Introduction


               Chief Executive Office, Richard Stone

               20 years experience in the field of international
               project and programme management, last 9 years
               focused within the education sector

               Experience in delivery through the Private Finance
               Initiative (PFI), Building Schools for the Future
               Programme and Academies Programmes within the
               UK

               Last three years based in UAE
What Clients Want


• Achieve Value for Money

• Improved Speed of Delivery

• High Standard of Quality

• Flexibility and Adaptability

• Sustainability

• Innovation

Above considerations are inextricably linked together throughout the
design and construction process.
Value for Money


• Balance the initial design and construction costs with the cost of
  lighting, heating, cooling, repairing and otherwise operating and
  maintaining the facility

• Remember FFE can be a significant component in capital
  expenditure. Development of standard specifications and good
  supply chain management can yield significant savings

• Land can be expensive and sites in built up areas may be restricted
  in size - maximise development potential of site by utilsing roof
  space for play and recreational uses

• Maximise utilisation of space by ensuring that accommodation
  schedule is based on a proper curriculum analysis
Value for Money




                  Use of roof space to maximise
                  available play and recreational areas
Value for Money

Development of standard specifications to source alternatives and
negotiate supply chain agreements
Value for Money




Properly integrated cost data bases linked to specifications will
facilitate better buying !
Speed of Delivery


• Off site solutions such as modular or prefabricated systems

• Components can be manufactured in parallel with securing
  authority approvals to commence work to reducing construction
  period

• Not without some risk ! Proceeding with off site manufacturing
  before final approval can result in abortive work

• Key to this approach : -
   • Early coordination of design
   • Relationship with Authorities flexibility is possible
Speed of Delivery

                    Winchester School Extension, UAE :
                     Three Storey Building, approx 10,000m²
                       BUA
                     Pre-cast system introduced for speed
                       and to minimise disruption to existing
                       school
                     Build time of 6 months
Speed of Delivery


                    American Academy, Abu Dhabi, UAE :
                     2,100 students K-12 School
                     G+2 Three with BUA of 27,500 m2
                     Precast beam and column system
                     Piling to handover in 12 months
Speed of Delivery

Other considerations : -

 • Partnering arrangements with contractors – early involvement
   to ensure buildability incorporated into the design

 • Phased approach – build as required based on student ramp
   ups – essential to incorporate this into design at early stage to
   ensure proper planning

 • Clients with high volumes of work can leverage efficiencies by
   looking at standardising design and construction processes to
   improve speed of delivery
Speed of Delivery


                    PHASED
                    APPROACH TO
                    CONSTRUCTION



       PHASE 2
Flexibility And Adaptability



• Future capacity - consider building in for growth – future proof
  foundations and services

• Flexibility and adaptability of teaching environment to suit new
  methods of teaching and developing technologies

• Innovation should be a way of thinking integrated into the project
  life cycle to provide novel solutions to problems ! Innovation for
  the sake of innovation is just waste
Flexibility And Adaptability




Adaptability of furniture

Break out areas provide greater
flexibility for use of space
Good Quality Design


•   Ensure that the right people are engaged in the design
    development process – identify stakeholders early on

•   ICT, Educationalists, Designers all need to have an input to the
    design – ensure that their required inputs are planned into the
    process at the right time

•   Focus on making sure that Furniture, Fittings and Equipment
    are properly coordinated into the design – not enough
    attention is paid to this – needs to be done at early stage

•   Room Data Sheets and Fully Loaded Drawings prepared at an
    early stage will facilitate proper coordination of requirements
Good Quality Design and Execution


                                    Initial Development of Furniture
Visualisations Can Help
Stakeholders have a fuller          Plans to Coordinate
                                    Requirements of Stakeholders -
understanding of how a space
                                    ICT, Education, FFE and Design
will function and look – this can
                                    Team
help to ensure that the design is
appropriate for the need and
avoid late changes in the design
and construction process
Good Quality Design and Execution


3D Renderings of Proposed FFE in Relation to Room Can Provide an
Understanding for Stakeholders that 2D Drawings Simply Cannot
Provide for Those Unfamiliar with Reading Drawings
Sustainability

• Use energy, water, and other resources efficiently

• Integrate renewable energy strategies, including passive solar
  design and, where appropriate, solar thermal and photovoltaics

• Integrate high-performance mechanical and lighting systems

• Conserve and protect natural areas

• Incorporate materials and products derived from sustainable-
  yield processes and/or are manufactured locally

• Provide opportunities for safe walking and bicycling to school
Sustainability


World Academy, Tianjin, China

Eco-City’s first School - aims to be
the most sustainable school in the
World - GBES silver certification

