Cautionary Statements
    All forecasted numbers in this presentation are issued and effective as of January 17, 2008

    Regulation G Statement
    Ameren has presented certain information in this presentation on a diluted cents per share basis. These diluted per
    share amounts reflect certain factors that directly impact Ameren’s total earnings per share. The non-GAAP earnings
    per share and non-GAAP earnings per share guidance excludes one or more of the following: costs related to severe
    January 2007 storms, abnormal weather, the earnings impact of the settlement agreement among parties in Illinois for
    comprehensive electric rate relief and customer assistance, the reversal of accruals made in 2006 for low-income
    energy assistance and energy efficiency program funding commitments in Illinois and a March 2007 FERC order, which
    retroactively adjusted prior years’ regional transmission organization costs. Ameren believes this information is useful
    because it enables readers to better understand the impact of these factors on Ameren’s results of operations and
    earnings per share.
    In providing non-GAAP earnings guidance and a non-GAAP earnings growth forecast, there could be differences
    between non-GAAP earnings and earnings prepared in accordance with Generally Accepted Accounting Principles
    (GAAP) for unusual items, such as the 2007 Illinois electric settlement and the impact of abnormal weather. Except for
    the Illinois settlement, Ameren is not able to estimate the impact, if any, on future GAAP earnings of these items.
    Therefore, Ameren is not able to provide a corresponding GAAP equivalent for its earnings growth rate forecast.

    Forward-looking Statements
    Ameren’s consolidated and segment earnings guidance excludes one or more of the following: costs related to severe
    January 2007 storms, abnormal weather, the earnings impact of the settlement agreement among parties in Illinois for
    comprehensive electric rate relief and customer assistance, the reversal of accruals made in 2006 for low-income
    energy assistance and energy efficiency program funding commitments in Illinois and a March 2007 FERC order, which
    retroactively adjusted prior years’ regional transmission organization costs. Ameren’s earnings guidance assumes
    normal weather and is subject to, among other things, regulatory and legislative decisions, plant operations, energy
    market and economic conditions, severe storms, unusual or otherwise unexpected gains or losses and other risks and
    uncertainties outlined in Ameren’s Forward-looking Statements in its news release issued today and in the Forward-
    looking Statements and Risk Factors sections in its periodic filings with the Securities and Exchange Commission.




    investing for our future.
3
Ameren Introduction

    ● Focused on the Basics
    ● Regional electric and gas utility
        • Missouri regulated generation,
          transmission and
                                                     CILCO
          delivery business
        • Illinois regulated transmission and
                                                          CIPS
          delivery businesses
                                                UE
                                                     IP
        • Non-rate-regulated
          generation business
    ● NYSE-listed under AEE
        • Market cap. ~ $9 billion
        • Component of the S&P 500



      investing for our future.
4
Ameren’s Business Plan
    ● Achieve operational excellence in all                Meaningful
      aspects of our business                              investment
                                                            in serving
    ● Improve our customer service,                         customers
      satisfaction and image
    ● Demonstrate environmental                  Fair
      leadership                                return                    High quality
                                                  on                        service
    ● Improve regulatory frameworks and       investment
      returns
    ● Optimize non-rate-regulated
      generation business                                     High
                                                            customer
    ● Maximize the value of our                            satisfaction
      shareholders’ investment


      investing for our future.
5
Financial Outlook
    ● Near-term regulatory lag
        • Rising cost environment (O&M and capital)
            • Fuel
            • Reliability projects
            • Environmental projects
            • Depreciation
            • Finance costs
        • No significant rate adjustments until late 2008 and early 2009

    ● Significant longer-term earnings growth opportunities




      investing for our future.
6
Financial Outlook Opportunities
    ● Regulated rates reflecting more current costs
    ● Increasing rate base investment
    ● Earning fair returns in regulated operations
    ● Position non-rate-regulated business for earnings growth
        • Improved plant performance
        • Effective marketing, trading and hedging
        • EPS contribution expected to be relatively flat through 2010
        • Expectations could change meaningfully depending upon future
          power, capacity and fuel prices
            • Greater prospects for tightening power markets
            • Ancillary and capacity market development

                 Bottom line: strong underlying value
               Straight-forward strategy to deliver value

      investing for our future.
7
Financial Objectives
    ● Targeting 4% to 6% average non-GAAP EPS growth from
      normalized 2007 base to 2010
        • Driven primarily by regulated business growth
        • Goal of ~$4 per share by 2011 and higher in 2012
    ● Overall percentage of earnings contribution by regulated business
      segments forecasted to increase and approximate current annual
      dividend by the end of 2010
    ● Focused on providing a strong, sustainable dividend
        • Current yield of ~6%
        • Cash flows do not support near-term change
        • Focus on future dividend growth
    ● Targeting long-term total annual shareholder return of ~10%
    ● Proven and lower-risk strategies to achieve these results

      investing for our future.
8
Long-Range EPS Expectations
      2007 to 2010 CAGR of 4% to 6%, continued growth thereafter
                                                                >$4.00
                                                ~$3.70
        Non-GAAP
                        Non-GAAP
       $3.25 - $3.35
                       $2.80 - $3.20

    Weather-Normalized
          $3.24
          GAAP
       $2.90 - $3.00      GAAP
                       $2.68 - $3.08




          2007            2008         2009     2010     2011   2012
                                       GAAP   Non-GAAP

     investing for our future.
9
Current Regulated Returns
       Support Earnings Growth
     ● Missouri Regulated Operations(a)
        2007 non-GAAP ROE = 9%
        Estimated 2008 non-GAAP ROE = 7%

        • Allowed return in last rate case was 10.2%. Every 1% equals
          approximately $50 million of revenues

     ● Illinois Regulated Operations(b)
         2007 non-GAAP ROE = 5%
         Estimated 2008 non-GAAP ROE = 5%

        • Allowed return in last rate case was 10%. Every 1% equals
          approximately $27 million of revenues
              Based on actual and projected financial results excluding non-GAAP items
        (a)

              Based on actual and projected financial results excluding non-GAAP items and
        (b)

              impact of goodwill associated with CILCORP and Illinois Power acquisitions


      investing for our future.
10
Regulated Investment Plans
           Support Earnings Growth
                                                                                     Rate Base Growth
           ($ in Millions)
                                                                $9,000
                                                                           Missouri
      Rate Base                                                 $8,000
                                                                $7,000
      Missouri(a)                                               $6,000
      Electric                                         $5,744   $5,000

      Gas                                                 218   $4,000

        Subtotal                                       $5,962   $3,000
                                                                $2,000
                                                                $1,000
      Illinois(b)                                                  $0
      Distribution                                     $2,120       2006      2007     2008   2009   2010   2011   2012
                                                                $4,500
      Transmission                                        245              Illinois
                                                                $4,000
      Gas                                                 928   $3,500
        Subtotal                                       $3,293   $3,000
                                                                $2,500
                                                                $2,000
      TOTAL                                            $9,255
                                                                $1,500
                                                                $1,000
     (a)
           At December 31, 2007                                  $500
     (b)
           At December 31, 2006,                                   $0
           as submitted in current rate case filings                2006      2007     2008   2009   2010   2011   2012


      investing for our future.
11
Illinois Rate Filings
     ● Illinois electric and gas delivery service rate cases filed November 2,
       2007
         • Decision by end of September 2008
     ● Requested revenue increase of $247 million
       ($180 million electric, $67 million gas)
         • Electric: 11% ROE; 51% to 53% equity;
           rate base = $2.1 billion
             • IP residential increase capped at 9.9% in year 1
         • Gas 11% ROE; 51% to 53% equity;
           rate base = $0.9 billion
     ● Increase driven by higher costs and increased investment
     ● Requested rider rate-making mechanisms for electric infrastructure
       investment, gas decoupling and bad debt expenses


       investing for our future.
12
Missouri Rate Case Filing
     ● Expect to file next electric rate case in Q2 2008
         • Rate case process in Missouri is typically an 11-month process, but
           can be settled earlier
     ● Increase driven by higher costs and increased investment
     ● Expect to seek implementation of fuel and environmental cost
       recovery mechanisms in next rate case
     ● Gas infrastructure cost recovery mechanism currently in place




       investing for our future.
13
Non-rate-regulated Generation
       Positioned for Earnings Growth
                            Baseload Generation                                    Baseload Capacity and
                             (Megawatthours)                                        Availability Factors
     40,000                                                                 100%
                                                                                       Net Capacity Factor
                                                            Forecasted
     35,000                                                                            Equivalent Availability Factor
                                Actual
                                                                            90%
     30,000


     25,000
                                                                            80%

     20,000


                                                                            70%
     15,000


     10,000
                                                                            60%

