JICA PV SYSTEM INTRODUCTION PROJECT
(THE PROJECT FOR CLEAN ENERGY PROMOTION USING SOLAR PV SYSTEM)
JICA PV System Introduction Project

PROJECT OVERVIEW

   Exchange of Notes (E/N) signed on December 8, 2009

       Japan to provide Grant Aid of 530MYen
            For the Project to promote clean energy using Solar PV System in
             FSM
       Grant to be executed by JICA thru “Grant Agreement (G/A)”
       Project to be executed by Crown Agents thru “Agent Agreement
        (A/A)”
       Committee to be established to discuss all necessary matters

   Project scope: Introduction of 160 kW grid-connected PV system in
    Palikir

       20kW at President’s Office
            Battery installation for power-outage backup
       140kW at PCM-FSM campus
JICA PV System Introduction Project

COMMITTEE
   Committee to be established by FSM Government
    (Authority)
       Chaired by representative of Authority
       Members: Representatives from Authority and JICA
       Advisor: Representative from Agent
       First meeting to be held immediately after Agent Agreement


   Committee to discuss all matters related to the Project such
    as;
       Implementation schedule
       Determination and/or modification of the Components
       Modification of the Project
       Others related to Projects, etc.
JICA PV System Introduction Project

PROJECT SCHEDULE                                                                              (Updated: October 13, 2011)

 Decided to purchase 20kW additional capacity by remaining budget of M¥20
      20kW at President Office, 160kW at COM-FSM

                   2010                          2011                                                        2012                                          2013
                   11   12   1   2   3   4   5   6   7    8      9   10   11   12     1   2   3   4      5    6      7     8    9   10   11      12    1    2     3




 Agent Agreement


 Tender

                                                 (Preparation)
 Equipment
 Production                                                                    (Production)



 Transportation

                                                                                                      (Civil Work)
 Installation
                                                                                                             (Equipment)


 Commissioning
 /Completion
                                                                          (1.0 Mos)                                      (1.25 Mos) (0.75 Mos)        (1.0 Mos)

 Training
JICA PV System Introduction Project

AGREEMENT PROCEDURES
                     (Preparatory Survey)

   Dec. 8, 2009     Exchange of Notes (E/N)
                                            within 7 days
    Feb. 1, 2010    Grant Agreement (G/A)     after B/A
                                                              Notification of Opening of the Account and
   Apr. 28, 2010    Banking Arrangement (B/A)                 Request for the Payment (NOA, RP) to JICA
   May. 30, 2010    Congress Approval
    Jully 8, 2010   530MYen Paid from JICA to FSM Account
   Nov. 22, 2010    Agent Agreement (A/A)
   Feb. 14, 2011    Consultant Agreement
                                                        Crown Agents visiting FSM (2/21 – 2/25)
   Feb. 25, 2011    1st   Committee
                    (Tender: Apr. 5 – May 19, 2011)
     Aug. 9, 2011   Supplier Contract

                      Procurement/Construction


                    Completion
JICA PV System Introduction Project

FUNDING PROCEDURES
   Open “Account” in a bank in Japan to receive the Grant
        “Account” to be opened within 14 days after G/A
        Notify JICA of opening of the “Account” within 7days
        Funds need to be completely disbursed within 12 months after execution of the Grant
   Disbursement Procedures
        Agent to make funds transfer request to Bank with;
            Detailed estimates of expenses and JICA’s approval on A/A
        Bank to notify Authority of the request made by Agent
        Bank to make payments to Agent if no opposition from Authority within 10 working
         days
        Agent to make payments to suppliers/service providers using the above advanced
         funds
        Authority to present, thru Agent, a report to JICA on those transactions
   Reimbursement/Refund Procedures
        When remaining amount is less than 3%, Authority can make reimbursement request
         to Agent and use it for payments already made by Authority for the Project
             Agent to request bank to transfer fund and make reimbursement to Authority
        If disbursement is incomplete within 12months, Authority should refund the remaining
         amount to JICA
JICA PV System Introduction Project

