SlideShare a Scribd company logo
1 of 28
Download to read offline
Embraer

Industrial Architecture

        November 2006
Product portfolio

                                        ERJ 145 Series




      ERJ 135               ERJ 140                  ERJ 145 XR             ERJ 145


                                 EMBRAER 170/190 Series




   EMBRAER 170            EMBRAER 175          EMBRAER 190              EMBRAER 195


                Defense                                     Executive




    ALX                       AEW           Legacy            Phenom        Lineage
Product Evolution

    ‘70s        ‘80s              ‘90s                                ‘00s

                                                                                ERJ 140
                                                        ERJ 135
                                  BRASILIA
                                  (EMB 120)
                BRASILIA                                ERJ 145               ERJ 145 XR
BANDEIRANTE     (EMB 120)
(EMB 110/111)                     ERJ 135
                                                      EMBRAER 175            EMBRAER 170

                                  ERJ 140
                EMB 321                                                      EMBRAER 190
                                                      EMBRAER 195
  EMB 326                         ERJ 145

                                                      PHENOM 300              PHENOM 100
                                            ALX
                                         (EMB 314)
                  AMX
                            AMX                       LEGACY 600             LINEAGE 1000
  EMB 121
                             EMB 145 AEW&C                                   SUPER TUCANO
                                                     EMB 145 AEW&C
                 TUCANO
                (EMB 312)    EMB 145 RS/AGS                                      P-99
                                                     EMB 145 RS/AGS
                                                                                 AMX
Industrial
Operations
Manufacturing Processes
                      Raw Material                       Equipment                          Segments
        r
     lie
   pp
 Su




               Harness               Sheet Metal          Machining     Tubing               Composite
           n
     ic ts
         io
   br ar
       at
 Fa P




                   Sub-assembly                    Segments                      Fuselage
      bl al
    em ur
        y
 ss ct
A tru
  S




                  Painting              System Installation and Tests            Flight Preparation




                                                                                                         DELIVERY
         y
      m l
    se na
       bl
  As Fi
Embraer Units
                      São Paulo State

                                                 Unit – Gaviao Peixoto



                                                                         Unit – Eugênio de Melo

    Brazil

             Brazil            Unit – Botucatú

                                                                         Unit – Faria Lima
Embraer Units: Faria Lima

Located in São José dos Campos, São Paulo State.
Designs and manufactures aircraft for the commercial,
defense and corporate markets and provides after-sales support.

                                                                    Floor space: 296,191 m²
                                                             Employees at Faria Lima: 10,882
Embraer Units: Faria Lima (cont.)




                Milling              Sheet Metal Shop




          Composite Material        Digital Manufacturing
Embraer Units: Faria Lima (cont.)




          Structural Assembly       Fuselage Junction




                Painting            Final Assembly
Embraer Units: Eugênio de Melo
Located in Eugênio de Melo, a district of São José dos Campos
This unit has a total area of 343,400 m², of which 54,607 m² are industrial buildings used in the development
and manufacturing of tooling equipment and piping, as well as for performing welding, milling and wire
looming operations.


Number of employees at Eugênio de Melo: 1,595
Embraer Units: Eugênio de Melo (cont.)




 Tooling – Design & Manufacturing



                                    Harness




                                              Tubing
Embraer Units: Gavião Peixoto
Located in Gavião Peixoto, São Paulo State.
Manufacturing facility that will host the final assembly activities of the Company´s executive and defense
aircraft, as well as a runway for test flights.

Floor Space: 53,979 m²
Number of employees: 1,348 Start-up of operations in October 2001
Embraer Units: Gavião Peixoto (cont.)

Executive Interior Cabinets:




                                                      Legacy Interior




      Cabinets Assembly Area



                               Conclusion 2004 sept                     1.750 m2
Embraer Units: Gavião Peixoto (cont.)




             F5-BR Revitalization




                                        Super Tucano
           Assembly Hangar
Embraer Units: Botucatu
Embraer – Botucatu
The Indústria Aeronáutica Neiva manufacturing activities have been taken over by EMBRAER – Botucatu Unit,
which was incorporated on July 1, 2006. The following activities are performed at the Botucatu Unit: Ipanema
aircraft production, manufacture of parts and structures for the jets of the ERJ 145, EMBRAER 170/190 and Phenom
families, assembly of the Super Tucano fuselage structure, and manufacture of Ground Support Equipment tooling
and devices.
Neiva will remain responsible for Ipanema aircraft marketing activities, spare parts sales and agricultural aircraft
after-sales support.
                                                                     Total Area: 122,980 m²
                                                                     Floor space: 41,553 m²
                                                                     Number of employees: 1,396
Embraer Units: Botucatu (cont.)