      5,000


         0                                                                  50%
              1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010           2007    2008       2009       2010



      investing for our future.
14
Solid Market Fundamentals
                                                          Hedged Power Sales
     ● Generation hedging policy                       (excludes capacity-only revenues)
       designed to reduce risk, but allow
                                               86%      Tar
       for market upside                                   get

     ● Energy prices                                               60%      Ran
                                                                                ge
         • ATC forward curve for 2008 to                                               45%
           2010 ranged from $48/MWh to                                                  $54
                                                                   $52
                                               $50                                      MWh
           $54/MWh at time of guidance                             MWh
                                               MWh
         • Fundamentals support energy         2008                2009                 2010
           prices strengthening
                                                         Hedged Capacity Sales
     ● Expect continued development
       and tightening of MISO capacity         28%
       market
                                                                  18%
         • Targeting to sell ~75%              37%                                    10%
                                                                  22%
           of capacity through 2010                                                   10%
         • MISO prices are well below PJM      2008                2009                2010
                                            Embedded in Full Requirements Contract   Capacity Only

       investing for our future.
15
Investment Highlights
     ● Focused on the Basics - the generation of electricity,
       and the delivery of electricity and natural gas
     ● Strong EPS growth prospects through 2010 – continued growth
       thereafter (goal of ~$4 per share by 2011 and higher in 2012)
         • 4% - 6% CAGR
         • Driven primarily by regulated business growth
         • Optimization of existing non-rate-regulated generation/potential tightening
           of power markets
     ● Strong, sustainable dividend
         • Current yield of ~6%
         • Focused on future dividend growth
     ● Commitment to conservative financial management
     ● Attractive, risk-adjusted long-term total return potential
     ● Strong underlying value/straight-forward strategy to deliver
       shareholder value

       investing for our future.
16
Appendix




  investing for our future.
                              17
Ameren Segments




     investing for our future.
                                 18
Missouri Regulated
                                                                      Electric Revenue Mix
     ● 1.2 million electric and                                             (LTM September 30, 2007)
       127,000 gas customers
                                                                                                                18%
         • Diverse electric revenue mix
                                                                                                                                         44%
     ● 10,000 MW generation                                                                                  38%
         • Low-cost 7,000 MW baseload
           coal-fired and nuclear fleet                                    Residential                                Commercial                                 Industrial

     ● 24,000 square miles                        Average Residential Electricity
         • 2,900 miles of electric                        Prices (2006)
                                             0.19
                                             19¢
           transmission lines                0.17
                                             17¢
                                             15¢
                                             0.15
         • 32,000 miles of electric
                                             13¢
                                             0.13
           distribution lines                11¢
                                             0.11

     ● 3,300 employees                        9¢
                                             0.09




                                                                                                                                                                                                    San Francisco
                                                                                                                                                                           New York City
                                              7¢




                                                                                                                                                                                                                    Los Angeles
     ● Residential rates approximately 40%   0.07




                                                                                                                                                  Philadelphia
                                                                                      Cleveland
                                                                                                  Wash DC
                                                     St.Louis*




                                                                                                                                                                 Houston
                                                                                                            Chicago
                                              5¢




                                                                                                                                                                                           Boston
                                                                 Seattle
                                                                            Atlanta




                                                                                                                       Detroit
                                             0.05




                                                                                                                                         Dallas
                                                                                                                                 Miami
       below national average                 3¢
                                             0.03
                                                    Source: Bureau of Labor statistics
                                                    Assumes UE’s 2007 rate increase was in effect in 2006



       investing for our future.
19
Ameren Illinois Utilities
                                                         Margin Mix (LTM September 30, 2007)

     ● Regulated transmission and
       distribution company                                         30%
                                                                                          Electric
         • Owns no generation
                                                                                          Gas
                                                                            70%
     ● 1.2 million electric and
       830,000 gas customers
     ● 44,000 square miles
         • 4,490 miles of electric transmission lines
         • 45,000 miles of electric distribution lines
                                                                                  CILCO
         • 17,900 miles of natural gas mains
     ● 2,300 employees
                                                                                        CIPS
     ● Current bundled electric rates approximate
                                                                                   IP
       national average


       investing for our future.
20
Non-Rate-Regulated Generation
     ● Operate power plants
                                                              Edwards
                                                                                        CTGs
         • Three legal entities                               745 MW
                                                                                     1,140 MW
                                                             Coal – 1960
                                                                                    Gas – 2000-01

     ● Market power and                                                                                       Hutsonville
                                           Duck Creek

       related products                                                                                        150 MW
                                            330 MW
                                                                                                              Coal – 1953
                                           Coal – 1976


     ● 6,300 MW generation
         • Low-cost 4,500 MW baseload
           coal-fired fleet                                                                                    Coffeen
                                          Meredosia
                                                                                                               900 MW
                                           445 MW
     ● 1,100 employees                                                                                        Coal – 1965
                                        Coal/Oil – 1948




                                                                                                  Newton
                                                                                                 1,210 MW
                                               Grand Tower CTG
                                                                                                Coal – 1977
                                                   510 MW
                                                  Gas – 2001
                                                                           Joppa – 80%
                                                                            1,000 MW
                                                                           Coal – 1953




       investing for our future.
21
Earnings Guidance




      investing for our future.
                                  22
Major 2008 Assumptions
       Missouri Regulated Segment
     ● Electric rate case expected to be filed Q2-2008
         • No impact on 2008 earnings/regulatory lag
     ● Rising cost environment continues
         • Labor, materials, etc.
         • Fuel
         • Depreciation and financing costs
     ● Increased investment in rate base and operating expenses to
       improve reliability and environmental compliance
     ● Generation output of 51 million MWh (capacity factor ~83%)
     ● Callaway nuclear plant refueling in Fall 2008 (25-30 days)
     ● Normal weather and organic growth



       investing for our future.
23
Major 2008 Assumptions
       Illinois Regulated Segment
     ● Electric and gas rate orders effective October 2008
         • Requested 11% ROE
         • Bad debt expense, electric infrastructure investment and gas decoupling rate
           mechanisms approved
     ● Rising cost environment continues
         • Labor, materials, etc.
         • Depreciation and financing costs
     ● Increased investment in rate base and operating expenses to improve
       reliability
     ● Impact of Illinois electric settlement (5 cents per share) excluded from
       guidance
     ● Normal weather and organic growth


       investing for our future.
24
Major 2008 Assumptions
       Non-Rate-Regulated Generation
     ● Improved plant operations
         • Generation output of 33 million MWh vs. 31 million MWh in 2007
         • Generation capacity factor of 79% vs. 74% in 2007
     ● Hedged approximately 86% of output at December 31, 2007
         • Expected realized prices of $53.50/MWh vs. $54.50/MWh in 2007
           (including energy and capacity sales)
     ● Ancillary services market revenues of approximately $15 million
       (vs. ~$5 million in 2007)
     ● Capacity market revenues of approximately $40 million
       (vs. ~$25 million in 2007)
     ● Rising cost environment
         • Labor, materials, etc.
         • Fuel
         • Depreciation and financing costs
     ● Impact of Illinois electric settlement (7 cents per share)
       excluded from guidance
     ● Illinois Monterey coal mine closure
       investing for our future.
25
Major 2008 Assumptions
       Corporate

     ● No new equity issuances planned outside of
       DRIP/401k plans (hybrids under consideration)
     ● Significant levels of debt financings
     ● No increase in dividend




       investing for our future.
26
2008 Non-GAAP Earnings Guidance
     2007 GAAP Earnings per Share Guidance            $2.98
     2007 Severe storm-related costs                   0.09
     IL electric rate relief settlement, net           0.21
     FERC order – MISO charges                         0.06
     2007 Non-GAAP Earnings per Share Guidance        $3.34
     Missouri 2007 rate case (margin and expense)      0.09
     Other electric and gas margins                    0.69
     Weather (estimate)                               (0.10)
     Fuel prices                                      (0.40)
     Callaway refueling and maintenance outage         0.06
     Plant operations and maintenance                 (0.19)
     Distribution system reliability                  (0.22)
     Other labor and employee benefits                (0.06)
     Depreciation and amortization                    (0.03)
     Dilution and financing, net                      (0.06)
     Other taxes                                      (0.05)
     Other, net                                       (0.07)
     2008 Non-GAAP EPS Guidance Range               $2.80 – $3.20
     Illinois electric rate relief settlement          (0.12)
     2008 GAAP EPS Guidance Range                   $2.68 – $3.08
     investing for our future.
27
2008 Non-GAAP Segment Guidance

      Contribution to Earnings per Share
                                                                                                 2007                              2008
      Missouri Regulated                                                                        $1.47                         $1.20 – $1.30
      Illinois Regulated                                                                         0.38                          0.35 – 0.45
      Non-Rate-Regulated Generation                                                              1.45                          1.25 – 1.45
      Other                                                                                      0.04                                –
      Non-GAAP EPS Guidance Range(a)                                                            $3.34                         $2.80 – $3.20




