SlideShare una empresa de Scribd logo
1 de 19
Descargar para leer sin conexión
NSP–Minnesota Plans
Dave Sparby
President and CEO
Northern States Power Company–Minnesota,
an Xcel Energy Company


                            New York Analyst Meeting
                            December 5, 2007
Safe Harbor
This material includes forward-looking statements that are subject to
certain risks, uncertainties and assumptions. Such forward-looking
statements include projected earnings, cash flows, capital
expenditures and other statements and are identified in this document
by the words “anticipate,” “estimate,” “expect,” “projected,”
“objective,” “outlook,” “possible,” “potential” and similar
expressions. Actual results may vary materially. Factors that could
cause actual results to differ materially include, but are not limited to:
general economic conditions, including the availability of credit,
actions of rating agencies and their impact on capital expenditures;
business conditions in the energy industry; competitive factors;
unusual weather; effects of geopolitical events, including war and acts
of terrorism; changes in federal or state legislation; regulation; actions
of accounting regulatory bodies; the higher degree of risk associated
with Xcel Energy’s nonregulated businesses compared with
Xcel Energy’s regulated business; and other risk factors listed from
time to time by Xcel Energy in reports filed with the SEC, including
Exhibit 99.01 to Xcel Energy’s report on Form 10-K for year 2006.
Northern States Power–Minnesota

                               2006 Financials
 North Dakota      Minnesota   Earnings Cont. Op $272 million
                               Assets           $9,079 million
                               GAAP ROE            11.2%
                               Equity Ratio        52.3%
                               2006 Owned Generation *
                               Coal            3,590 MW
                               Gas             2,335 MW
 South Dakota                  Nuclear         1,817 MW
                               Renewable         399 MW
                               2006 Retail Sales
     2006 Customers
                               (Thousands of MWh / MMBtu)
  Electric      1,360,000      Electric          35,923
  Gas             465,000      Gas               70,497
                               * 2006 Owned generation
                                 includes NSPW MW
2006 Rate Base and ROE
Dollars in millions
                                          Weather
                                        Normalized
                           Rate Base    Earned ROE
Minnesota Electric           $3,599         10.3%
Minnesota Gas                   441          6.1
North Dakota Electric           188          8.9
North Dakota Gas                 44          7.5
South Dakota Electric           232         11.1
Wholesale                        27    Not Reported
Total Rate Base              $4,531


           Regulated Equity Ratio = 51.6%
2007 Legislation Session
                                 Demand-
                                   Side
                Renewable      Management
                 Portfolio     (annual MWh     Carbon
    State       Standards        savings)     Reduction
                                             30% by 2025
Minnesota      30% by 2020 *      1.5%
                                              (over 2005)
North Dakota   10% by 2015         N/A            N/A

               * Timeline for 30% RPS
                    15% by 2010
                    18% by 2012
                    25% by 2016
                    30% by 2020
Renewables at Year End 2007

                 NSPM
                & NSPW       NSPM (85%)
  MW
  Wind           1,115          948
  Biomass          297          253
  Hydro *          277          235




 * Does not include Manitoba Hydro
Wind and Biomass Resources




Wind
Density
    High                       Thousand Tons/Year
           Xcel Energy     Above 500   150 – 250   50 – 100
           States Served
    Low                    250 – 500   100 - 150   Less 50
Transmission Expansion
      CapX 2020 Group 1
CapX Group 1 Proposed
                                                                  Total Cost ~ 1.5 billion
               Project Study Corridors

                                                                  Xcel Energy ~ $800 million
                                                                  Miles – 700
                                                                  CON filed August 2007
                                                                  Approval expected 2008
                                                                  Construction 2012–2015
                                 Bemidji-Grand Rapids (230-kV)
                                 Fargo-St. Cloud-Monticello (345-kV)
                                 SE Twin Cities-Rochester-La Crosse
                                 (345-kV)
                                 Brookings, SD-SE Twin Cities
                                 (345-kV)




                                                                Note: Certificate of Need (CON)
The shaded areas are potential corridors or proposed lines
Transmission for
Renewable Requirements

