SlideShare a Scribd company logo
1 of 2
Rollout Project Services




                                  An introduction to AzteQ Solutions
                                  AzteQ Solutions specialises in the provision of managed field services;
                                  project managing highly proficient IT engineering resource, for the installation of
                                  network cabling, IT hardware such as PCs, printers, servers, software upgrades, as well
                                  as EFTPoS credit card and EPoS terminals with associated ancillaries. Installations are
                                  provided as part of a rollout project or as an ongoing site support service.

                                  Primary Activities
                                  Desktop Services: Rollout projects and incumbent
                                  support (hardware and software installations)
                                  Network Cabling:
                                  Rollout projects and incumbent support
                                  Broadband connectivity:
                                  Rollout projects, network cabling,
                                  headend and hardware installations
                                  Laser & Wireless Bridge Installations:
                                  Remote building connectivity

                                  Installation Services
                                  AzteQ operates a formulated project management
                                  methodology, specifically designed for our working
                                  system. It ensures that projects are effectively risk
                                  analysed, planned, scheduled and controlled. They
                                  are therefore completed on time and within budget.
                                                                                          Quality Assurance
                                  Installation services provided include:
                                                                                          AzteQ Solutions is an ISO accredited company, and
                                  • MADC/IMAC services
                                                                                          operates to the requirements of BS EN ISO
                                  • Network Cabling
                                                                                          9001:2000. The AzteQ Solutions’ Quality System
                                  • Terminal (including EPoS and EFTPoS) installations    has been documented using Ten Performance
                                                                                          Manager, which is a business modeling program.
                                  • PC & Server implementation & deployment
                                                                                          This enables a fully integrated electronic system,
                                  • Software & Hardware implementation & upgrade          accessed through the Company network. The
                                                                                          following are documented:
                                  • Hardware installation and maintenance services
                                    including digital signage, LCD/plasma screens,        • Company Processes Diagrams
                                    kiosks, interactive whiteboards, RFID, ATMs etc.
                                                                                          • Forms
                                  • Printer installs, incorporating configuration
                                                                                          • Responsibilities
                                    and assignation
                                                                                          • Strategy
                                  • Remote building connectivity – wireless & laser
                                    technology                                            • Objectives
                                  • Wireless LAN                                          • Initiatives
                                  • CCTV over IP                                          • Key Performance Indicators
                                  • VoIP
                                                                                          Target Metrics Management
                                  • Site surveys
                                                                                          Target Metrics are achieved through the
                                  • Asset recording                                       management control of the operational process.
                                                                                          This includes activities such as scheduling of
                                  For all services, we can provide a Communication
                                                                                          engineers, site visits, constant liaison between
                                  Program, which can include undertaking telephone
                                                                                          engineers and internal coordinators (from
                                  site surveys and to book engineer visits with users
                                                                                          confirmation of receipt of daily activities, through to
                                  to effect the service provision and to meet specified
                                                                                          confirmation of call and call closure). Target Metrics
                                  schedules. Additional telephone services can be
                                                                                          are monitored utilising our scheduling process.
                                  provided, if required.



Copyright ©Azteq solutions 2008
Engineer Vetting                                   Engineers on Site                                  Co-ordination & AzteQ Job
                                                                                                      Management System; AJaMS
Suitable engineers are assessed utilising a        Engineers are regarded as brand ambassadors
skills matrix (as part of our quality assurance    and consider this in all actions undertaken.       AzteQ utilises a fully integrated real-time web
procedures) and project overview description,                                                         based management system (AJaMS), which is
                                                   They are expected to arrive on site in a timely
to ensure full field engineering competence.                                                          visible to customers and staff via a secure
                                                   fashion. Any delays on route result in a phone
Furthermore, engineers utilised by AzteQ have                                                         password. Once installation advice has been
                                                   call to the co-ordinator, with an explanation
their references verified and may be CRB, HM                                                          sent to AzteQ, the jobs are uploaded on the
                                                   and e.t.a. As a matter of course, all engineers
Treasury and credit checked using online                                                              system and the engineers allocated. The jobs
                                                   are contacted prior to site attendance.
disclosure services.                                                                                  are then visible to the engineers by viewing their
                                                   Engineers are smartly dressed to correctly
                                                                                                      own web portal, prior to installation activities.
Management & Admin Support                         represent our customer’s business.
                                                                                                      The engineers organise their own routes, and
                                                   All engineers are expected to liaise with the
We provide all necessary staff, including a
                                                                                                      close down each job in real time via a phone
                                                   end client in a friendly, helpful and good-
contract manager for one point of contact for
                                                                                                      call; this information is then added to the web
                                                   humoured manner.
the customer, administration staff for user
                                                                                                      as it happens giving our customers a real time
communication and engineer co-ordination,
                                                   All referral calls from site are made via the      job closure system.
activity closure and engineer support.
                                                   engineer’s mobile.
                                                                                                      End of day/end of week report can be supplied
Furthermore, if required, we can link in with
                                                                                                      according to customer requirements. Further
the customer’s software to acquire activity
                                                                                                      customised activities, including KPIs can be
information, in order to disseminate activities
                                                                                                      incorporated accordingly.
to the field.