     (a) The 12 cents per share earnings impact of the settlement agreement among parties in Illinois for comprehensive electric rate relief and customer assistance are
          excluded from non-GAAP guidance.



     investing for our future.
28
Capital Expenditure Summary
                                                                          ($ in Millions)
                                               Capital Expenditures
     ● 65% to 70% of total
       capital expenditures in the        $2,235
       regulated business
       segments                                             Target Range:
                                            735
     ● Approximately 70% of                       $1,600 to $2,100 per year
       non-rate-regulated          $1,395
       generation capital
                                            400
       expenditures due to           425               Non-Rate-Regulated Generation
       environmental
                                                       Illinois Regulated
       compliance                    310
     ● Does not include any                            Missouri Regulated
                                           1030
       potential expenditures
                                                       Other/Corporate
       related to climate            620
       legislation
                                                 70
                                         40
                                         2007    2008    2009   2010    2011       2012

       investing for our future.
29
Expected Cash Flow
       ($ in Millions)

                                                     2008
        Funds From Operations                       $1,340
        Capital Expenditures                        (2,235)
        Dividends                                     (530)
        EEI Dividends                                  (30)
        Free Cash Flow                             ($1,455)



     ● Negative free cash flow for foreseeable future, an industry-wide
       phenomenon
     ● Cash flow needs expected to be primarily financed with debt and
       proceeds from DRIP/401k plan issuances


       investing for our future.
30
2008 Illinois Electric Rate Redesign
     ● Illinois electric rate
       redesign will result
       in quarterly changes                   18¢
       in earnings per
       share, but no annual
       change
                                         2¢

                                                    7¢
                                   13¢




                                   Q1    Q2   Q3    Q4


       investing for our future.
31
Post-2008 Commentary
     ● Rising cost environment continues (e.g. labor, materials, fuel,
       depreciation, financing)
     ● Regulatory lag will persist, but will be less significant over time
     ● Rate cases
         • Will be more frequent
         • Proposed recovery mechanisms will be granted
         • Granted fair ROEs
     ● No Callaway refueling in 2009 and 2012
     ● New baseload plant decision for Missouri regulated operations
       will need to be made
         • Constructive regulatory framework will need to be in place




       investing for our future.
32
Fuel Costs
                                                                        Fuel Costs per MWh(a)

     ● Fuel costs expected to continue
       to increase
                                                                                                            $23
     ● Estimates include all fuel costs                                                  $21
                                                                     $19
                                                                                                      $17
                                                                                 $15
                                                               $14
       (coal, nuclear, natural gas,
       diesel, emission allowances and
       transportation)
                                                                 2008                 2009              2010



                                                                     Estimated Costs Hedged
     ● Regulated costs are assumed to
       be recoverable through a cost
       recovery mechanism beginning
       in 2009
                                                               94% 98%
                                                                                 86%
                                                                                        72%
                                                                                                     54%

                                                                                                            16%

                                                                 2008                 2009              2010
       (a)
             Includes contracted and estimated cost increase     Regulated Missouri    Non-Rate-Regulated


       investing for our future.
33
Post-2008 Commentary
     ● Improved non-rate-regulated generation plant performance
     ● 2 million MWhs of below-market wholesale contracts at ~$33/MWh
       expire in late 2008
     ● Fundamentals point to more robust energy and capacity prices
       compared to current forward curves
     ● No impact from climate legislation
     ● No new equity issuances currently planned through 2010, excluding
       DRIP/401k plans (hybrids under consideration)
     ● Focused on strong, sustainable dividend and growing dividend in
       the future




       investing for our future.
34
Illinois Settlement




       investing for our future.
                                   35
Illinois Electric Settlement
     ● Constructively resolved significant legislative, regulatory and legal
       uncertainties
         • All major parties participated in settlement
     ● Provides stability to Illinois electric market and provides agreed path for
       power procurement
     ● Significant disincentives for additional legislative action
         • Rate relief programs would terminate
         • Financial swap agreements could be terminated or renegotiated
         • Strong legal position
     ● No prohibition on ability to file for delivery service
       rate increases




       investing for our future.
36
Illinois Electric Settlement Costs
     ($ in Millions, Except Per Share Amounts)



                                                  2007    2008    2009    2010   Total
      Ameren Illinois Customers’ Benefit         $231.6 $150.4 $100.5     $5.5 $488.0
      Contributions of Ameren Companies
      Non-rate-regulated Generation                48.2    24.9    15.8    1.1    90.0
      Illinois Regulated                           30.7    17.9    10.7    0.7    60.0
      Total Funding                               $78.9   $42.8   $26.5   $1.8 $150.0
      EPS impact                                  $0.25   $0.12   $0.07 $0.01    $0.45




     investing for our future.
37
Illinois Electric Settlement - Swap
     ●    Ameren Illinois utilities entered into swap agreements with an affiliate to lock-in prices
          for a portion of power requirements from 2008 through 2012 at relevant market prices
          Period                                 Volume                        Price per MWh
          6/1/08 to 12/31/08                      400 MW                           $47.45
          1/1/09 to 05/31/09                      400 MW                           $49.47
          6/1/09 to 12/31/09                      800 MW                           $49.47
          1/1/10 to 5/31/10                       800 MW                           $51.09
          6/1/10 to 12/31/10                    1,000 MW                           $51.09
          1/1/11 to 12/31/11                    1,000 MW                           $52.06
          1/1/12 to 12/31/12                    1,000 MW                           $53.08
     ●    If any of the following events occur, negotiations may be undertaken so as to preserve
          the economic benefits of the swap agreements. If unable to negotiate a settlement, the
          swap agreements may be terminated in 60 to 90 days after the event occurs
            • A state tax is enacted on electric generation
            • A state or federal tax is enacted on or regulation is imposed on greenhouse
               gas emissions
            • A state law is enacted that eliminates retail electric supplier choice for residential
               and small commercial customers


         investing for our future.
38
Power Procurement
     ● Procurement plan approved                                          ● New Illinois Power Agency (IPA)
       by Illinois Commerce                                                 to procure power for Illinois utilities
       Commission (ICC) for June                                            beginning June 2009
       2008 to May 2009                                                      • Process based on acquiring
                         20
                                                                                standard market products
                                Contracted Power Supply
                         18
                                                                                (e.g., 7x24 and 5x16 blocks
                         16
                                                                                of energy)
     MWh (in millions)




                         14
                                                                             • RFP process with benchmarks
                         12

                                                                             • Third party administrator hired
                         10
                         8
                                                                                by IPA
                         6
                                                                             • ICC review and approval
                         4

                                                                             • Results of IPA procurement
                         2

                                                                                process deemed prudent
                         0
                              2008      2009     2010       2011      2012
                                     Auction   Financial Swap Contracts


                   investing for our future.
39
References




   investing for our future.
                               40
Ameren Calendar
       Illinois
            ICC Staff and intervenor testimony filed   March 14, 2008
            Ameren rebuttal filed                      April 14, 2008
            ICC Staff and intervenor rebuttal          May 13, 2008
            Ameren surrebuttal                         May 27, 2008
            Written prehearing motions                 May 29, 2008
            Evidentiary hearings                       June 9-13, 2008
            Briefs                                     July 2008
            Proposed delivery service order            August 2008 (estimate)
            Final delivery service order issued        September 2008
       Missouri
            Final environmental rider rules            Q2 2008
            File electric rate case                    Q2 2008
       Investor Relations
            Q1 2008 quiet period                       Begins April 7, 2008
            Q2 2008 quiet period                       Begins July 7, 2008
            Q3 2008 quiet period                       Begins October 7, 2008



     investing for our future.
41
Major Regulatory Proceedings
      Illinois
      Web site www.icc.illinois.gov/e-docket
      Case # 07-0527
          – Interim procurement plan
      Case # 07-0585, 07-0586, 07-0587
          – Electric delivery services rate cases
      Case #07-0588, 07-0589, 07-0590
          – Gas delivery services rate cases
      Missouri
      Web site www.efis.psc.mo.gov/mpsc/DocketSheet.html
      Case # ER-2007-0002 – Electric rate case (Order issued)
      Case # GR-2007-0003 – Gas rate case (Order issued)
      Case # ES-2007-0474 – Taum Sauk incident investigation


     investing for our future.
42
Investor Relations Contacts

     ● Bruce Steinke                            314-554-2574
        • Vice President & Controller     bsteinke@ameren.com
          Manager – Investor Relations