Eco-features - solar and
geothermal heated swimming
pool, solar PV panels

Energy Wall will display real time information of electricity
consumption of the school and renewable energy harnessed – eco
features integrated into curriculum

Más contenido relacionado

Destacado

Mobile internet in Russia 2011 by Google and J'son & Partners
Mobile internet in Russia 2011 by Google and J'son & PartnersMobile internet in Russia 2011 by Google and J'son & Partners
Mobile internet in Russia 2011 by Google and J'son & PartnersMitya Voskresensky
 
June 2015 - General Overview
June 2015 - General Overview June 2015 - General Overview
June 2015 - General Overview MLSListings Inc
 
татев
татев татев
татев nelaT
 
20160901褒揚臺灣傑出京劇家故顧正秋女士案
20160901褒揚臺灣傑出京劇家故顧正秋女士案20160901褒揚臺灣傑出京劇家故顧正秋女士案
20160901褒揚臺灣傑出京劇家故顧正秋女士案R.O.C.Executive Yuan
 
神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3
神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3
神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3hinger35
 
Narek
NarekNarek
NareknelaT
 
CM15007 Compendium July
CM15007 Compendium JulyCM15007 Compendium July
CM15007 Compendium JulyDerek Phelan
 

Destacado (14)

蒙古帝國
蒙古帝國蒙古帝國
蒙古帝國
 
Mobile internet in Russia 2011 by Google and J'son & Partners
Mobile internet in Russia 2011 by Google and J'son & PartnersMobile internet in Russia 2011 by Google and J'son & Partners
Mobile internet in Russia 2011 by Google and J'son & Partners
 
#NVDM11, Joris Toonders, Yonego
#NVDM11, Joris Toonders, Yonego#NVDM11, Joris Toonders, Yonego
#NVDM11, Joris Toonders, Yonego
 
редакция 66.ru
редакция 66.ruредакция 66.ru
редакция 66.ru
 
Pay mortgage early
Pay mortgage earlyPay mortgage early
Pay mortgage early
 
June 2015 - General Overview
June 2015 - General Overview June 2015 - General Overview
June 2015 - General Overview
 
Taller d'art
Taller d'artTaller d'art
Taller d'art
 
татев
татев татев
татев
 
UN medal
UN medalUN medal
UN medal
 
20160901褒揚臺灣傑出京劇家故顧正秋女士案
20160901褒揚臺灣傑出京劇家故顧正秋女士案20160901褒揚臺灣傑出京劇家故顧正秋女士案
20160901褒揚臺灣傑出京劇家故顧正秋女士案
 
神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3
神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3
神戸市の道路計画に対する西須磨主婦の会の意見書1997年 2/3
 
Unit 2 question formation
Unit 2 question formationUnit 2 question formation
Unit 2 question formation
 
Narek
NarekNarek
Narek
 
CM15007 Compendium July
CM15007 Compendium JulyCM15007 Compendium July
CM15007 Compendium July
 

Similar a 21st Century Education Sis Bfe Mena 2011

GCCISD Technology Plan
GCCISD Technology Plan GCCISD Technology Plan
GCCISD Technology Plan mjjoseph
 
Step3-part2.ppt.pdf
Step3-part2.ppt.pdfStep3-part2.ppt.pdf
Step3-part2.ppt.pdfHIRALBATHIA
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design WorkshopJerry Yudelson
 
Sidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPTSidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPTPrathmesh001
 
About engineering College PPt
About engineering College PPtAbout engineering College PPt
About engineering College PPtPrathmesh001
 
Project Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and JustificationsProject Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and Justificationsclatcham
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesaAconex
 
Project considerations
Project considerationsProject considerations
Project considerationsclatcham
 
Project Considerations
Project ConsiderationsProject Considerations
Project Considerationsclatcham
 
Project Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and JustificationsProject Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and Justificationsclatcham
 
Efficient project delivery joc focus - 20141030
Efficient project delivery   joc focus - 20141030Efficient project delivery   joc focus - 20141030
Efficient project delivery joc focus - 20141030Peter Cholakis
 
Innovative technology educational center
Innovative technology educational centerInnovative technology educational center
Innovative technology educational centerRyan Gunhold
 
Sidhivinayak techncalcampus
Sidhivinayak techncalcampusSidhivinayak techncalcampus
Sidhivinayak techncalcampusPrathmesh001
 