   Montagem de Segmentos




                           Sheet Metal




                                         Plug Panel EMBRAER 170
Embraer Units: Botucatu (cont.)




                         Ipanema Álcool




    EMB202 - Ipanema                      Ground Support Equipment
Manufacturing Strategies
                  Time-To-Market:                                                                                                                                                            Manufacturing Cycle Reduction
                                                                                                                                                                                                  Mtg. 1
                                                                                                                                                                                                  Mtg. 1        Mtg. 2       Mtg. 3   Mtg. 4
                                                                                                                                                                                                                                      Mtg. 4
 Responsiveness

                                                                                                                                                                                                  1º C.C.       2º C.C.




                                                                                                                                                                                     LSE                                                       LSE

    Process                                                                                                                                                                          Obj.                                                      Obj.

   Capability                                                                                                                                                                        LIE
                                                                                                                                                                                                                                               LIE




                   Inventory Turn Over
                    8,0


                                                                                                                                                                               6,7
                    7,0




     Costs          6,0



                    5,0
                                                                                                                                                                              4,4




   Reduction
                    4,0



                    3,0



                    2,0


                                                                                ALMOX. AERON.                PROCESSO TOTAL
                    1,0



                    0,0
                                   fev/02


                                            abr/02


                                                     jun/02


                                                              ago/02


                                                                       out/02




                                                                                           fev/03


                                                                                                    abr/03


                                                                                                             jun/03


                                                                                                                      ago/03


                                                                                                                               out/03




                                                                                                                                                 fev/04


                                                                                                                                                          abr/04


                                                                                                                                                                   jun/04


                                                                                                                                                                            ago/04
                          dez/01




                                                                                  dez/02




                                                                                                                                        dez/03




                                                      Postponement:                                                                                                                                                       Configuration Cycle
                   Primary                                                                                                     Structural                                              Final
 Manufacturing     Parts                                                                                                       Assembly                                                Assembly

   Flexibility
                                                                                                                                                                                                                                                      delivery

                                                                                                                                                                                                            month
Phenom™ 100
       and
 Phenom™ 300

Introducing a New
  Manufacturing
 Process concept
Phenom manufacturing concept

  • High performance line                             •   Bonded Warehouse
      • Maximize activities, sub-assemblies                • Inventory management
      • Components Assemblies in parallel with the         • Planning parameter
        line
      • “First in First Out”
  • Backflushing
      • Automatic deduction from inventory based on
        the Bill of Materials (BOM)
      • Reduce the number of manual transactions
Phenom manufacturing concept

  • Fixed Workcenter per employee
      • Acceleration of Phenom Assembly learning curve and maturity
      • Improving the quality of the product
  • Multi-functional employee, dedicated in the workcenter
      • Electric and mechanical assemblies done by the same employee
Phenom manufacturing concept

  • Visual Management
      • Padronization;
      • Easy performance evaluation;
      • Clear instructions;
      • Areas of material storage marked and defined;


  • Quality
      • Quality with Simplified Process;
      • Who does, he/she makes the quality (the operator does
        and it verifies);
Investments
      &
Manufacturing
  expansion
Production Ramp Up


 Embraer 170/190:                       70 to 78 Seats


      2006 -   Up to   08 ac/m
                                        78 to 86 Seats
      2007 -   Up to   12 ac/m
      2008 -   Up to   14 ac/m
                                        98 to 106 Seats



                                        108 to 118 Seats




 Phenom 100/300
      2008 2nd Half-   15 to 20 ac/y
      2009 -           120 to150 ac/y
Facilities Investments: few examples




  Final Assembly                   Surface
      Hangar                      Treatment




     Painting                      Chemical
      Shop                          Milling
Embraer Logistics
ASRS System: Automated System

    Automatic Storage and retrieval system for trays with integrated picking work
    stations
    Suitable for up to 500 pick-and-put moviments per man-hour
    Heigth: up to 6 m (8m Embraer Project)
Thank you

More Related Content

What's hot

750 j ii-t384321x54 (1)
750 j ii-t384321x54 (1)750 j ii-t384321x54 (1)
750 j ii-t384321x54 (1)arildochaves1
 
Case ih case international 5140 tractor service repair manual
Case ih case international 5140 tractor service repair manualCase ih case international 5140 tractor service repair manual
Case ih case international 5140 tractor service repair manualfjjsieskekfmmse
 
