42m2 – 63.42m2 over of the standards
 Staff and Admin totalling 174.1m2 – 60.1m2 over of the standards
 Learning Resources totalling 249.7m2 – 171.7m2m2 over of the standards
 Storage totalling 107.61m2 – 42.39m2 short of the standards
 Swimming pool
 Dining Hall Block with Community Rooms
 NNI Building
Site
 Pitches (Team Games) measuring 0m2 – 8,400m2 short the standards
 Hard Surface Games Courts and Hard Surface Informal & Social totalling
4,582m2 (combined) – 2,112m2 over of the standards
 The total site is 15,970m2 – 3,330m2 short of the upper standard
 Car parking – Limited Car Parking for current staff levels
Proposed Schemes
Roby Park (Appendix A)
It is envisaged that the east side of the building could remain unchanged (currently
has 8 classrooms) with internal remodelling undertaken to the west side (nursery
side).The remodelling would create 3 classrooms at approximately 66m2 each and
a 4th
classroom could be created by a new build extension of approximately 66m2.
The total area to be remodelled would be approximately 200m2 (excluding the
nursery area). A further 2 classrooms would be required and it is proposed that a
double temporary classroom be utilised on the east side of the site. This would give
a total provision of 14 classrooms.
To address the shortfall of staff and admin areas, a modular building solution could
be utilised behind the main entrance area. This would need to be approximately
114m2.
The area of the building to be re-modelled would need to be taken out of school use
whilst the works were carried out, potentially including the Nursery area depending
on the extent of works. The area would need to be physically segregated and a
temporary perimeter fence erected around the proposed extension area. An area
would also be required for a contractor’s compound. It is envisaged that depending
on the extent of work required the area could be out of school use for approximately
20 weeks. This could possibly be reduced if an alternative to the new build extension
was chosen. A single temporary classroom could be utilised so the school could
remain operational whilst the works were being carried out. Control of building work
during school hours would be needed, specifically with regard to noise levels,
however it is envisaged that because of the layout of site, a solution could be
developed which would allow works to be carried out without causing disruption to
the school.
Areas of hard play area would be out of use whilst the works are carried out,
therefore additional hard play areas could be created adjacent to the existing prior to
the main building works commencing. This would ensure that there is sufficient hard
play area available whilst the works are carried out and once complete will also
increase the overall hard play area to be in line with the requirements set out above.
Another issue to consider would be the future of the Private Nursery at the school. If
Roby Park was the chosen option, there would no longer be space for the private
nursery to operate at the school.
Park View (Appendix B)
It is envisaged that the north side of the building could remain unchanged
(Gymnasium and Assembly Hall side) together with the office area in the centre,
however extensive internal remodelling would be required to the remainder of the
building approx (1,200m2). This is due to the relatively small sized classrooms at an
average size of 45m2. Existing walls would need to be removed, which following a
site visit were deemed to be load bearing and replaced with steel supports and new
partition walls constructed to create larger classrooms in line with the requirements
above. Works would also be required to the electrics, heating and alarm systems in
these areas to suit the new configuration, together with new floor finishes and
decoration.
The reconfiguration of rooms would give a total of 13 classrooms, meaning an
additional classroom would be required. An option could be to build an extension
onto the existing staff room (room 064) and convert into a classroom. (The staff room
could be relocated to the existing classroom adjacent to the Assembly Hall). The
extension would need to be approximately 30m2, giving a total new room area of
64m2. An alternative solution would be utilising a single temporary classroom. Either
way, this would give the required total provision of 14 classrooms.
We believe that further development would also be required if the Car Park is
deemed to be too small. One option would be to move the car park and entrance to
the other side of the site/building. Works would be required to transform part of the
hard play area into a car park and a small extension (18m2) to create a new
entrance/foyer. The schools former car park could then be turned into a hard
Informal & Social area for the school.
For the school to remain operational whilst the works were ongoing the works would
have to be carried out in two phases, with one half of the teaching area vacated and
physically segregated at a time. It is envisaged that depending on the extent of work
required each area could be out of school use for approximately 15 weeks each
giving a total period of 30 weeks. It is envisaged that works would have to be carried