Present to cop
Present to copPresent to cop
Present to copCtl Ul
 
2022 IC_Designing for Results breakout session_Final.pptx
2022 IC_Designing for Results breakout session_Final.pptx2022 IC_Designing for Results breakout session_Final.pptx
2022 IC_Designing for Results breakout session_Final.pptxRILearn
 
The First Year Experience - Lisa Curran - RMIT University
The First Year Experience - Lisa Curran - RMIT UniversityThe First Year Experience - Lisa Curran - RMIT University
The First Year Experience - Lisa Curran - RMIT UniversityBlackboard APAC
 
Handouts New and Emerging Models for Work-based Learnin
Handouts  New and Emerging Models for  Work-based LearninHandouts  New and Emerging Models for  Work-based Learnin
Handouts New and Emerging Models for Work-based LearninNAFCareerAcads
 
Why education stakeholders must work together to achieve digital transformation
Why education stakeholders must work together to achieve digital transformationWhy education stakeholders must work together to achieve digital transformation
Why education stakeholders must work together to achieve digital transformationLuciano Sathler
 

Similar a 21st Century Education Sis Bfe Mena 2011 (20)

GCCISD Technology Plan
GCCISD Technology Plan GCCISD Technology Plan
GCCISD Technology Plan
 
Step3-part2.ppt.pdf
Step3-part2.ppt.pdfStep3-part2.ppt.pdf
Step3-part2.ppt.pdf
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
Sidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPTSidhivinayak techncal campus PPT
Sidhivinayak techncal campus PPT
 
About engineering College PPt
About engineering College PPtAbout engineering College PPt
About engineering College PPt
 
Project Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and JustificationsProject Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and Justifications
 
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
5 methods session 1 webinar slideshare colorado hpte_siemensgamesa
 
Project considerations
Project considerationsProject considerations
Project considerations
 
Project Considerations
Project ConsiderationsProject Considerations
Project Considerations
 
Project Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and JustificationsProject Considerations, Curriculum Links and Justifications
Project Considerations, Curriculum Links and Justifications
 
Efficient project delivery joc focus - 20141030
Efficient project delivery   joc focus - 20141030Efficient project delivery   joc focus - 20141030
Efficient project delivery joc focus - 20141030
 
Innovative technology educational center
Innovative technology educational centerInnovative technology educational center
Innovative technology educational center
 
Sidhivinayak techncalcampus
Sidhivinayak techncalcampusSidhivinayak techncalcampus
Sidhivinayak techncalcampus
 
Present to cop
Present to copPresent to cop
Present to cop
 
2022 IC_Designing for Results breakout session_Final.pptx
2022 IC_Designing for Results breakout session_Final.pptx2022 IC_Designing for Results breakout session_Final.pptx
2022 IC_Designing for Results breakout session_Final.pptx
 
Bldg const pedagogy
Bldg const pedagogyBldg const pedagogy
Bldg const pedagogy
 
The First Year Experience - Lisa Curran - RMIT University
The First Year Experience - Lisa Curran - RMIT UniversityThe First Year Experience - Lisa Curran - RMIT University
The First Year Experience - Lisa Curran - RMIT University
 
Project Name
 Project Name                                       Project Name
Project Name
 
Handouts New and Emerging Models for Work-based Learnin
Handouts  New and Emerging Models for  Work-based LearninHandouts  New and Emerging Models for  Work-based Learnin
Handouts New and Emerging Models for Work-based Learnin
 
Why education stakeholders must work together to achieve digital transformation
Why education stakeholders must work together to achieve digital transformationWhy education stakeholders must work together to achieve digital transformation
Why education stakeholders must work together to achieve digital transformation
 

Más de espie77

Education Principles That Work Ncpsa Bfe Mena 2011
Education Principles That Work Ncpsa Bfe Mena 2011Education Principles That Work Ncpsa Bfe Mena 2011
Education Principles That Work Ncpsa Bfe Mena 2011espie77
 
Learning For All The World Bank Bfe Mena 2011
Learning For All The World Bank Bfe Mena 2011Learning For All The World Bank Bfe Mena 2011
Learning For All The World Bank Bfe Mena 2011espie77
 
Sustainability In Education Facilities Diac Bfe Mena 2011
Sustainability In Education Facilities Diac Bfe Mena 2011Sustainability In Education Facilities Diac Bfe Mena 2011
Sustainability In Education Facilities Diac Bfe Mena 2011espie77
 
Sportation Aecom Bfe Mena 2011
Sportation Aecom Bfe Mena 2011Sportation Aecom Bfe Mena 2011
Sportation Aecom Bfe Mena 2011espie77
 
