R.W. Baird Industrial Conference
                   November 12, 2008




Built strong.
Building for the future.
                         Charles L. Szews
                         President and Chief Operating
                         Officer

                         David M. Sagehorn
                         Executive Vice President and
                         Chief Financial Officer
Forward Looking Statements
   Our remarks that follow, including answers to your questions and these slides, include statements
   that we believe are “forward-looking statements” within the meaning of the Private Securities
   Litigation Reform Act of 1995. All statements other than statements of historical fact, including
   without limitation, statements regarding the Company’s future financial position, business strategy,
   targets, projected sales, costs, earnings, capital expenditures, debt levels and cash flows, and plans
   and objectives of management for future operations, are forward-looking statements. When used in
   this presentation, words such as “may,” “will,” “expect,” “intend,” “estimate,” “anticipate,” “believe,”
   “should,” “project” or “plan” or the negative thereof or variations thereon or similar terminology are
   generally intended to identify forward-looking statements. These forward-looking statements are
   not guarantees of future performance and are subject to risks, uncertainties, assumptions and other
   factors, some of which are beyond the Company’s control, which could cause actual results to differ
   materially from those expressed or implied by such forward-looking statements. These factors
   include the consequences of financial leverage associated with the JLG acquisition, especially
   given recent turmoil in the credit markets, the level of the Company’s borrowing costs and the
   Company’s ability to maintain compliance with financial covenants in its credit agreement; the
   cyclical nature of the Company’s access equipment, commercial and fire & emergency markets,
   especially during a global economic downturn and credit crisis; the Company’s ability to offset
   higher steel and raw material costs through other cost decreases or product selling price increases;
   the expected level and timing of U.S. Department of Defense procurement of products and services
   and funding thereof; risks related to reductions in government expenditures and the uncertainty of
   government contracts; risks associated with international operations and sales, including foreign
   currency fluctuations; the Company’s ability to turn around its Geesink business; risks related to the
   collectibility of access equipment receivables; and the potential for increased costs relating to
   compliance with changes in laws and regulations. Additional information concerning these and other
   factors and assumptions is contained in our filings with the SEC, including our Form 8-K filed
   November 3, 2008. Except as set forth in such Form 8-K, we disclaim any obligation to update
   such forward-looking statements.


Built strong.
Building for the future.                                   2
Oshkosh At A Glance
         Global leader in specialty vehicles
         4 business segments, each over $1B in sales:
          –   Access Equipment
          –   Defense
          –   Fire & Emergency
          –   Commercial
         Broad product lines with leading market positions that
         generate significant free cash flow
         Growing international revenues and operations base




Built strong.
Building for the future.               3
Oshkosh Fiscal 2008 Highlights
     Sales increased 13.2% to $7.1
     billion                                           OSK Full Year Performance
                                                               (millions)
      – International sales were $2.1
        billion, or 30% of total sales
                                                      $8,000                                                                     $800.0
                                                                                                                       $7,138
      – Market share gains and record                 $7,000                                                                     $700.0




                                                                                                                                          Operating Income
                                                                                             $6,307
        orders at Pierce and domestic                 $6,000                                                                     $600.0




                                          Net Sales
                                                                                                 $596.3
        refuse                                                                                                         $582.0*
                                                      $5,000                                                                     $500.0
                                                      $4,000                                                                     $400.0
                                                                        $3,427
     Operating income decreased                       $3,000                                                                     $300.0
                                                                         $325.9
     1.5% to $582 million*                            $2,000                                                                     $200.0

                                                      $1,000                                                                     $100.0
     EPS decreased 5.9% to $3.37*                           $0                                                                   $0.0
                                                                         2006                    2007                  2008
     $283 million of debt reduction                                                  Net Sales      Operating Income



     Cost reductions of $100 million in
     annual savings
                                                          * Figures exclude non-cash charges for asset impairment of $175.2 million or $2.31/share



Built strong.
Building for the future.                              4
Recent Highlights
      Multiple defense contract awards
       – Multi-year FHTV contract
       – MTVR reducible-height armor kits
       – UK Light Equipment Transporter (LET2) for 2010 – preferred bidder

      Significant opportunities in domestic refuse collection vehicles
       – Growth from customers ordering units to reduce fleet age
       – CNG-powered units starting to gain momentum

