SlideShare una empresa de Scribd logo
1 de 8
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Robust Production Management
Metrilogics
Front-line controls for bottom-line savings.
TM
SM
Module 2:
Performance Framework
By Lance Latham
Senior Managing Partner
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
The Differences Between Direct vs. Indirect Time
Direct Time:
Paid time dedicated to
performing primary or
core customer work.
Indirect Time:
Paid time not dedicated to performing core
customer work. Indirect time can include:
v Project time
v Meetings
v System downtime
v Classroom training
v Sick time
v Vacation
v Holidaysv Equipment changeovers
v Paid breaks
v PTO (if paid)
v STD (if paid)
v LTD (if paid)
Direct time is also the
time over which front-
line team members
have the most control
(i.e., during direct time,
front-line team members
can opt to work in a
high-quality, productive
manner – or not).
Indirect time is the time over which managers
tend to have the most control (i.e., managers
allot, coordinate and schedule indirect time that
front-line team members take).
2
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Factoring Earned Work Credit Hours by Quality
Earned Work Credit Hours represent “gross” output.
When factored by quality (accuracy and completeness),
Quality Work Credit and Failed Work Hours are the result.
Earned Work Credit
= 5.00 Hrs.
x Quality score of
90%
Failed Work = .50 Hrs.
Quality Work Credit
= 4.50 Hrs.
5
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Performance Framework:
Example of Tracking Hours vs. Percentages vs. Dollars
Total Paid Hrs. = 2,100
Paid Time Off
= 420 Hours
Lost Time
= 420 Hours
Unearned Time
= 378 Hours
Quality Work
= 777 Hours
Failed Work= 105 Hours
Total Paid Hrs. = 100%
Paid Time Off
= 20%
Lost Time
= 20%
Unearned Time
= 18%
Quality Work
= 37%
Failed Work= 5%
Total Paid Hrs. = $50,000
(Loaded)
Paid Time Off
= $10,000
Lost Time
= $10,000
Unearned Time
= $9,000
Quality Work
= $18,500
Failed Work= $2,500
8
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Example of Applying the Performance Framework
Assume a
single team
member’s
typical 8-hour
work day,
including a mix
of completed
primary
customer work,
direct and
indirect time
(and costs)
incurred…
Paid Time
Off
Lost Time
Unearned
Time
Failed
Work
Quality
Work
KEYTotal Paid Hours = 8
8
7
6
5
4
3
2
1
0
#Hours
So…did the team
member have a “good”
day or a “bad” day?
11
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Example of The Real-World Impact of Low Efficiency
Total Paid Hours = $50,000
(Loaded)
Paid Time Off
= $10,000
Lost Time
= $10,000
Unearned Time
= $9,000
Quality Work
= $18,500
Failed Work= $2,500
Quality Work
= $18,500
Non-Value Add Cost
= $31,500
Total Paid Hours = $50,000
(Loaded)
$ Efficiency:
= 37%
$18,500
$50,000
In this example, 37%
efficiency means that
a company paid an
employee total
annual salary +
benefits equal to
$50,000, but the
employee generated
only $18,500 of
quality value add
work.
Restated, 63% of
what the employee
was paid resulted in
no revenue-
generating output for
the company.
14
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
Copyright © 2005 Metrilogics, LLC. All rights reserved.
Metrilogics
TM
Module 2 Summary (cont.)
v Operational savings occur when spare capacity is either:
o Used in a productive manner without increasing other costs
(= cost avoidance scenario), or
o Eliminated along with associated costs (= cost savings scenario).
v There is a direct real-world connection between a company’s
efficiency and the return the company receives on the compensation
paid to its employees. In a nutshell, high efficiency = “more bang for
the buck.”
v Efficiency reflects supervisor and manager performance, based on
Quality Work Credit Hours produced vs. the combination of Direct and
Indirect Hours that they manage.
17
This document is a partial preview. Full document download can be found on Flevy:
http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
1
Flevy (www.flevy.com) is the marketplace
for premium documents. These
documents can range from Business
Frameworks to Financial Models to
PowerPoint Templates.
Flevy was founded under the principle that
companies waste a lot of time and money
recreating the same foundational business
documents. Our vision is for Flevy to
become a comprehensive knowledge base
of business documents. All organizations,
from startups to large enterprises, can use
Flevy— whether it's to jumpstart projects, to
find reference or comparison materials, or
just to learn.
Contact Us
Please contact us with any questions you may have
about our company.
• General Inquiries
support@flevy.com
• Media/PR
press@flevy.com
• Billing
billing@flevy.com

