BREAKWATERSBREAKWATERS
ByBy
J.W. van der Meer, PhD. CEJ.W. van der Meer, PhD. CE
J.C. van der Lem MSc. CEJ.C. van der Lem MSc. CE
ROYAL HASKONING
J.C. (Cock) van der Lem M.Sc.
Sr. Port Engineer
Maritime Advisory Group Rotterdam
Haskoning Nederland B.V.
a company of Royal Haskoning
George Hintzenweg 85
P.O.Box 8520
3009 AM Rotterdam
The Netherlands
tel. +31-(0)10-4433666
direct +31-(0)10-4433722
mobile +31-(0)6-15006372
fax. +31-(0)10-4433688
e-mail: C.vanderLem@RoyalHaskoning.com
www.royalhaskoning.com
Contact detailsContact details
33
BreakwatersBreakwaters
February 2011February 2011
BREAKWATERSBREAKWATERS
SUBJECTS
• Rubble mound breakwaters (J.W. van der Meer)
• Vertical wall breakwaters (J.C. van der Lem)
• Berm breakwaters (J.W. van der Meer)
• Submerged breakwaters (J.W. van der Meer)
44
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall BreakwatersVertical Wall Breakwaters
Objectives (end of the course)
• To be able to make an assessment of hydraulic
loads against caisson breakwater
• To be able to make a preliminary design of a
caisson breakwater (length, width, height)
• To be able to compare caisson breakwater against
rubble mound breakwater
55
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall BreakwatersVertical Wall Breakwaters
CONTENTS
• Day 1 – Introduction, set the problem
• Day 2 – PROVERBS parameter map (exercise) &
design methods (functional requirements)
• Day 3 – Design methods (static analysis)
• Day 4 – Design methods (dynamic analysis)
• Day 5 – Worked example
66
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall BreakwatersVertical Wall Breakwaters
DAY 1 - INTRODUCTION
• Information (readers)
• Functions
• Types
• Problem definition
• Design methods (intro)
77
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall BreakwatersVertical Wall Breakwaters
Readers
In lecture notes/distributed:
• Y. Goda, Ch. 4 Design of Vertical Breakwaters
(from: Random Seas and Design of Maritime Structures.
1985)
• S. Takahashi, Design of Vertical Breakwaters
(Short Coarse, ICCE, 1996)
• PIANC; Breakwaters with Vertical and Inclined Concrete
Walls, Report WG 28, 2003
• G. Cuomo: Wave impacts on vertical sea walls & caisson
breakwaters. PIANC On Course Magazine 127 van Mei
2007.
88
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall BreakwatersVertical Wall Breakwaters
Readers (continued)
Separate:
• PowerPoint presentations (el. platform)
• PIANC WG 28 sub-group reports (el.
platform)
• Overtopping manual:
www.overtopping-manual.com
Additional reading:Additional reading:
• Oumeraci, H. et. al.; Probabilistic Design
Tools for Vertical Breakwaters
(PROVERBS), February 2001
(ISBN 09 5809 248 8 / 249 6)
• Coastal Engineering Manual
• The Rock Manual
• Breakwat (Deltares formerly WL|Delft Hydraulics)
99
BreakwatersBreakwaters
February 2011February 2011
Gijon (Spain)IJmuiden (Netherlands)Kamaishi (Japan)Marsaxlokk (Malta)Ras Laffan (Qatar)
Vertical Wall Breakwaters -Vertical Wall Breakwaters - FunctionsFunctions
FUNCTIONS
• Wave protection in
port/channel
• Protection from siltation,
currents
• Tsunami protection
• Berthing facilities
• Access/transport facility
1010
BreakwatersBreakwaters
February 2011February 2011
TYPES
(breakwaters with vertical and
inclined concrete walls)
• Conventional
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
The caisson is placed on a
relatively thin stone bedding.
Advantage of this type is the
minimum use of natural rock (in
case scarse)
Wave walls are generally placed on
shore connected caissons (reduce
overtopping)Mutsu-Ogawara (Japan)
1111
BreakwatersBreakwaters
February 2011February 2011
TYPES (continued)
• Vertical composite
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
The caisson is placed on a high
rubble foundation.
This type is economic in deep
waters, but requires substantial
volumes of (small size) rock fill
Algeciras (Spain)
1212
BreakwatersBreakwaters
February 2011February 2011
TYPES (continued)
• Horizontal composite
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
The front slope of the caisson is covered
by armour units
This type is used in shallow water. The
mound reduces wave reflection, wave
impact and wave overtopping
Repair of displaced vertical breakwaters
(day 2)
Used when a (deep) quay is required at the
inside of rubble mound breakwater
Gela (Sicily, Italy)
1313
BreakwatersBreakwaters