      Market share gains at Pierce and airport products
      Strengthening leadership



Built strong.
Building for the future.                  5
Current State Conditions
     Market volatility and credit crisis make it very difficult to project fiscal 2009
     Defense, fire and domestic refuse backlogs partially mitigate difficulties
     Better positioned to address challenging conditions
      – Improved cost structure; eliminated an expected $100 million
         of annual costs
      – Lowered debt and inventories
      – Actively sourcing in low-cost countries
      – Re-energizing operations with Global Manufacturing Services executive
     Moving forward with plan seeking to avoid or delay credit agreement
     amendment in fiscal 2009
      – Action plans to drive $500 million or more in debt reduction
      – Will assess ability to achieve plan quarterly
     Continuing to invest in limited strategic global and
     new product development initiatives

Built strong.
Building for the future.                      6
Access Equipment
                           Key Markets:
                            – Residential and non-residential construction,
                              general industrial and military
                           Challenges:
                            – Soft construction markets, economic
                              weakness in particularly North America and
                              Europe
                            – Higher finished goods inventories
                           Our Actions:
                            – Reducing cost structure: headcount, supply
                              chain and expenses
                            – Responsible inventory reduction
                           Outlook for 2009:
                            – N. America - lower
                            – Europe       - lower
                            – ROW          - higher


Built strong.
Building for the future.       7
Defense
    Key Markets:
     – Vehicles; mostly U.S with some international
     – Parts & service; domestic and in-theater
    Challenges:
     – Reset & recapitalization of equipment
     – Win new business
     – Margin pressure
    Our Actions:
     – Expansion into armored vehicle sales
     – International bids
    Outlook for 2009:
     – Growth in vehicles and parts & service
        • Recent FHTV contract renewal
        • MTVR reducible-height armor kit order
        • UK LET2



Built strong.
Building for the future.                        8
Fire & Emergency
    Key Markets:
     – Municipal (North America), airport (global),
       general industrial, mobile broadcast and
       mobile medical (global), towing and recovery
    Challenges:
     – Reduced tax receipts expected to lead to
       soft municipal spending environment
     – Economic weakness in North America and
       Europe
    Our Actions:
     – New products and stronger distribution
       leading to share gains
     – Lower cost structure, selected investments
       in growth opportunities
    Outlook for 2009:
     – Growth in fire apparatus and airport vehicles
     – Declines in most other markets


Built strong.
Building for the future.                         9
Commercial
                           Key Markets:
                            – Residential and non-residential construction,
                              refuse collection, mining, and general
                              industrial
                           Challenges:
                            – Soft construction markets
                            – Economic weakness in North America and
                              Europe
                           Our Actions:
                            – Lowered cost structure; completed
                              restructuring in Europe
                            – New products (CNG-powered vehicles)
                              leading to share gains & growth outlook
                            – Expanding concrete products to more
                              international markets
                           Outlook for 2009:
                            – Continued weakness in concrete mixer and
                              batch plant markets
                            – Strong refuse collection vehicle backlog
                            – Improved results at Geesink Norba

Built strong.
Building for the future.     10
Summary of Senior Secured Credit Facility
  Originated on December 6, 2006

   Joint Lead Arrangers &          Banc of America Securities LLC and J.P. Morgan Securities Inc.
   Bookrunners:
   Description of Facility:        Senior Secured Credit Facilities, consisting of:
                                   $550 million, 5-year Senior Secured Revolving Credit Facility
                                   $500 million, 5-year Term Loan A
                                   $2,600 million, 7-year Term Loan B

   Term Loan Amortization:         Term Loan A:    10% per annum, bullet at maturity
                                   Term Loan B:    1% per annum, bullet at maturity
   Financial Covenants:            Maximum Leverage Ratio of 4.75x on 12/31/07 reducing to 4.25x
                                   on 12/31/08 and 3.75x on 12/31/09
                                   Minimum Interest Coverage Ratio (EBITDA/cash interest expense)
                                   of 2.50x
   Debt Outstanding:               Current :  $93.5 million
   at September 30, 2008           Long-term: $2.68 billion
                                   Term Loan A: prepaid required quarterly principal payments
                                   through March 2009
                                   Term Loan B: prepaid remaining required quarterly principal
                                   payments and $110.5 million of final principal payment

