f msreliabilit y.com http://www.fmsreliability.com/education/derating-value/
Derating Value
Estimating the Value of Derating
This example is based on a real situation. Af ter a class on design f or reliability, a senior manager declared that
every component would be f ully derated in every product (electronic test & measurement devices). Within a
year the design team redesigned all new and existing products, with strict adherence to the derating guidelines
provided in the class. A year af ter the class the product line enjoyed a 50% reduction in warranty claims. They
learned about derating and a manager saw the potential value.
We of ten do not have a manager with such f oresight, so we need to provide justif ication f or the investment.
Here is a case that provides a way to view reliability investments and determine the return.
Derating and field failure rate
The specialized test and measurement industry creates very complex electronic equipment, expensive tools
with total production of maybe 50 per year over a f our year period. And, like other high cost/low volume
products the cost of f ailure is very high.
Because the unit costs are very high, the ability to test suf f icient numbers of units to f ailure is severely limited.
It is not uncommon to have only one or two units f or all qualif ication testing. Furthermore, the complexity of
the units provides multiple possible f ailure mechanisms and only rarely does the design provide a clearly
dominant f ailure mechanism to f ocus reliability evaluations.
Given the barriers to conducting physical testing, the reliability team recommends implementing detailed
derating analysis f or the selection of every electronic component. The design team does use some derating
concepts, yet only based on a 50% guideline and without detailed analysis. Theref ore, the project manager has
requested more inf ormation about the process, costs, and value.
Derating and Field Failures Discussion
Derating is the selection of components that have ratings (power, voltage, etc) above the expected stress [1] .
Selecting a capacitor that bridges a 5-volt potential that has a voltage rating of 10 volts would be considered a
50% derating. Selecting components that match the expected stress and rating generally lead to premature
f ailure of the components. The ratings vendors provide only imply that the component can experience the
stress at the rated value f or a very short time. Derating provides a margin to minimize the accumulation of
damage or the chance exposure of high enough stress to cause a f ailure. The same concept can be applied
f or mechanical designs, using saf ety margins.
At Hewlett-Packard, a study of the ef f ects of various design f or reliability tools f ound a very high correlation
between well-executed derating programs and low f ield f ailure rates. This contributed to the 50% f ewer f ield
f ailures experienced [1]. In one particular division where the design team embarked on a f ull implementation of
derating on all products, the project realized a 50% reduction in f ield f ailures in the f irst year, and continued to
reduce f ailure rates over subsequent years as more f ully derated product designs shipped.
Derating Cost
Components that are rated higher cost more and are generally larger in size. Assuming the current bill of
material cost is $100k, the implementation of detailed and thorough derating the bill of material costs can rise
to $200,000, or double. For a production run of 50 units, the cost increases to $5m.
The additional engineering time f or training, circuit analysis, and procurement may add an additional $1m to the
project cost. The total cost is an estimated additional $6m to the program.
The primary value of component derating is the increase in circuit robustness of the product leads to f ewer
f ield f ailures [1]. The cost of a f ield f ailure is expensive, due to the replacement cost, f ailure analysis, and
possible redesign and qualif ication costs. Let’s assume that each f ield f ailure has an average cost of $2m, or
f our times the sales price.
Reducing a 10% annual f ailure rate (a low estimate f or such complex products) to 5% would results in 2.5
f ewer $2m f ailures per year f or an annual savings of $5m.
Derating ROI
The ROI is the ratio of the expected return over the cost. With a cost of $6 million and return of only $5m, the
ROI is less than one at 0.83.
If the starting f ailure rate or cost of f ailure is low, then this ROI may not exceed the breakeven point. Also,
consider the market and impact on competition. If the high f ailure rate caused a loss of market share, that may
f urther increase the cost of f ailure. Still, implementing derating may not make sense in this situation.
See also Reliability, HALT and ALT Value articles.
1. Ireson, William Grant, Clyde F Coombs, and Richard Y Moss. Handbook of Reliability Engineering and
Management. New York: McGraw Hill, 1995., pg. 16.9.
2. Ireson, William Grant, Clyde F Coombs, and Richard Y Moss. Handbook of Reliability Engineering and
Management. New York: McGraw Hill, 1995, pg. 5.4.

Más contenido relacionado

La actualidad más candente

La actualidad más candente (7)

Dont Miss these DRI CBCP Dumps
Dont Miss these DRI CBCP DumpsDont Miss these DRI CBCP Dumps
Dont Miss these DRI CBCP Dumps
 
The Future Of Testing Is In The Business From AppLabs
The Future Of Testing Is In The Business From AppLabsThe Future Of Testing Is In The Business From AppLabs
The Future Of Testing Is In The Business From AppLabs
 
DFR Methods Survey 2014
DFR Methods Survey 2014DFR Methods Survey 2014
DFR Methods Survey 2014
 
9 Critical Risk Factors Impacting Your Supply Base
9 Critical Risk Factors Impacting Your Supply Base9 Critical Risk Factors Impacting Your Supply Base
9 Critical Risk Factors Impacting Your Supply Base
 