OBLIGATIONS OF FSM GOVERNMENT

   FSM Government should take necessary measures to;
       Ensure prompt unloading and customs clearance at ports
       Ensure exemption of customs duties, internal taxes and other
        fiscal levies
       Accord project-related persons’ entry into FSM
       Ensure proper maintenance and use of the Components
       Give due environmental and social considerations
       Provide necessary information to JICA upon request
       Others referred to in the Article 10 of G/A
JICA PV System Introduction Project

LAYOUT PLAN (PRESIDENT’S OFFICE)
JICA PV System Introduction Project

LAYOUT PLAN (COM – FSM)
JICA PV System Introduction Project

SYSTEM DESIGN (PRESIDENT’S OFFICE)




                  20 kWp Solar Array on
                  Presidents Office
                                                                        Automatic
                                                                        disconnect unit                    PUC public grid
 (PV) kWh meter                     reductant master controller

                                    DC/DC    DC//DC    DC/AC
                                                                                          By-directional
                                                                                          kWh meter


                                                                  110 V / AC




                                                                    President
                                                                      office

Más contenido relacionado

Destacado

Japan Technical Cooperation Statistics
Japan Technical Cooperation StatisticsJapan Technical Cooperation Statistics
Japan Technical Cooperation Statisticsduggu94
 
20131127 JICA Final Presentation
20131127 JICA Final Presentation20131127 JICA Final Presentation
20131127 JICA Final PresentationNatsuki Hara
 
Session3 renewable energy and energy efficiency and present and future strate...
Session3 renewable energy and energy efficiency and present and future strate...Session3 renewable energy and energy efficiency and present and future strate...
Session3 renewable energy and energy efficiency and present and future strate...RCREEE
 
Chapter 6: An Overview of the Technical Writing Process
Chapter 6: An Overview of the Technical Writing ProcessChapter 6: An Overview of the Technical Writing Process
Chapter 6: An Overview of the Technical Writing Processjoancrittenden
 
What Is Technical Writing And Documentation
What Is Technical Writing And DocumentationWhat Is Technical Writing And Documentation
What Is Technical Writing And Documentationanjaliarv
 
Technical writing lecture
Technical writing lectureTechnical writing lecture
Technical writing lectureFahe Em
 
Proposal Writing
Proposal WritingProposal Writing
Proposal WritingProf S
 
Proposal Writing
Proposal WritingProposal Writing
Proposal WritingHuiying Ke
 
Lesson Study Continuous Professional Development for Teachers A case from ...
Lesson Study  Continuous Professional Development for Teachers   A case from ...Lesson Study  Continuous Professional Development for Teachers   A case from ...
Lesson Study Continuous Professional Development for Teachers A case from ...Teachers Task Force for Education 2030
 
8 Elements In A Research Proposal
8 Elements In A Research Proposal8 Elements In A Research Proposal
8 Elements In A Research ProposalAzmi Latiff
 

Destacado (16)

Japan Technical Cooperation Statistics
Japan Technical Cooperation StatisticsJapan Technical Cooperation Statistics
Japan Technical Cooperation Statistics
 
Pv system introduction project
Pv system introduction projectPv system introduction project
Pv system introduction project
 
20131127 JICA Final Presentation
20131127 JICA Final Presentation20131127 JICA Final Presentation
20131127 JICA Final Presentation
 
JICA powerpoint
JICA powerpointJICA powerpoint
JICA powerpoint
 
Session3 renewable energy and energy efficiency and present and future strate...
Session3 renewable energy and energy efficiency and present and future strate...Session3 renewable energy and energy efficiency and present and future strate...
Session3 renewable energy and energy efficiency and present and future strate...
 