Built strong.
Building for the future.                            11
Oshkosh Financing Update
     $202 million debt reduction in Q4
      – In compliance with financial covenants at Sept. 30, 2008
     Driving plan seeking to avoid or delay credit agreement amendment in
     fiscal 2009 that requires:
      – Delivering earnings at higher end of estimate range
      – Achieving $500 million or more in debt reduction
     Tightly managing spending
      – Further reductions likely if demand softens
     Continuing actions to reduce working capital
      – Strong focus on inventory reduction
      – Negotiating European receivables sales program
     Limiting capital expenditures to $60 million
     Sufficient liquidity, even if amendment is necessary




Built strong.
Building for the future.                        12
Oshkosh in Summary…
    Global market conditions are volatile and difficult to project, but
    Oshkosh is moving forward with:
     – Powerful leading brands
     – Prudent investments in key global markets
     – Value-driven sourcing
     – Lower cost structure to mitigate weak market conditions
     – Manufacturing excellence initiatives
     – Cash generation to deliver debt reduction


    The Oshkosh team is Built Strong and …
                           …committed to Building for the Future



Built strong.
Building for the future.                      13
Why Invest in Oshkosh?
                                                           Business model
     Leader in key            Strong operating team
                                                          supports success
       markets                 Swift & decisive in        Strong near-term outlook
     #1 or #2 player           response to weakness       for defense, refuse and fire
     Innovation leader         Strong track record in     Long-term growth
     Service second to none    variety of conditions      expected for access equip.
                               Realistic & conservative   Technology advantages




Built strong.
Building for the future.                      14

Más contenido relacionado

La actualidad más candente

La actualidad más candente (14)

Oshkosh
OshkoshOshkosh
Oshkosh
 
oshkosh Q407_Earnings
oshkosh   Q407_Earningsoshkosh   Q407_Earnings
oshkosh Q407_Earnings
 
oshkosh Q208_Slides
oshkosh   Q208_Slidesoshkosh   Q208_Slides
oshkosh Q208_Slides
 
CMI051007
CMI051007CMI051007
CMI051007
 
New York Analyst Meeting Presentation
	New York Analyst Meeting Presentation	New York Analyst Meeting Presentation
New York Analyst Meeting Presentation
 
raytheon Q4 Earnings Presentation
raytheon Q4 Earnings Presentationraytheon Q4 Earnings Presentation
raytheon Q4 Earnings Presentation
 
Rohm & Haas 3Q earnings release
Rohm & Haas 3Q earnings releaseRohm & Haas 3Q earnings release
Rohm & Haas 3Q earnings release
 
Q1 2009 Earning Report of International Paper Company
Q1 2009 Earning Report of International Paper CompanyQ1 2009 Earning Report of International Paper Company
Q1 2009 Earning Report of International Paper Company
 
Yahoo Q1 2008 Earnings Call Presentation
Yahoo Q1 2008 Earnings Call PresentationYahoo Q1 2008 Earnings Call Presentation
Yahoo Q1 2008 Earnings Call Presentation
 
metlife Investor Day 2008 Institutional
metlife 	Investor Day 2008 Institutionalmetlife 	Investor Day 2008 Institutional
metlife Investor Day 2008 Institutional
 
newmont mining 5_20_08_GS_Basic_Materials_Conference
newmont mining 5_20_08_GS_Basic_Materials_Conferencenewmont mining 5_20_08_GS_Basic_Materials_Conference
newmont mining 5_20_08_GS_Basic_Materials_Conference
 
Slides from Conference Call
Slides from Conference CallSlides from Conference Call
Slides from Conference Call
 
2006_AR
2006_AR2006_AR
2006_AR
 
Raytheon Reports 2007 Third Quarter Results
Raytheon Reports 2007 Third Quarter ResultsRaytheon Reports 2007 Third Quarter Results
Raytheon Reports 2007 Third Quarter Results
 

Similar a oshkosh Baird_111208

oshkosh Q308_Slides
oshkosh   Q308_Slidesoshkosh   Q308_Slides
oshkosh Q308_Slides
finance44
 
oshkosh Q308_Slides
oshkosh   Q308_Slidesoshkosh   Q308_Slides
oshkosh Q308_Slides
finance44
 