out during school hours to be completed within the above periods.
Other issues to consider would be the future of the Neighbourhood Nursery,
Swimming Pool and the newly refurbished Community Rooms in the Dining Hall
Block and Family Centre.
Conclusion
It is possible with a combination of reconfiguration of internal space and the
incorporation of new build extensions/modular buildings that both schools could be
made suitable for 2 form of entry.
Park View only requires a small amount of new build extension, however the amount
of internal remodelling required is extensive and would be to approximately 6 times
the area than what would be required at Roby Park. The area affected is spread
across the whole building at Park View, whereas at Roby Park it is limited to one
area which could be completely segregated from the remaining area of the school
whilst the works are ongoing. Physical segregation and keeping disruption to a
minimum at Park View would be much more difficult to achieve whilst the works were
ongoing. Please refer to SWOT analysis in Appendix C for further information.
When making a decision on which site to chose, the authority also needs to consider
the Department of Educations views on a possible future land disposal. In a Land
Disposal Application we have to include the background to how this site became
surplus to requirements. If Roby Park was to be disposed of, we would have to justify
choosing a site with no green playing fields over a site which has well over the
minimum standards. This may cause the department (DfE) to question the authority’s
judgement.
On the basis of the extensive works identified as being required from this feasibility
study at Park View together with the restricted site area, it would appear that in terms
of timescale, cost and potential disruption to pupils whilst works are ongoing, Roby
Park would appear to be best suited to be reconfigured to a 2 form of entry school.
This document was created by the KMBC Corporate Asset Management Team.
Appendix A – Roby Park Phasing Plan for required works
Appendix B – Park View Phasing Plan for required works
Appendix C – SWOT Analysis
Park View SWOT Analysis
Strength
 Large Solid Building, which is in good
condition
 High levels of hard play areas, that can
be used all year round
Opportunity
 Develop a large solid building into a 21st
Century Learning environment
 Swimming Pool on site which is used by
local schools and community
 Has a number of 3rd
Party Users – Family
Centre, NNI,
Weakness
 Small site with no grassed playing fields
 Currently majority of classrooms around
45m2 to 50m2 (10 out of 14 Classrooms)
 Higher cost scheme
 School have extended Car Park a number
time – Car Park very narrow
 All walls identified for demolition are
load bearing and would require steel
beams for support
 Swimming Pool Energy Costs are high
 School buildings are in good condition,
but on first inspection, the Swimming
Pool looks like it requires more
investment
Threat
 Major works and a number of phases,
could destabilise the running of the
school.
 Justifying disposing of a large site with
playing fields and retaining a small
school site
Roby Park SWOT Analysis
Strength
 Large site with large Playing Fields
 Only 3 Classrooms are between 40m2
and 45m2 (the remaining 8 classrooms
are just under 60m2
 Scheme to remodel and extend the
school would be to the rear of the school
while the school operates at the front of
the school relatively unaffected
 The majority of walls identified for
demolition are not load bearing and
wouldn’t require steel beams for
support. This is a significant factor in
reducing the cost of the scheme.
Opportunity
 School could extend beyond 2FE and still
manage to meet or exceed the DfE
requirements
Weakness
 Small building would need extending to
meet the DfE requirements
 School has no Swimming Pool
 School will also require 1 Double Mobile
Classroom to meet DfE requirements.
 Teaching areas are 2 storey with no lift.
Threat
 If this site is chosen could potentially
need to relocate/rebuild NNI, Family
Centre and Swimming Pool buildings
 Need to relocate Private Nursery at
School
Appendix D – Budget Cost Summary
The area of refurbishment / remodelling required at Park View is 1,200m2 compared
to 200m2 at Roby Park.
The new build extension areas / area of modular building required at Park View is
48m2 compared to 310m2 at Roby Park.
Modifications and extension to hard landscape areas is 700m2 at Park View
compared to 300m2 at Roby Park.
The changes/extension of the building at Roby Park could take place to the rear of
the school, while the school remains operational at the front. The changes required
at Park View are throughout the school (small classrooms) and would need to be
completed over a number of phases, which would cost more money and time to
complete and cause greater disruption to pupils.
The overall assessment of budget costs for the reconfiguration and modernisation of
the Park View site is £1.45m compared to £1.15m for the Roby Park site.
Budget costs were calculated by measuring the areas requiring remodelling and the
amount of new build at each site. The same rates were used for both sites to ensure
impartiality and were based on previous schemes undertaken.