Más contenido relacionado

Más de Flevy.com Best Practices

[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
Flevy.com Best Practices
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
Flevy.com Best Practices
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
Flevy.com Best Practices
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
Flevy.com Best Practices
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
Flevy.com Best Practices
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
Flevy.com Best Practices
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
Flevy.com Best Practices
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
Flevy.com Best Practices
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
Flevy.com Best Practices
 
Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)
Flevy.com Best Practices
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
Flevy.com Best Practices
 
Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)
Flevy.com Best Practices
 

Más de Flevy.com Best Practices (20)

[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
[Whitepaper] 8 Key Steps of Data Integration: Restructuring Redeployment Asse...
 
[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model[Whitepaper] Strategy Classics: Value Disciplines Model
[Whitepaper] Strategy Classics: Value Disciplines Model
 
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
[Whitepaper] The Definitive Guide to Strategic Planning: Here’s What You Need...
 
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
[Whitepaper] The Definitive Introduction to Strategy Development and Strategy...
 
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
[Whitepaper] The “Theory of Constraints:” What’s Limiting Your Organization?
 
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management[Whitepaper] Transportation Cost Reduction in Supply Chain Management
[Whitepaper] Transportation Cost Reduction in Supply Chain Management
 
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
[Whitepaper] A Great Leadership Experience: Dr. Rachid Yazami, Inventor of th...
 
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
[Whitepaper] Finding It Hard to Manage Conflict at the Workplace? Use the Tho...
 
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
[Whitepaper] Key Account Management: Handling Large Global Accounts the Right...
 
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
[Whitepaper] Nudge Theory: An Effective Way to Transform Negative Behaviors
 
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
[Whitepaper] Business Model Innovation: Creation of Scalable Business Models ...
 
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
[Whitepaper] Shareholder Value Traps: How to Evade Them and Focus on Value Cr...
 
The Top 101 Consulting Frameworks of 2020
The Top 101 Consulting Frameworks of 2020The Top 101 Consulting Frameworks of 2020
The Top 101 Consulting Frameworks of 2020
 
Six Sigma - Statistical Process Control (SPC)
Six Sigma - Statistical Process Control (SPC)Six Sigma - Statistical Process Control (SPC)
Six Sigma - Statistical Process Control (SPC)
 
Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)Lean Six Sigma - Process Risk Analysis (FMEA)
Lean Six Sigma - Process Risk Analysis (FMEA)
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)Effective Staff Suggestion System (Kaizen Teian)
Effective Staff Suggestion System (Kaizen Teian)
 
Sales Excellence - Diagnostic Tool
Sales Excellence - Diagnostic ToolSales Excellence - Diagnostic Tool
Sales Excellence - Diagnostic Tool
 
Variance Analysis
Variance AnalysisVariance Analysis
Variance Analysis
 
Change Management Models
Change Management ModelsChange Management Models
Change Management Models
 

Último

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Último (20)

Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Phases of negotiation .pptx
 Phases of negotiation .pptx Phases of negotiation .pptx
Phases of negotiation .pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 