     ● Theresa Nistendirk                       314-206-0693
        • Managing Supervisor,           tnistendirk@ameren.com
           Investor Relations




      investing for our future.
43

Más contenido relacionado

La actualidad más candente

Raytheon Reports 2005 Third Quarter Results
Raytheon Reports 2005 Third Quarter ResultsRaytheon Reports 2005 Third Quarter Results
Raytheon Reports 2005 Third Quarter Resultsfinance12
 
progress energy 08/07/08slides
progress energy 08/07/08slidesprogress energy 08/07/08slides
progress energy 08/07/08slidesfinance25
 
Raytheon Reports 2006 First Quarter Results
	Raytheon Reports 2006 First Quarter Results	Raytheon Reports 2006 First Quarter Results
Raytheon Reports 2006 First Quarter Resultsfinance12
 
Q1 2008 SunTrust Earnings Conference Call
Q1 2008 SunTrust Earnings Conference CallQ1 2008 SunTrust Earnings Conference Call
Q1 2008 SunTrust Earnings Conference Callfinance20
 
omnicom group annual reports 2004
omnicom group annual reports 2004omnicom group annual reports 2004
omnicom group annual reports 2004finance22
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnLinkMidstreamLLC
 
spectra energy 3Q07SpectraEnergyEarnings
spectra energy 3Q07SpectraEnergyEarningsspectra energy 3Q07SpectraEnergyEarnings
spectra energy 3Q07SpectraEnergyEarningsfinance49
 
metlife Investor Day 2008 Finance
metlife 	Investor Day 2008 Financemetlife 	Investor Day 2008 Finance
metlife Investor Day 2008 Financefinance5
 
raytheon Investor Conference Presentation - Afternoon Session
raytheon	Investor Conference Presentation - Afternoon Sessionraytheon	Investor Conference Presentation - Afternoon Session
raytheon Investor Conference Presentation - Afternoon Sessionfinance12
 
PEG_Boston Investor Meeting
PEG_Boston Investor MeetingPEG_Boston Investor Meeting
PEG_Boston Investor Meetingfinance20
 
public serviceenterprise group european_trip
public serviceenterprise group european_trippublic serviceenterprise group european_trip
public serviceenterprise group european_tripfinance20
 
FUS Mid-year Financial Update January 2012
FUS Mid-year Financial Update January 2012FUS Mid-year Financial Update January 2012
FUS Mid-year Financial Update January 2012fusmadison
 
raytheon Q4 Earnings Presentation
raytheon Q4 Earnings Presentationraytheon Q4 Earnings Presentation
raytheon Q4 Earnings Presentationfinance12
 
American Taxpayer Relief Act
American Taxpayer Relief ActAmerican Taxpayer Relief Act
American Taxpayer Relief ActSkoda Minotti
 
Services - GMAC Annual and Fourth Quarter Earnings
Services - GMAC Annual and Fourth Quarter Earnings Services - GMAC Annual and Fourth Quarter Earnings
Services - GMAC Annual and Fourth Quarter Earnings finance8
 

La actualidad más candente (16)

Raytheon Reports 2005 Third Quarter Results
Raytheon Reports 2005 Third Quarter ResultsRaytheon Reports 2005 Third Quarter Results
Raytheon Reports 2005 Third Quarter Results
 
progress energy 08/07/08slides
progress energy 08/07/08slidesprogress energy 08/07/08slides
progress energy 08/07/08slides
 
Raytheon Reports 2006 First Quarter Results
	Raytheon Reports 2006 First Quarter Results	Raytheon Reports 2006 First Quarter Results
Raytheon Reports 2006 First Quarter Results
 
Q1 2008 SunTrust Earnings Conference Call
Q1 2008 SunTrust Earnings Conference CallQ1 2008 SunTrust Earnings Conference Call
Q1 2008 SunTrust Earnings Conference Call
 
omnicom group annual reports 2004
omnicom group annual reports 2004omnicom group annual reports 2004
omnicom group annual reports 2004
 
Enlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations reportEnlk and enlc first quarter 2017 operations report
Enlk and enlc first quarter 2017 operations report
 
spectra energy 3Q07SpectraEnergyEarnings
spectra energy 3Q07SpectraEnergyEarningsspectra energy 3Q07SpectraEnergyEarnings
spectra energy 3Q07SpectraEnergyEarnings
 
metlife Investor Day 2008 Finance
metlife 	Investor Day 2008 Financemetlife 	Investor Day 2008 Finance
metlife Investor Day 2008 Finance
 
raytheon Investor Conference Presentation - Afternoon Session
raytheon	Investor Conference Presentation - Afternoon Sessionraytheon	Investor Conference Presentation - Afternoon Session
raytheon Investor Conference Presentation - Afternoon Session
 
PEG_Boston Investor Meeting
PEG_Boston Investor MeetingPEG_Boston Investor Meeting
PEG_Boston Investor Meeting
 
public serviceenterprise group european_trip
public serviceenterprise group european_trippublic serviceenterprise group european_trip
public serviceenterprise group european_trip
 
FUS Mid-year Financial Update January 2012
FUS Mid-year Financial Update January 2012FUS Mid-year Financial Update January 2012
FUS Mid-year Financial Update January 2012
 
pepco POM2
pepco POM2pepco POM2
pepco POM2
 
raytheon Q4 Earnings Presentation
raytheon Q4 Earnings Presentationraytheon Q4 Earnings Presentation
raytheon Q4 Earnings Presentation
 
American Taxpayer Relief Act
American Taxpayer Relief ActAmerican Taxpayer Relief Act
American Taxpayer Relief Act
 
Services - GMAC Annual and Fourth Quarter Earnings
Services - GMAC Annual and Fourth Quarter Earnings Services - GMAC Annual and Fourth Quarter Earnings
Services - GMAC Annual and Fourth Quarter Earnings
 

Destacado

smurfit stone container 1999_AR
smurfit stone container  1999_ARsmurfit stone container  1999_AR
smurfit stone container 1999_ARfinance30
 
smurfit stone container 2004_AR
smurfit stone container  2004_ARsmurfit stone container  2004_AR
smurfit stone container 2004_ARfinance30
 
ameren Lehman_090507
ameren Lehman_090507ameren Lehman_090507
ameren Lehman_090507finance30
 
Bestemming Hnw@Amersfoort
Bestemming Hnw@AmersfoortBestemming Hnw@Amersfoort
Bestemming Hnw@AmersfoortRoyVermeulen
 
Frukostseminarie 8 Maj
Frukostseminarie 8 MajFrukostseminarie 8 Maj
Frukostseminarie 8 Majwickedone
 
Debugger & Profiler in NetBeans
Debugger & Profiler in NetBeansDebugger & Profiler in NetBeans
Debugger & Profiler in NetBeansHuu Bang Le Phan
 
smurfit stone container Q107_Release
smurfit stone container Q107_Releasesmurfit stone container Q107_Release
smurfit stone container Q107_Releasefinance30
 

Destacado (8)

smurfit stone container 1999_AR
smurfit stone container  1999_ARsmurfit stone container  1999_AR
smurfit stone container 1999_AR
 
smurfit stone container 2004_AR
smurfit stone container  2004_ARsmurfit stone container  2004_AR
smurfit stone container 2004_AR
 
ameren Lehman_090507
ameren Lehman_090507ameren Lehman_090507
ameren Lehman_090507
 
Bestemming Hnw@Amersfoort
Bestemming Hnw@AmersfoortBestemming Hnw@Amersfoort
Bestemming Hnw@Amersfoort
 
HYP Presentation
HYP PresentationHYP Presentation
HYP Presentation
 
Frukostseminarie 8 Maj
Frukostseminarie 8 MajFrukostseminarie 8 Maj
Frukostseminarie 8 Maj
 
Debugger & Profiler in NetBeans
Debugger & Profiler in NetBeansDebugger & Profiler in NetBeans
Debugger & Profiler in NetBeans
 
smurfit stone container Q107_Release
smurfit stone container Q107_Releasesmurfit stone container Q107_Release
smurfit stone container Q107_Release
 

Similar a ameren InvestorMeetings_0308

xcel energy November 2008
xcel energy  November 2008 xcel energy  November 2008
xcel energy November 2008 finance26
 
xcel energy EEI November2008
xcel energy  EEI November2008 xcel energy  EEI November2008
xcel energy EEI November2008 finance26
 
shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...
shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...
shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...finance36
 
xcel energy 1108Mid-Atlantic_Presentation
xcel energy  1108Mid-Atlantic_Presentationxcel energy  1108Mid-Atlantic_Presentation
xcel energy 1108Mid-Atlantic_Presentationfinance26
 
xcel energy 1108Mid-Atlantic_Presentation
xcel energy  1108Mid-Atlantic_Presentationxcel energy  1108Mid-Atlantic_Presentation
xcel energy 1108Mid-Atlantic_Presentationfinance26
 
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruaryxcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruaryfinance26
 
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruaryxcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruaryfinance26
 