JAICA
JAICAJAICA
JAICA
 
Scaling up JICA
Scaling up JICAScaling up JICA
Scaling up JICA
 
Basic Proposal Writing, PTAC
Basic Proposal Writing, PTACBasic Proposal Writing, PTAC
Basic Proposal Writing, PTAC
 
Chapter 6: An Overview of the Technical Writing Process
Chapter 6: An Overview of the Technical Writing ProcessChapter 6: An Overview of the Technical Writing Process
Chapter 6: An Overview of the Technical Writing Process
 
What Is Technical Writing And Documentation
What Is Technical Writing And DocumentationWhat Is Technical Writing And Documentation
What Is Technical Writing And Documentation
 
Technical writing lecture
Technical writing lectureTechnical writing lecture
Technical writing lecture
 
Proposal Writing
Proposal WritingProposal Writing
Proposal Writing
 
Proposal Writing
Proposal WritingProposal Writing
Proposal Writing
 
Lesson Study Continuous Professional Development for Teachers A case from ...
Lesson Study  Continuous Professional Development for Teachers   A case from ...Lesson Study  Continuous Professional Development for Teachers   A case from ...
Lesson Study Continuous Professional Development for Teachers A case from ...
 
Project proposal
Project proposalProject proposal
Project proposal
 
8 Elements In A Research Proposal
8 Elements In A Research Proposal8 Elements In A Research Proposal
8 Elements In A Research Proposal
 

Similar a JICA Solar Project

Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarIrinaParitet
 
K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka
K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri LankaK.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka
K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lankaslcf
 
Minh Le - GW Solar Symposium 2012
Minh Le  - GW Solar Symposium 2012Minh Le  - GW Solar Symposium 2012
Minh Le - GW Solar Symposium 2012GW Solar Institute
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATRommel Siasat
 
Investor Presentation - September 2010
Investor Presentation - September 2010Investor Presentation - September 2010
Investor Presentation - September 2010ChinaWind
 
TCI 2015 FTLAB Co. Ltd
TCI 2015 FTLAB Co. LtdTCI 2015 FTLAB Co. Ltd
TCI 2015 FTLAB Co. LtdTCI Network
 
Asserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill siteAsserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill siteSWANA Northern Lights Chapter
 
Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...
Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...
Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...Global CCS Institute
 
CT Self Storage Association Energy Summit presentation
CT Self Storage Association Energy Summit presentationCT Self Storage Association Energy Summit presentation
CT Self Storage Association Energy Summit presentationAdam Ramli
 
Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...
Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...
Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...Oupa Teke
 
Electricity & Water Demand Forecast 2009 - 2030
Electricity & Water DemandForecast 2009 - 2030Electricity & Water DemandForecast 2009 - 2030
Electricity & Water Demand Forecast 2009 - 2030mubarak2009
 
Lynas malaysia public communication july 13 2009 pknp presentation
Lynas malaysia public communication july 13 2009  pknp presentationLynas malaysia public communication july 13 2009  pknp presentation
Lynas malaysia public communication july 13 2009 pknp presentationLynas Malaysia
 
Osx project update inglês_setembro_final
Osx project update inglês_setembro_finalOsx project update inglês_setembro_final
Osx project update inglês_setembro_finalosxri
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureSALMAN SAEED
 

Similar a JICA Solar Project (20)

Presentation Paritet law firm_Cissolar
Presentation Paritet law firm_CissolarPresentation Paritet law firm_Cissolar
Presentation Paritet law firm_Cissolar
 
K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka
K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri LankaK.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka
K.K.S. Large Scale Wind and Solar PV Hybrid Power CDM Project in Sri Lanka
 
Minh Le - GW Solar Symposium 2012
Minh Le  - GW Solar Symposium 2012Minh Le  - GW Solar Symposium 2012
Minh Le - GW Solar Symposium 2012
 
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASATCV-Engineering Manager-Lead Electrical Eng_RFSIASAT
CV-Engineering Manager-Lead Electrical Eng_RFSIASAT
 
Investor Presentation - September 2010
Investor Presentation - September 2010Investor Presentation - September 2010
Investor Presentation - September 2010
 
China Wind Power Investor Presentation September 2010
China Wind Power Investor Presentation September 2010China Wind Power Investor Presentation September 2010
China Wind Power Investor Presentation September 2010
 