                                         Meeting 2025 RES *
                   MINNESOTA
      Grand Forks Bemidji
 NORTH
                                           Total cost: $2 – 3 billion
              Fargo    Grand
 DAKOTA
                       Rapids
                                           Xcel Energy: $1.3 – 2 billion
                        WISCONSIN
SOUTH                                      Miles: 700 – 1,000
                        Twin Cities
DAKOTA
     Sioux Falls
                                         Meeting 2016 RES *
                      IOWA
             Sioux    Fort       Plano
                                           Plan Complete 2008
             City     Dodge
                                           State Review 2009
                              ILLINOIS

                                           Scope:
CapX Group 1                                 $450 million
                                             110 miles
Potential RES Vision

                                         * Renewable Energy Standards
Conservation and DSM
                                 Lighting
                                 Motors
                                 Design
                                 Custom Efficiency
  Energy & Demand Savings                  Dollars in Millions
   500                                                   $60

                                                         $50
   400
                                                         $40
   300
                                                         $30
   200
                                                         $20
   100                                                   $10

    0                                                    $0
      97




      00
     90
     91

     92
     93
     94

     95
     96


     98
     99


     01

     02
     03

     04
     05
     06
   19




   20
   19
   19

   19

   19
   19

   19
   19


   19
   19


   20

   20

   20
   20

   20
   20    Demand (MW)        Energy (GWh)     Expenditures
Conservation and DSM
MN Summer System Peak Day

                          Peak Day
         MW
10,500
10,000
                             Expected
 9,500
                            System Load
 9,000
 8,500
                             System Load
 8,000
 7,500
 7,000
 6,500
 6,000
         8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
                        Hour Ending
Redeploying Existing Assets

                   Xcel Energy North



                                       Flambeau
    Granite City

                              Monticello
                                                  Wheaton
         Blue Lake
                                             Prairie Island

      Key City
                         Blackdog            Red Wing


                   Wilmarth                          French Island
Redeploying Existing Assets
Regulatory Approvals

   Resource Plan Sherco   December 2007
   CON Monticello         December 2007
   CON Prairie Island     February 2008
Requested Resource Plan Outcomes

 Nuclear extension and uprate CON approvals
 Sherco upgrade approval
 Manitoba Hydro extension approval
 Approval of peaking plan and renewable
 energy ownership plan
 Conservation plan at 1.1%
 Implement 2007 legislation
20+% Carbon Reduction by 2020

             Energy by                CO2 Reduction from
           Resource Type              2005 Existing Levels Tons CO2
GWh
60,000                                                          37,000,000

50,000
                                                                32,000,000
40,000
                                                                27,000,000
30,000
                                                                22,000,000
20,000                                       CO2 Levels
                                                                17,000,000
10,000

                                                                12,000,000
  -0
                                    2005                       2020
     2008                    2020
                                            CO2 w/o Reductions
      Bio      MH          Hydro
                                            CO2 with Reductions
      Wind     System      Oil
                                           MERP        Wind     DSM
               Purchase
                                                       MH
                                           Upgrades
         Gas   Nuclear     Coal
Recovery on Capital Investment

        Dollars in millions
1,600
                                               $1,380
1,400
1,200
                                     $1,060
          $1,025
                              $955
                     $935
1,000
 800
 600
 400
 200
   0
          2007       2008     2009    2010      2011
         Traditional    Enhanced Recovery     Depreciation
Minnesota Recovery Mechanisms

 Forward test year with interim rates
 MERP rider
 Transmission rider
 Conservation Improvement Program rider
 Mercury Reduction & Environmental
 Improvement rider
 Renewable Development Fund rider
 State Energy Policy rider
 Fuel clause adjustment
 Purchased gas adjustment
Dakota’s Cost Recovery Mechanisms

  Forward test year with interim rates (ND)
  Historic test year (SD)
  Environmental rider (ND & SD)
  Transmission rider (ND & SD)
  Fuel clause adjustment (ND & SD)
  Full decoupling on retail natural gas (ND)
Positioned for Success


Environmental leadership with:
 Clear objectives
 Operating expertise
 Cost recovery
 Reasonable cost