AVIA1000 Group Project
AVIA1000 Group ProjectAVIA1000 Group Project
AVIA1000 Group ProjectDan Morrell
 
1429498303wpdm product print 4 201408r
1429498303wpdm product print 4 201408r1429498303wpdm product print 4 201408r
1429498303wpdm product print 4 201408rgoogle.com
 
Group assignment revision uld
Group assignment revision uldGroup assignment revision uld
Group assignment revision uldnisaqmathanafi
 
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti BalaAircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti BalaMalay Kanti Bala
 
AIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING AC
AIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING ACAIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING AC
AIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING ACNat Rice
 
Aircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_SlideshareAircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_SlideshareFrank Alfieri
 
سازمان بین‌المللی هوانوردی کشوری
سازمان بین‌المللی هوانوردی کشوری سازمان بین‌المللی هوانوردی کشوری
سازمان بین‌المللی هوانوردی کشوری Islamic Republic of Iran Air Force
 
Renault Clio Estate
Renault Clio EstateRenault Clio Estate
Renault Clio EstateAutoblog.it
 
John deere xuv 620i gator utility vehicle service repair manual
John deere xuv 620i gator utility vehicle service repair manualJohn deere xuv 620i gator utility vehicle service repair manual
John deere xuv 620i gator utility vehicle service repair manualfusjejfjskekemm
 
Yamaha t50 tr outboard service repair manual l 406850
Yamaha t50 tr outboard service repair manual l 406850 Yamaha t50 tr outboard service repair manual l 406850
Yamaha t50 tr outboard service repair manual l 406850 jkjsekmd
 
DO 178C Upcoming Guidance for OOS
DO 178C Upcoming Guidance for OOSDO 178C Upcoming Guidance for OOS
DO 178C Upcoming Guidance for OOSAdaCore
 
Jcb t2 t3 mech engine 4 cyl service repair manual
Jcb t2  t3 mech engine 4 cyl service repair manualJcb t2  t3 mech engine 4 cyl service repair manual
Jcb t2 t3 mech engine 4 cyl service repair manualujfjjskekkksmem
 

What's hot (20)

750 j ii-t384321x54 (1)
750 j ii-t384321x54 (1)750 j ii-t384321x54 (1)
750 j ii-t384321x54 (1)
 
Case ih case international 5140 tractor service repair manual
Case ih case international 5140 tractor service repair manualCase ih case international 5140 tractor service repair manual
Case ih case international 5140 tractor service repair manual
 
Solution homework2
Solution homework2Solution homework2
Solution homework2
 
AVIA1000 Group Project
AVIA1000 Group ProjectAVIA1000 Group Project
AVIA1000 Group Project
 
Aircraft Airworthiness
Aircraft AirworthinessAircraft Airworthiness
Aircraft Airworthiness
 
1429498303wpdm product print 4 201408r
1429498303wpdm product print 4 201408r1429498303wpdm product print 4 201408r
1429498303wpdm product print 4 201408r
 
Group assignment revision uld
Group assignment revision uldGroup assignment revision uld
Group assignment revision uld
 
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti BalaAircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
Aircraft Maintenance Manuals for Engineer's by Engr. Malay Kanti Bala
 
AIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING AC
AIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING ACAIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING AC
AIRBUS A320 AIRCRAFT CHARACTERISTICS AIRPORT AND MAINTENANCE PLANNING AC
 
Aircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_SlideshareAircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
Aircraft Rotable Components - MRO Cost Models_v17_Final_Slideshare
 
VFR و IFR
 VFR و IFR VFR و IFR
VFR و IFR
 
4 a regulation
4 a regulation4 a regulation
4 a regulation
 
Dassault aviation
Dassault aviationDassault aviation
Dassault aviation
 
سازمان بین‌المللی هوانوردی کشوری
سازمان بین‌المللی هوانوردی کشوری سازمان بین‌المللی هوانوردی کشوری
سازمان بین‌المللی هوانوردی کشوری
 
Aviation business basics 3
Aviation business basics   3Aviation business basics   3
Aviation business basics 3
 
Renault Clio Estate
Renault Clio EstateRenault Clio Estate
Renault Clio Estate
 
John deere xuv 620i gator utility vehicle service repair manual
John deere xuv 620i gator utility vehicle service repair manualJohn deere xuv 620i gator utility vehicle service repair manual
John deere xuv 620i gator utility vehicle service repair manual
 