Más contenido relacionado

Similar a 14 summary of feasibility report roby park park view 11 12-13

presentation_indoorclimatecomfort (2)
presentation_indoorclimatecomfort (2)presentation_indoorclimatecomfort (2)
presentation_indoorclimatecomfort (2)
Adam Haj-hamad
 
community garden
community gardencommunity garden
community garden
Suzan Nihad
 
Beech worth montessori school
Beech worth montessori schoolBeech worth montessori school
Beech worth montessori school
Mythili Vinayagam
 
ITC_Renovation article
ITC_Renovation articleITC_Renovation article
ITC_Renovation article
Karel Forman
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
Cordoba Corp
 
Sustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain GardenSustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain Garden
MatthewLawrence70
 
Hkp Presentation
Hkp PresentationHkp Presentation
Hkp Presentation
Kate Hodges
 

Similar a 14 summary of feasibility report roby park park view 11 12-13 (20)

presentation_indoorclimatecomfort (2)
presentation_indoorclimatecomfort (2)presentation_indoorclimatecomfort (2)
presentation_indoorclimatecomfort (2)
 
Case Study: School Renovations
Case Study: School RenovationsCase Study: School Renovations
Case Study: School Renovations
 
639.pdf
639.pdf639.pdf
639.pdf
 
community garden
community gardencommunity garden
community garden
 
Sustainable school design Case study- Discovery elementary school
Sustainable school design Case study- Discovery elementary schoolSustainable school design Case study- Discovery elementary school
Sustainable school design Case study- Discovery elementary school
 
Proposed RCE School
Proposed RCE SchoolProposed RCE School
Proposed RCE School
 
Beech worth montessori school
Beech worth montessori schoolBeech worth montessori school
Beech worth montessori school
 
The Process of Building A Green Project
The Process of Building A Green ProjectThe Process of Building A Green Project
The Process of Building A Green Project
 
ITC_Renovation article
ITC_Renovation articleITC_Renovation article
ITC_Renovation article
 
Ici report (1)
Ici report (1)Ici report (1)
Ici report (1)
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
 
Case Study - Heritage School
Case Study - Heritage SchoolCase Study - Heritage School
Case Study - Heritage School
 
St Mark's Center for Innovation
St Mark's Center for InnovationSt Mark's Center for Innovation
St Mark's Center for Innovation
 
Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
 
Sustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain GardenSustainable Picnic Pavilion and Rain Garden
Sustainable Picnic Pavilion and Rain Garden
 
Hkp Presentation
Hkp PresentationHkp Presentation
Hkp Presentation
 
GNA Education Presentation - Our Projects
GNA Education Presentation - Our ProjectsGNA Education Presentation - Our Projects
GNA Education Presentation - Our Projects
 
Principles of Planning of School (Public Building)
Principles of Planning of School (Public Building)Principles of Planning of School (Public Building)
Principles of Planning of School (Public Building)
 
FAQs Islander Middle School Project (10 07 14)rj
FAQs Islander Middle School Project (10 07 14)rjFAQs Islander Middle School Project (10 07 14)rj
FAQs Islander Middle School Project (10 07 14)rj
 

Más de EDIN BROW, DCE, AMET

Más de EDIN BROW, DCE, AMET (20)

Prepositions 2
Prepositions 2Prepositions 2
Prepositions 2
 
Body language
Body languageBody language
Body language
 
Innovative teaching methodologies
Innovative teaching methodologiesInnovative teaching methodologies
Innovative teaching methodologies
 
Group Discussion ppt
Group Discussion pptGroup Discussion ppt
Group Discussion ppt
 