Más contenido relacionado

La actualidad más candente

xcel energy West_Coast_Road
xcel energy  West_Coast_Roadxcel energy  West_Coast_Road
xcel energy West_Coast_Roadfinance26
 
xcel energy 6_12AGEdwardsSECPresentation
xcel energy  6_12AGEdwardsSECPresentationxcel energy  6_12AGEdwardsSECPresentation
xcel energy 6_12AGEdwardsSECPresentationfinance26
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03finance26
 
xcel energy 5_25CanadianPresentation2007
xcel energy  5_25CanadianPresentation2007xcel energy  5_25CanadianPresentation2007
xcel energy 5_25CanadianPresentation2007finance26
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SECfinance26
 

La actualidad más candente (7)

xcel energy West_Coast_Road
xcel energy  West_Coast_Roadxcel energy  West_Coast_Road
xcel energy West_Coast_Road
 
xcel energy 6_12AGEdwardsSECPresentation
xcel energy  6_12AGEdwardsSECPresentationxcel energy  6_12AGEdwardsSECPresentation
xcel energy 6_12AGEdwardsSECPresentation
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03
 
xcel energy 5_25CanadianPresentation2007
xcel energy  5_25CanadianPresentation2007xcel energy  5_25CanadianPresentation2007
xcel energy 5_25CanadianPresentation2007
 
xel_102303b
xel_102303bxel_102303b
xel_102303b
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SEC
 
XEL_090506
XEL_090506XEL_090506
XEL_090506
 

Destacado

xcel energy 031502proxy
xcel energy 031502proxyxcel energy 031502proxy
xcel energy 031502proxyfinance26
 
xcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qbxcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qbfinance26
 
xcel energy NSP-WI_Q210-Q2008
xcel energy NSP-WI_Q210-Q2008xcel energy NSP-WI_Q210-Q2008
xcel energy NSP-WI_Q210-Q2008finance26
 
xcel energy 2007_Q2_Earnings_Release
xcel energy 2007_Q2_Earnings_Releasexcel energy 2007_Q2_Earnings_Release
xcel energy 2007_Q2_Earnings_Releasefinance26
 
xcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qbxcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qbfinance26
 
xcel energy IR2007Q4
xcel energy IR2007Q4xcel energy IR2007Q4
xcel energy IR2007Q4finance26
 
xcel energy SPS_10Q_Q32008
xcel energy SPS_10Q_Q32008xcel energy SPS_10Q_Q32008
xcel energy SPS_10Q_Q32008finance26
 
xel_062006_environmental
xel_062006_environmentalxel_062006_environmental
xel_062006_environmentalfinance26
 
xcel energy SPS_10Q_2007_Q3
xcel energy SPS_10Q_2007_Q3xcel energy SPS_10Q_2007_Q3
xcel energy SPS_10Q_2007_Q3finance26
 
xcel energy NSP-WI_Q106_10Q
xcel energy NSP-WI_Q106_10Qxcel energy NSP-WI_Q106_10Q
xcel energy NSP-WI_Q106_10Qfinance26
 
xcel energy SPS_Q206_10Qb
xcel energy SPS_Q206_10Qbxcel energy SPS_Q206_10Qb
xcel energy SPS_Q206_10Qbfinance26
 
xcel energy Proxy06
xcel energy Proxy06xcel energy Proxy06
xcel energy Proxy06finance26
 
xcel energy 10q NSPW
xcel energy 10q NSPWxcel energy 10q NSPW
xcel energy 10q NSPWfinance26
 
xcel energy NSPWI10Q2007Q2
xcel energy NSPWI10Q2007Q2xcel energy NSPWI10Q2007Q2
xcel energy NSPWI10Q2007Q2finance26
 
xcel energy 5_2A GASEC04/29/2007
xcel energy  5_2A GASEC04/29/2007xcel energy  5_2A GASEC04/29/2007
xcel energy 5_2A GASEC04/29/2007finance26
 
xcel energy 10qSPS
xcel energy 10qSPSxcel energy 10qSPS
xcel energy 10qSPSfinance26
 