February 2011February 2011
TYPES (continued)
• Block type
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
This type of breakwater needs to
be placed on rock sea beds or on
very strong soils due to very high
foundation loads and sensitivity to
differential settlements
Alderney (Guernsey, UK)
1414
BreakwatersBreakwaters
February 2011February 2011
TYPES (continued)
• Piled breakwater with
concrete wall
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
Piled breakwaters consist of an
inclined or curtain wall mounted
on pile work.
The type is applicable in less
severe wave climates on site with
weak and soft subsoils with very
thick layers.
Manfredonia New Port (Italy)
1515
BreakwatersBreakwaters
February 2011February 2011
TYPES (continued)
• Sloping top
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
The upper part of the front slope
above still water level is given a
slope to reduce wave forces and
improve the direction of the wave
forces on the sloping front.
Overtopping is larger than for a
vertical wall with equal level.Napels (Italy)
1616
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
TYPES (continued)
• Perforated front wall
The front wall is perforated by
holes or slots with a wave chamber
behind.
Due to the dissipation of energy
both the wave forces on the
caisson and the wave reflection are
reducedDieppe (France)
1717
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
TYPES (continued)
• Semi-circular caisson
Well suited for shallow water
situations with intensive wave
breaking
Due to the dissipation of energy
both the wave forces on the
caisson and the wave reflection are
reducedMiyazaki Port (Japan)
1818
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
TYPES (continued)
• Dual cylindrical caisson
Outer permeable and inner
impermeable cylinder.
Low reflection and low permeable
Centre chamber and lower ring
chamber filles with sand
Nagashima Port (Japan)
1919
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - TypesTypes
• TYPES (continued)
• “Combi-caisson”
Sloping top
Semi-circular/perforated
Perforated front wall
Perforated rear wall
2020
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
What is needed?
• Proper understanding of functional requirements
• Proper understanding of loads and resistance
• Insight in failure modes
• Understanding of breaking/non-breaking waves
2121
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Functional requirements
• Access
• Quay facilities
• Overtopping
• Transmission
2222
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirements: acces (pedestrians, supply traffic)
Piraeus (Greece)
2323
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirements: acces (harbour workers, traffic, oil piping)
Marsaxlokk (Malta)
2424
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirements: acces (harbour workers, traffic, LNG piping)
Ras Laffan (Qatar)
2525
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirements: acces (harbour workers, traffic, conveyors)
Porto Torres (Sicily, Italy)
2626
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirements: quay facilities (access, warehouses, sheds)
Constantza Port (Romania)
2727
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirements: quay facilities (access, warehouses, sheds)
Durres Port (Albania)
2828
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Problem definitionProblem definition
Requirement: limit overtopping and transmission
Marina do Lugar de Baixo (Madeira, Portugal)
2929
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Loads and resistanceLoads and resistance
Loads and resistance
Loads:
• Hydraulic loads
• Weight
Resistance:
• Friction (mostly)
• Soil bearing capacity
FH
W
U
FH
W
U
F H
f W U−( )⋅
SF
≤ M F H( )
W t⋅ M u−
SF
≤
3030
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Loads and resistanceLoads and resistance
Failure modes (overall)
Hydraulic failure Geotechnical
failure
Sliding Overturning Slip
FH
W
U
FH
W
U
FH
W
U
Planar
slip
Circular slip
Earthquake loading:
LIQUEFACTION
F H
f W U−( )⋅
SF
≤ M F H( )
W t⋅ M u−
SF
≤ τ τ max<
3131
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Loads and resistanceLoads and resistance
Failure modes (local)
Instability of mound Erosion of seabed Partial
Instability
U
Erosion Scour
F H
f W U−( )⋅
SF
≤
3232
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Loads and resistanceLoads and resistance
