SlideShare una empresa de Scribd logo
1 de 33
For Royal Gorge Public Process
July 21, 2013
Introduce Randy Martin of
Trailscape
Why trails?
The Real Estate Value
Added of Trails
 The parts of the trail
Presentation on use conflict
and the causes of it
How to manage use via
designations
How to manage use via
design
Sample Projects
14 miles Multiuse trail
Susanville Ca. 2009
14 Miles Hiking Primarily Trail,
Genoa 2011
Guest Trail Builder Jamaica,
2009
Sugarbowl, 6 miles design, 2
miles built from Disney to Lake
Mary, 2010
Tahoe Donner, Euer Valley, 2
miles, 2012
Market Studies and
Premium Analysis
Advisory Board Hidden
Falls Regional Park, CA
Frequent Speaker:
California Trail Symposium
California Park and
Recreation Society,
Urban Land Institute
International Trail
Symposium
Professional Trail Builders
Association
Professional Highlights
• Brings people to a
place of interest
• Keeps people away
from sensitive areas
• Meet recreational
needs of people
• Economic benefits
• Public Health
• Introduce people to
the outdoors
When constructing trails, the Land
Trust follows stringent federal and
State standards
Donner Summit Canyon Trail December 4, 2012
Meandering low-gradient
trails
• keep speed down
Grade reversals-
undulations in the tread
 Keep water from running
down tread
• Slows bikes and
minimizes skidding
Grade dips
• Easier to build than a
water bar; therefore more
get built!
• Make them
smooth- no hoof
or tire-catchers!
• Rock-hopper
stones next to it
for hikers?
• Most maintenance on
modern trails occurs
because of the
original design and
layout
• A well-built trail
should need mostly
annual spring
cleaning-not much
more
• Major maintenance
needs after flood
events (maybe)
Sustainable?
Sustainable
GUILTY
HAVING THE
VOLUME UP TOO
LOUD FOR SAFE
TRAIL SHARING
GUILTY
TRAMPLING STREAM
BANKS AND WALKING
SIDE-BY-SIDE ON
SINGLE TRACKS
GUILTY
CUTTING
SWITCHBACKS AND
LEAVING ‘ROAD
APPLES’
GUILTY
NOT YIELDING
TRAIL AND GOING
TOO FAST
Why?
P.S. EXTRA CREDIT IF YOU
KNOW WHAT IS WRONG
WITH THIS SIGN…
According to the Forest Service it is defined as:
“Goal interference attributed to another's behavior”
Huh?
•Varying rates of speed by trail users
Out for a
workout
Thrillseeking
Bird/critter/wild
-flower viewing
Family/Friend
time
Enjoyment of
Nature
Solitude
All of the above can happen here!
Perceptions of who
should rightly be
able to use the trail.
Lack of clarity or
understanding of
regulations
Poaching
It’d be tough to lay out a multi use route through here!
Use-Conflict-Why do we have it? (cont’d)
Considerations in
designation:
•Single-user, or several
users?
•Resource preservation
and/or use-conflict
mitigation?
•Ordinance or voluntary
compliance?
•Enforcement plan?
The Good:
Segregates use however
designed
Provides a level of
security against potential
use-conflict
Allows a clear line for
enforcement
Can mitigate erosion by
singling out high impact
users (particularly on older,
non-sustainable trail)
The bad:
Does not necessarily
mitigate user conflict; may
actually cause an increase
in it
More trails to satisfy all
users= redundancy, larger
footprint of impacted area,
greater costs
Tough to enforce
The Good:
Less trails needed= less
impact to watershed
Easier navigation
Use conflict minimized
through design
Larger pool of potential
funders and volunteers for
construction and
maintenance
Easier enforcement
The bad:
Varying rates of speed by
users WILL occur
Design critical to
minimization of use-conflict
Potential for user-group
dominance
Sustainable design employs:
Low overall gradient
Maximum grades determined
by soil type
Follows contours
Meanders designed to slow
users
Lots of grade reversals*
* But not to the point of having P.U.D.’s
Design is critical on this section of trail as there is no place to yield
•Slow fast-paced trail users
down, provide extra
durability where there is
high-use
 Multi-use trails in the
backcountry- (the majority
of the trails)
 Single-use on flatter terrain
for accessibility and walking
 Single-use (proposed) trails
for mountain bikes
 Single-use routes (potential)
for safer travel to areas with
steep or exposed access.
See you on the trail!