Overview of Clean Energy Community resources
Overview of Clean Energy Community resourcesOverview of Clean Energy Community resources
Overview of Clean Energy Community resources
 
Cesc limited
Cesc limitedCesc limited
Cesc limited
 
PCAPP Monthly Status Briefing October 2011
PCAPP Monthly Status Briefing October 2011PCAPP Monthly Status Briefing October 2011
PCAPP Monthly Status Briefing October 2011
 
PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011
 
TCI 2015 FTLAB Co. Ltd
TCI 2015 FTLAB Co. LtdTCI 2015 FTLAB Co. Ltd
TCI 2015 FTLAB Co. Ltd
 
Asserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill siteAsserting carbon offsets from landfill gas flaring at regina’s landfill site
Asserting carbon offsets from landfill gas flaring at regina’s landfill site
 
Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...
Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...
Constantin Sava Title - CCS Regulatory Toolkit in Romania - Presentation at t...
 
CT Self Storage Association Energy Summit presentation
CT Self Storage Association Energy Summit presentationCT Self Storage Association Energy Summit presentation
CT Self Storage Association Energy Summit presentation
 
Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...
Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...
Castle Terminal Co. (Pty) Ltd & Oupa Teke responding to the Department of Pub...
 
Electricity & Water Demand Forecast 2009 - 2030
Electricity & Water DemandForecast 2009 - 2030Electricity & Water DemandForecast 2009 - 2030
Electricity & Water Demand Forecast 2009 - 2030
 
LESCO_report
LESCO_reportLESCO_report
LESCO_report
 
Lynas malaysia public communication july 13 2009 pknp presentation
Lynas malaysia public communication july 13 2009  pknp presentationLynas malaysia public communication july 13 2009  pknp presentation
Lynas malaysia public communication july 13 2009 pknp presentation
 
Osx project update inglês_setembro_final
Osx project update inglês_setembro_finalOsx project update inglês_setembro_final
Osx project update inglês_setembro_final
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
 

Más de FSM Department of Resources & Development

Más de FSM Department of Resources & Development (20)

DREA 2nd Quarter News
DREA 2nd Quarter NewsDREA 2nd Quarter News
DREA 2nd Quarter News
 
Serehd Quarterly Newsletter
Serehd Quarterly NewsletterSerehd Quarterly Newsletter
Serehd Quarterly Newsletter
 
Final outcomes document forum trade ministers meeting-2012
Final outcomes document   forum trade ministers meeting-2012Final outcomes document   forum trade ministers meeting-2012
Final outcomes document forum trade ministers meeting-2012
 
GLISPA Brochure 2012 - Final
GLISPA Brochure 2012 - FinalGLISPA Brochure 2012 - Final
GLISPA Brochure 2012 - Final
 
DREA 1st Quarter Newsletter
DREA 1st Quarter NewsletterDREA 1st Quarter Newsletter
DREA 1st Quarter Newsletter
 
Micronesia Challenge - 5 Year Progress Report
Micronesia Challenge - 5 Year Progress ReportMicronesia Challenge - 5 Year Progress Report
Micronesia Challenge - 5 Year Progress Report
 
FSMRD Organization Chart
FSMRD Organization ChartFSMRD Organization Chart
FSMRD Organization Chart
 
FSM Energy Policy-Summary
FSM Energy Policy-SummaryFSM Energy Policy-Summary
FSM Energy Policy-Summary
 
Energy Policy (Volume II Action Plans) - Updated
Energy Policy (Volume II   Action Plans) - UpdatedEnergy Policy (Volume II   Action Plans) - Updated
Energy Policy (Volume II Action Plans) - Updated
 
Energy Policy (volume I) - Updated
Energy Policy (volume I) - UpdatedEnergy Policy (volume I) - Updated
Energy Policy (volume I) - Updated
 
15th_MCES_Signed_Joint_Communique
15th_MCES_Signed_Joint_Communique15th_MCES_Signed_Joint_Communique
15th_MCES_Signed_Joint_Communique
 