OSK_Q4_2008_Earnings_Release_Slides
OSK_Q4_2008_Earnings_Release_SlidesOSK_Q4_2008_Earnings_Release_Slides
OSK_Q4_2008_Earnings_Release_Slides
finance44
 
oshkosh Q208_Slides
oshkosh   Q208_Slidesoshkosh   Q208_Slides
oshkosh Q208_Slides
finance44
 
federal mogul 9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentation
federal mogul  9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentationfederal mogul  9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentation
federal mogul 9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentation
finance33
 
raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...
raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...
raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...
finance12
 
Cummins_07/03/06
Cummins_07/03/06Cummins_07/03/06
Cummins_07/03/06
finance21
 
cmi_07/03/06
cmi_07/03/06cmi_07/03/06
cmi_07/03/06
finance21
 
oshkosh Q108_earnings_slides
oshkosh   Q108_earnings_slidesoshkosh   Q108_earnings_slides
oshkosh Q108_earnings_slides
finance44
 
oshkosh Q108_earnings_slides
oshkosh   Q108_earnings_slidesoshkosh   Q108_earnings_slides
oshkosh Q108_earnings_slides
finance44
 
metlife Investor Day 2008 Finance
metlife 	Investor Day 2008 Financemetlife 	Investor Day 2008 Finance
metlife Investor Day 2008 Finance
finance5
 
raytheonQ4 Earnings Presentation
raytheonQ4 Earnings PresentationraytheonQ4 Earnings Presentation
raytheonQ4 Earnings Presentation
finance12
 
Raytheon Reports 2005 Fourth Quarter Results
	Raytheon Reports 2005 Fourth Quarter Results	Raytheon Reports 2005 Fourth Quarter Results
Raytheon Reports 2005 Fourth Quarter Results
finance12
 
citigroup April 18, 2008 - First Quarter Press Release
citigroup April 18, 2008 - First Quarter Press Releasecitigroup April 18, 2008 - First Quarter Press Release
citigroup April 18, 2008 - First Quarter Press Release
QuarterlyEarningsReports
 
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...
finance8
 
citigroup January 15, 2008 - Fourth Quarter Press Release
citigroup January 15, 2008 - Fourth Quarter Press Releasecitigroup January 15, 2008 - Fourth Quarter Press Release
citigroup January 15, 2008 - Fourth Quarter Press Release
QuarterlyEarningsReports
 
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...
finance8
 

Similar a oshkosh Baird_111208 (20)

oshkosh Q308_Slides
oshkosh   Q308_Slidesoshkosh   Q308_Slides
oshkosh Q308_Slides
 
oshkosh Q308_Slides
oshkosh   Q308_Slidesoshkosh   Q308_Slides
oshkosh Q308_Slides
 
OSK_Q4_2008_Earnings_Release_Slides
OSK_Q4_2008_Earnings_Release_SlidesOSK_Q4_2008_Earnings_Release_Slides
OSK_Q4_2008_Earnings_Release_Slides
 
oshkosh Q208_Slides
oshkosh   Q208_Slidesoshkosh   Q208_Slides
oshkosh Q208_Slides
 
2006_AR
2006_AR2006_AR
2006_AR
 
CMI051007
CMI051007CMI051007
CMI051007
 
federal mogul 9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentation
federal mogul  9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentationfederal mogul  9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentation
federal mogul 9E16462A-2277-45CF-98D1-FD0F18782C97_Q408_Presentation
 
raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...
raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...
raytheonSmith Barney Citigroup 18th Annual Global Industrial Manufacturing Co...
 
Cummins_07/03/06
Cummins_07/03/06Cummins_07/03/06
Cummins_07/03/06
 
cmi_07/03/06
cmi_07/03/06cmi_07/03/06
cmi_07/03/06
 
oshkosh Q108_earnings_slides
oshkosh   Q108_earnings_slidesoshkosh   Q108_earnings_slides
oshkosh Q108_earnings_slides
 
oshkosh Q108_earnings_slides
oshkosh   Q108_earnings_slidesoshkosh   Q108_earnings_slides
oshkosh Q108_earnings_slides
 
metlife Investor Day 2008 Finance
metlife 	Investor Day 2008 Financemetlife 	Investor Day 2008 Finance
metlife Investor Day 2008 Finance
 
raytheonQ4 Earnings Presentation
raytheonQ4 Earnings PresentationraytheonQ4 Earnings Presentation
raytheonQ4 Earnings Presentation
 