2Q_2008_Earnings_FINAL_(Web)
2Q_2008_Earnings_FINAL_(Web)2Q_2008_Earnings_FINAL_(Web)
2Q_2008_Earnings_FINAL_(Web)finance49
 
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007
xcel energy  9_11EuropeanRoadShowPresentationSeptember2007xcel energy  9_11EuropeanRoadShowPresentationSeptember2007
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007finance26
 
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007
xcel energy  9_11EuropeanRoadShowPresentationSeptember2007xcel energy  9_11EuropeanRoadShowPresentationSeptember2007
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007finance26
 
Investor Conference 2008
Investor Conference 2008Investor Conference 2008
Investor Conference 2008finance7
 
el paso EP3Q2008EarningsFINAL(Web)
el paso  EP3Q2008EarningsFINAL(Web)el paso  EP3Q2008EarningsFINAL(Web)
el paso EP3Q2008EarningsFINAL(Web)finance49
 
el paso EP3Q2008EarningsFINAL(Web)
el paso  EP3Q2008EarningsFINAL(Web)el paso  EP3Q2008EarningsFINAL(Web)
el paso EP3Q2008EarningsFINAL(Web)finance49
 
air products & chemicals fy 08 q2 earnings
air products & chemicals fy 08 q2 earningsair products & chemicals fy 08 q2 earnings
air products & chemicals fy 08 q2 earningsfinance26
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Presfinance26
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Presfinance26
 
Owens_slides
Owens_slidesOwens_slides
Owens_slidesfinance33
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008finance26
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008finance26
 
xcel energy Canada_June_08_SEC
xcel energy  Canada_June_08_SECxcel energy  Canada_June_08_SEC
xcel energy Canada_June_08_SECfinance26
 

Similar a ameren InvestorMeetings_0308 (20)

xcel energy November 2008
xcel energy  November 2008 xcel energy  November 2008
xcel energy November 2008
 
xcel energy EEI November2008
xcel energy  EEI November2008 xcel energy  EEI November2008
xcel energy EEI November2008
 
shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...
shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...
shaw group 8C04E297-E3DD-4F1E-8BB2-56C5BB51CEDA_SGR_AnnualShareholdersMeeting...
 
xcel energy 1108Mid-Atlantic_Presentation
xcel energy  1108Mid-Atlantic_Presentationxcel energy  1108Mid-Atlantic_Presentation
xcel energy 1108Mid-Atlantic_Presentation
 
xcel energy 1108Mid-Atlantic_Presentation
xcel energy  1108Mid-Atlantic_Presentationxcel energy  1108Mid-Atlantic_Presentation
xcel energy 1108Mid-Atlantic_Presentation
 
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruaryxcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
 
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruaryxcel energy  AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
xcel energy AB7A4639-F266-4C1B-8624-A2DC294B5C02_2009_NEWFixedIncomeFebruary
 
2Q_2008_Earnings_FINAL_(Web)
2Q_2008_Earnings_FINAL_(Web)2Q_2008_Earnings_FINAL_(Web)
2Q_2008_Earnings_FINAL_(Web)
 
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007
xcel energy  9_11EuropeanRoadShowPresentationSeptember2007xcel energy  9_11EuropeanRoadShowPresentationSeptember2007
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007
 
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007
xcel energy  9_11EuropeanRoadShowPresentationSeptember2007xcel energy  9_11EuropeanRoadShowPresentationSeptember2007
xcel energy 9_11EuropeanRoadShowPresentationSeptember2007
 
Investor Conference 2008
Investor Conference 2008Investor Conference 2008
Investor Conference 2008
 
el paso EP3Q2008EarningsFINAL(Web)
el paso  EP3Q2008EarningsFINAL(Web)el paso  EP3Q2008EarningsFINAL(Web)
el paso EP3Q2008EarningsFINAL(Web)
 
el paso EP3Q2008EarningsFINAL(Web)
el paso  EP3Q2008EarningsFINAL(Web)el paso  EP3Q2008EarningsFINAL(Web)
el paso EP3Q2008EarningsFINAL(Web)
 
air products & chemicals fy 08 q2 earnings
air products & chemicals fy 08 q2 earningsair products & chemicals fy 08 q2 earnings
air products & chemicals fy 08 q2 earnings
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Pres
 
xcel energy 3-19-2008_Boston_Pres
xcel energy  3-19-2008_Boston_Presxcel energy  3-19-2008_Boston_Pres
xcel energy 3-19-2008_Boston_Pres
 
Owens_slides
Owens_slidesOwens_slides
Owens_slides
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008
 
XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008XEL_Fixed_Income_Presentation_February2008
XEL_Fixed_Income_Presentation_February2008
 
xcel energy Canada_June_08_SEC
xcel energy  Canada_June_08_SECxcel energy  Canada_June_08_SEC
xcel energy Canada_June_08_SEC
 

Más de finance30

smurfit stone container 1Q05_french
smurfit stone container 1Q05_frenchsmurfit stone container 1Q05_french
smurfit stone container 1Q05_frenchfinance30
 
smurfit stone container 1Q05
smurfit stone container 1Q05smurfit stone container 1Q05
smurfit stone container 1Q05finance30
 
smurfit stone container 2Q05_french
smurfit stone container 2Q05_frenchsmurfit stone container 2Q05_french
smurfit stone container 2Q05_frenchfinance30
 
smurfit stone container 2Q05
smurfit stone container 2Q05smurfit stone container 2Q05
smurfit stone container 2Q05finance30
 
smurfit stone container 3Q05_french
smurfit stone container 3Q05_frenchsmurfit stone container 3Q05_french
smurfit stone container 3Q05_frenchfinance30
 
smurfit stone container 3Q05
smurfit stone container 3Q05smurfit stone container 3Q05
smurfit stone container 3Q05finance30
 
smurfit stone container 2006_0125_4Q05%20Earnings_Fr
smurfit stone container 2006_0125_4Q05%20Earnings_Frsmurfit stone container 2006_0125_4Q05%20Earnings_Fr
smurfit stone container 2006_0125_4Q05%20Earnings_Frfinance30
 
smurfit stone container English_2005_4Q
smurfit stone container English_2005_4Qsmurfit stone container English_2005_4Q
smurfit stone container English_2005_4Qfinance30
 
smurfit stone container 1Q06_FR
smurfit stone container 1Q06_FRsmurfit stone container 1Q06_FR
smurfit stone container 1Q06_FRfinance30
 
smurfit stone container 1Q06_EN
smurfit stone container 1Q06_ENsmurfit stone container 1Q06_EN
smurfit stone container 1Q06_ENfinance30
 
smurfit stone container 2Q06_FR
smurfit stone container 2Q06_FRsmurfit stone container 2Q06_FR
smurfit stone container 2Q06_FRfinance30
 
smurfit stone container 2Q06_EN_2
smurfit stone container 2Q06_EN_2smurfit stone container 2Q06_EN_2
smurfit stone container 2Q06_EN_2finance30
 
smurfit stone container Q406_French
smurfit stone container Q406_Frenchsmurfit stone container Q406_French
smurfit stone container Q406_Frenchfinance30
 
smurfit stone container Q406_Release
smurfit stone container Q406_Releasesmurfit stone container Q406_Release
smurfit stone container Q406_Releasefinance30
 
smurfit stone container Q107_French
smurfit stone container Q107_Frenchsmurfit stone container Q107_French
smurfit stone container Q107_Frenchfinance30
 
smurfit stone container 2Q07_Release_FR
smurfit stone container 2Q07_Release_FRsmurfit stone container 2Q07_Release_FR
smurfit stone container 2Q07_Release_FRfinance30
 
smurfit stone container 2Q07_Release_EN
smurfit stone container 2Q07_Release_ENsmurfit stone container 2Q07_Release_EN
smurfit stone container 2Q07_Release_ENfinance30
 
smurfit stone container 3Q07_Release_FR
smurfit stone container 3Q07_Release_FRsmurfit stone container 3Q07_Release_FR
smurfit stone container 3Q07_Release_FRfinance30
 
smurfit stone container 3Q07_Release_EN
smurfit stone container 3Q07_Release_ENsmurfit stone container 3Q07_Release_EN
smurfit stone container 3Q07_Release_ENfinance30
 
smurfit stone container 4Q07_Release_FR
smurfit stone container 4Q07_Release_FRsmurfit stone container 4Q07_Release_FR
smurfit stone container 4Q07_Release_FRfinance30
 