Electricity Production Data (YAP)
Electricity Production Data (YAP)Electricity Production Data (YAP)
Electricity Production Data (YAP)
 
Electricity Production Data (KOSRAE)
Electricity Production Data (KOSRAE)Electricity Production Data (KOSRAE)
Electricity Production Data (KOSRAE)
 
Electricity Production Data (CHUUK)
Electricity Production Data (CHUUK)Electricity Production Data (CHUUK)
Electricity Production Data (CHUUK)
 
Petroleum Import (2000-2010)
Petroleum Import (2000-2010)Petroleum Import (2000-2010)
Petroleum Import (2000-2010)
 
SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf
SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf
SPREP_Meeting_Report-Implementing_the_Nagoya_Outcomes_FINAL_24_06_2011.pdf
 
Signed Water Day Proclamation
Signed Water Day ProclamationSigned Water Day Proclamation
Signed Water Day Proclamation
 
Fsm EPA Resolution_ 2011
Fsm EPA Resolution_ 2011Fsm EPA Resolution_ 2011
Fsm EPA Resolution_ 2011
 
Water summit resolution and policy framework
Water summit resolution and policy frameworkWater summit resolution and policy framework
Water summit resolution and policy framework
 
Poster & Essay Competition
Poster & Essay CompetitionPoster & Essay Competition
Poster & Essay Competition
 

Último

lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxdigiyvbmrkt
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxSasikiranMarri
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)ssuser583c35
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptUsmanKaran
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.pptNandinituteja1
 
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road ConnectivityTransforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivitynarsireddynannuri1
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxunark75
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...The Lifesciences Magazine
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Último (14)

lok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptxlok sabha Elections in india- 2024 .pptx
lok sabha Elections in india- 2024 .pptx
 
16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf16042024_First India Newspaper Jaipur.pdf
16042024_First India Newspaper Jaipur.pdf
 
14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf14042024_First India Newspaper Jaipur.pdf
14042024_First India Newspaper Jaipur.pdf
 
Political-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptxPolitical-Ideologies-and-The-Movements.pptx
Political-Ideologies-and-The-Movements.pptx
 
Power in International Relations (Pol 5)
Power in International Relations (Pol 5)Power in International Relations (Pol 5)
Power in International Relations (Pol 5)
 
Geostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.pptGeostrategic significance of South Asian countries.ppt
Geostrategic significance of South Asian countries.ppt
 
12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf12042024_First India Newspaper Jaipur.pdf
12042024_First India Newspaper Jaipur.pdf
 
11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf11042024_First India Newspaper Jaipur.pdf
11042024_First India Newspaper Jaipur.pdf
 
13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf13042024_First India Newspaper Jaipur.pdf
13042024_First India Newspaper Jaipur.pdf
 
Emerging issues in migration policies.ppt
Emerging issues in migration policies.pptEmerging issues in migration policies.ppt
Emerging issues in migration policies.ppt
 
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road ConnectivityTransforming Andhra Pradesh: TDP's Legacy in Road Connectivity
Transforming Andhra Pradesh: TDP's Legacy in Road Connectivity
 
Foreign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptxForeign Relation of Pakistan with Neighboring Countries.pptx
Foreign Relation of Pakistan with Neighboring Countries.pptx
 
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
Mitochondrial Fusion Vital for Adult Brain Function and Disease Understanding...
 