Example overall failure: Mutsu Ogawara Port, East Breakwater (Japan)
3333
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Loads and resistanceLoads and resistance
Example local failure: Catania Breakwater (Sicily, Italy)
3434
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Impression of hydraulic forces (field)
3535
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Hydraulic Forces (laboratory)
3636
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Hydraulic Forces (laboratory)
iCam optical sensor (Deltaflume Deltares)
3737
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
• Aerated impact
• The wave breaks before reaching the wall
• Air pocket entrapped in the water not on
the wall
• Pressure varies gradually in time in phase
with wave elevation
iCam optical sensor (Deltaflume Deltares)
3838
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
• Air pocket impact
• The wave breaks closer to the wall
• A large air pocket is entrapped against
the wall
• Large peak force by crest hitting wall
• Followed by small force oscillations
• Duration of the pressure peak: O(0.01 s)
3939
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
• Flip through impact
• Forward moving wave crest and rising
wave trough converge at same impact
point
• No air pocket entrapped against the wall
• Large peak force by crest hitting wall
accelating into vertical jet
• Very short duration of impacts O(0.01 s)
4040
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
• Slosh impact
• Rising wave trough arrives at
convergence point way before forward
moving crest
• No air pocket entrapped against the wall
• Small forces with long durations
4141
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Hydraulic Forces
• Differentiate between non-breaking and breaking waves
• Identification of types of horizontal loading by means of the
PROVERBS parameter map (distribute)
4242
BreakwatersBreakwaters
February 2011February 2011
PROVERBS Definition of geometric parameters
hs
d h1
Bb
hr
hb
1:m
Beq
dc
Bc
hc hf
Rc
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
αα
Lhs
Hs Hb
4343
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
• PROVERBS parameter map (also PIANC WG 28)
Beq = Bb + 0.5∙m ∙ hb
4444
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methodsDesign methods
• PROVERBS parameter map
Beq = Bb + 0.5∙m ∙ hb
4545
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methodsDesign methods
Beq = Bb + 0.5∙m ∙ hb
4646
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methodsDesign methods
Beq = Bb + 0.5∙m ∙ hb
4747
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methodsDesign methods
Beq = Bb + 0.5∙m ∙ hb
4848
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Example: Sakata Detached Breakwater (Japan)
4949
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Example: Sakata Detached Breakwater (Japan)
Hs
hs
0.65=
hb
hs
0.541=
Hs 5.85m=hb 4.87m=hs 9m=
hb ELberm ELbottom−:=Height of berm:
Hs 0.65 hs⋅:=Design wave height
hs ELwater ELbottom−:=Design depth
ELberm 3.63− m⋅:=Berm elevation
ELwater 0.5 m⋅:=Design water level
ELbottom 8.5− m⋅:=Bottom elevation
5050
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methodsDesign methods
Beq = Bb + 0.5∙m ∙ hb
5151
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Example: Sakata Detached Breakwater (Japan)
What in case of low mound?
Hs
hs
0.65=
hb
hs
0.208=
Hs 5.85m=hb 1.87m=hs 9m=
hb ELberm ELbottom−:=Height of berm:
Hs 0.65 hs⋅:=Design wave height
hs ELwater ELbottom−:=Design depth
ELberm 6.63− m⋅:=Berm elevation
ELwater 0.5 m⋅:=Design water level
ELbottom 8.5− m⋅:=Bottom elevation
5252
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methodsDesign methods
• PROVERBS parameter map
Beq = Bb + 0.5∙m ∙ hb
5353
BreakwatersBreakwaters
February 2011February 2011
Vertical Wall Breakwaters -Vertical Wall Breakwaters - Design methods (intro)Design methods (intro)
Hydraulic Forces: evaluation of wave breaking
Sainflou Goda PROVERBSGoda (extended)
BREAKWATERSBREAKWATERS
To be continued…..To be continued…..
((distribute PIANC WG 28 cases and PROVERBS mapdistribute PIANC WG 28 cases and PROVERBS map))
Homework: read the PIANC WG 28 caseHomework: read the PIANC WG 28 case
Next course: bring PIANC case, Proverbs map & calculatorNext course: bring PIANC case, Proverbs map & calculator