Yamaha t50 tr outboard service repair manual l 406850
Yamaha t50 tr outboard service repair manual l 406850 Yamaha t50 tr outboard service repair manual l 406850
Yamaha t50 tr outboard service repair manual l 406850
 
DO 178C Upcoming Guidance for OOS
DO 178C Upcoming Guidance for OOSDO 178C Upcoming Guidance for OOS
DO 178C Upcoming Guidance for OOS
 
Jcb t2 t3 mech engine 4 cyl service repair manual
Jcb t2  t3 mech engine 4 cyl service repair manualJcb t2  t3 mech engine 4 cyl service repair manual
Jcb t2 t3 mech engine 4 cyl service repair manual
 

Viewers also liked

Embraer march 2016 book ri
Embraer march 2016 book riEmbraer march 2016 book ri
Embraer march 2016 book riEmbraer RI
 
Aircraft final Assembly
Aircraft final Assembly Aircraft final Assembly
Aircraft final Assembly vikalpdongre
 
Embraer may 2015 book ri
Embraer may 2015 book riEmbraer may 2015 book ri
Embraer may 2015 book riEmbraer RI
 
3.0 embraer day march 2016 final2
3.0 embraer day march 2016 final23.0 embraer day march 2016 final2
3.0 embraer day march 2016 final2Embraer RI
 
5.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.155.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.15Embraer RI
 
4.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev74.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev7Embraer RI
 
Manufacturing process
Manufacturing processManufacturing process
Manufacturing processAkhtar Kamal
 
2006 - Embraer A&I Meeting Airline Market
2006 - Embraer A&I Meeting Airline Market2006 - Embraer A&I Meeting Airline Market
2006 - Embraer A&I Meeting Airline MarketEmbraer RI
 
Embraer day 2011_ny_ds(1)
Embraer day 2011_ny_ds(1)Embraer day 2011_ny_ds(1)
Embraer day 2011_ny_ds(1)Embraer RI
 
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
2008* Embraer Day   ApresentaçãO OperaçõEs Industriais2008* Embraer Day   ApresentaçãO OperaçõEs Industriais
2008* Embraer Day ApresentaçãO OperaçõEs IndustriaisEmbraer RI
 
2007* Industrial Operations Embraer Day 2007
2007* Industrial Operations Embraer Day 20072007* Industrial Operations Embraer Day 2007
2007* Industrial Operations Embraer Day 2007Embraer RI
 
H.C. Shin Executive Vice President, Industrial and Transportation Business
H.C. Shin Executive Vice President, Industrial and Transportation BusinessH.C. Shin Executive Vice President, Industrial and Transportation Business
H.C. Shin Executive Vice President, Industrial and Transportation Businessfinance10
 
2.0 embraer day agenda
2.0 embraer day agenda2.0 embraer day agenda
2.0 embraer day agendaEmbraer RI
 
Embraer may 2010 soc_gen
Embraer may 2010 soc_genEmbraer may 2010 soc_gen
Embraer may 2010 soc_genEmbraer RI
 
2008 - Apimec SãO Paulo Resultados Dos 2º Trimestre De 2008
2008 - Apimec SãO Paulo   Resultados Dos 2º Trimestre De 20082008 - Apimec SãO Paulo   Resultados Dos 2º Trimestre De 2008
2008 - Apimec SãO Paulo Resultados Dos 2º Trimestre De 2008Embraer RI
 
IR Institucional Presentation - March 2013
IR Institucional Presentation - March 2013IR Institucional Presentation - March 2013
IR Institucional Presentation - March 2013Embraer RI
 
Emb day executive aviation oct2013
Emb day executive aviation oct2013Emb day executive aviation oct2013
Emb day executive aviation oct2013Embraer RI
 
Embraer Presentation (Nov.11)
Embraer Presentation (Nov.11)Embraer Presentation (Nov.11)
Embraer Presentation (Nov.11)Embraer RI
 
D) 06 aircraft areas and dimensions
D) 06 aircraft areas and dimensionsD) 06 aircraft areas and dimensions
D) 06 aircraft areas and dimensionsHifon Wong
 

Viewers also liked (20)

Embraer march 2016 book ri
Embraer march 2016 book riEmbraer march 2016 book ri
Embraer march 2016 book ri
 
Aircraft final Assembly
Aircraft final Assembly Aircraft final Assembly
Aircraft final Assembly
 
Embraer may 2015 book ri
Embraer may 2015 book riEmbraer may 2015 book ri
Embraer may 2015 book ri
 
3.0 embraer day march 2016 final2
3.0 embraer day march 2016 final23.0 embraer day march 2016 final2
3.0 embraer day march 2016 final2
 