Destacado (20)

xcel energy 031502proxy
xcel energy 031502proxyxcel energy 031502proxy
xcel energy 031502proxy
 
xcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qbxcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qb
 
xel_021104
xel_021104xel_021104
xel_021104
 
xcel energy NSP-WI_Q210-Q2008
xcel energy NSP-WI_Q210-Q2008xcel energy NSP-WI_Q210-Q2008
xcel energy NSP-WI_Q210-Q2008
 
xcel energy 2007_Q2_Earnings_Release
xcel energy 2007_Q2_Earnings_Releasexcel energy 2007_Q2_Earnings_Release
xcel energy 2007_Q2_Earnings_Release
 
xcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qbxcel energy NSP-MN_Q206_10Qb
xcel energy NSP-MN_Q206_10Qb
 
xcel energy IR2007Q4
xcel energy IR2007Q4xcel energy IR2007Q4
xcel energy IR2007Q4
 
xcel energy SPS_10Q_Q32008
xcel energy SPS_10Q_Q32008xcel energy SPS_10Q_Q32008
xcel energy SPS_10Q_Q32008
 
xel_062006_environmental
xel_062006_environmentalxel_062006_environmental
xel_062006_environmental
 
XEL_Q306
XEL_Q306XEL_Q306
XEL_Q306
 
xel_051706c
xel_051706cxel_051706c
xel_051706c
 
xcel energy SPS_10Q_2007_Q3
xcel energy SPS_10Q_2007_Q3xcel energy SPS_10Q_2007_Q3
xcel energy SPS_10Q_2007_Q3
 
xcel energy NSP-WI_Q106_10Q
xcel energy NSP-WI_Q106_10Qxcel energy NSP-WI_Q106_10Q
xcel energy NSP-WI_Q106_10Q
 
xcel energy SPS_Q206_10Qb
xcel energy SPS_Q206_10Qbxcel energy SPS_Q206_10Qb
xcel energy SPS_Q206_10Qb
 
xcel energy Proxy06
xcel energy Proxy06xcel energy Proxy06
xcel energy Proxy06
 
xcel energy 10q NSPW
xcel energy 10q NSPWxcel energy 10q NSPW
xcel energy 10q NSPW
 
xcel energy NSPWI10Q2007Q2
xcel energy NSPWI10Q2007Q2xcel energy NSPWI10Q2007Q2
xcel energy NSPWI10Q2007Q2
 
XEL_092005
XEL_092005XEL_092005
XEL_092005
 
xcel energy 5_2A GASEC04/29/2007
xcel energy  5_2A GASEC04/29/2007xcel energy  5_2A GASEC04/29/2007
xcel energy 5_2A GASEC04/29/2007
 
xcel energy 10qSPS
xcel energy 10qSPSxcel energy 10qSPS
xcel energy 10qSPS
 

Similar a xcel energy 2D SNSPMPlan_Xcel_Energy_12052007

xcel energy 8_16_2007KohlerPresentation8172007SEC
xcel energy  8_16_2007KohlerPresentation8172007SECxcel energy  8_16_2007KohlerPresentation8172007SEC
xcel energy 8_16_2007KohlerPresentation8172007SECfinance26
 
xcel energy 6_12AGEdwardsSECPresentation
xcel energy  6_12AGEdwardsSECPresentationxcel energy  6_12AGEdwardsSECPresentation
xcel energy 6_12AGEdwardsSECPresentationfinance26
 
xcel energy 5_25CanadianPresentation2007
xcel energy  5_25CanadianPresentation2007xcel energy  5_25CanadianPresentation2007
xcel energy 5_25CanadianPresentation2007finance26
 
xcel energy 09/30/08_Texas
xcel energy  09/30/08_Texasxcel energy  09/30/08_Texas
xcel energy 09/30/08_Texasfinance26
 
xcel energy AGA_Meeting_10-2-08
xcel energy  AGA_Meeting_10-2-08xcel energy  AGA_Meeting_10-2-08
xcel energy AGA_Meeting_10-2-08finance26
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SECfinance26
 
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007
xcel energy  3_19_2007MidwestInvMtgsSECMarch2007xcel energy  3_19_2007MidwestInvMtgsSECMarch2007
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007finance26
 
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007
xcel energy  3_19_2007MidwestInvMtgsSECMarch2007xcel energy  3_19_2007MidwestInvMtgsSECMarch2007
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007finance26
 