Typical Projects
Server installations                               Terminal Installations                             Broadband Terminal Installations
AzteQ has successfully completed 3 distinct        AzteQ has completed a complex project which        Assistance to customer with head end
but linked projects, managing in excess of 30      included the provision of a project                building & testing. Installation of equipment
engineers at approximately 350 sites across        management/co-ordination             function,     into IDF locations, installation of Ethernet
the UK, in order to carry out site surveys,        including administering the logistics              IRM’s, placement and connection of customer
deployment and server racking installations.       management, concerning the de-installation         terminal, patching of customer network and
                                                   and installation of terminals at approximately     testing of signal tone. Where necessary,
The survey requirements included site
                                                   2000 specified end user sites.                     including network cabling.
attendance in order to conduct surveys in the
Comms rooms, with a view to installing new         The project also involved earth loop
                                                                                                      Front & Back Office Installations
servers within. Also included was the logistical   impedance testing and on-site terminal
                                                                                                      Approximately 30 lead engineers were utilised
handling, including the collection of              training for the end users, at installation. The
                                                                                                      UK wide, visiting over 300 sites for a major
equipment from FSL for delivery to site.           rollout was completed over a nine week
                                                                                                      retail chain, to install PCs and Servers during
Thereafter, the engineering teams were then        period, on time.
                                                                                                      OOH. Activities included on site responsibility
responsible for cabling, patching, racking &
                                                   Printer Installations                              to ensure additional engineering resource
software builds. All packaging etc was
                                                                                                      installed tills (up to 23 in stores) and
removed & returned to FSL for disposal. All        AzteQ has also completed an installation
                                                                                                      thereafter providing connectivity to the server,
activities were conducted to the customer’s        project, requiring the management/co-
                                                                                                      according to prescribed procedures.
exact standards and documentation.                 ordination function, including administering
                                                   the logistics management, for the installation
Patch installations                                                                                   For more information about this, or any of our
                                                   of printers, at approximately 280 sites across
                                                                                                      other packages or services please contact us.
                                                   the UK. The project also involved procurement
To aid deployment tracking, engineers
                                                   of all materials for data and power cabling
labelled each successfully upgraded
                                                   requirements and help-desk liaison during
workstation and identified those where
                                                   configuration and on-site testing.
problems were experienced that prevented
successful completion. Each workstation
                                                   Terminal installations
identification number was then entered onto
an asset log, which was faxed to the co-           Site surveys over 80 sites across the country.
ordination team at the end of each shift.          Site installation including cabinet, data               call   01442 244444
Engineers then acted as a ‘floorwalkers’ at        cabling and power installation. Hardware and
                                                                                                           email info@azteqsolutions.com
each site on the day following deployment.         terminal installations, including hub, router
                                                                                                           visit www.azteqsolutions.com
The local business contacts were requested to      and power box. Project includes provision of a
maintain an awareness of any problems              project management/co-ordination function,
experienced whilst the floorwalkers were           including administering the logistics
present, to ensure as many issues as possible      management. The project also involved
were resolved without the need for re-visiting     procurement of all materials for data and
the site. The floorwalkers reported all            power cabling requirements and customer
problems and actions taken to the customer’s       liaison during configuration and on-site
overall co-ordinator.                              testing.