Affordable Innovative Education Elhaam Bfe Mena 2011
Affordable Innovative Education Elhaam Bfe Mena 2011Affordable Innovative Education Elhaam Bfe Mena 2011
Affordable Innovative Education Elhaam Bfe Mena 2011espie77
 
Education For Employment Ifc Bfe Mena 2011
Education For Employment Ifc Bfe Mena 2011Education For Employment Ifc Bfe Mena 2011
Education For Employment Ifc Bfe Mena 2011espie77
 
Special Education Needs Hlm Bfe Mena 2011
Special Education Needs Hlm Bfe Mena 2011Special Education Needs Hlm Bfe Mena 2011
Special Education Needs Hlm Bfe Mena 2011espie77
 
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011espie77
 
High Quality Learning Environments Ec Harris Bfe Mena 2011
High Quality Learning Environments Ec Harris Bfe Mena 2011High Quality Learning Environments Ec Harris Bfe Mena 2011
High Quality Learning Environments Ec Harris Bfe Mena 2011espie77
 
Maximising Asset Value Aecom Bfe Mena 2011
Maximising Asset Value Aecom Bfe Mena 2011Maximising Asset Value Aecom Bfe Mena 2011
Maximising Asset Value Aecom Bfe Mena 2011espie77
 
Outstanding School Buildings Oecd Bfe Mena 2011
Outstanding School Buildings Oecd Bfe Mena 2011Outstanding School Buildings Oecd Bfe Mena 2011
Outstanding School Buildings Oecd Bfe Mena 2011espie77
 
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011espie77
 
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011espie77
 

Más de espie77 (13)

Education Principles That Work Ncpsa Bfe Mena 2011
Education Principles That Work Ncpsa Bfe Mena 2011Education Principles That Work Ncpsa Bfe Mena 2011
Education Principles That Work Ncpsa Bfe Mena 2011
 
Learning For All The World Bank Bfe Mena 2011
Learning For All The World Bank Bfe Mena 2011Learning For All The World Bank Bfe Mena 2011
Learning For All The World Bank Bfe Mena 2011
 
Sustainability In Education Facilities Diac Bfe Mena 2011
Sustainability In Education Facilities Diac Bfe Mena 2011Sustainability In Education Facilities Diac Bfe Mena 2011
Sustainability In Education Facilities Diac Bfe Mena 2011
 
Sportation Aecom Bfe Mena 2011
Sportation Aecom Bfe Mena 2011Sportation Aecom Bfe Mena 2011
Sportation Aecom Bfe Mena 2011
 
Affordable Innovative Education Elhaam Bfe Mena 2011
Affordable Innovative Education Elhaam Bfe Mena 2011Affordable Innovative Education Elhaam Bfe Mena 2011
Affordable Innovative Education Elhaam Bfe Mena 2011
 
Education For Employment Ifc Bfe Mena 2011
Education For Employment Ifc Bfe Mena 2011Education For Employment Ifc Bfe Mena 2011
Education For Employment Ifc Bfe Mena 2011
 
Special Education Needs Hlm Bfe Mena 2011
Special Education Needs Hlm Bfe Mena 2011Special Education Needs Hlm Bfe Mena 2011
Special Education Needs Hlm Bfe Mena 2011
 
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
Human Capital Challenges In The 21st Century Rand Bfe Mena 2011
 
High Quality Learning Environments Ec Harris Bfe Mena 2011
High Quality Learning Environments Ec Harris Bfe Mena 2011High Quality Learning Environments Ec Harris Bfe Mena 2011
High Quality Learning Environments Ec Harris Bfe Mena 2011
 
Maximising Asset Value Aecom Bfe Mena 2011
Maximising Asset Value Aecom Bfe Mena 2011Maximising Asset Value Aecom Bfe Mena 2011
Maximising Asset Value Aecom Bfe Mena 2011
 
Outstanding School Buildings Oecd Bfe Mena 2011
Outstanding School Buildings Oecd Bfe Mena 2011Outstanding School Buildings Oecd Bfe Mena 2011
Outstanding School Buildings Oecd Bfe Mena 2011
 
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
Private Investment Opportunities In Education Booz And Company Bfe Mena 2011
 
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
Outreach Support Service Zayed Higher Organisation Bfe Mena 2011
 