Más contenido relacionado

La actualidad más candente

Terms related to docks and harbours
Terms related to docks and harboursTerms related to docks and harbours
Terms related to docks and harbours
Latif Hyder Wadho
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
Latif Hyder Wadho
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
Latif Hyder Wadho
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
Nitish Anand
 

La actualidad más candente (20)

Dredging
DredgingDredging
Dredging
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
Breakwaters ports and harbors report
Breakwaters ports and harbors reportBreakwaters ports and harbors report
Breakwaters ports and harbors report
 
Offshore Structures Presentation
Offshore Structures PresentationOffshore Structures Presentation
Offshore Structures Presentation
 
Terms related to docks and harbours
Terms related to docks and harboursTerms related to docks and harbours
Terms related to docks and harbours
 
02 Coastal Stabilization And Alternative Solutions
02  Coastal Stabilization And Alternative Solutions02  Coastal Stabilization And Alternative Solutions
02 Coastal Stabilization And Alternative Solutions
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
1.2 flood damage mitigation reservoirs
1.2 flood damage mitigation reservoirs1.2 flood damage mitigation reservoirs
1.2 flood damage mitigation reservoirs
 
Lecture 7 stress distribution in soil
Lecture 7 stress distribution in soilLecture 7 stress distribution in soil
Lecture 7 stress distribution in soil
 
Breakwaters
BreakwatersBreakwaters
Breakwaters
 
Dam outlet works lecture 1
Dam outlet works lecture 1Dam outlet works lecture 1
Dam outlet works lecture 1
 
Chapter 4 Introduction to beach processes and management strategies
Chapter  4 Introduction to beach processes and management strategiesChapter  4 Introduction to beach processes and management strategies
Chapter 4 Introduction to beach processes and management strategies
 
Hydrostatics and stability
Hydrostatics and stabilityHydrostatics and stability
Hydrostatics and stability
 
Dams
DamsDams
Dams
 
Chapter 2 wave and tides with examples
Chapter  2 wave and tides with examplesChapter  2 wave and tides with examples
Chapter 2 wave and tides with examples
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
SLUICE GATE
SLUICE GATESLUICE GATE
SLUICE GATE
 
Offshore platform
Offshore platform Offshore platform
Offshore platform
 
Introduction to offshore structures
Introduction to offshore structuresIntroduction to offshore structures
Introduction to offshore structures
 
Ship Building (parts of ship)
Ship Building (parts of ship)Ship Building (parts of ship)
Ship Building (parts of ship)
 

Destacado

Horbour & Dock Engineerin
Horbour & Dock EngineerinHorbour & Dock Engineerin
Horbour & Dock Engineerin
jamalkhan619
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
Latif Hyder Wadho
 

Destacado (20)

Horbour & Dock Engineerin
Horbour & Dock EngineerinHorbour & Dock Engineerin
Horbour & Dock Engineerin
 
Breakwater, jetties and groins.
Breakwater, jetties and groins.Breakwater, jetties and groins.
Breakwater, jetties and groins.
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
Classification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptxClassification of port and harbour ppt.pptx
Classification of port and harbour ppt.pptx
 
Port and Harbor Engineering
Port and Harbor EngineeringPort and Harbor Engineering
Port and Harbor Engineering
 
Harbour
HarbourHarbour
Harbour
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction
 
Breakwaters and types
Breakwaters and types Breakwaters and types
Breakwaters and types
 
Rubble mound breakwater
Rubble mound breakwaterRubble mound breakwater
Rubble mound breakwater
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
Design of Rubble Mound Seawall
Design of Rubble Mound SeawallDesign of Rubble Mound Seawall
Design of Rubble Mound Seawall
 
Breakwater Consulting BPC
Breakwater Consulting BPCBreakwater Consulting BPC
Breakwater Consulting BPC
 
WEC_TEC_Infastructure
WEC_TEC_InfastructureWEC_TEC_Infastructure
WEC_TEC_Infastructure
 
Transit shades and aprons.
Transit shades and aprons.Transit shades and aprons.
Transit shades and aprons.
 
Aids to Navigation
Aids to NavigationAids to Navigation
Aids to Navigation
 
Navigation aids
Navigation aidsNavigation aids
Navigation aids
 
Navigational aids
Navigational aidsNavigational aids
Navigational aids
 
Railway track:An Introduction
Railway track:An IntroductionRailway track:An Introduction
Railway track:An Introduction
 
Airport planning and Design
Airport planning and DesignAirport planning and Design
Airport planning and Design
 
railway ppt for civil engg.
 railway ppt for civil engg. railway ppt for civil engg.
railway ppt for civil engg.
 

Similar a Breakwaters day 1 - introduction

Coastal structure presentation_usace
Coastal structure presentation_usaceCoastal structure presentation_usace
Coastal structure presentation_usace
kumarrec
 

Similar a Breakwaters day 1 - introduction (20)

Curso_Hidro_1.pdf
Curso_Hidro_1.pdfCurso_Hidro_1.pdf
Curso_Hidro_1.pdf
 
Dawlish seawall collapse.
Dawlish seawall collapse.Dawlish seawall collapse.
Dawlish seawall collapse.
 
SUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentationSUBMERGED FLOATING TUNNEL Civil engineering presentation
SUBMERGED FLOATING TUNNEL Civil engineering presentation
 
IAHR 2015 - Long waves in intermediate depths and their influence on the desi...
IAHR 2015 - Long waves in intermediate depths and their influence on the desi...IAHR 2015 - Long waves in intermediate depths and their influence on the desi...
IAHR 2015 - Long waves in intermediate depths and their influence on the desi...
 
Chapter 2 Of Rock Engineering
Chapter 2 Of  Rock  EngineeringChapter 2 Of  Rock  Engineering
Chapter 2 Of Rock Engineering
 
Positioning the Solitaire
Positioning the SolitairePositioning the Solitaire
Positioning the Solitaire
 
Final ppt of ts
Final ppt of tsFinal ppt of ts
Final ppt of ts
 
Aahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptxAahe ppt grp 5 (2).pptx
Aahe ppt grp 5 (2).pptx
 
Health and flood plan
Health and flood planHealth and flood plan
Health and flood plan
 
Submerged floating tunnel
Submerged floating tunnelSubmerged floating tunnel
Submerged floating tunnel
 
Submerged floating tunnel
Submerged floating tunnel Submerged floating tunnel
Submerged floating tunnel
 
First assignment group (2) presentation.pdf
First assignment group (2) presentation.pdfFirst assignment group (2) presentation.pdf
First assignment group (2) presentation.pdf
 
20150421031337318
2015042103133731820150421031337318
20150421031337318
 
Possibilty of Dam failures
Possibilty of Dam failuresPossibilty of Dam failures
Possibilty of Dam failures
 
Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)Tunnelling & underground design (Topic2-geological uncertainty)
Tunnelling & underground design (Topic2-geological uncertainty)
 
Submerged floating tunnel ppt
Submerged floating tunnel pptSubmerged floating tunnel ppt
Submerged floating tunnel ppt
 
Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...Recommendations for proof load testing of reinforced concrete slab bridges - ...
Recommendations for proof load testing of reinforced concrete slab bridges - ...
 
DSD-INT 2018 Mud dynamics in the Scheldt estuary - modelling natural dynamics...
DSD-INT 2018 Mud dynamics in the Scheldt estuary - modelling natural dynamics...DSD-INT 2018 Mud dynamics in the Scheldt estuary - modelling natural dynamics...
DSD-INT 2018 Mud dynamics in the Scheldt estuary - modelling natural dynamics...
 
Coastal structure presentation_usace
Coastal structure presentation_usaceCoastal structure presentation_usace
Coastal structure presentation_usace
 
1926 tunneling safety 2015
1926 tunneling safety 20151926 tunneling safety 2015
1926 tunneling safety 2015
 

Último

Último (20)

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 

Breakwaters day 1 - introduction

Notas del editor

  1. North Eastern port of Japan, facing the Pacific Ocean Construction started in 1983 Length of some 1800 m Partially completed by beginning 1991, but also part under construction In February 1991 high waves struck breakwater during winter depression (968 mbar), i.e. not by a typhoon. Damage at three locations along the breakwater H s = 6.9 to 7.6 m H max = 12.1 to 13.2 m T1/3 = 13 s Method: Goda γ sliding = 1.35 – 2.16 γ overturning = 2.60 – 4.54 Damage (finished section) Caissons displaced (some up to 6 m) Caisson walls broken Wave dissipating blocks scattered and inside caisson! Scour Damage (part under construction): 17 caissons displaced some up to 5 m Measured waves: H s = 9.94 m, T 1/3 = 13.4 s. Cause of damage: Waves beyond design wave Scattering of wave dissipating blocks
  2. North Western part of Japan, facing the Japan Sea Construction in 1972/1973 Length of some 1800 m In winter 1973/1974 sliding occurred. Damage at three locations along the breakwater H s = 5.9 m H max = 8.1 m T1/3 = 10.5 s Method: Hiroi γ sliding = some sections ≤1. γ overturning = ≥ 1.3 Damage (finished section) Caissons displaced (some up to 6 m) Caisson walls broken Wave dissipating blocks scattered and inside caisson! Scour Damage (part under construction): 17 caissons displaced some up to 5 m Measured waves: H s = 4.3 to 5.8 m, T 1/3 = 13.4 s. Cause of damage: Insufficient knowledge of impacting breaking waves