Charleston House 13 High Street Old Hemel Hempstead Hertfordshire HP1 3AA t: +44 (0)1442 244444 f: +44 (0)1442 244443 www.azteqsolutions.com

More Related Content

Viewers also liked

Csodaszepbarlangokceriel
CsodaszepbarlangokcerielCsodaszepbarlangokceriel
Csodaszepbarlangokcerielzsoltslideshare
 
Magyar AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRja
Magyar  AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRjaMagyar  AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRja
Magyar AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRjazsoltslideshare
 
A recipe for meditation
A recipe for meditationA recipe for meditation
A recipe for meditationVishy Poosala
 
Πρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής Μάθησης
Πρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής ΜάθησηςΠρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής Μάθησης
Πρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής ΜάθησηςChrysanthi Tziortzioti
 
Silliman Divinity School: Introductions and Culture Shifts
Silliman Divinity School: Introductions and Culture ShiftsSilliman Divinity School: Introductions and Culture Shifts
Silliman Divinity School: Introductions and Culture ShiftsBruce Reyes-Chow
 
Remember Names Webinar
Remember Names WebinarRemember Names Webinar
Remember Names Webinarpkearley
 
Szombathelyi SzéKesegyháZ
Szombathelyi SzéKesegyháZSzombathelyi SzéKesegyháZ
Szombathelyi SzéKesegyháZzsoltslideshare
 

Viewers also liked (18)

National Geographic
National GeographicNational Geographic
National Geographic
 
Holt Tenger
Holt TengerHolt Tenger
Holt Tenger
 
Fascinio Olhares Szemek
Fascinio Olhares SzemekFascinio Olhares Szemek
Fascinio Olhares Szemek
 
Argomentazioni draft V conto energia
Argomentazioni draft V conto energiaArgomentazioni draft V conto energia
Argomentazioni draft V conto energia
 
Dark side of the moon
Dark side of the moonDark side of the moon
Dark side of the moon
 
Espanha
EspanhaEspanha
Espanha
 
Projektarbetet 100p
Projektarbetet 100pProjektarbetet 100p
Projektarbetet 100p
 
Csodaszepbarlangokceriel
CsodaszepbarlangokcerielCsodaszepbarlangokceriel
Csodaszepbarlangokceriel
 
Klnlegesvrosok
KlnlegesvrosokKlnlegesvrosok
Klnlegesvrosok
 
Magyar AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRja
Magyar  AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRjaMagyar  AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRja
Magyar AutóSnak Nincs PáRja Magyar AutóSnak Nincsen PáRja
 
PechaKucha Slides on Race
PechaKucha Slides on RacePechaKucha Slides on Race
PechaKucha Slides on Race
 
A recipe for meditation
A recipe for meditationA recipe for meditation
A recipe for meditation
 
I skolan gör vi riktiga saker gbg
I skolan gör vi riktiga saker gbgI skolan gör vi riktiga saker gbg
I skolan gör vi riktiga saker gbg
 
Πρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής Μάθησης
Πρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής ΜάθησηςΠρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής Μάθησης
Πρακτική Εκπαίδευση Εκπαιδευτικών Πληροφορικής: Μια προσέγγιση Μικτής Μάθησης
 
Korsika
KorsikaKorsika
Korsika
 
Silliman Divinity School: Introductions and Culture Shifts
Silliman Divinity School: Introductions and Culture ShiftsSilliman Divinity School: Introductions and Culture Shifts
Silliman Divinity School: Introductions and Culture Shifts
 
Remember Names Webinar
Remember Names WebinarRemember Names Webinar
Remember Names Webinar
 
Szombathelyi SzéKesegyháZ
Szombathelyi SzéKesegyháZSzombathelyi SzéKesegyháZ
Szombathelyi SzéKesegyháZ
 

More from gcsmith007

AzteQ Rail Installation and Maintenance Services
AzteQ Rail Installation and Maintenance ServicesAzteQ Rail Installation and Maintenance Services
AzteQ Rail Installation and Maintenance Servicesgcsmith007
 