Raytheon Reports 2005 Fourth Quarter Results
	Raytheon Reports 2005 Fourth Quarter Results	Raytheon Reports 2005 Fourth Quarter Results
Raytheon Reports 2005 Fourth Quarter Results
 
citigroup April 18, 2008 - First Quarter Press Release
citigroup April 18, 2008 - First Quarter Press Releasecitigroup April 18, 2008 - First Quarter Press Release
citigroup April 18, 2008 - First Quarter Press Release
 
Google financial results
Google financial resultsGoogle financial results
Google financial results
 
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services A...
 
citigroup January 15, 2008 - Fourth Quarter Press Release
citigroup January 15, 2008 - Fourth Quarter Press Releasecitigroup January 15, 2008 - Fourth Quarter Press Release
citigroup January 15, 2008 - Fourth Quarter Press Release
 
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...
Sanjiv Khattri, Executive Vice President and CFO of GMAC Financial Services U...
 

Más de finance44

oshkosh Q32007slides
oshkosh   Q32007slidesoshkosh   Q32007slides
oshkosh Q32007slides
finance44
 
oshkosh B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509
oshkosh   B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509oshkosh   B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509
oshkosh B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509
finance44
 
goodrich AllMasterBW
goodrich  AllMasterBWgoodrich  AllMasterBW
goodrich AllMasterBW
finance44
 
goodrich AllMasterBW
goodrich  AllMasterBWgoodrich  AllMasterBW
goodrich AllMasterBW
finance44
 
goodrich MasterJefferiesConfFinal
goodrich  MasterJefferiesConfFinalgoodrich  MasterJefferiesConfFinal
goodrich MasterJefferiesConfFinal
finance44
 
goodrich MasterJefferiesConfFinal
goodrich  MasterJefferiesConfFinalgoodrich  MasterJefferiesConfFinal
goodrich MasterJefferiesConfFinal
finance44
 
goodrich Q403ReleaseFinal
goodrich  Q403ReleaseFinalgoodrich  Q403ReleaseFinal
goodrich Q403ReleaseFinal
finance44
 
goodrich Q403ReleaseFinal
goodrich  Q403ReleaseFinalgoodrich  Q403ReleaseFinal
goodrich Q403ReleaseFinal
finance44
 
goodrich Q403PresentationBW
goodrich  Q403PresentationBWgoodrich  Q403PresentationBW
goodrich Q403PresentationBW
finance44
 
goodrich Q403PresentationBW
goodrich  Q403PresentationBWgoodrich  Q403PresentationBW
goodrich Q403PresentationBW
finance44
 
goodrich PresentationMasterBWSGC
goodrich  PresentationMasterBWSGCgoodrich  PresentationMasterBWSGC
goodrich PresentationMasterBWSGC
finance44
 
goodrich PresentationMasterBWSGC
goodrich  PresentationMasterBWSGCgoodrich  PresentationMasterBWSGC
goodrich PresentationMasterBWSGC
finance44
 
goodrich BearPresentationBW
goodrich  BearPresentationBWgoodrich  BearPresentationBW
goodrich BearPresentationBW
finance44
 

Más de finance44 (13)

oshkosh Q32007slides
oshkosh   Q32007slidesoshkosh   Q32007slides
oshkosh Q32007slides
 
oshkosh B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509
oshkosh   B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509oshkosh   B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509
oshkosh B9FAB733-F810-4AE7-A95B-4388C6B08318_Cowen_020509
 
goodrich AllMasterBW
goodrich  AllMasterBWgoodrich  AllMasterBW
goodrich AllMasterBW
 
goodrich AllMasterBW
goodrich  AllMasterBWgoodrich  AllMasterBW
goodrich AllMasterBW
 
goodrich MasterJefferiesConfFinal
goodrich  MasterJefferiesConfFinalgoodrich  MasterJefferiesConfFinal
goodrich MasterJefferiesConfFinal
 
goodrich MasterJefferiesConfFinal
goodrich  MasterJefferiesConfFinalgoodrich  MasterJefferiesConfFinal
goodrich MasterJefferiesConfFinal
 