Más de finance30 (20)

smurfit stone container 1Q05_french
smurfit stone container 1Q05_frenchsmurfit stone container 1Q05_french
smurfit stone container 1Q05_french
 
smurfit stone container 1Q05
smurfit stone container 1Q05smurfit stone container 1Q05
smurfit stone container 1Q05
 
smurfit stone container 2Q05_french
smurfit stone container 2Q05_frenchsmurfit stone container 2Q05_french
smurfit stone container 2Q05_french
 
smurfit stone container 2Q05
smurfit stone container 2Q05smurfit stone container 2Q05
smurfit stone container 2Q05
 
smurfit stone container 3Q05_french
smurfit stone container 3Q05_frenchsmurfit stone container 3Q05_french
smurfit stone container 3Q05_french
 
smurfit stone container 3Q05
smurfit stone container 3Q05smurfit stone container 3Q05
smurfit stone container 3Q05
 
smurfit stone container 2006_0125_4Q05%20Earnings_Fr
smurfit stone container 2006_0125_4Q05%20Earnings_Frsmurfit stone container 2006_0125_4Q05%20Earnings_Fr
smurfit stone container 2006_0125_4Q05%20Earnings_Fr
 
smurfit stone container English_2005_4Q
smurfit stone container English_2005_4Qsmurfit stone container English_2005_4Q
smurfit stone container English_2005_4Q
 
smurfit stone container 1Q06_FR
smurfit stone container 1Q06_FRsmurfit stone container 1Q06_FR
smurfit stone container 1Q06_FR
 
smurfit stone container 1Q06_EN
smurfit stone container 1Q06_ENsmurfit stone container 1Q06_EN
smurfit stone container 1Q06_EN
 
smurfit stone container 2Q06_FR
smurfit stone container 2Q06_FRsmurfit stone container 2Q06_FR
smurfit stone container 2Q06_FR
 
smurfit stone container 2Q06_EN_2
smurfit stone container 2Q06_EN_2smurfit stone container 2Q06_EN_2
smurfit stone container 2Q06_EN_2
 
smurfit stone container Q406_French
smurfit stone container Q406_Frenchsmurfit stone container Q406_French
smurfit stone container Q406_French
 
smurfit stone container Q406_Release
smurfit stone container Q406_Releasesmurfit stone container Q406_Release
smurfit stone container Q406_Release
 
smurfit stone container Q107_French
smurfit stone container Q107_Frenchsmurfit stone container Q107_French
smurfit stone container Q107_French
 
smurfit stone container 2Q07_Release_FR
smurfit stone container 2Q07_Release_FRsmurfit stone container 2Q07_Release_FR
smurfit stone container 2Q07_Release_FR
 
smurfit stone container 2Q07_Release_EN
smurfit stone container 2Q07_Release_ENsmurfit stone container 2Q07_Release_EN
smurfit stone container 2Q07_Release_EN
 
smurfit stone container 3Q07_Release_FR
smurfit stone container 3Q07_Release_FRsmurfit stone container 3Q07_Release_FR
smurfit stone container 3Q07_Release_FR
 
smurfit stone container 3Q07_Release_EN
smurfit stone container 3Q07_Release_ENsmurfit stone container 3Q07_Release_EN
smurfit stone container 3Q07_Release_EN
 
smurfit stone container 4Q07_Release_FR
smurfit stone container 4Q07_Release_FRsmurfit stone container 4Q07_Release_FR
smurfit stone container 4Q07_Release_FR
 

Último

VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...Call Girls in Nagpur High Profile
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfGale Pooley
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...Suhani Kapoor
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free DeliveryPooja Nehwal
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Call Girls in Nagpur High Profile
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130Suhani Kapoor
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdfFinTech Belgium
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptxFinTech Belgium
 

Último (20)

VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdf
 
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
VIP Call Girls LB Nagar ( Hyderabad ) Phone 8250192130 | ₹5k To 25k With Room...
 
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
 
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services  9892124323 | ₹,4500 With Room Free DeliveryMalad Call Girl in Services  9892124323 | ₹,4500 With Room Free Delivery
Malad Call Girl in Services 9892124323 | ₹,4500 With Room Free Delivery
 
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
(INDIRA) Call Girl Mumbai Call Now 8250077686 Mumbai Escorts 24x7
 
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...Top Rated  Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
Top Rated Pune Call Girls Viman Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Sex...
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Koregaon Park Call Me 7737669865 Budget Friendly No Advance Booking
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
VIP Call Girls Service Dilsukhnagar Hyderabad Call +91-8250192130
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Maya Call 7001035870 Meet With Nagpur Escorts
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
05_Annelore Lenoir_Docbyte_MeetupDora&Cybersecurity.pptx
 