AzteQ Installation Services
AzteQ Installation ServicesAzteQ Installation Services
AzteQ Installation Servicesgcsmith007
 
AzteQ Whiteboards
AzteQ WhiteboardsAzteQ Whiteboards
AzteQ Whiteboardsgcsmith007
 
AzteQ Rail Services
AzteQ Rail ServicesAzteQ Rail Services
AzteQ Rail Servicesgcsmith007
 
AzteQ Laser Links
AzteQ Laser LinksAzteQ Laser Links
AzteQ Laser Linksgcsmith007
 
AzteQ Has Moved
AzteQ Has MovedAzteQ Has Moved
AzteQ Has Movedgcsmith007
 

More from gcsmith007 (6)

AzteQ Rail Installation and Maintenance Services
AzteQ Rail Installation and Maintenance ServicesAzteQ Rail Installation and Maintenance Services
AzteQ Rail Installation and Maintenance Services
 
AzteQ Installation Services
AzteQ Installation ServicesAzteQ Installation Services
AzteQ Installation Services
 
AzteQ Whiteboards
AzteQ WhiteboardsAzteQ Whiteboards
AzteQ Whiteboards
 
AzteQ Rail Services
AzteQ Rail ServicesAzteQ Rail Services
AzteQ Rail Services
 
AzteQ Laser Links
AzteQ Laser LinksAzteQ Laser Links
AzteQ Laser Links
 
AzteQ Has Moved
AzteQ Has MovedAzteQ Has Moved
AzteQ Has Moved
 

Recently uploaded

Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 

Recently uploaded (20)

Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 

AzteQ Solutions Rollout Project Services

  • 1. Rollout Project Services An introduction to AzteQ Solutions AzteQ Solutions specialises in the provision of managed field services; project managing highly proficient IT engineering resource, for the installation of network cabling, IT hardware such as PCs, printers, servers, software upgrades, as well as EFTPoS credit card and EPoS terminals with associated ancillaries. Installations are provided as part of a rollout project or as an ongoing site support service. Primary Activities Desktop Services: Rollout projects and incumbent support (hardware and software installations) Network Cabling: Rollout projects and incumbent support Broadband connectivity: Rollout projects, network cabling, headend and hardware installations Laser & Wireless Bridge Installations: Remote building connectivity Installation Services AzteQ operates a formulated project management methodology, specifically designed for our working system. It ensures that projects are effectively risk analysed, planned, scheduled and controlled. They are therefore completed on time and within budget. Quality Assurance Installation services provided include: AzteQ Solutions is an ISO accredited company, and • MADC/IMAC services operates to the requirements of BS EN ISO • Network Cabling 9001:2000. The AzteQ Solutions’ Quality System • Terminal (including EPoS and EFTPoS) installations has been documented using Ten Performance Manager, which is a business modeling program. • PC & Server implementation & deployment This enables a fully integrated electronic system, • Software & Hardware implementation & upgrade accessed through the Company network. The following are documented: • Hardware installation and maintenance services including digital signage, LCD/plasma screens, • Company Processes Diagrams kiosks, interactive whiteboards, RFID, ATMs etc. • Forms • Printer installs, incorporating configuration • Responsibilities and assignation • Strategy • Remote building connectivity – wireless & laser technology • Objectives • Wireless LAN • Initiatives • CCTV over IP • Key Performance Indicators • VoIP Target Metrics Management • Site surveys Target Metrics are achieved through the • Asset recording management control of the operational process. This includes activities such as scheduling of For all services, we can provide a Communication engineers, site visits, constant liaison between Program, which can include undertaking telephone engineers and internal coordinators (from site surveys and to book engineer visits with users confirmation of receipt of daily activities, through to to effect the service provision and to meet specified confirmation of call and call closure). Target Metrics schedules. Additional telephone services can be are monitored utilising our scheduling process. provided, if required. Copyright ©Azteq solutions 2008
  • 2. Engineer Vetting Engineers on Site Co-ordination & AzteQ Job Management System; AJaMS Suitable engineers are assessed utilising a Engineers are regarded as brand ambassadors skills matrix (as part of our quality assurance and consider this in all actions undertaken. AzteQ utilises a fully integrated real-time web procedures) and project overview description, based management system (AJaMS), which is They are expected to arrive on site in a timely to ensure full field engineering competence. visible to customers and staff via a secure fashion. Any delays on route result in a phone Furthermore, engineers utilised by AzteQ have password. Once installation advice has been call to the co-ordinator, with an explanation their references verified and may be CRB, HM sent to AzteQ, the jobs are uploaded on the and e.t.a. As a matter of course, all engineers Treasury and credit checked using online system and the engineers allocated. The jobs are contacted prior to site attendance. disclosure services. are then visible to the engineers by viewing their Engineers are smartly dressed to correctly own web portal, prior to installation activities. Management & Admin Support represent our customer’s business. The engineers organise their own routes, and All engineers are expected to liaise with the We provide all necessary staff, including a close down each job in real time via a phone end client in a friendly, helpful and good- contract manager for one point of contact for call; this information is then added to the web humoured manner. the customer, administration staff for user as it happens giving our customers a real time communication and engineer co-ordination, All referral calls from site are made via the job closure system. activity closure and engineer support. engineer’s mobile. End of day/end of week report can be supplied Furthermore, if required, we can link in with according to customer requirements. Further the customer’s software to acquire activity customised activities, including KPIs can be information, in order to disseminate activities incorporated accordingly. to the field. Typical Projects Server installations Terminal Installations Broadband Terminal Installations AzteQ has successfully completed 3 distinct AzteQ has completed a complex project which Assistance to customer with head end but linked projects, managing in excess of 30 included the provision of a project building & testing. Installation of equipment engineers at approximately 350 sites across management/co-ordination function, into IDF locations, installation of Ethernet the UK, in order to carry out site surveys, including administering the logistics IRM’s, placement and connection of customer deployment and server racking installations. management, concerning the de-installation terminal, patching of customer network and and installation of terminals at approximately testing of signal tone. Where necessary, The survey requirements included site 2000 specified end user sites. including network cabling. attendance in order to conduct surveys in the Comms rooms, with a view to installing new The project also involved earth loop Front & Back Office Installations servers within. Also included was the logistical impedance testing and on-site terminal Approximately 30 lead engineers were utilised handling, including the collection of training for the end users, at installation. The UK wide, visiting over 300 sites for a major equipment from FSL for delivery to site. rollout was completed over a nine week retail chain, to install PCs and Servers during Thereafter, the engineering teams were then period, on time. OOH. Activities included on site responsibility responsible for cabling, patching, racking & Printer Installations to ensure additional engineering resource software builds. All packaging etc was installed tills (up to 23 in stores) and removed & returned to FSL for disposal. All AzteQ has also completed an installation thereafter providing connectivity to the server, activities were conducted to the customer’s project, requiring the management/co- according to prescribed procedures. exact standards and documentation. ordination function, including administering the logistics management, for the installation Patch installations For more information about this, or any of our of printers, at approximately 280 sites across other packages or services please contact us. the UK. The project also involved procurement To aid deployment tracking, engineers of all materials for data and power cabling labelled each successfully upgraded requirements and help-desk liaison during workstation and identified those where configuration and on-site testing. problems were experienced that prevented successful completion. Each workstation Terminal installations identification number was then entered onto an asset log, which was faxed to the co- Site surveys over 80 sites across the country. ordination team at the end of each shift. Site installation including cabinet, data call 01442 244444 Engineers then acted as a ‘floorwalkers’ at cabling and power installation. Hardware and email info@azteqsolutions.com each site on the day following deployment. terminal installations, including hub, router visit www.azteqsolutions.com The local business contacts were requested to and power box. Project includes provision of a maintain an awareness of any problems project management/co-ordination function, experienced whilst the floorwalkers were including administering the logistics present, to ensure as many issues as possible management. The project also involved were resolved without the need for re-visiting procurement of all materials for data and the site. The floorwalkers reported all power cabling requirements and customer problems and actions taken to the customer’s liaison during configuration and on-site overall co-ordinator. testing. Charleston House 13 High Street Old Hemel Hempstead Hertfordshire HP1 3AA t: +44 (0)1442 244444 f: +44 (0)1442 244443 www.azteqsolutions.com