Similar a xcel energy 2D SNSPMPlan_Xcel_Energy_12052007 (20)

xcel energy 8_16_2007KohlerPresentation8172007SEC
xcel energy  8_16_2007KohlerPresentation8172007SECxcel energy  8_16_2007KohlerPresentation8172007SEC
xcel energy 8_16_2007KohlerPresentation8172007SEC
 
XEL_090506
XEL_090506XEL_090506
XEL_090506
 
XEL_090506
XEL_090506XEL_090506
XEL_090506
 
xcel energy 6_12AGEdwardsSECPresentation
xcel energy  6_12AGEdwardsSECPresentationxcel energy  6_12AGEdwardsSECPresentation
xcel energy 6_12AGEdwardsSECPresentation
 
xcel energy 5_25CanadianPresentation2007
xcel energy  5_25CanadianPresentation2007xcel energy  5_25CanadianPresentation2007
xcel energy 5_25CanadianPresentation2007
 
xcel energy 09/30/08_Texas
xcel energy  09/30/08_Texasxcel energy  09/30/08_Texas
xcel energy 09/30/08_Texas
 
xcel energy AGA_Meeting_10-2-08
xcel energy  AGA_Meeting_10-2-08xcel energy  AGA_Meeting_10-2-08
xcel energy AGA_Meeting_10-2-08
 
xcel energy Lehman_Sept_2008-SEC
xcel energy  Lehman_Sept_2008-SECxcel energy  Lehman_Sept_2008-SEC
xcel energy Lehman_Sept_2008-SEC
 
XEL_111506
XEL_111506XEL_111506
XEL_111506
 
XEL_111506
XEL_111506XEL_111506
XEL_111506
 
XEL_111506
XEL_111506XEL_111506
XEL_111506
 
xel_092404
xel_092404xel_092404
xel_092404
 
xel_092404
xel_092404xel_092404
xel_092404
 
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007
xcel energy  3_19_2007MidwestInvMtgsSECMarch2007xcel energy  3_19_2007MidwestInvMtgsSECMarch2007
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007
 
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007
xcel energy  3_19_2007MidwestInvMtgsSECMarch2007xcel energy  3_19_2007MidwestInvMtgsSECMarch2007
xcel energy 3_19_2007MidwestInvMtgsSECMarch2007
 
XEL_092606
XEL_092606XEL_092606
XEL_092606
 
XEL_092606
XEL_092606XEL_092606
XEL_092606
 
XEL_092606
XEL_092606XEL_092606
XEL_092606
 
xel_091906
xel_091906xel_091906
xel_091906
 
xel_091906
xel_091906xel_091906
xel_091906
 

Más de finance26

xcel energy merrill_09/16//03
xcel energy  merrill_09/16//03xcel energy  merrill_09/16//03
xcel energy merrill_09/16//03finance26
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03finance26
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03finance26
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03finance26
 
xel_111604_new
xel_111604_newxel_111604_new
xel_111604_newfinance26
 
xel_111604_new
xel_111604_newxel_111604_new
xel_111604_newfinance26
 
xel_111604_new
xel_111604_newxel_111604_new
xel_111604_newfinance26
 

Más de finance26 (20)

xcel energy merrill_09/16//03
xcel energy  merrill_09/16//03xcel energy  merrill_09/16//03
xcel energy merrill_09/16//03
 
xcel energy merrill_09/16/03
xcel energy  merrill_09/16/03xcel energy  merrill_09/16/03
xcel energy merrill_09/16/03
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03
 
xcel energy BofA_09/16/03
xcel energy  BofA_09/16/03xcel energy  BofA_09/16/03
xcel energy BofA_09/16/03
 