ameren InvestorMeetings_0308

  • 1. Investor Meetings March 2008 investing for our future. 1
  • 2. Warner Baxter Executive Vice President & Chief Financial Officer Bruce Steinke Vice President and Controller investing for our future. 2
  • 3. Cautionary Statements All forecasted numbers in this presentation are issued and effective as of January 17, 2008 Regulation G Statement Ameren has presented certain information in this presentation on a diluted cents per share basis. These diluted per share amounts reflect certain factors that directly impact Ameren’s total earnings per share. The non-GAAP earnings per share and non-GAAP earnings per share guidance excludes one or more of the following: costs related to severe January 2007 storms, abnormal weather, the earnings impact of the settlement agreement among parties in Illinois for comprehensive electric rate relief and customer assistance, the reversal of accruals made in 2006 for low-income energy assistance and energy efficiency program funding commitments in Illinois and a March 2007 FERC order, which retroactively adjusted prior years’ regional transmission organization costs. Ameren believes this information is useful because it enables readers to better understand the impact of these factors on Ameren’s results of operations and earnings per share. In providing non-GAAP earnings guidance and a non-GAAP earnings growth forecast, there could be differences between non-GAAP earnings and earnings prepared in accordance with Generally Accepted Accounting Principles (GAAP) for unusual items, such as the 2007 Illinois electric settlement and the impact of abnormal weather. Except for the Illinois settlement, Ameren is not able to estimate the impact, if any, on future GAAP earnings of these items. Therefore, Ameren is not able to provide a corresponding GAAP equivalent for its earnings growth rate forecast. Forward-looking Statements Ameren’s consolidated and segment earnings guidance excludes one or more of the following: costs related to severe January 2007 storms, abnormal weather, the earnings impact of the settlement agreement among parties in Illinois for comprehensive electric rate relief and customer assistance, the reversal of accruals made in 2006 for low-income energy assistance and energy efficiency program funding commitments in Illinois and a March 2007 FERC order, which retroactively adjusted prior years’ regional transmission organization costs. Ameren’s earnings guidance assumes normal weather and is subject to, among other things, regulatory and legislative decisions, plant operations, energy market and economic conditions, severe storms, unusual or otherwise unexpected gains or losses and other risks and uncertainties outlined in Ameren’s Forward-looking Statements in its news release issued today and in the Forward- looking Statements and Risk Factors sections in its periodic filings with the Securities and Exchange Commission. investing for our future. 3
  • 4. Ameren Introduction ● Focused on the Basics ● Regional electric and gas utility • Missouri regulated generation, transmission and CILCO delivery business • Illinois regulated transmission and CIPS delivery businesses UE IP • Non-rate-regulated generation business ● NYSE-listed under AEE • Market cap. ~ $9 billion • Component of the S&P 500 investing for our future. 4
  • 5. Ameren’s Business Plan ● Achieve operational excellence in all Meaningful aspects of our business investment in serving ● Improve our customer service, customers satisfaction and image ● Demonstrate environmental Fair leadership return High quality on service ● Improve regulatory frameworks and investment returns ● Optimize non-rate-regulated generation business High customer ● Maximize the value of our satisfaction shareholders’ investment investing for our future. 5
  • 6. Financial Outlook ● Near-term regulatory lag • Rising cost environment (O&M and capital) • Fuel • Reliability projects • Environmental projects • Depreciation • Finance costs • No significant rate adjustments until late 2008 and early 2009 ● Significant longer-term earnings growth opportunities investing for our future. 6
  • 7. Financial Outlook Opportunities ● Regulated rates reflecting more current costs ● Increasing rate base investment ● Earning fair returns in regulated operations ● Position non-rate-regulated business for earnings growth • Improved plant performance • Effective marketing, trading and hedging • EPS contribution expected to be relatively flat through 2010 • Expectations could change meaningfully depending upon future power, capacity and fuel prices • Greater prospects for tightening power markets • Ancillary and capacity market development Bottom line: strong underlying value Straight-forward strategy to deliver value investing for our future. 7
  • 8. Financial Objectives ● Targeting 4% to 6% average non-GAAP EPS growth from normalized 2007 base to 2010 • Driven primarily by regulated business growth • Goal of ~$4 per share by 2011 and higher in 2012 ● Overall percentage of earnings contribution by regulated business segments forecasted to increase and approximate current annual dividend by the end of 2010 ● Focused on providing a strong, sustainable dividend • Current yield of ~6% • Cash flows do not support near-term change • Focus on future dividend growth ● Targeting long-term total annual shareholder return of ~10% ● Proven and lower-risk strategies to achieve these results investing for our future. 8
  • 9. Long-Range EPS Expectations 2007 to 2010 CAGR of 4% to 6%, continued growth thereafter >$4.00 ~$3.70 Non-GAAP Non-GAAP $3.25 - $3.35 $2.80 - $3.20 Weather-Normalized $3.24 GAAP $2.90 - $3.00 GAAP $2.68 - $3.08 2007 2008 2009 2010 2011 2012 GAAP Non-GAAP investing for our future. 9
  • 10. Current Regulated Returns Support Earnings Growth ● Missouri Regulated Operations(a) 2007 non-GAAP ROE = 9% Estimated 2008 non-GAAP ROE = 7% • Allowed return in last rate case was 10.2%. Every 1% equals approximately $50 million of revenues ● Illinois Regulated Operations(b) 2007 non-GAAP ROE = 5% Estimated 2008 non-GAAP ROE = 5% • Allowed return in last rate case was 10%. Every 1% equals approximately $27 million of revenues Based on actual and projected financial results excluding non-GAAP items (a) Based on actual and projected financial results excluding non-GAAP items and (b) impact of goodwill associated with CILCORP and Illinois Power acquisitions investing for our future. 10
  • 11. Regulated Investment Plans Support Earnings Growth Rate Base Growth ($ in Millions) $9,000 Missouri Rate Base $8,000 $7,000 Missouri(a) $6,000 Electric $5,744 $5,000 Gas 218 $4,000 Subtotal $5,962 $3,000 $2,000 $1,000 Illinois(b) $0 Distribution $2,120 2006 2007 2008 2009 2010 2011 2012 $4,500 Transmission 245 Illinois $4,000 Gas 928 $3,500 Subtotal $3,293 $3,000 $2,500 $2,000 TOTAL $9,255 $1,500 $1,000 (a) At December 31, 2007 $500 (b) At December 31, 2006, $0 as submitted in current rate case filings 2006 2007 2008 2009 2010 2011 2012 investing for our future. 11
  • 12. Illinois Rate Filings ● Illinois electric and gas delivery service rate cases filed November 2, 2007 • Decision by end of September 2008 ● Requested revenue increase of $247 million ($180 million electric, $67 million gas) • Electric: 11% ROE; 51% to 53% equity; rate base = $2.1 billion • IP residential increase capped at 9.9% in year 1 • Gas 11% ROE; 51% to 53% equity; rate base = $0.9 billion ● Increase driven by higher costs and increased investment ● Requested rider rate-making mechanisms for electric infrastructure investment, gas decoupling and bad debt expenses investing for our future. 12
  • 13. Missouri Rate Case Filing ● Expect to file next electric rate case in Q2 2008 • Rate case process in Missouri is typically an 11-month process, but can be settled earlier ● Increase driven by higher costs and increased investment ● Expect to seek implementation of fuel and environmental cost recovery mechanisms in next rate case ● Gas infrastructure cost recovery mechanism currently in place investing for our future. 13
  • 14. Non-rate-regulated Generation Positioned for Earnings Growth Baseload Generation Baseload Capacity and (Megawatthours) Availability Factors 40,000 100% Net Capacity Factor Forecasted 35,000 Equivalent Availability Factor Actual 90% 30,000 25,000 80% 20,000 70% 15,000 10,000 60% 5,000 0 50% 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2007 2008 2009 2010 investing for our future. 14
  • 15. Solid Market Fundamentals Hedged Power Sales ● Generation hedging policy (excludes capacity-only revenues) designed to reduce risk, but allow 86% Tar for market upside get ● Energy prices 60% Ran ge • ATC forward curve for 2008 to 45% 2010 ranged from $48/MWh to $54 $52 $50 MWh $54/MWh at time of guidance MWh MWh • Fundamentals support energy 2008 2009 2010 prices strengthening Hedged Capacity Sales ● Expect continued development and tightening of MISO capacity 28% market 18% • Targeting to sell ~75% 37% 10% 22% of capacity through 2010 10% • MISO prices are well below PJM 2008 2009 2010 Embedded in Full Requirements Contract Capacity Only investing for our future. 15
  • 16. Investment Highlights ● Focused on the Basics - the generation of electricity, and the delivery of electricity and natural gas ● Strong EPS growth prospects through 2010 – continued growth thereafter (goal of ~$4 per share by 2011 and higher in 2012) • 4% - 6% CAGR • Driven primarily by regulated business growth • Optimization of existing non-rate-regulated generation/potential tightening of power markets ● Strong, sustainable dividend • Current yield of ~6% • Focused on future dividend growth ● Commitment to conservative financial management ● Attractive, risk-adjusted long-term total return potential ● Strong underlying value/straight-forward strategy to deliver shareholder value investing for our future. 16
  • 17. Appendix investing for our future. 17
  • 18. Ameren Segments investing for our future. 18
  • 19. Missouri Regulated Electric Revenue Mix ● 1.2 million electric and (LTM September 30, 2007) 127,000 gas customers 18% • Diverse electric revenue mix 44% ● 10,000 MW generation 38% • Low-cost 7,000 MW baseload coal-fired and nuclear fleet Residential Commercial Industrial ● 24,000 square miles Average Residential Electricity • 2,900 miles of electric Prices (2006) 0.19 19¢ transmission lines 0.17 17¢ 15¢ 0.15 • 32,000 miles of electric 13¢ 0.13 distribution lines 11¢ 0.11 ● 3,300 employees 9¢ 0.09 San Francisco New York City 7¢ Los Angeles ● Residential rates approximately 40% 0.07 Philadelphia Cleveland Wash DC St.Louis* Houston Chicago 5¢ Boston Seattle Atlanta Detroit 0.05 Dallas Miami below national average 3¢ 0.03 Source: Bureau of Labor statistics Assumes UE’s 2007 rate increase was in effect in 2006 investing for our future. 19