Robust Production Management (RPM) Module 2: Performance Framework

  • 1. Copyright © 2005 Metrilogics, LLC. All rights reserved. Robust Production Management Metrilogics Front-line controls for bottom-line savings. TM SM Module 2: Performance Framework By Lance Latham Senior Managing Partner
  • 2. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM The Differences Between Direct vs. Indirect Time Direct Time: Paid time dedicated to performing primary or core customer work. Indirect Time: Paid time not dedicated to performing core customer work. Indirect time can include: v Project time v Meetings v System downtime v Classroom training v Sick time v Vacation v Holidaysv Equipment changeovers v Paid breaks v PTO (if paid) v STD (if paid) v LTD (if paid) Direct time is also the time over which front- line team members have the most control (i.e., during direct time, front-line team members can opt to work in a high-quality, productive manner – or not). Indirect time is the time over which managers tend to have the most control (i.e., managers allot, coordinate and schedule indirect time that front-line team members take). 2 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
  • 3. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Factoring Earned Work Credit Hours by Quality Earned Work Credit Hours represent “gross” output. When factored by quality (accuracy and completeness), Quality Work Credit and Failed Work Hours are the result. Earned Work Credit = 5.00 Hrs. x Quality score of 90% Failed Work = .50 Hrs. Quality Work Credit = 4.50 Hrs. 5 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
  • 4. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Performance Framework: Example of Tracking Hours vs. Percentages vs. Dollars Total Paid Hrs. = 2,100 Paid Time Off = 420 Hours Lost Time = 420 Hours Unearned Time = 378 Hours Quality Work = 777 Hours Failed Work= 105 Hours Total Paid Hrs. = 100% Paid Time Off = 20% Lost Time = 20% Unearned Time = 18% Quality Work = 37% Failed Work= 5% Total Paid Hrs. = $50,000 (Loaded) Paid Time Off = $10,000 Lost Time = $10,000 Unearned Time = $9,000 Quality Work = $18,500 Failed Work= $2,500 8 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
  • 5. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Example of Applying the Performance Framework Assume a single team member’s typical 8-hour work day, including a mix of completed primary customer work, direct and indirect time (and costs) incurred… Paid Time Off Lost Time Unearned Time Failed Work Quality Work KEYTotal Paid Hours = 8 8 7 6 5 4 3 2 1 0 #Hours So…did the team member have a “good” day or a “bad” day? 11 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
  • 6. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Example of The Real-World Impact of Low Efficiency Total Paid Hours = $50,000 (Loaded) Paid Time Off = $10,000 Lost Time = $10,000 Unearned Time = $9,000 Quality Work = $18,500 Failed Work= $2,500 Quality Work = $18,500 Non-Value Add Cost = $31,500 Total Paid Hours = $50,000 (Loaded) $ Efficiency: = 37% $18,500 $50,000 In this example, 37% efficiency means that a company paid an employee total annual salary + benefits equal to $50,000, but the employee generated only $18,500 of quality value add work. Restated, 63% of what the employee was paid resulted in no revenue- generating output for the company. 14 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
  • 7. Copyright © 2005 Metrilogics, LLC. All rights reserved. Metrilogics TM Module 2 Summary (cont.) v Operational savings occur when spare capacity is either: o Used in a productive manner without increasing other costs (= cost avoidance scenario), or o Eliminated along with associated costs (= cost savings scenario). v There is a direct real-world connection between a company’s efficiency and the return the company receives on the compensation paid to its employees. In a nutshell, high efficiency = “more bang for the buck.” v Efficiency reflects supervisor and manager performance, based on Quality Work Credit Hours produced vs. the combination of Direct and Indirect Hours that they manage. 17 This document is a partial preview. Full document download can be found on Flevy: http://flevy.com/browse/document/robust-production-management-rpm-module-2-performance-framework-460
  • 8. 1 Flevy (www.flevy.com) is the marketplace for premium documents. These documents can range from Business Frameworks to Financial Models to PowerPoint Templates. Flevy was founded under the principle that companies waste a lot of time and money recreating the same foundational business documents. Our vision is for Flevy to become a comprehensive knowledge base of business documents. All organizations, from startups to large enterprises, can use Flevy— whether it's to jumpstart projects, to find reference or comparison materials, or just to learn. Contact Us Please contact us with any questions you may have about our company. • General Inquiries support@flevy.com • Media/PR press@flevy.com • Billing billing@flevy.com