Water
WaterWater
Water
 
Phonemic symbols
Phonemic symbolsPhonemic symbols
Phonemic symbols
 
Mispronounced words
Mispronounced wordsMispronounced words
Mispronounced words
 
Communication skills
Communication skillsCommunication skills
Communication skills
 
Words
WordsWords
Words
 
8ee8 attitude
8ee8 attitude8ee8 attitude
8ee8 attitude
 
4. success
4. success4. success
4. success
 
3. new creativity
3. new creativity3. new creativity
3. new creativity
 
Active voice and passive voice
Active voice and passive voiceActive voice and passive voice
Active voice and passive voice
 
Punctuations
PunctuationsPunctuations
Punctuations
 
Writing a body paragraph
Writing a body paragraphWriting a body paragraph
Writing a body paragraph
 
Non verbal Communication
Non verbal CommunicationNon verbal Communication
Non verbal Communication
 
2. 4b3a personality development_notes
2. 4b3a personality development_notes2. 4b3a personality development_notes
2. 4b3a personality development_notes
 
5. 7a74 teamrace
5. 7a74 teamrace5. 7a74 teamrace
5. 7a74 teamrace
 
1. 4480 the wise way
1. 4480 the wise way1. 4480 the wise way
1. 4480 the wise way
 
50 phrasal-verbs-for-work-and-business
50 phrasal-verbs-for-work-and-business50 phrasal-verbs-for-work-and-business
50 phrasal-verbs-for-work-and-business
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