5.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.155.0 embraer day ny march2016 defense r.15
5.0 embraer day ny march2016 defense r.15
 
4.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev74.0 embraer day br 2016 commercial aviation rev7
4.0 embraer day br 2016 commercial aviation rev7
 
Manufacturing process
Manufacturing processManufacturing process
Manufacturing process
 
2006 - Embraer A&I Meeting Airline Market
2006 - Embraer A&I Meeting Airline Market2006 - Embraer A&I Meeting Airline Market
2006 - Embraer A&I Meeting Airline Market
 
Embraer day 2011_ny_ds(1)
Embraer day 2011_ny_ds(1)Embraer day 2011_ny_ds(1)
Embraer day 2011_ny_ds(1)
 
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
2008* Embraer Day   ApresentaçãO OperaçõEs Industriais2008* Embraer Day   ApresentaçãO OperaçõEs Industriais
2008* Embraer Day ApresentaçãO OperaçõEs Industriais
 
2007* Industrial Operations Embraer Day 2007
2007* Industrial Operations Embraer Day 20072007* Industrial Operations Embraer Day 2007
2007* Industrial Operations Embraer Day 2007
 
H.C. Shin Executive Vice President, Industrial and Transportation Business
H.C. Shin Executive Vice President, Industrial and Transportation BusinessH.C. Shin Executive Vice President, Industrial and Transportation Business
H.C. Shin Executive Vice President, Industrial and Transportation Business
 
2.0 embraer day agenda
2.0 embraer day agenda2.0 embraer day agenda
2.0 embraer day agenda
 
Embraer may 2010 soc_gen
Embraer may 2010 soc_genEmbraer may 2010 soc_gen
Embraer may 2010 soc_gen
 
2008 - Apimec SãO Paulo Resultados Dos 2º Trimestre De 2008
2008 - Apimec SãO Paulo   Resultados Dos 2º Trimestre De 20082008 - Apimec SãO Paulo   Resultados Dos 2º Trimestre De 2008
2008 - Apimec SãO Paulo Resultados Dos 2º Trimestre De 2008
 
IR Institucional Presentation - March 2013
IR Institucional Presentation - March 2013IR Institucional Presentation - March 2013
IR Institucional Presentation - March 2013
 
Emb day executive aviation oct2013
Emb day executive aviation oct2013Emb day executive aviation oct2013
Emb day executive aviation oct2013
 
Embraer Presentation (Nov.11)
Embraer Presentation (Nov.11)Embraer Presentation (Nov.11)
Embraer Presentation (Nov.11)
 
D) 06 aircraft areas and dimensions
D) 06 aircraft areas and dimensionsD) 06 aircraft areas and dimensions
D) 06 aircraft areas and dimensions
 
Area-51
Area-51Area-51
Area-51
 

Similar to Industrial EMBRAER DAY 2006

Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006Embraer RI
 
2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate Overview2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate OverviewEmbraer RI
 
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...Embraer RI
 
2005* Ubs 6th Annual Conference Embraer Presentation
2005* Ubs 6th Annual Conference   Embraer Presentation2005* Ubs 6th Annual Conference   Embraer Presentation
2005* Ubs 6th Annual Conference Embraer PresentationEmbraer RI
 
Corporate Presentation
Corporate Presentation Corporate Presentation
Corporate Presentation Embraer RI
 
Arq12610161 091209104850-phpapp01
Arq12610161 091209104850-phpapp01Arq12610161 091209104850-phpapp01
Arq12610161 091209104850-phpapp01cirobondesan
 
2007 - 7th Analysts And Investors Meeting MauríCio Botelho
2007 - 7th Analysts And Investors Meeting  MauríCio Botelho2007 - 7th Analysts And Investors Meeting  MauríCio Botelho
2007 - 7th Analysts And Investors Meeting MauríCio BotelhoEmbraer RI
 
Santander Conference - Cancun
Santander Conference - CancunSantander Conference - Cancun
Santander Conference - CancunEmbraer RI
 
Industrial operations embraer day 2007
Industrial operations embraer day 2007Industrial operations embraer day 2007
Industrial operations embraer day 2007Embraer RI
 
Military Division
Military DivisionMilitary Division
Military Divisionnixmed
 
Internship at Pakistan Aeronautical Complex
Internship at Pakistan Aeronautical ComplexInternship at Pakistan Aeronautical Complex
Internship at Pakistan Aeronautical ComplexMuhammad Usman
 
2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190...
2004* 5o.Encontro Anual De Investidores Da Embraer   Programa Embraer 170 190...2004* 5o.Encontro Anual De Investidores Da Embraer   Programa Embraer 170 190...
2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190...Embraer RI
 

Similar to Industrial EMBRAER DAY 2006 (12)

Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006Engineering and Development EMBREAR DAY 2006
Engineering and Development EMBREAR DAY 2006
 
2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate Overview2005 - Defense Market And Corporate Overview
2005 - Defense Market And Corporate Overview
 
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...2004* 5o.Encontro Anual De Investidores Da Embraer   Panorama Industrial (Dis...
2004* 5o.Encontro Anual De Investidores Da Embraer Panorama Industrial (Dis...
 