FMEA Final Project
FMEA Final ProjectFMEA Final Project
FMEA Final Project
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance management
 
The visual machine_infographic 1.11.26 pm
The visual machine_infographic 1.11.26 pmThe visual machine_infographic 1.11.26 pm
The visual machine_infographic 1.11.26 pm
 

Similar a Derating value FMS Reliability

Performance report sample
Performance report samplePerformance report sample
Performance report sample
Sekighenda
 
Life cycle cost definitions (2)
Life cycle cost definitions (2)Life cycle cost definitions (2)
Life cycle cost definitions (2)
Adil Shaikh
 

Similar a Derating value FMS Reliability (20)

ALT value FMS Reliability
ALT value FMS ReliabilityALT value FMS Reliability
ALT value FMS Reliability
 
HALT value FMS Reliability
HALT value FMS ReliabilityHALT value FMS Reliability
HALT value FMS Reliability
 
Is Software Testing a Zero Sum Game??
Is Software Testing a Zero Sum Game??Is Software Testing a Zero Sum Game??
Is Software Testing a Zero Sum Game??
 
Performance report sample
Performance report samplePerformance report sample
Performance report sample
 
Costofquality
Costofquality Costofquality
Costofquality
 
Limits+of+the+learning+curve
Limits+of+the+learning+curveLimits+of+the+learning+curve
Limits+of+the+learning+curve
 
JR Dickens - IWCS 2007
JR Dickens - IWCS 2007JR Dickens - IWCS 2007
JR Dickens - IWCS 2007
 
Lecture08
Lecture08Lecture08
Lecture08
 
Life cycle cost definitions (2)
Life cycle cost definitions (2)Life cycle cost definitions (2)
Life cycle cost definitions (2)
 
Mro spare parts optimisation and inventory reduction uk 2017 11
Mro spare parts optimisation and inventory reduction uk 2017 11Mro spare parts optimisation and inventory reduction uk 2017 11
Mro spare parts optimisation and inventory reduction uk 2017 11
 
B0342014027
B0342014027B0342014027
B0342014027
 
KJ Ross Whitepaper How CXO's can reduce IT Project risk by improving software...
KJ Ross Whitepaper How CXO's can reduce IT Project risk by improving software...KJ Ross Whitepaper How CXO's can reduce IT Project risk by improving software...
KJ Ross Whitepaper How CXO's can reduce IT Project risk by improving software...
 
Why do the Projects fail
Why do the Projects failWhy do the Projects fail
Why do the Projects fail
 
Spi Cost Roi
Spi Cost RoiSpi Cost Roi
Spi Cost Roi
 
Financial Sensitivity in the Wind Industry The Numbers You Really Need to Know
Financial Sensitivity in the Wind Industry The Numbers You Really Need to KnowFinancial Sensitivity in the Wind Industry The Numbers You Really Need to Know
Financial Sensitivity in the Wind Industry The Numbers You Really Need to Know
 
Addressing the High Cost of Quality
Addressing the High Cost of QualityAddressing the High Cost of Quality
Addressing the High Cost of Quality
 
Risk management by YouExec
Risk management by YouExecRisk management by YouExec
Risk management by YouExec
 
Bus 630 preview full class
Bus 630 preview full classBus 630 preview full class
Bus 630 preview full class
 
A prescription for saving money case study
A prescription for saving money   case studyA prescription for saving money   case study
A prescription for saving money case study
 
Cost Reduction using QMS-1
Cost Reduction using QMS-1Cost Reduction using QMS-1
Cost Reduction using QMS-1
 

Más de Accendo Reliability

Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
Accendo Reliability
 

Más de Accendo Reliability (20)

Should RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdfShould RCM be applied to all assets.pdf
Should RCM be applied to all assets.pdf
 
T or F Must have failure data.pdf
T or F Must have failure data.pdfT or F Must have failure data.pdf
T or F Must have failure data.pdf
 
Should RCM Templates be used.pdf
Should RCM Templates be used.pdfShould RCM Templates be used.pdf
Should RCM Templates be used.pdf
 
12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf12-RCM NOT a Maintenance Program.pdf
12-RCM NOT a Maintenance Program.pdf
 
13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf13-RCM Reduces Maintenance.pdf
13-RCM Reduces Maintenance.pdf
 
11-RCM is like a diet.pdf
11-RCM is like a diet.pdf11-RCM is like a diet.pdf
11-RCM is like a diet.pdf
 
09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf09-Myth RCM only product is maintenance.pdf
09-Myth RCM only product is maintenance.pdf
 
10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf10-RCM has serious weaknesses industrial environment.pdf
10-RCM has serious weaknesses industrial environment.pdf
 
08-Master the basics carousel.pdf
08-Master the basics carousel.pdf08-Master the basics carousel.pdf
08-Master the basics carousel.pdf
 
07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf07-Manufacturer Recommended Maintenance.pdf
07-Manufacturer Recommended Maintenance.pdf
 
06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf06-Is a Criticality Analysis Required.pdf
06-Is a Criticality Analysis Required.pdf
 