goodrich Q403ReleaseFinal
goodrich  Q403ReleaseFinalgoodrich  Q403ReleaseFinal
goodrich Q403ReleaseFinal
 
goodrich Q403ReleaseFinal
goodrich  Q403ReleaseFinalgoodrich  Q403ReleaseFinal
goodrich Q403ReleaseFinal
 
goodrich Q403PresentationBW
goodrich  Q403PresentationBWgoodrich  Q403PresentationBW
goodrich Q403PresentationBW
 
goodrich Q403PresentationBW
goodrich  Q403PresentationBWgoodrich  Q403PresentationBW
goodrich Q403PresentationBW
 
goodrich PresentationMasterBWSGC
goodrich  PresentationMasterBWSGCgoodrich  PresentationMasterBWSGC
goodrich PresentationMasterBWSGC
 
goodrich PresentationMasterBWSGC
goodrich  PresentationMasterBWSGCgoodrich  PresentationMasterBWSGC
goodrich PresentationMasterBWSGC
 
goodrich BearPresentationBW
goodrich  BearPresentationBWgoodrich  BearPresentationBW
goodrich BearPresentationBW
 

Último

VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
roshnidevijkn ( Why You Choose Us? ) Escorts
 
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
priyasharma62062
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort : 9352852248 Make on-demand Arrangements Near yOU
 
Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432
motiram463
 
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
dipikadinghjn ( Why You Choose Us? ) Escorts
 

Último (20)

VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
VIP Kalyan Call Girls 🌐 9920725232 🌐 Make Your Dreams Come True With Mumbai E...
 
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
8377087607, Door Step Call Girls In Kalkaji (Locanto) 24/7 Available
 
Pension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdfPension dashboards forum 1 May 2024 (1).pdf
Pension dashboards forum 1 May 2024 (1).pdf
 
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
CBD Belapur Expensive Housewife Call Girls Number-📞📞9833754194 No 1 Vipp HIgh...
 
Cybersecurity Threats in Financial Services Protection.pptx
Cybersecurity Threats in  Financial Services Protection.pptxCybersecurity Threats in  Financial Services Protection.pptx
Cybersecurity Threats in Financial Services Protection.pptx
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
 
Airport Road Best Experience Call Girls Number-📞📞9833754194 Santacruz MOst Es...
Airport Road Best Experience Call Girls Number-📞📞9833754194 Santacruz MOst Es...Airport Road Best Experience Call Girls Number-📞📞9833754194 Santacruz MOst Es...
Airport Road Best Experience Call Girls Number-📞📞9833754194 Santacruz MOst Es...
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
 
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
(Vedika) Low Rate Call Girls in Pune Call Now 8250077686 Pune Escorts 24x7
 
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
Kopar Khairane Russian Call Girls Number-9833754194-Navi Mumbai Fantastic Unl...
 
Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432Best VIP Call Girls Morni Hills Just Click Me 6367492432
Best VIP Call Girls Morni Hills Just Click Me 6367492432
 
Vasai-Virar Fantastic Call Girls-9833754194-Call Girls MUmbai
Vasai-Virar Fantastic Call Girls-9833754194-Call Girls MUmbaiVasai-Virar Fantastic Call Girls-9833754194-Call Girls MUmbai
Vasai-Virar Fantastic Call Girls-9833754194-Call Girls MUmbai
 
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
VIP Independent Call Girls in Mumbai 🌹 9920725232 ( Call Me ) Mumbai Escorts ...
 
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
( Jasmin ) Top VIP Escorts Service Dindigul 💧 7737669865 💧 by Dindigul Call G...
 
Toronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdfToronto dominion bank investor presentation.pdf
Toronto dominion bank investor presentation.pdf
 
Business Principles, Tools, and Techniques in Participating in Various Types...
Business Principles, Tools, and Techniques  in Participating in Various Types...Business Principles, Tools, and Techniques  in Participating in Various Types...
Business Principles, Tools, and Techniques in Participating in Various Types...
 