2005* Ubs 6th Annual Conference Embraer Presentation
2005* Ubs 6th Annual Conference   Embraer Presentation2005* Ubs 6th Annual Conference   Embraer Presentation
2005* Ubs 6th Annual Conference Embraer Presentation
 
Corporate Presentation
Corporate Presentation Corporate Presentation
Corporate Presentation
 
Arq12610161 091209104850-phpapp01
Arq12610161 091209104850-phpapp01Arq12610161 091209104850-phpapp01
Arq12610161 091209104850-phpapp01
 
2007 - 7th Analysts And Investors Meeting MauríCio Botelho
2007 - 7th Analysts And Investors Meeting  MauríCio Botelho2007 - 7th Analysts And Investors Meeting  MauríCio Botelho
2007 - 7th Analysts And Investors Meeting MauríCio Botelho
 
Santander Conference - Cancun
Santander Conference - CancunSantander Conference - Cancun
Santander Conference - Cancun
 
Industrial operations embraer day 2007
Industrial operations embraer day 2007Industrial operations embraer day 2007
Industrial operations embraer day 2007
 
Military Division
Military DivisionMilitary Division
Military Division
 
Internship at Pakistan Aeronautical Complex
Internship at Pakistan Aeronautical ComplexInternship at Pakistan Aeronautical Complex
Internship at Pakistan Aeronautical Complex
 
2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190...
2004* 5o.Encontro Anual De Investidores Da Embraer   Programa Embraer 170 190...2004* 5o.Encontro Anual De Investidores Da Embraer   Programa Embraer 170 190...
2004* 5o.Encontro Anual De Investidores Da Embraer Programa Embraer 170 190...
 

More from Embraer RI

1.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v21.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v2Embraer RI
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3Embraer RI
 
Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)Embraer RI
 
Embraer february 2016 book ri
Embraer february 2016 book riEmbraer february 2016 book ri
Embraer february 2016 book riEmbraer RI
 
Embraer december 2015 book ri
Embraer december 2015 book riEmbraer december 2015 book ri
Embraer december 2015 book riEmbraer RI
 
5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_site5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_siteEmbraer RI
 
Embraer november 2015 book ri
Embraer november 2015 book riEmbraer november 2015 book ri
Embraer november 2015 book riEmbraer RI
 
1 embraer 3-q15_results_final
1 embraer 3-q15_results_final1 embraer 3-q15_results_final
1 embraer 3-q15_results_finalEmbraer RI
 
5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-final5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-finalEmbraer RI
 
2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-final2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-finalEmbraer RI
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3Embraer RI
 
Embraer 3 q15_results_final
Embraer 3 q15_results_finalEmbraer 3 q15_results_final
Embraer 3 q15_results_finalEmbraer RI
 
2015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev92015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev9Embraer RI
 
Embraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer RI
 
Embraer august 2015 book ri
Embraer august 2015 book riEmbraer august 2015 book ri
Embraer august 2015 book riEmbraer RI
 
Embraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer RI
 
Embraer 1 q15_results_final (1)
Embraer 1 q15_results_final (1)Embraer 1 q15_results_final (1)
Embraer 1 q15_results_final (1)Embraer RI
 
Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)Embraer RI
 
Embraer 4 q14_results_final (8)
Embraer 4 q14_results_final (8)Embraer 4 q14_results_final (8)
Embraer 4 q14_results_final (8)Embraer RI
 
Embraer 4 q14_results_final (1)
Embraer 4 q14_results_final (1)Embraer 4 q14_results_final (1)
Embraer 4 q14_results_final (1)Embraer RI
 

More from Embraer RI (20)

1.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v21.0 embraer 4 q15_results_final_v2
1.0 embraer 4 q15_results_final_v2
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3
 
Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)Emb day executive aviation oct2013 (2)
Emb day executive aviation oct2013 (2)
 