14 summary of feasibility report roby park park view 11 12-13

  • 1. Summary of Feasibility Report On Roby Park Primary and Park View Primary Background The Corporate Asset Management team were asked to produce a Feasibility Report on Roby Park Primary and Park View Primary, to see which site best fits the requirements for a 2 Forms of Entry primary school. Roby Park Primary is situated on a large site with extensive playing fields. The Building has been rewired and had new windows installed in recent years. Park View Primary is situated on a site with no grassed playing fields but has large Hard Play Areas. The Building has been rewired and had sections of new roofing and windows installed in recent years. Officers from the Corporate Asset Management Team visited both Roby Park, and Park View on the 20 July 2011. This visit enabled the Officers to assess individual areas and structure against the DfE requirements. Requirements for a Two Form of Entry School Two forms of entry school require: Building  14 classrooms of an average size (60m2) 822m2  1 (or 1 Large and 1 small) Assembly Hall totalling 226m2  Staff and Admin areas totalling 114m2  Learning Resources (Inc. Library and SEN areas) totalling 78m2 and  Storage totalling 150m2 Site  Pitches (Team Games) 8,400m2  Hard Surface Games Courts at 1,440m2 and Hard Surface Informal & Social at 1,030m2 (these areas can be combined)  The site should be between 17,320m2 and 17,300m2 Figures above are taken from Building Bulletin 99 Minimum Standards
  • 2. Roby Park Roby Park currently has the following areas Building  12 Classrooms totalling 654.24m2 (average size 60m2) – 2 classrooms and 227.76m2 short of the standards  Assembly hall measuring 204.08m2 – 21.92m2 short of the standards  Staff and Admin totalling 65.48m2 – 48.52m2 short of the standards  Learning Resources totalling 51.9m2 – 26.1m2 short of the standards  Storage totalling 70.66m2 – 79.34m2 short of the standards  Private Nursery 111.76m2 Site  Pitches (Team Games) measuring 22,650m2 – 14,250m2 over the standards  Hard Surface Games Courts and Hard Surface Informal & Social totalling 2470m2 (combined) – 687m2 short of the standards  The total site is 35,220m2 – 15,920m2 over the upper standard  Car parking – Limited Car Parking for current staff levels Park View Park View currently has the following areas Building  14 Classrooms totalling 724.21m2 (average size 45m2) – 97.79m2 short of the standards  Assembly hall & Gym totalling 289.42m2 – 63.42m2 over of the standards  Staff and Admin totalling 174.1m2 – 60.1m2 over of the standards  Learning Resources totalling 249.7m2 – 171.7m2m2 over of the standards  Storage totalling 107.61m2 – 42.39m2 short of the standards  Swimming pool  Dining Hall Block with Community Rooms  NNI Building Site  Pitches (Team Games) measuring 0m2 – 8,400m2 short the standards  Hard Surface Games Courts and Hard Surface Informal & Social totalling 4,582m2 (combined) – 2,112m2 over of the standards  The total site is 15,970m2 – 3,330m2 short of the upper standard  Car parking – Limited Car Parking for current staff levels
  • 3. Proposed Schemes Roby Park (Appendix A) It is envisaged that the east side of the building could remain unchanged (currently has 8 classrooms) with internal remodelling undertaken to the west side (nursery side).The remodelling would create 3 classrooms at approximately 66m2 each and a 4th classroom could be created by a new build extension of approximately 66m2. The total area to be remodelled would be approximately 200m2 (excluding the nursery area). A further 2 classrooms would be required and it is proposed that a double temporary classroom be utilised on the east side of the site. This would give a total provision of 14 classrooms. To address the shortfall of staff and admin areas, a modular building solution could be utilised behind the main entrance area. This would need to be approximately 114m2. The area of the building to be re-modelled would need to be taken out of school use whilst the works were carried out, potentially including the Nursery area depending on the extent of works. The area would need to be physically segregated and a temporary perimeter fence erected around the proposed extension area. An area would also be required for a contractor’s compound. It is envisaged that depending on the extent of work required the area could be out of school use for approximately 20 weeks. This could possibly be reduced if an alternative to the new build extension was chosen. A single temporary classroom could be utilised so the school could remain operational whilst the works were being carried out. Control of building work during school hours would be needed, specifically with regard to noise levels, however it is envisaged that because of the layout of site, a solution could be developed which would allow works to be carried out without causing disruption to the school. Areas of hard play area would be out of use whilst the works are carried out, therefore additional hard play areas could be created adjacent to the existing prior to the main building works commencing. This would ensure that there is sufficient hard play area available whilst the works are carried out and once complete will also increase the overall hard play area to be in line with the requirements set out above. Another issue to consider would be the future of the Private Nursery at the school. If Roby Park was the chosen option, there would no longer be space for the private nursery to operate at the school.