Más contenido relacionado

Similar a Trail Construction and Use-Conflict Minimization Overview

2018 GIS in Recreation: A Creek Runs Through It
2018 GIS in Recreation: A Creek Runs Through It2018 GIS in Recreation: A Creek Runs Through It
2018 GIS in Recreation: A Creek Runs Through It
GIS in the Rockies
 
Tega Cay Trails
Tega Cay TrailsTega Cay Trails
Tega Cay Trails
Ben Ullman
 
Road Design Session
Road Design SessionRoad Design Session
Road Design Session
Praja
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forum
chapinspencer
 
Trail Builders and Equipment Workshop
Trail Builders and Equipment WorkshopTrail Builders and Equipment Workshop
Trail Builders and Equipment Workshop
BikeTexas
 
Neighborhood Greenways
Neighborhood GreenwaysNeighborhood Greenways
Neighborhood Greenways
Trailnet
 
LTCP Meeting 9-16-04
LTCP Meeting 9-16-04LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
HartTWI
 
CZ09 Sea Grant presentations
CZ09 Sea Grant presentationsCZ09 Sea Grant presentations
CZ09 Sea Grant presentations
moniquemyers
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINAL
Dan Ross
 

Similar a Trail Construction and Use-Conflict Minimization Overview (20)

East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
2018 GIS in Recreation: A Creek Runs Through It
2018 GIS in Recreation: A Creek Runs Through It2018 GIS in Recreation: A Creek Runs Through It
2018 GIS in Recreation: A Creek Runs Through It
 
Tega Cay Trails
Tega Cay TrailsTega Cay Trails
Tega Cay Trails
 
Prepare to Launch! Guidelines for Assessing, Designing, and Building Launch ...
Prepare to Launch!  Guidelines for Assessing, Designing, and Building Launch ...Prepare to Launch!  Guidelines for Assessing, Designing, and Building Launch ...
Prepare to Launch! Guidelines for Assessing, Designing, and Building Launch ...
 
Road Design Session
Road Design SessionRoad Design Session
Road Design Session
 
Burlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public ForumBurlington Bike Path Improvement Public Forum
Burlington Bike Path Improvement Public Forum
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
ThinkBike Chattanooga 9.24.13
ThinkBike Chattanooga 9.24.13ThinkBike Chattanooga 9.24.13
ThinkBike Chattanooga 9.24.13
 
Trail Builders and Equipment Workshop
Trail Builders and Equipment WorkshopTrail Builders and Equipment Workshop
Trail Builders and Equipment Workshop
 
Heritage Trail Final community presentation
Heritage Trail Final community presentationHeritage Trail Final community presentation
Heritage Trail Final community presentation
 
Self Regulating Streets
Self Regulating StreetsSelf Regulating Streets
Self Regulating Streets
 
South Suburban Master Plan Public Meeting Presentation
South Suburban Master Plan Public Meeting PresentationSouth Suburban Master Plan Public Meeting Presentation
South Suburban Master Plan Public Meeting Presentation
 
04 LT and SS
04 LT and SS04 LT and SS
04 LT and SS
 
Enticer Trail: Road-to-Trail Conversion
Enticer Trail: Road-to-Trail ConversionEnticer Trail: Road-to-Trail Conversion
Enticer Trail: Road-to-Trail Conversion
 
Neighborhood Greenways
Neighborhood GreenwaysNeighborhood Greenways
Neighborhood Greenways
 
LTCP Meeting 9-16-04
LTCP Meeting 9-16-04LTCP Meeting 9-16-04
LTCP Meeting 9-16-04
 
CZ09 Sea Grant presentations
CZ09 Sea Grant presentationsCZ09 Sea Grant presentations
CZ09 Sea Grant presentations
 
#78 Sustaining Complete Streets Momentum - Lopez
#78 Sustaining Complete Streets Momentum - Lopez#78 Sustaining Complete Streets Momentum - Lopez
#78 Sustaining Complete Streets Momentum - Lopez
 
Dan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINALDan Ross NextGen ppt FINAL
Dan Ross NextGen ppt FINAL
 