21st Century Education Sis Bfe Mena 2011

  • 1. Delivering 21st century education. Meeting the Challenges of Delivering High Quality Education Facilities in The 21st Century
  • 2. SIS – a key company within GEMS Education Solutions Introduction by Chris Kirk, CEO of GEMS Education Solutions School School Education Strategy Improvement Infrastructure Managed Schools Programmes Services
  • 3. Introduction Chief Executive Office, Richard Stone 20 years experience in the field of international project and programme management, last 9 years focused within the education sector Experience in delivery through the Private Finance Initiative (PFI), Building Schools for the Future Programme and Academies Programmes within the UK Last three years based in UAE
  • 4. What Clients Want • Achieve Value for Money • Improved Speed of Delivery • High Standard of Quality • Flexibility and Adaptability • Sustainability • Innovation Above considerations are inextricably linked together throughout the design and construction process.
  • 5. Value for Money • Balance the initial design and construction costs with the cost of lighting, heating, cooling, repairing and otherwise operating and maintaining the facility • Remember FFE can be a significant component in capital expenditure. Development of standard specifications and good supply chain management can yield significant savings • Land can be expensive and sites in built up areas may be restricted in size - maximise development potential of site by utilsing roof space for play and recreational uses • Maximise utilisation of space by ensuring that accommodation schedule is based on a proper curriculum analysis
  • 6. Value for Money Use of roof space to maximise available play and recreational areas
  • 7. Value for Money Development of standard specifications to source alternatives and negotiate supply chain agreements
  • 8. Value for Money Properly integrated cost data bases linked to specifications will facilitate better buying !
  • 9. Speed of Delivery • Off site solutions such as modular or prefabricated systems • Components can be manufactured in parallel with securing authority approvals to commence work to reducing construction period • Not without some risk ! Proceeding with off site manufacturing before final approval can result in abortive work • Key to this approach : - • Early coordination of design • Relationship with Authorities flexibility is possible
  • 10. Speed of Delivery Winchester School Extension, UAE :  Three Storey Building, approx 10,000m² BUA  Pre-cast system introduced for speed and to minimise disruption to existing school  Build time of 6 months
  • 11. Speed of Delivery American Academy, Abu Dhabi, UAE :  2,100 students K-12 School  G+2 Three with BUA of 27,500 m2  Precast beam and column system  Piling to handover in 12 months
  • 12. Speed of Delivery Other considerations : - • Partnering arrangements with contractors – early involvement to ensure buildability incorporated into the design • Phased approach – build as required based on student ramp ups – essential to incorporate this into design at early stage to ensure proper planning • Clients with high volumes of work can leverage efficiencies by looking at standardising design and construction processes to improve speed of delivery
  • 13. Speed of Delivery PHASED APPROACH TO CONSTRUCTION PHASE 2
  • 14. Flexibility And Adaptability • Future capacity - consider building in for growth – future proof foundations and services • Flexibility and adaptability of teaching environment to suit new methods of teaching and developing technologies • Innovation should be a way of thinking integrated into the project life cycle to provide novel solutions to problems ! Innovation for the sake of innovation is just waste
  • 15. Flexibility And Adaptability Adaptability of furniture Break out areas provide greater flexibility for use of space
  • 16. Good Quality Design • Ensure that the right people are engaged in the design development process – identify stakeholders early on • ICT, Educationalists, Designers all need to have an input to the design – ensure that their required inputs are planned into the process at the right time • Focus on making sure that Furniture, Fittings and Equipment are properly coordinated into the design – not enough attention is paid to this – needs to be done at early stage • Room Data Sheets and Fully Loaded Drawings prepared at an early stage will facilitate proper coordination of requirements
  • 17. Good Quality Design and Execution Initial Development of Furniture Visualisations Can Help Stakeholders have a fuller Plans to Coordinate Requirements of Stakeholders - understanding of how a space ICT, Education, FFE and Design will function and look – this can Team help to ensure that the design is appropriate for the need and avoid late changes in the design and construction process
  • 18. Good Quality Design and Execution 3D Renderings of Proposed FFE in Relation to Room Can Provide an Understanding for Stakeholders that 2D Drawings Simply Cannot Provide for Those Unfamiliar with Reading Drawings
  • 19. Sustainability • Use energy, water, and other resources efficiently • Integrate renewable energy strategies, including passive solar design and, where appropriate, solar thermal and photovoltaics • Integrate high-performance mechanical and lighting systems • Conserve and protect natural areas • Incorporate materials and products derived from sustainable- yield processes and/or are manufactured locally • Provide opportunities for safe walking and bicycling to school
  • 20. Sustainability World Academy, Tianjin, China Eco-City’s first School - aims to be the most sustainable school in the World - GBES silver certification Eco-features - solar and geothermal heated swimming pool, solar PV panels Energy Wall will display real time information of electricity consumption of the school and renewable energy harnessed – eco features integrated into curriculum