xel_102303b
xel_102303bxel_102303b
xel_102303b
 
xel_102303b
xel_102303bxel_102303b
xel_102303b
 
xel_111403
xel_111403xel_111403
xel_111403
 
xel_111403
xel_111403xel_111403
xel_111403
 
xel_111403
xel_111403xel_111403
xel_111403
 
xel_021104
xel_021104xel_021104
xel_021104
 
xel_072804
xel_072804xel_072804
xel_072804
 
xel_102204
xel_102204xel_102204
xel_102204
 
EEI_1004
EEI_1004EEI_1004
EEI_1004
 
xel_111604_new
xel_111604_newxel_111604_new
xel_111604_new
 
xel_111604_new
xel_111604_newxel_111604_new
xel_111604_new
 
xel_111604_new
xel_111604_newxel_111604_new
xel_111604_new
 
XEL_Q105
XEL_Q105XEL_Q105
XEL_Q105
 
xel_050205
xel_050205xel_050205
xel_050205
 
xel_050205
xel_050205xel_050205
xel_050205
 
xel_050205
xel_050205xel_050205
xel_050205
 

Último

The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...Amil baba
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》rnrncn29
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Sapana Sha
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...First NO1 World Amil baba in Faisalabad
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...Amil baba
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...yordanosyohannes2
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)ECTIJ
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 

Último (20)

The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
 
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
Authentic No 1 Amil Baba In Pakistan Authentic No 1 Amil Baba In Karachi No 1...
 
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)QUT毕业证昆士兰科技大学毕业证学位证留信学历认证成绩单补办
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results Presentation
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
NO1 WorldWide Love marriage specialist baba ji Amil Baba Kala ilam powerful v...
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)Economics, Commerce and Trade Management: An International Journal (ECTIJ)
Economics, Commerce and Trade Management: An International Journal (ECTIJ)
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 