Embraer february 2016 book ri
Embraer february 2016 book riEmbraer february 2016 book ri
Embraer february 2016 book ri
 
Embraer december 2015 book ri
Embraer december 2015 book riEmbraer december 2015 book ri
Embraer december 2015 book ri
 
5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_site5 embraer day 2015 vae bf-final_v2_sc_site
5 embraer day 2015 vae bf-final_v2_sc_site
 
Embraer november 2015 book ri
Embraer november 2015 book riEmbraer november 2015 book ri
Embraer november 2015 book ri
 
1 embraer 3-q15_results_final
1 embraer 3-q15_results_final1 embraer 3-q15_results_final
1 embraer 3-q15_results_final
 
5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-final5 embraer day 2015 vae bf-final
5 embraer day 2015 vae bf-final
 
2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-final2015 10 8 emb day - commercial rev-final
2015 10 8 emb day - commercial rev-final
 
3 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_33 embraer day ny 2015 defesa-final_3
3 embraer day ny 2015 defesa-final_3
 
Embraer 3 q15_results_final
Embraer 3 q15_results_finalEmbraer 3 q15_results_final
Embraer 3 q15_results_final
 
2015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev92015 10 8 emb day - commercial rev9
2015 10 8 emb day - commercial rev9
 
Embraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer 2 q15_results_final
Embraer 2 q15_results_final
 
Embraer august 2015 book ri
Embraer august 2015 book riEmbraer august 2015 book ri
Embraer august 2015 book ri
 
Embraer 2 q15_results_final
Embraer 2 q15_results_finalEmbraer 2 q15_results_final
Embraer 2 q15_results_final
 
Embraer 1 q15_results_final (1)
Embraer 1 q15_results_final (1)Embraer 1 q15_results_final (1)
Embraer 1 q15_results_final (1)
 
Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)Embraer march 2015 book ri (1)
Embraer march 2015 book ri (1)
 
Embraer 4 q14_results_final (8)
Embraer 4 q14_results_final (8)Embraer 4 q14_results_final (8)
Embraer 4 q14_results_final (8)
 
Embraer 4 q14_results_final (1)
Embraer 4 q14_results_final (1)Embraer 4 q14_results_final (1)
Embraer 4 q14_results_final (1)
 

Recently uploaded

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 

Recently uploaded (20)

Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 

Industrial EMBRAER DAY 2006

  • 2. Product portfolio ERJ 145 Series ERJ 135 ERJ 140 ERJ 145 XR ERJ 145 EMBRAER 170/190 Series EMBRAER 170 EMBRAER 175 EMBRAER 190 EMBRAER 195 Defense Executive ALX AEW Legacy Phenom Lineage
  • 3. Product Evolution ‘70s ‘80s ‘90s ‘00s ERJ 140 ERJ 135 BRASILIA (EMB 120) BRASILIA ERJ 145 ERJ 145 XR BANDEIRANTE (EMB 120) (EMB 110/111) ERJ 135 EMBRAER 175 EMBRAER 170 ERJ 140 EMB 321 EMBRAER 190 EMBRAER 195 EMB 326 ERJ 145 PHENOM 300 PHENOM 100 ALX (EMB 314) AMX AMX LEGACY 600 LINEAGE 1000 EMB 121 EMB 145 AEW&C SUPER TUCANO EMB 145 AEW&C TUCANO (EMB 312) EMB 145 RS/AGS P-99 EMB 145 RS/AGS AMX
  • 5. Manufacturing Processes Raw Material Equipment Segments r lie pp Su Harness Sheet Metal Machining Tubing Composite n ic ts io br ar at Fa P Sub-assembly Segments Fuselage bl al em ur y ss ct A tru S Painting System Installation and Tests Flight Preparation DELIVERY y m l se na bl As Fi
  • 6. Embraer Units São Paulo State Unit – Gaviao Peixoto Unit – Eugênio de Melo Brazil Brazil Unit – Botucatú Unit – Faria Lima
  • 7. Embraer Units: Faria Lima Located in São José dos Campos, São Paulo State. Designs and manufactures aircraft for the commercial, defense and corporate markets and provides after-sales support. Floor space: 296,191 m² Employees at Faria Lima: 10,882
  • 8. Embraer Units: Faria Lima (cont.) Milling Sheet Metal Shop Composite Material Digital Manufacturing
  • 9. Embraer Units: Faria Lima (cont.) Structural Assembly Fuselage Junction Painting Final Assembly
  • 10. Embraer Units: Eugênio de Melo Located in Eugênio de Melo, a district of São José dos Campos This unit has a total area of 343,400 m², of which 54,607 m² are industrial buildings used in the development and manufacturing of tooling equipment and piping, as well as for performing welding, milling and wire looming operations. Number of employees at Eugênio de Melo: 1,595
  • 11. Embraer Units: Eugênio de Melo (cont.) Tooling – Design & Manufacturing Harness Tubing
  • 12. Embraer Units: Gavião Peixoto Located in Gavião Peixoto, São Paulo State. Manufacturing facility that will host the final assembly activities of the Company´s executive and defense aircraft, as well as a runway for test flights. Floor Space: 53,979 m² Number of employees: 1,348 Start-up of operations in October 2001
  • 13. Embraer Units: Gavião Peixoto (cont.) Executive Interior Cabinets: Legacy Interior Cabinets Assembly Area Conclusion 2004 sept 1.750 m2
  • 14. Embraer Units: Gavião Peixoto (cont.) F5-BR Revitalization Super Tucano Assembly Hangar
  • 15. Embraer Units: Botucatu Embraer – Botucatu The Indústria Aeronáutica Neiva manufacturing activities have been taken over by EMBRAER – Botucatu Unit, which was incorporated on July 1, 2006. The following activities are performed at the Botucatu Unit: Ipanema aircraft production, manufacture of parts and structures for the jets of the ERJ 145, EMBRAER 170/190 and Phenom families, assembly of the Super Tucano fuselage structure, and manufacture of Ground Support Equipment tooling and devices. Neiva will remain responsible for Ipanema aircraft marketing activities, spare parts sales and agricultural aircraft after-sales support. Total Area: 122,980 m² Floor space: 41,553 m² Number of employees: 1,396
  • 16. Embraer Units: Botucatu (cont.) Montagem de Segmentos Sheet Metal Plug Panel EMBRAER 170
  • 17. Embraer Units: Botucatu (cont.) Ipanema Álcool EMB202 - Ipanema Ground Support Equipment
  • 18. Manufacturing Strategies Time-To-Market: Manufacturing Cycle Reduction Mtg. 1 Mtg. 1 Mtg. 2 Mtg. 3 Mtg. 4 Mtg. 4 Responsiveness 1º C.C. 2º C.C. LSE LSE Process Obj. Obj. Capability LIE LIE Inventory Turn Over 8,0 6,7 7,0 Costs 6,0 5,0 4,4 Reduction 4,0 3,0 2,0 ALMOX. AERON. PROCESSO TOTAL 1,0 0,0 fev/02 abr/02 jun/02 ago/02 out/02 fev/03 abr/03 jun/03 ago/03 out/03 fev/04 abr/04 jun/04 ago/04 dez/01 dez/02 dez/03 Postponement: Configuration Cycle Primary Structural Final Manufacturing Parts Assembly Assembly Flexibility delivery month
  • 19. Phenom™ 100 and Phenom™ 300 Introducing a New Manufacturing Process concept
  • 20. Phenom manufacturing concept • High performance line • Bonded Warehouse • Maximize activities, sub-assemblies • Inventory management • Components Assemblies in parallel with the • Planning parameter line • “First in First Out” • Backflushing • Automatic deduction from inventory based on the Bill of Materials (BOM) • Reduce the number of manual transactions
  • 21. Phenom manufacturing concept • Fixed Workcenter per employee • Acceleration of Phenom Assembly learning curve and maturity • Improving the quality of the product • Multi-functional employee, dedicated in the workcenter • Electric and mechanical assemblies done by the same employee
  • 22. Phenom manufacturing concept • Visual Management • Padronization; • Easy performance evaluation; • Clear instructions; • Areas of material storage marked and defined; • Quality • Quality with Simplified Process; • Who does, he/she makes the quality (the operator does and it verifies);
  • 23. Investments & Manufacturing expansion
  • 24. Production Ramp Up Embraer 170/190: 70 to 78 Seats 2006 - Up to 08 ac/m 78 to 86 Seats 2007 - Up to 12 ac/m 2008 - Up to 14 ac/m 98 to 106 Seats 108 to 118 Seats Phenom 100/300 2008 2nd Half- 15 to 20 ac/y 2009 - 120 to150 ac/y
  • 25. Facilities Investments: few examples Final Assembly Surface Hangar Treatment Painting Chemical Shop Milling
  • 27. ASRS System: Automated System Automatic Storage and retrieval system for trays with integrated picking work stations Suitable for up to 500 pick-and-put moviments per man-hour Heigth: up to 6 m (8m Embraer Project)