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
 
Q1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdfQ1 2024 Conference Call Presentation vF.pdf
Q1 2024 Conference Call Presentation vF.pdf
 

oshkosh Baird_111208

  • 1. R.W. Baird Industrial Conference November 12, 2008 Built strong. Building for the future. Charles L. Szews President and Chief Operating Officer David M. Sagehorn Executive Vice President and Chief Financial Officer
  • 2. Forward Looking Statements Our remarks that follow, including answers to your questions and these slides, include statements that we believe are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical fact, including without limitation, statements regarding the Company’s future financial position, business strategy, targets, projected sales, costs, earnings, capital expenditures, debt levels and cash flows, and plans and objectives of management for future operations, are forward-looking statements. When used in this presentation, words such as “may,” “will,” “expect,” “intend,” “estimate,” “anticipate,” “believe,” “should,” “project” or “plan” or the negative thereof or variations thereon or similar terminology are generally intended to identify forward-looking statements. These forward-looking statements are not guarantees of future performance and are subject to risks, uncertainties, assumptions and other factors, some of which are beyond the Company’s control, which could cause actual results to differ materially from those expressed or implied by such forward-looking statements. These factors include the consequences of financial leverage associated with the JLG acquisition, especially given recent turmoil in the credit markets, the level of the Company’s borrowing costs and the Company’s ability to maintain compliance with financial covenants in its credit agreement; the cyclical nature of the Company’s access equipment, commercial and fire & emergency markets, especially during a global economic downturn and credit crisis; the Company’s ability to offset higher steel and raw material costs through other cost decreases or product selling price increases; the expected level and timing of U.S. Department of Defense procurement of products and services and funding thereof; risks related to reductions in government expenditures and the uncertainty of government contracts; risks associated with international operations and sales, including foreign currency fluctuations; the Company’s ability to turn around its Geesink business; risks related to the collectibility of access equipment receivables; and the potential for increased costs relating to compliance with changes in laws and regulations. Additional information concerning these and other factors and assumptions is contained in our filings with the SEC, including our Form 8-K filed November 3, 2008. Except as set forth in such Form 8-K, we disclaim any obligation to update such forward-looking statements. Built strong. Building for the future. 2
  • 3. Oshkosh At A Glance Global leader in specialty vehicles 4 business segments, each over $1B in sales: – Access Equipment – Defense – Fire & Emergency – Commercial Broad product lines with leading market positions that generate significant free cash flow Growing international revenues and operations base Built strong. Building for the future. 3
  • 4. Oshkosh Fiscal 2008 Highlights Sales increased 13.2% to $7.1 billion OSK Full Year Performance (millions) – International sales were $2.1 billion, or 30% of total sales $8,000 $800.0 $7,138 – Market share gains and record $7,000 $700.0 Operating Income $6,307 orders at Pierce and domestic $6,000 $600.0 Net Sales $596.3 refuse $582.0* $5,000 $500.0 $4,000 $400.0 $3,427 Operating income decreased $3,000 $300.0 $325.9 1.5% to $582 million* $2,000 $200.0 $1,000 $100.0 EPS decreased 5.9% to $3.37* $0 $0.0 2006 2007 2008 $283 million of debt reduction Net Sales Operating Income Cost reductions of $100 million in annual savings * Figures exclude non-cash charges for asset impairment of $175.2 million or $2.31/share Built strong. Building for the future. 4
  • 5. Recent Highlights Multiple defense contract awards – Multi-year FHTV contract – MTVR reducible-height armor kits – UK Light Equipment Transporter (LET2) for 2010 – preferred bidder Significant opportunities in domestic refuse collection vehicles – Growth from customers ordering units to reduce fleet age – CNG-powered units starting to gain momentum Market share gains at Pierce and airport products Strengthening leadership Built strong. Building for the future. 5
  • 6. Current State Conditions Market volatility and credit crisis make it very difficult to project fiscal 2009 Defense, fire and domestic refuse backlogs partially mitigate difficulties Better positioned to address challenging conditions – Improved cost structure; eliminated an expected $100 million of annual costs – Lowered debt and inventories – Actively sourcing in low-cost countries – Re-energizing operations with Global Manufacturing Services executive Moving forward with plan seeking to avoid or delay credit agreement amendment in fiscal 2009 – Action plans to drive $500 million or more in debt reduction – Will assess ability to achieve plan quarterly Continuing to invest in limited strategic global and new product development initiatives Built strong. Building for the future. 6