DMURS - DIT November 2014
DMURS - DIT November 2014 DMURS - DIT November 2014
DMURS - DIT November 2014
 

Más de freshtrackscommunications

Truckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary ReportTruckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary Report
freshtrackscommunications
 

Más de freshtrackscommunications (14)

Examples of Successful Uses of Aquatic Herbicides
Examples of Successful Uses of Aquatic HerbicidesExamples of Successful Uses of Aquatic Herbicides
Examples of Successful Uses of Aquatic Herbicides
 
June 17 presentation - Tahoe Expedition Academy New Campus public workshop
June 17 presentation - Tahoe Expedition Academy New Campus public workshopJune 17 presentation - Tahoe Expedition Academy New Campus public workshop
June 17 presentation - Tahoe Expedition Academy New Campus public workshop
 
June 1 TEA New Campus Meetings with Architects Detailed Feedback
June 1 TEA New Campus Meetings with Architects Detailed FeedbackJune 1 TEA New Campus Meetings with Architects Detailed Feedback
June 1 TEA New Campus Meetings with Architects Detailed Feedback
 
June 1 TEA New Campus Meetings with Architects Feedback
June 1 TEA New Campus Meetings with Architects FeedbackJune 1 TEA New Campus Meetings with Architects Feedback
June 1 TEA New Campus Meetings with Architects Feedback
 
Tahoe Expedition Acadamy Campus Feedback
Tahoe Expedition Acadamy Campus FeedbackTahoe Expedition Acadamy Campus Feedback
Tahoe Expedition Acadamy Campus Feedback
 
May 8th CommuniTEA Event | Family Feedback Summary
May 8th CommuniTEA Event | Family Feedback SummaryMay 8th CommuniTEA Event | Family Feedback Summary
May 8th CommuniTEA Event | Family Feedback Summary
 
North Tahoe Tourism Master Plan Public Workshop Presentation
North Tahoe Tourism Master Plan Public Workshop PresentationNorth Tahoe Tourism Master Plan Public Workshop Presentation
North Tahoe Tourism Master Plan Public Workshop Presentation
 
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13Truckee Tahoe Airport Master Plan Public Meeting Nov 13
Truckee Tahoe Airport Master Plan Public Meeting Nov 13
 
Truckee Tahoe Airport Master Plan Update, 2013
Truckee Tahoe Airport Master Plan Update, 2013Truckee Tahoe Airport Master Plan Update, 2013
Truckee Tahoe Airport Master Plan Update, 2013
 
Final Outreach Presentation - August 31
Final Outreach Presentation - August 31Final Outreach Presentation - August 31
Final Outreach Presentation - August 31
 
Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13Van Norden Dam Public Meeting 7-29-13
Van Norden Dam Public Meeting 7-29-13
 
Royal Gorge Public Outreach Summary (not final)
Royal Gorge Public Outreach Summary (not final)Royal Gorge Public Outreach Summary (not final)
Royal Gorge Public Outreach Summary (not final)
 
Long Term Forest Management at Royal Gorge
Long Term Forest Management at Royal GorgeLong Term Forest Management at Royal Gorge
Long Term Forest Management at Royal Gorge
 
Truckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary ReportTruckee Tahoe Airport District Community Outreach Summary Report
Truckee Tahoe Airport District Community Outreach Summary Report
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 