  • 20. Ameren Illinois Utilities Margin Mix (LTM September 30, 2007) ● Regulated transmission and distribution company 30% Electric • Owns no generation Gas 70% ● 1.2 million electric and 830,000 gas customers ● 44,000 square miles • 4,490 miles of electric transmission lines • 45,000 miles of electric distribution lines CILCO • 17,900 miles of natural gas mains ● 2,300 employees CIPS ● Current bundled electric rates approximate IP national average investing for our future. 20
  • 21. Non-Rate-Regulated Generation ● Operate power plants Edwards CTGs • Three legal entities 745 MW 1,140 MW Coal – 1960 Gas – 2000-01 ● Market power and Hutsonville Duck Creek related products 150 MW 330 MW Coal – 1953 Coal – 1976 ● 6,300 MW generation • Low-cost 4,500 MW baseload coal-fired fleet Coffeen Meredosia 900 MW 445 MW ● 1,100 employees Coal – 1965 Coal/Oil – 1948 Newton 1,210 MW Grand Tower CTG Coal – 1977 510 MW Gas – 2001 Joppa – 80% 1,000 MW Coal – 1953 investing for our future. 21
  • 22. Earnings Guidance investing for our future. 22
  • 23. Major 2008 Assumptions Missouri Regulated Segment ● Electric rate case expected to be filed Q2-2008 • No impact on 2008 earnings/regulatory lag ● Rising cost environment continues • Labor, materials, etc. • Fuel • Depreciation and financing costs ● Increased investment in rate base and operating expenses to improve reliability and environmental compliance ● Generation output of 51 million MWh (capacity factor ~83%) ● Callaway nuclear plant refueling in Fall 2008 (25-30 days) ● Normal weather and organic growth investing for our future. 23
  • 24. Major 2008 Assumptions Illinois Regulated Segment ● Electric and gas rate orders effective October 2008 • Requested 11% ROE • Bad debt expense, electric infrastructure investment and gas decoupling rate mechanisms approved ● Rising cost environment continues • Labor, materials, etc. • Depreciation and financing costs ● Increased investment in rate base and operating expenses to improve reliability ● Impact of Illinois electric settlement (5 cents per share) excluded from guidance ● Normal weather and organic growth investing for our future. 24
  • 25. Major 2008 Assumptions Non-Rate-Regulated Generation ● Improved plant operations • Generation output of 33 million MWh vs. 31 million MWh in 2007 • Generation capacity factor of 79% vs. 74% in 2007 ● Hedged approximately 86% of output at December 31, 2007 • Expected realized prices of $53.50/MWh vs. $54.50/MWh in 2007 (including energy and capacity sales) ● Ancillary services market revenues of approximately $15 million (vs. ~$5 million in 2007) ● Capacity market revenues of approximately $40 million (vs. ~$25 million in 2007) ● Rising cost environment • Labor, materials, etc. • Fuel • Depreciation and financing costs ● Impact of Illinois electric settlement (7 cents per share) excluded from guidance ● Illinois Monterey coal mine closure investing for our future. 25
  • 26. Major 2008 Assumptions Corporate ● No new equity issuances planned outside of DRIP/401k plans (hybrids under consideration) ● Significant levels of debt financings ● No increase in dividend investing for our future. 26
  • 27. 2008 Non-GAAP Earnings Guidance 2007 GAAP Earnings per Share Guidance $2.98 2007 Severe storm-related costs 0.09 IL electric rate relief settlement, net 0.21 FERC order – MISO charges 0.06 2007 Non-GAAP Earnings per Share Guidance $3.34 Missouri 2007 rate case (margin and expense) 0.09 Other electric and gas margins 0.69 Weather (estimate) (0.10) Fuel prices (0.40) Callaway refueling and maintenance outage 0.06 Plant operations and maintenance (0.19) Distribution system reliability (0.22) Other labor and employee benefits (0.06) Depreciation and amortization (0.03) Dilution and financing, net (0.06) Other taxes (0.05) Other, net (0.07) 2008 Non-GAAP EPS Guidance Range $2.80 – $3.20 Illinois electric rate relief settlement (0.12) 2008 GAAP EPS Guidance Range $2.68 – $3.08 investing for our future. 27
  • 28. 2008 Non-GAAP Segment Guidance Contribution to Earnings per Share 2007 2008 Missouri Regulated $1.47 $1.20 – $1.30 Illinois Regulated 0.38 0.35 – 0.45 Non-Rate-Regulated Generation 1.45 1.25 – 1.45 Other 0.04 – Non-GAAP EPS Guidance Range(a) $3.34 $2.80 – $3.20 (a) The 12 cents per share earnings impact of the settlement agreement among parties in Illinois for comprehensive electric rate relief and customer assistance are excluded from non-GAAP guidance. investing for our future. 28
  • 29. Capital Expenditure Summary ($ in Millions) Capital Expenditures ● 65% to 70% of total capital expenditures in the $2,235 regulated business segments Target Range: 735 ● Approximately 70% of $1,600 to $2,100 per year non-rate-regulated $1,395 generation capital 400 expenditures due to 425 Non-Rate-Regulated Generation environmental Illinois Regulated compliance 310 ● Does not include any Missouri Regulated 1030 potential expenditures Other/Corporate related to climate 620 legislation 70 40 2007 2008 2009 2010 2011 2012 investing for our future. 29
  • 30. Expected Cash Flow ($ in Millions) 2008 Funds From Operations $1,340 Capital Expenditures (2,235) Dividends (530) EEI Dividends (30) Free Cash Flow ($1,455) ● Negative free cash flow for foreseeable future, an industry-wide phenomenon ● Cash flow needs expected to be primarily financed with debt and proceeds from DRIP/401k plan issuances investing for our future. 30
  • 31. 2008 Illinois Electric Rate Redesign ● Illinois electric rate redesign will result in quarterly changes 18¢ in earnings per share, but no annual change 2¢ 7¢ 13¢ Q1 Q2 Q3 Q4 investing for our future. 31
  • 32. Post-2008 Commentary ● Rising cost environment continues (e.g. labor, materials, fuel, depreciation, financing) ● Regulatory lag will persist, but will be less significant over time ● Rate cases • Will be more frequent • Proposed recovery mechanisms will be granted • Granted fair ROEs ● No Callaway refueling in 2009 and 2012 ● New baseload plant decision for Missouri regulated operations will need to be made • Constructive regulatory framework will need to be in place investing for our future. 32
  • 33. Fuel Costs Fuel Costs per MWh(a) ● Fuel costs expected to continue to increase $23 ● Estimates include all fuel costs $21 $19 $17 $15 $14 (coal, nuclear, natural gas, diesel, emission allowances and transportation) 2008 2009 2010 Estimated Costs Hedged ● Regulated costs are assumed to be recoverable through a cost recovery mechanism beginning in 2009 94% 98% 86% 72% 54% 16% 2008 2009 2010 (a) Includes contracted and estimated cost increase Regulated Missouri Non-Rate-Regulated investing for our future. 33
  • 34. Post-2008 Commentary ● Improved non-rate-regulated generation plant performance ● 2 million MWhs of below-market wholesale contracts at ~$33/MWh expire in late 2008 ● Fundamentals point to more robust energy and capacity prices compared to current forward curves ● No impact from climate legislation ● No new equity issuances currently planned through 2010, excluding DRIP/401k plans (hybrids under consideration) ● Focused on strong, sustainable dividend and growing dividend in the future investing for our future. 34
  • 35. Illinois Settlement investing for our future. 35
  • 36. Illinois Electric Settlement ● Constructively resolved significant legislative, regulatory and legal uncertainties • All major parties participated in settlement ● Provides stability to Illinois electric market and provides agreed path for power procurement ● Significant disincentives for additional legislative action • Rate relief programs would terminate • Financial swap agreements could be terminated or renegotiated • Strong legal position ● No prohibition on ability to file for delivery service rate increases investing for our future. 36
  • 37. Illinois Electric Settlement Costs ($ in Millions, Except Per Share Amounts) 2007 2008 2009 2010 Total Ameren Illinois Customers’ Benefit $231.6 $150.4 $100.5 $5.5 $488.0 Contributions of Ameren Companies Non-rate-regulated Generation 48.2 24.9 15.8 1.1 90.0 Illinois Regulated 30.7 17.9 10.7 0.7 60.0 Total Funding $78.9 $42.8 $26.5 $1.8 $150.0 EPS impact $0.25 $0.12 $0.07 $0.01 $0.45 investing for our future. 37
  • 38. Illinois Electric Settlement - Swap ● Ameren Illinois utilities entered into swap agreements with an affiliate to lock-in prices for a portion of power requirements from 2008 through 2012 at relevant market prices Period Volume Price per MWh 6/1/08 to 12/31/08 400 MW $47.45 1/1/09 to 05/31/09 400 MW $49.47 6/1/09 to 12/31/09 800 MW $49.47 1/1/10 to 5/31/10 800 MW $51.09 6/1/10 to 12/31/10 1,000 MW $51.09 1/1/11 to 12/31/11 1,000 MW $52.06 1/1/12 to 12/31/12 1,000 MW $53.08 ● If any of the following events occur, negotiations may be undertaken so as to preserve the economic benefits of the swap agreements. If unable to negotiate a settlement, the swap agreements may be terminated in 60 to 90 days after the event occurs • A state tax is enacted on electric generation • A state or federal tax is enacted on or regulation is imposed on greenhouse gas emissions • A state law is enacted that eliminates retail electric supplier choice for residential and small commercial customers investing for our future. 38
  • 39. Power Procurement ● Procurement plan approved ● New Illinois Power Agency (IPA) by Illinois Commerce to procure power for Illinois utilities Commission (ICC) for June beginning June 2009 2008 to May 2009 • Process based on acquiring 20 standard market products Contracted Power Supply 18 (e.g., 7x24 and 5x16 blocks 16 of energy) MWh (in millions) 14 • RFP process with benchmarks 12 • Third party administrator hired 10 8 by IPA 6 • ICC review and approval 4 • Results of IPA procurement 2 process deemed prudent 0 2008 2009 2010 2011 2012 Auction Financial Swap Contracts investing for our future. 39
  • 40. References investing for our future. 40
  • 41. Ameren Calendar Illinois ICC Staff and intervenor testimony filed March 14, 2008 Ameren rebuttal filed April 14, 2008 ICC Staff and intervenor rebuttal May 13, 2008 Ameren surrebuttal May 27, 2008 Written prehearing motions May 29, 2008 Evidentiary hearings June 9-13, 2008 Briefs July 2008 Proposed delivery service order August 2008 (estimate) Final delivery service order issued September 2008 Missouri Final environmental rider rules Q2 2008 File electric rate case Q2 2008 Investor Relations Q1 2008 quiet period Begins April 7, 2008 Q2 2008 quiet period Begins July 7, 2008 Q3 2008 quiet period Begins October 7, 2008 investing for our future. 41
  • 42. Major Regulatory Proceedings Illinois Web site www.icc.illinois.gov/e-docket Case # 07-0527 – Interim procurement plan Case # 07-0585, 07-0586, 07-0587 – Electric delivery services rate cases Case #07-0588, 07-0589, 07-0590 – Gas delivery services rate cases Missouri Web site www.efis.psc.mo.gov/mpsc/DocketSheet.html Case # ER-2007-0002 – Electric rate case (Order issued) Case # GR-2007-0003 – Gas rate case (Order issued) Case # ES-2007-0474 – Taum Sauk incident investigation investing for our future. 42
  • 43. Investor Relations Contacts ● Bruce Steinke 314-554-2574 • Vice President & Controller bsteinke@ameren.com Manager – Investor Relations ● Theresa Nistendirk 314-206-0693 • Managing Supervisor, tnistendirk@ameren.com Investor Relations investing for our future. 43