  • 4. Park View (Appendix B) It is envisaged that the north side of the building could remain unchanged (Gymnasium and Assembly Hall side) together with the office area in the centre, however extensive internal remodelling would be required to the remainder of the building approx (1,200m2). This is due to the relatively small sized classrooms at an average size of 45m2. Existing walls would need to be removed, which following a site visit were deemed to be load bearing and replaced with steel supports and new partition walls constructed to create larger classrooms in line with the requirements above. Works would also be required to the electrics, heating and alarm systems in these areas to suit the new configuration, together with new floor finishes and decoration. The reconfiguration of rooms would give a total of 13 classrooms, meaning an additional classroom would be required. An option could be to build an extension onto the existing staff room (room 064) and convert into a classroom. (The staff room could be relocated to the existing classroom adjacent to the Assembly Hall). The extension would need to be approximately 30m2, giving a total new room area of 64m2. An alternative solution would be utilising a single temporary classroom. Either way, this would give the required total provision of 14 classrooms. We believe that further development would also be required if the Car Park is deemed to be too small. One option would be to move the car park and entrance to the other side of the site/building. Works would be required to transform part of the hard play area into a car park and a small extension (18m2) to create a new entrance/foyer. The schools former car park could then be turned into a hard Informal & Social area for the school. For the school to remain operational whilst the works were ongoing the works would have to be carried out in two phases, with one half of the teaching area vacated and physically segregated at a time. It is envisaged that depending on the extent of work required each area could be out of school use for approximately 15 weeks each giving a total period of 30 weeks. It is envisaged that works would have to be carried out during school hours to be completed within the above periods. Other issues to consider would be the future of the Neighbourhood Nursery, Swimming Pool and the newly refurbished Community Rooms in the Dining Hall Block and Family Centre.
  • 5. Conclusion It is possible with a combination of reconfiguration of internal space and the incorporation of new build extensions/modular buildings that both schools could be made suitable for 2 form of entry. Park View only requires a small amount of new build extension, however the amount of internal remodelling required is extensive and would be to approximately 6 times the area than what would be required at Roby Park. The area affected is spread across the whole building at Park View, whereas at Roby Park it is limited to one area which could be completely segregated from the remaining area of the school whilst the works are ongoing. Physical segregation and keeping disruption to a minimum at Park View would be much more difficult to achieve whilst the works were ongoing. Please refer to SWOT analysis in Appendix C for further information. When making a decision on which site to chose, the authority also needs to consider the Department of Educations views on a possible future land disposal. In a Land Disposal Application we have to include the background to how this site became surplus to requirements. If Roby Park was to be disposed of, we would have to justify choosing a site with no green playing fields over a site which has well over the minimum standards. This may cause the department (DfE) to question the authority’s judgement. On the basis of the extensive works identified as being required from this feasibility study at Park View together with the restricted site area, it would appear that in terms of timescale, cost and potential disruption to pupils whilst works are ongoing, Roby Park would appear to be best suited to be reconfigured to a 2 form of entry school. This document was created by the KMBC Corporate Asset Management Team.
  • 6. Appendix A – Roby Park Phasing Plan for required works Appendix B – Park View Phasing Plan for required works
  • 7. Appendix C – SWOT Analysis Park View SWOT Analysis Strength  Large Solid Building, which is in good condition  High levels of hard play areas, that can be used all year round Opportunity  Develop a large solid building into a 21st Century Learning environment  Swimming Pool on site which is used by local schools and community  Has a number of 3rd Party Users – Family Centre, NNI, Weakness  Small site with no grassed playing fields  Currently majority of classrooms around 45m2 to 50m2 (10 out of 14 Classrooms)  Higher cost scheme  School have extended Car Park a number time – Car Park very narrow  All walls identified for demolition are load bearing and would require steel beams for support  Swimming Pool Energy Costs are high  School buildings are in good condition, but on first inspection, the Swimming Pool looks like it requires more investment Threat  Major works and a number of phases, could destabilise the running of the school.  Justifying disposing of a large site with playing fields and retaining a small school site Roby Park SWOT Analysis Strength  Large site with large Playing Fields  Only 3 Classrooms are between 40m2 and 45m2 (the remaining 8 classrooms are just under 60m2  Scheme to remodel and extend the school would be to the rear of the school while the school operates at the front of the school relatively unaffected  The majority of walls identified for demolition are not load bearing and wouldn’t require steel beams for support. This is a significant factor in reducing the cost of the scheme. Opportunity  School could extend beyond 2FE and still manage to meet or exceed the DfE requirements Weakness  Small building would need extending to meet the DfE requirements  School has no Swimming Pool  School will also require 1 Double Mobile Classroom to meet DfE requirements.  Teaching areas are 2 storey with no lift. Threat  If this site is chosen could potentially need to relocate/rebuild NNI, Family Centre and Swimming Pool buildings  Need to relocate Private Nursery at School
  • 8. Appendix D – Budget Cost Summary The area of refurbishment / remodelling required at Park View is 1,200m2 compared to 200m2 at Roby Park. The new build extension areas / area of modular building required at Park View is 48m2 compared to 310m2 at Roby Park. Modifications and extension to hard landscape areas is 700m2 at Park View compared to 300m2 at Roby Park. The changes/extension of the building at Roby Park could take place to the rear of the school, while the school remains operational at the front. The changes required at Park View are throughout the school (small classrooms) and would need to be completed over a number of phases, which would cost more money and time to complete and cause greater disruption to pupils. The overall assessment of budget costs for the reconfiguration and modernisation of the Park View site is £1.45m compared to £1.15m for the Roby Park site. Budget costs were calculated by measuring the areas requiring remodelling and the amount of new build at each site. The same rates were used for both sites to ensure impartiality and were based on previous schemes undertaken.