SlideShare una empresa de Scribd logo
1 de 23
Mansfield LFE Activity September 5, 2008
Define the Process Situation  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Data Analysis  ,[object Object],[object Object],[object Object]
Project Information Effect on Lead-time Information availability/correctness reduce 1 st  Pass Yield, which increases rework activity
Effect of Design Complexity on Lead-Time
Current Data Control
WorkManager Data Control of Engineering Worksheets  Linear Processing
Time Allocation on Process Checklist 7 days Trade Compliance Egr WS  Initial Info Complete 14 days Confirm Info Complete  Complete BOM Type / Review BOM 10 Days of WAIT time {  Waste  }
Current State VSM – Order Management
Current State VSM – Order Management
Current State VSM – Order Management
Current State VSM – Order Management
Current State VSM – Order Management
Current State VSM – Order Management
Current State VSM – Binder Flow
Waste Reduction Opportunities ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Near-term Incremental Actions ,[object Object],[object Object],[object Object],[object Object],[object Object]
Respond to Targets Capture the START DATE when the customer quote is issued as a PO.  Set PRELIMINARY Target Dates that are revised as more information becomes available.
Project Control
Project Control Workflow & Project Tracking Information Processing  ORACLE FILECODER Project  Status
Scanned barcode in binder will enter data into field
Data may be COPY/PASTE into any MS-application (Excel, Word, Access) Trace user who performed the transaction
Long-term Actions (proposed timeline)

Más contenido relacionado

La actualidad más candente

Peak Review Metrics Brochure
Peak Review Metrics BrochurePeak Review Metrics Brochure
Peak Review Metrics Brochuremdalewitz
 
Advance Project Module
Advance Project ModuleAdvance Project Module
Advance Project ModuleMiftahul Huda
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy SmithAndy Smith
 
Performance Testing Technical Meeting (http://managingperformancetesting.blog...
Performance Testing Technical Meeting (http://managingperformancetesting.blog...Performance Testing Technical Meeting (http://managingperformancetesting.blog...
Performance Testing Technical Meeting (http://managingperformancetesting.blog...akbollinger
 
Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011Rob_Skeleton
 
Bridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptBridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptp6academy
 
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...Project Consulting Services, Inc.
 
Performance tracking
Performance tracking Performance tracking
Performance tracking Reza Fahlevi
 
DPS ATG PM Service Profile R3
DPS ATG PM Service Profile R3DPS ATG PM Service Profile R3
DPS ATG PM Service Profile R3Tom Gorman
 
Project cost management a simplified approach ppt - Oracle Primavera Collab...
Project cost management   a simplified approach ppt - Oracle Primavera Collab...Project cost management   a simplified approach ppt - Oracle Primavera Collab...
Project cost management a simplified approach ppt - Oracle Primavera Collab...p6academy
 
_Tonia_Allen_Resume
_Tonia_Allen_Resume_Tonia_Allen_Resume
_Tonia_Allen_ResumeTonia Allen
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
Innovations in program controls integrating primavera and cost systems
Innovations in program controls   integrating primavera and cost systemsInnovations in program controls   integrating primavera and cost systems
Innovations in program controls integrating primavera and cost systemsp6academy
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7Pragmatic Techsoft
 
05262016 resume
05262016 resume05262016 resume
05262016 resumeDan Faust
 

La actualidad más candente (18)

Peak Review Metrics Brochure
Peak Review Metrics BrochurePeak Review Metrics Brochure
Peak Review Metrics Brochure
 
Advance Project Module
Advance Project ModuleAdvance Project Module
Advance Project Module
 
EPA Project - Andy Smith
EPA Project - Andy SmithEPA Project - Andy Smith
EPA Project - Andy Smith
 
Performance Testing Technical Meeting (http://managingperformancetesting.blog...
Performance Testing Technical Meeting (http://managingperformancetesting.blog...Performance Testing Technical Meeting (http://managingperformancetesting.blog...
Performance Testing Technical Meeting (http://managingperformancetesting.blog...
 
Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011Construct Sim V8i 5 19 2011
Construct Sim V8i 5 19 2011
 
Bridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems pptBridging the cost schedule divide - integrating primavera and cost systems ppt
Bridging the cost schedule divide - integrating primavera and cost systems ppt
 
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
Deploying Mobile Construction Inspection Forms as a Case Study for Technology...
 
Performance tracking
Performance tracking Performance tracking
Performance tracking
 
DPS ATG PM Service Profile R3
DPS ATG PM Service Profile R3DPS ATG PM Service Profile R3
DPS ATG PM Service Profile R3
 
Project cost management a simplified approach ppt - Oracle Primavera Collab...
Project cost management   a simplified approach ppt - Oracle Primavera Collab...Project cost management   a simplified approach ppt - Oracle Primavera Collab...
Project cost management a simplified approach ppt - Oracle Primavera Collab...
 
_Tonia_Allen_Resume
_Tonia_Allen_Resume_Tonia_Allen_Resume
_Tonia_Allen_Resume
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
Part 3
Part 3Part 3
Part 3
 
OpenERP Construction
OpenERP ConstructionOpenERP Construction
OpenERP Construction
 
Innovations in program controls integrating primavera and cost systems
Innovations in program controls   integrating primavera and cost systemsInnovations in program controls   integrating primavera and cost systems
Innovations in program controls integrating primavera and cost systems
 
OpenERP Construction Module Version 7
OpenERP Construction Module Version 7OpenERP Construction Module Version 7
OpenERP Construction Module Version 7
 
05262016 resume
05262016 resume05262016 resume
05262016 resume
 

Similar a Improve Rotary Vane Actuator Order Lead Times

Six Sigma Blackbelt Certification Project
Six Sigma Blackbelt Certification ProjectSix Sigma Blackbelt Certification Project
Six Sigma Blackbelt Certification Projectmrt77
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016NITIN VAIDYA
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 
205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)p6academy
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)Benjan Amtipuesto
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementQuantitative Software Management, Inc.
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.pptFirasAlhilu
 
Previous WorksLink systems
Previous WorksLink systemsPrevious WorksLink systems
Previous WorksLink systemsAndrew McGrath
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Resume_-_Alok_Nayak_Current
Resume_-_Alok_Nayak_CurrentResume_-_Alok_Nayak_Current
Resume_-_Alok_Nayak_CurrentAlok Nayak
 
Qimonda Pm Foils
Qimonda Pm FoilsQimonda Pm Foils
Qimonda Pm Foilstrahanr
 
Oracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionOracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionTony Sebastian
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaainfinitepestcontrol
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxtodd771
 

Similar a Improve Rotary Vane Actuator Order Lead Times (20)

Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
Six Sigma Blackbelt Certification Project
Six Sigma Blackbelt Certification ProjectSix Sigma Blackbelt Certification Project
Six Sigma Blackbelt Certification Project
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
Mrp 1
Mrp 1Mrp 1
Mrp 1
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
LaMima Gilbert Lewis PM
LaMima Gilbert Lewis PMLaMima Gilbert Lewis PM
LaMima Gilbert Lewis PM
 
205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)205210 project driven supply chain (pdsc)
205210 project driven supply chain (pdsc)
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
Using Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process ImprovementUsing Benchmarking to Quantify the Benefits of Software Process Improvement
Using Benchmarking to Quantify the Benefits of Software Process Improvement
 
ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)ACH 216 Lecture 06 (Pre Construction Planning)
ACH 216 Lecture 06 (Pre Construction Planning)
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
Previous WorksLink systems
Previous WorksLink systemsPrevious WorksLink systems
Previous WorksLink systems
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
Resume_-_Alok_Nayak_Current
Resume_-_Alok_Nayak_CurrentResume_-_Alok_Nayak_Current
Resume_-_Alok_Nayak_Current
 
Qimonda Pm Foils
Qimonda Pm FoilsQimonda Pm Foils
Qimonda Pm Foils
 
Oracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP SolutionOracle SCM Cloud ERP Solution
Oracle SCM Cloud ERP Solution
 
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaaSCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
SCHEDULING.pptdjdgjgjdjgajdjasdjadasgdgdduaa
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
 

Improve Rotary Vane Actuator Order Lead Times