xcel energy 2D SNSPMPlan_Xcel_Energy_12052007

  • 1. NSP–Minnesota Plans Dave Sparby President and CEO Northern States Power Company–Minnesota, an Xcel Energy Company New York Analyst Meeting December 5, 2007
  • 2. Safe Harbor This material includes forward-looking statements that are subject to certain risks, uncertainties and assumptions. Such forward-looking statements include projected earnings, cash flows, capital expenditures and other statements and are identified in this document by the words “anticipate,” “estimate,” “expect,” “projected,” “objective,” “outlook,” “possible,” “potential” and similar expressions. Actual results may vary materially. Factors that could cause actual results to differ materially include, but are not limited to: general economic conditions, including the availability of credit, actions of rating agencies and their impact on capital expenditures; business conditions in the energy industry; competitive factors; unusual weather; effects of geopolitical events, including war and acts of terrorism; changes in federal or state legislation; regulation; actions of accounting regulatory bodies; the higher degree of risk associated with Xcel Energy’s nonregulated businesses compared with Xcel Energy’s regulated business; and other risk factors listed from time to time by Xcel Energy in reports filed with the SEC, including Exhibit 99.01 to Xcel Energy’s report on Form 10-K for year 2006.
  • 3. Northern States Power–Minnesota 2006 Financials North Dakota Minnesota Earnings Cont. Op $272 million Assets $9,079 million GAAP ROE 11.2% Equity Ratio 52.3% 2006 Owned Generation * Coal 3,590 MW Gas 2,335 MW South Dakota Nuclear 1,817 MW Renewable 399 MW 2006 Retail Sales 2006 Customers (Thousands of MWh / MMBtu) Electric 1,360,000 Electric 35,923 Gas 465,000 Gas 70,497 * 2006 Owned generation includes NSPW MW
  • 4. 2006 Rate Base and ROE Dollars in millions Weather Normalized Rate Base Earned ROE Minnesota Electric $3,599 10.3% Minnesota Gas 441 6.1 North Dakota Electric 188 8.9 North Dakota Gas 44 7.5 South Dakota Electric 232 11.1 Wholesale 27 Not Reported Total Rate Base $4,531 Regulated Equity Ratio = 51.6%
  • 5. 2007 Legislation Session Demand- Side Renewable Management Portfolio (annual MWh Carbon State Standards savings) Reduction 30% by 2025 Minnesota 30% by 2020 * 1.5% (over 2005) North Dakota 10% by 2015 N/A N/A * Timeline for 30% RPS 15% by 2010 18% by 2012 25% by 2016 30% by 2020
  • 6. Renewables at Year End 2007 NSPM & NSPW NSPM (85%) MW Wind 1,115 948 Biomass 297 253 Hydro * 277 235 * Does not include Manitoba Hydro
  • 7. Wind and Biomass Resources Wind Density High Thousand Tons/Year Xcel Energy Above 500 150 – 250 50 – 100 States Served Low 250 – 500 100 - 150 Less 50
  • 8. Transmission Expansion CapX 2020 Group 1 CapX Group 1 Proposed Total Cost ~ 1.5 billion Project Study Corridors Xcel Energy ~ $800 million Miles – 700 CON filed August 2007 Approval expected 2008 Construction 2012–2015 Bemidji-Grand Rapids (230-kV) Fargo-St. Cloud-Monticello (345-kV) SE Twin Cities-Rochester-La Crosse (345-kV) Brookings, SD-SE Twin Cities (345-kV) Note: Certificate of Need (CON) The shaded areas are potential corridors or proposed lines
  • 9. Transmission for Renewable Requirements Meeting 2025 RES * MINNESOTA Grand Forks Bemidji NORTH Total cost: $2 – 3 billion Fargo Grand DAKOTA Rapids Xcel Energy: $1.3 – 2 billion WISCONSIN SOUTH Miles: 700 – 1,000 Twin Cities DAKOTA Sioux Falls Meeting 2016 RES * IOWA Sioux Fort Plano Plan Complete 2008 City Dodge State Review 2009 ILLINOIS Scope: CapX Group 1 $450 million 110 miles Potential RES Vision * Renewable Energy Standards
  • 10. Conservation and DSM Lighting Motors Design Custom Efficiency Energy & Demand Savings Dollars in Millions 500 $60 $50 400 $40 300 $30 200 $20 100 $10 0 $0 97 00 90 91 92 93 94 95 96 98 99 01 02 03 04 05 06 19 20 19 19 19 19 19 19 19 19 19 20 20 20 20 20 20 Demand (MW) Energy (GWh) Expenditures
  • 11. Conservation and DSM MN Summer System Peak Day Peak Day MW 10,500 10,000 Expected 9,500 System Load 9,000 8,500 System Load 8,000 7,500 7,000 6,500 6,000 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hour Ending
  • 12. Redeploying Existing Assets Xcel Energy North Flambeau Granite City Monticello Wheaton Blue Lake Prairie Island Key City Blackdog Red Wing Wilmarth French Island
  • 13. Redeploying Existing Assets Regulatory Approvals Resource Plan Sherco December 2007 CON Monticello December 2007 CON Prairie Island February 2008
  • 14. Requested Resource Plan Outcomes Nuclear extension and uprate CON approvals Sherco upgrade approval Manitoba Hydro extension approval Approval of peaking plan and renewable energy ownership plan Conservation plan at 1.1% Implement 2007 legislation
  • 15. 20+% Carbon Reduction by 2020 Energy by CO2 Reduction from Resource Type 2005 Existing Levels Tons CO2 GWh 60,000 37,000,000 50,000 32,000,000 40,000 27,000,000 30,000 22,000,000 20,000 CO2 Levels 17,000,000 10,000 12,000,000 -0 2005 2020 2008 2020 CO2 w/o Reductions Bio MH Hydro CO2 with Reductions Wind System Oil MERP Wind DSM Purchase MH Upgrades Gas Nuclear Coal
  • 16. Recovery on Capital Investment Dollars in millions 1,600 $1,380 1,400 1,200 $1,060 $1,025 $955 $935 1,000 800 600 400 200 0 2007 2008 2009 2010 2011 Traditional Enhanced Recovery Depreciation
  • 17. Minnesota Recovery Mechanisms Forward test year with interim rates MERP rider Transmission rider Conservation Improvement Program rider Mercury Reduction & Environmental Improvement rider Renewable Development Fund rider State Energy Policy rider Fuel clause adjustment Purchased gas adjustment
  • 18. Dakota’s Cost Recovery Mechanisms Forward test year with interim rates (ND) Historic test year (SD) Environmental rider (ND & SD) Transmission rider (ND & SD) Fuel clause adjustment (ND & SD) Full decoupling on retail natural gas (ND)
  • 19. Positioned for Success Environmental leadership with: Clear objectives Operating expertise Cost recovery Reasonable cost