15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf15042024_First India Newspaper Jaipur.pdf
15042024_First India Newspaper Jaipur.pdf
 

JICA Solar Project

  • 1. JICA PV SYSTEM INTRODUCTION PROJECT (THE PROJECT FOR CLEAN ENERGY PROMOTION USING SOLAR PV SYSTEM)
  • 2. JICA PV System Introduction Project PROJECT OVERVIEW  Exchange of Notes (E/N) signed on December 8, 2009  Japan to provide Grant Aid of 530MYen  For the Project to promote clean energy using Solar PV System in FSM  Grant to be executed by JICA thru “Grant Agreement (G/A)”  Project to be executed by Crown Agents thru “Agent Agreement (A/A)”  Committee to be established to discuss all necessary matters  Project scope: Introduction of 160 kW grid-connected PV system in Palikir  20kW at President’s Office  Battery installation for power-outage backup  140kW at PCM-FSM campus
  • 3. JICA PV System Introduction Project COMMITTEE  Committee to be established by FSM Government (Authority)  Chaired by representative of Authority  Members: Representatives from Authority and JICA  Advisor: Representative from Agent  First meeting to be held immediately after Agent Agreement  Committee to discuss all matters related to the Project such as;  Implementation schedule  Determination and/or modification of the Components  Modification of the Project  Others related to Projects, etc.
  • 4. JICA PV System Introduction Project PROJECT SCHEDULE (Updated: October 13, 2011)  Decided to purchase 20kW additional capacity by remaining budget of M¥20  20kW at President Office, 160kW at COM-FSM 2010 2011 2012 2013 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 Agent Agreement Tender (Preparation) Equipment Production (Production) Transportation (Civil Work) Installation (Equipment) Commissioning /Completion (1.0 Mos) (1.25 Mos) (0.75 Mos) (1.0 Mos) Training
  • 5. JICA PV System Introduction Project AGREEMENT PROCEDURES (Preparatory Survey) Dec. 8, 2009 Exchange of Notes (E/N) within 7 days Feb. 1, 2010 Grant Agreement (G/A) after B/A Notification of Opening of the Account and Apr. 28, 2010 Banking Arrangement (B/A) Request for the Payment (NOA, RP) to JICA May. 30, 2010 Congress Approval Jully 8, 2010 530MYen Paid from JICA to FSM Account Nov. 22, 2010 Agent Agreement (A/A) Feb. 14, 2011 Consultant Agreement Crown Agents visiting FSM (2/21 – 2/25) Feb. 25, 2011 1st Committee (Tender: Apr. 5 – May 19, 2011) Aug. 9, 2011 Supplier Contract Procurement/Construction Completion
  • 6. JICA PV System Introduction Project FUNDING PROCEDURES  Open “Account” in a bank in Japan to receive the Grant  “Account” to be opened within 14 days after G/A  Notify JICA of opening of the “Account” within 7days  Funds need to be completely disbursed within 12 months after execution of the Grant  Disbursement Procedures  Agent to make funds transfer request to Bank with;  Detailed estimates of expenses and JICA’s approval on A/A  Bank to notify Authority of the request made by Agent  Bank to make payments to Agent if no opposition from Authority within 10 working days  Agent to make payments to suppliers/service providers using the above advanced funds  Authority to present, thru Agent, a report to JICA on those transactions  Reimbursement/Refund Procedures  When remaining amount is less than 3%, Authority can make reimbursement request to Agent and use it for payments already made by Authority for the Project  Agent to request bank to transfer fund and make reimbursement to Authority  If disbursement is incomplete within 12months, Authority should refund the remaining amount to JICA
  • 7. JICA PV System Introduction Project OBLIGATIONS OF FSM GOVERNMENT  FSM Government should take necessary measures to;  Ensure prompt unloading and customs clearance at ports  Ensure exemption of customs duties, internal taxes and other fiscal levies  Accord project-related persons’ entry into FSM  Ensure proper maintenance and use of the Components  Give due environmental and social considerations  Provide necessary information to JICA upon request  Others referred to in the Article 10 of G/A
  • 8. JICA PV System Introduction Project LAYOUT PLAN (PRESIDENT’S OFFICE)
  • 9. JICA PV System Introduction Project LAYOUT PLAN (COM – FSM)
  • 10. JICA PV System Introduction Project SYSTEM DESIGN (PRESIDENT’S OFFICE) 20 kWp Solar Array on Presidents Office Automatic disconnect unit PUC public grid (PV) kWh meter reductant master controller DC/DC DC//DC DC/AC By-directional kWh meter 110 V / AC President office