05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf05-Failure Modes Right Detail.pdf
05-Failure Modes Right Detail.pdf
 
03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf03-3 Ways to Do RCM.pdf
03-3 Ways to Do RCM.pdf
 
04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf04-Equipment Experts Couldn't believe response.pdf
04-Equipment Experts Couldn't believe response.pdf
 
02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf02-5 RCM Myths Carousel.pdf
02-5 RCM Myths Carousel.pdf
 
01-5 CBM Facts.pdf
01-5 CBM Facts.pdf01-5 CBM Facts.pdf
01-5 CBM Facts.pdf
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Reliability Engineering Management course flyer
Reliability Engineering Management course flyerReliability Engineering Management course flyer
Reliability Engineering Management course flyer
 
How to Create an Accelerated Life Test
How to Create an Accelerated Life TestHow to Create an Accelerated Life Test
How to Create an Accelerated Life Test
 
Reliability Programs
Reliability ProgramsReliability Programs
Reliability Programs
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 

Derating value FMS Reliability

  • 1. f msreliabilit y.com http://www.fmsreliability.com/education/derating-value/ Derating Value Estimating the Value of Derating This example is based on a real situation. Af ter a class on design f or reliability, a senior manager declared that every component would be f ully derated in every product (electronic test & measurement devices). Within a year the design team redesigned all new and existing products, with strict adherence to the derating guidelines provided in the class. A year af ter the class the product line enjoyed a 50% reduction in warranty claims. They learned about derating and a manager saw the potential value. We of ten do not have a manager with such f oresight, so we need to provide justif ication f or the investment. Here is a case that provides a way to view reliability investments and determine the return. Derating and field failure rate The specialized test and measurement industry creates very complex electronic equipment, expensive tools with total production of maybe 50 per year over a f our year period. And, like other high cost/low volume products the cost of f ailure is very high. Because the unit costs are very high, the ability to test suf f icient numbers of units to f ailure is severely limited. It is not uncommon to have only one or two units f or all qualif ication testing. Furthermore, the complexity of the units provides multiple possible f ailure mechanisms and only rarely does the design provide a clearly dominant f ailure mechanism to f ocus reliability evaluations. Given the barriers to conducting physical testing, the reliability team recommends implementing detailed derating analysis f or the selection of every electronic component. The design team does use some derating concepts, yet only based on a 50% guideline and without detailed analysis. Theref ore, the project manager has requested more inf ormation about the process, costs, and value. Derating and Field Failures Discussion
  • 2. Derating is the selection of components that have ratings (power, voltage, etc) above the expected stress [1] . Selecting a capacitor that bridges a 5-volt potential that has a voltage rating of 10 volts would be considered a 50% derating. Selecting components that match the expected stress and rating generally lead to premature f ailure of the components. The ratings vendors provide only imply that the component can experience the stress at the rated value f or a very short time. Derating provides a margin to minimize the accumulation of damage or the chance exposure of high enough stress to cause a f ailure. The same concept can be applied f or mechanical designs, using saf ety margins. At Hewlett-Packard, a study of the ef f ects of various design f or reliability tools f ound a very high correlation between well-executed derating programs and low f ield f ailure rates. This contributed to the 50% f ewer f ield f ailures experienced [1]. In one particular division where the design team embarked on a f ull implementation of derating on all products, the project realized a 50% reduction in f ield f ailures in the f irst year, and continued to reduce f ailure rates over subsequent years as more f ully derated product designs shipped. Derating Cost Components that are rated higher cost more and are generally larger in size. Assuming the current bill of material cost is $100k, the implementation of detailed and thorough derating the bill of material costs can rise to $200,000, or double. For a production run of 50 units, the cost increases to $5m. The additional engineering time f or training, circuit analysis, and procurement may add an additional $1m to the project cost. The total cost is an estimated additional $6m to the program. The primary value of component derating is the increase in circuit robustness of the product leads to f ewer f ield f ailures [1]. The cost of a f ield f ailure is expensive, due to the replacement cost, f ailure analysis, and possible redesign and qualif ication costs. Let’s assume that each f ield f ailure has an average cost of $2m, or f our times the sales price. Reducing a 10% annual f ailure rate (a low estimate f or such complex products) to 5% would results in 2.5 f ewer $2m f ailures per year f or an annual savings of $5m. Derating ROI The ROI is the ratio of the expected return over the cost. With a cost of $6 million and return of only $5m, the ROI is less than one at 0.83. If the starting f ailure rate or cost of f ailure is low, then this ROI may not exceed the breakeven point. Also, consider the market and impact on competition. If the high f ailure rate caused a loss of market share, that may f urther increase the cost of f ailure. Still, implementing derating may not make sense in this situation. See also Reliability, HALT and ALT Value articles. 1. Ireson, William Grant, Clyde F Coombs, and Richard Y Moss. Handbook of Reliability Engineering and Management. New York: McGraw Hill, 1995., pg. 16.9. 2. Ireson, William Grant, Clyde F Coombs, and Richard Y Moss. Handbook of Reliability Engineering and Management. New York: McGraw Hill, 1995, pg. 5.4.