  • 7. Access Equipment Key Markets: – Residential and non-residential construction, general industrial and military Challenges: – Soft construction markets, economic weakness in particularly North America and Europe – Higher finished goods inventories Our Actions: – Reducing cost structure: headcount, supply chain and expenses – Responsible inventory reduction Outlook for 2009: – N. America - lower – Europe - lower – ROW - higher Built strong. Building for the future. 7
  • 8. Defense Key Markets: – Vehicles; mostly U.S with some international – Parts & service; domestic and in-theater Challenges: – Reset & recapitalization of equipment – Win new business – Margin pressure Our Actions: – Expansion into armored vehicle sales – International bids Outlook for 2009: – Growth in vehicles and parts & service • Recent FHTV contract renewal • MTVR reducible-height armor kit order • UK LET2 Built strong. Building for the future. 8
  • 9. Fire & Emergency Key Markets: – Municipal (North America), airport (global), general industrial, mobile broadcast and mobile medical (global), towing and recovery Challenges: – Reduced tax receipts expected to lead to soft municipal spending environment – Economic weakness in North America and Europe Our Actions: – New products and stronger distribution leading to share gains – Lower cost structure, selected investments in growth opportunities Outlook for 2009: – Growth in fire apparatus and airport vehicles – Declines in most other markets Built strong. Building for the future. 9
  • 10. Commercial Key Markets: – Residential and non-residential construction, refuse collection, mining, and general industrial Challenges: – Soft construction markets – Economic weakness in North America and Europe Our Actions: – Lowered cost structure; completed restructuring in Europe – New products (CNG-powered vehicles) leading to share gains & growth outlook – Expanding concrete products to more international markets Outlook for 2009: – Continued weakness in concrete mixer and batch plant markets – Strong refuse collection vehicle backlog – Improved results at Geesink Norba Built strong. Building for the future. 10
  • 11. Summary of Senior Secured Credit Facility Originated on December 6, 2006 Joint Lead Arrangers & Banc of America Securities LLC and J.P. Morgan Securities Inc. Bookrunners: Description of Facility: Senior Secured Credit Facilities, consisting of: $550 million, 5-year Senior Secured Revolving Credit Facility $500 million, 5-year Term Loan A $2,600 million, 7-year Term Loan B Term Loan Amortization: Term Loan A: 10% per annum, bullet at maturity Term Loan B: 1% per annum, bullet at maturity Financial Covenants: Maximum Leverage Ratio of 4.75x on 12/31/07 reducing to 4.25x on 12/31/08 and 3.75x on 12/31/09 Minimum Interest Coverage Ratio (EBITDA/cash interest expense) of 2.50x Debt Outstanding: Current : $93.5 million at September 30, 2008 Long-term: $2.68 billion Term Loan A: prepaid required quarterly principal payments through March 2009 Term Loan B: prepaid remaining required quarterly principal payments and $110.5 million of final principal payment Built strong. Building for the future. 11
  • 12. Oshkosh Financing Update $202 million debt reduction in Q4 – In compliance with financial covenants at Sept. 30, 2008 Driving plan seeking to avoid or delay credit agreement amendment in fiscal 2009 that requires: – Delivering earnings at higher end of estimate range – Achieving $500 million or more in debt reduction Tightly managing spending – Further reductions likely if demand softens Continuing actions to reduce working capital – Strong focus on inventory reduction – Negotiating European receivables sales program Limiting capital expenditures to $60 million Sufficient liquidity, even if amendment is necessary Built strong. Building for the future. 12
  • 13. Oshkosh in Summary… Global market conditions are volatile and difficult to project, but Oshkosh is moving forward with: – Powerful leading brands – Prudent investments in key global markets – Value-driven sourcing – Lower cost structure to mitigate weak market conditions – Manufacturing excellence initiatives – Cash generation to deliver debt reduction The Oshkosh team is Built Strong and … …committed to Building for the Future Built strong. Building for the future. 13
  • 14. Why Invest in Oshkosh? Business model Leader in key Strong operating team supports success markets Swift & decisive in Strong near-term outlook #1 or #2 player response to weakness for defense, refuse and fire Innovation leader Strong track record in Long-term growth Service second to none variety of conditions expected for access equip. Realistic & conservative Technology advantages Built strong. Building for the future. 14