1. Scope of Work

Scope of work comprises of:

   1.1. INSPECTIONS AND MEASUREMENTS AT SITE

            LEAP Standard on Stator Windings

            Consists of the following measurements and analysis

            1.1 Polarization De-Polarization Current Analysis (PDCA)
            1.2 Measurement of Capacitance and Tandelta
            1.3 Recording of Partial Discharges & analysis
            1.4 Non-Linear Behavior Analysis
            1.5 Winding Resistance Measurements
            1.6 Life Expectancy Analysis



    1.2 ANALYSIS AND RECOMMENDATIONS

    The submission of data consists of:
    (a) Interpretation and reporting of tests results and analysis, which will include defect
        identification, its severity, possible causes and effects
    (b) ABB will provide recommendations based on the study of measurements and
        analysis for extending the life and/or improving the reliability and availability of the
        stator windings tested, and will consist of:
        • Recommendations for maintenance, including the development of a
            maintenance and inspection plan, which could also include major
            repair/modification/part replacements as required, in order to extend the
            estimated life of the stator winding insulation.
        •    The life expectancy analysis of the stator winding insulation based on the
             existing  operating   conditions,  and     after  suggested    maintenance
             recommendations.

Más contenido relacionado

Similar a ABB LEAP Scope Of Work (Level 2 Or Standard)

Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
Engineers Australia
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
Britt Bettell
 

Similar a ABB LEAP Scope Of Work (Level 2 Or Standard) (19)

OCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADCOCS - Rig Inspection Workshop - accredited by IADC
OCS - Rig Inspection Workshop - accredited by IADC
 
Ocs rig inspection workshop - july schedule
Ocs   rig inspection workshop - july scheduleOcs   rig inspection workshop - july schedule
Ocs rig inspection workshop - july schedule
 
"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”"Rig Inspection Workshop - accredited by OCS Training Institute”
"Rig Inspection Workshop - accredited by OCS Training Institute”
 
Structural Welding.pptx
Structural Welding.pptxStructural Welding.pptx
Structural Welding.pptx
 
asmecodesstandards.ppt
asmecodesstandards.pptasmecodesstandards.ppt
asmecodesstandards.ppt
 
ASME CODES & STANDARDS - department of metallurgy.ppt
ASME CODES & STANDARDS - department of metallurgy.pptASME CODES & STANDARDS - department of metallurgy.ppt
ASME CODES & STANDARDS - department of metallurgy.ppt
 
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
ASME Code and Quality assurance for construction of nuclear facilitiesASME Co...
 
How to Study for ASQ Calibration Technician (CCT) Certification Exam.pdf
How to Study for ASQ Calibration Technician (CCT) Certification Exam.pdfHow to Study for ASQ Calibration Technician (CCT) Certification Exam.pdf
How to Study for ASQ Calibration Technician (CCT) Certification Exam.pdf
 
Anab Guidance Scopes Accreditation
Anab Guidance Scopes AccreditationAnab Guidance Scopes Accreditation
Anab Guidance Scopes Accreditation
 
Asmecodesstandards
AsmecodesstandardsAsmecodesstandards
Asmecodesstandards
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
In-Place Pipe Support Load Testing and Hanger Surveys_Part of a Best in Class...
 
Improving Rotating Equipment Reliability and Machinery Health
Improving Rotating Equipment Reliability and Machinery HealthImproving Rotating Equipment Reliability and Machinery Health
Improving Rotating Equipment Reliability and Machinery Health
 
CAC Meeting 18 September 2013
CAC Meeting 18 September 2013CAC Meeting 18 September 2013
CAC Meeting 18 September 2013
 
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service PerformanceTESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
TESCO Recommendations for New ANSI C12-1 Standards for In-Service Performance
 
boilers maintenance .pdf
boilers maintenance .pdfboilers maintenance .pdf
boilers maintenance .pdf
 
"IADC Accredited Rig Inspection Workshop"
"IADC Accredited Rig Inspection Workshop""IADC Accredited Rig Inspection Workshop"
"IADC Accredited Rig Inspection Workshop"
 
20080610 03 - SQuaRE, évolution de la norme iso9126
20080610 03 - SQuaRE, évolution de la norme iso912620080610 03 - SQuaRE, évolution de la norme iso9126
20080610 03 - SQuaRE, évolution de la norme iso9126
 
Nace standards.pdf
Nace standards.pdfNace standards.pdf
Nace standards.pdf
 

ABB LEAP Scope Of Work (Level 2 Or Standard)

  • 1. 1. Scope of Work Scope of work comprises of: 1.1. INSPECTIONS AND MEASUREMENTS AT SITE LEAP Standard on Stator Windings Consists of the following measurements and analysis 1.1 Polarization De-Polarization Current Analysis (PDCA) 1.2 Measurement of Capacitance and Tandelta 1.3 Recording of Partial Discharges & analysis 1.4 Non-Linear Behavior Analysis 1.5 Winding Resistance Measurements 1.6 Life Expectancy Analysis 1.2 ANALYSIS AND RECOMMENDATIONS The submission of data consists of: (a) Interpretation and reporting of tests results and analysis, which will include defect identification, its severity, possible causes and effects (b) ABB will provide recommendations based on the study of measurements and analysis for extending the life and/or improving the reliability and availability of the stator windings tested, and will consist of: • Recommendations for maintenance, including the development of a maintenance and inspection plan, which could also include major repair/modification/part replacements as required, in order to extend the estimated life of the stator winding insulation. • The life expectancy analysis of the stator winding insulation based on the existing operating conditions, and after suggested maintenance recommendations.