Trail Construction and Use-Conflict Minimization Overview

  • 1. For Royal Gorge Public Process July 21, 2013
  • 2. Introduce Randy Martin of Trailscape Why trails? The Real Estate Value Added of Trails  The parts of the trail Presentation on use conflict and the causes of it How to manage use via designations How to manage use via design
  • 3. Sample Projects 14 miles Multiuse trail Susanville Ca. 2009 14 Miles Hiking Primarily Trail, Genoa 2011 Guest Trail Builder Jamaica, 2009 Sugarbowl, 6 miles design, 2 miles built from Disney to Lake Mary, 2010 Tahoe Donner, Euer Valley, 2 miles, 2012 Market Studies and Premium Analysis Advisory Board Hidden Falls Regional Park, CA Frequent Speaker: California Trail Symposium California Park and Recreation Society, Urban Land Institute International Trail Symposium Professional Trail Builders Association Professional Highlights
  • 4. • Brings people to a place of interest • Keeps people away from sensitive areas • Meet recreational needs of people • Economic benefits • Public Health • Introduce people to the outdoors
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. When constructing trails, the Land Trust follows stringent federal and State standards
  • 10. Donner Summit Canyon Trail December 4, 2012
  • 11.
  • 12. Meandering low-gradient trails • keep speed down Grade reversals- undulations in the tread  Keep water from running down tread • Slows bikes and minimizes skidding Grade dips • Easier to build than a water bar; therefore more get built!
  • 13. • Make them smooth- no hoof or tire-catchers! • Rock-hopper stones next to it for hikers?
  • 14. • Most maintenance on modern trails occurs because of the original design and layout • A well-built trail should need mostly annual spring cleaning-not much more • Major maintenance needs after flood events (maybe) Sustainable? Sustainable
  • 15. GUILTY HAVING THE VOLUME UP TOO LOUD FOR SAFE TRAIL SHARING GUILTY TRAMPLING STREAM BANKS AND WALKING SIDE-BY-SIDE ON SINGLE TRACKS GUILTY CUTTING SWITCHBACKS AND LEAVING ‘ROAD APPLES’ GUILTY NOT YIELDING TRAIL AND GOING TOO FAST
  • 16. Why? P.S. EXTRA CREDIT IF YOU KNOW WHAT IS WRONG WITH THIS SIGN…
  • 17. According to the Forest Service it is defined as: “Goal interference attributed to another's behavior” Huh?
  • 18. •Varying rates of speed by trail users
  • 19. Out for a workout Thrillseeking Bird/critter/wild -flower viewing Family/Friend time Enjoyment of Nature Solitude All of the above can happen here!
  • 20. Perceptions of who should rightly be able to use the trail. Lack of clarity or understanding of regulations Poaching It’d be tough to lay out a multi use route through here! Use-Conflict-Why do we have it? (cont’d)
  • 21. Considerations in designation: •Single-user, or several users? •Resource preservation and/or use-conflict mitigation? •Ordinance or voluntary compliance? •Enforcement plan?
  • 22. The Good: Segregates use however designed Provides a level of security against potential use-conflict Allows a clear line for enforcement Can mitigate erosion by singling out high impact users (particularly on older, non-sustainable trail) The bad: Does not necessarily mitigate user conflict; may actually cause an increase in it More trails to satisfy all users= redundancy, larger footprint of impacted area, greater costs Tough to enforce
  • 23. The Good: Less trails needed= less impact to watershed Easier navigation Use conflict minimized through design Larger pool of potential funders and volunteers for construction and maintenance Easier enforcement The bad: Varying rates of speed by users WILL occur Design critical to minimization of use-conflict Potential for user-group dominance
  • 24. Sustainable design employs: Low overall gradient Maximum grades determined by soil type Follows contours Meanders designed to slow users Lots of grade reversals* * But not to the point of having P.U.D.’s Design is critical on this section of trail as there is no place to yield
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31. •Slow fast-paced trail users down, provide extra durability where there is high-use
  • 32.  Multi-use trails in the backcountry- (the majority of the trails)  Single-use on flatter terrain for accessibility and walking  Single-use (proposed) trails for mountain bikes  Single-use routes (potential) for safer travel to areas with steep or exposed access.
  • 33. See you on the trail!

Notas del editor

  1. Erosion consists of two components: disturbance and transport. Horses and hikers: High level of disturbance, low level of transport Bikes: low level of disturbance (unless skidding), high level of transport
  2. Water bars are out
  3. Construction of sustainable trails allows for more durable trails, less maintenance work Clear drains, “ to daylight” Clear deadfall discreetly Prune brush at an angle Reconstruct tread: maintain backslope and critical edge, restore outslope Grade dips
  4. These pictures don’t show the guilty activity
  5. It also says that contact between users need not be made The “level of resentment is often lopsided”
  6. Even Day/Odd Day use management Ordnance vs. recommendation
  7. Can lead to “trail vigilanteism” by empowering the entitled user
  8. Check out sawtooth, DLRT from Castle, emigrant to summit for good design Check out Mt. Lala Trail steps, Confluence Trail in Auburn for bad design
  9. Road analogy
  10. A non-skidding bike is one of the lowest impacts on trails