SlideShare a Scribd company logo
1 of 22
GUIDELINES FOR PREPARATION OF

                  PERSPECTIVE PLAN

            NATIONAL FOOD FOR WORK

                  PROGRAMME (NFFWP)


        TRAINING OF TRAINERS
        Dr. N. Sai Bhaskar Reddy
  AMR-APARD, RAJENDRANAGAR, HYDERABAD
Objective - comprehensive
    perspective plan of five years
   That would enable develop all the Panchayats of
    the 150 most backward districts during the 5
    years period of 2005-2010 in such a way that
    there is visible impact on the major problems of
    each Panchayat and a sound base is created for
    self sustaining economy to remove poverty
    and bring these Districts at least at par with
    other developed areas of the state and the
    country.
   It will facilitate optimizing all resources available
    under all the developmental programmes operational
    at the panchayat level
   To provide best possible and meaningful option for
    convergence/dovetailing of all such
    programmes to derive maximum benefit in favour
    of the rural poor especially with regard to
    generation of employment opportunities both in
    terms of wage and self employment through creation
    of need based optimum infrastructure at the
    panchayat level in the short term and develop self
    sustaining robust panchayat economy In the
    long run.
Preparing the Perspective
    Plan
   Survey each village and panchayat in the district to
    collect data on

        A. Existing economy infrastructure needs and to

        B. Assess feasibility of projects to be included in
          the plan

   Rough cost estimate for project/works suggested
    must be given based on acceptable parameters and they
    may be indicated in the plan document.
The people involved in perspective
plan preparation
   Consolidation and preparation of final document
    – AMR-APARD
   Training of trainers at District level (~40
    officers) – AMR-APARD
   TOTs – Senior Level Officers / special officers in
    the District
   Training of Mandal level resource persons –
    ToTs
   Perspective plan preparation of each village with
    the participation of primary stakeholders and
    facilitation by Mandal level resource persons.
PERSPECTIVE PLAN OF THE DISTRICT
The perspective plan will be a comprehensive document with
several chapters

CHAPTER-1
The  information for the district as a whole on -
demography - SC/ST, women and children population with
work force divided into employed, semi-employed,
unemployed, occupational distribution,
month wise rainfall distribution,
depth of water table, depletion rate,
gender-wise illiteracy,
main crops, number of crops per year, per hectare
productivity, type of soil, agriculture productivity per
worker,
distribution of average land holding, average size of tilling,
distribution of commercial/Regional Rural Bank, availability
of bank branches per sq. km,
potential occupation, service and industry.
CHAPTER-II
Scheme-wise    availability of resources of the district as
a whole in respect of all employment and development
oriented Programme such as
Swarnajayanti Gram Swarozgar Yojana (SGSY),
Rashtriya Sam Vikas Yojana (RSVY),
Watershed development programmes (such as IWDP,
DPAP, DDP)
PMRY (its share for rural segment),
Rural Employment Generation Programme of KVIC,
Sampoorna Grameena Rozgar Yojana (SGRY)
MPLAD, MLALAD
NFFWP and
all other Centrally and state sponsored programmes
   Block-wise breakup of
    distribution/availability of resources
    under the above programmes along with
    the present status of number of
    persons unemployed/ semi-
    employed may be given.
Location/area specific kinds/types of infrastructure, which are
   expected in the Panchayat.
(i) One panchayat Ghar
(ii) One primary/secondary school building sufficient for the number of
   children studying.
(iii) One low cost storage go down for storing food grains
(iv) Tube/open wells (whichever is relevant in that area) for drinking /
   irrigation purpose.
(v) Internal roads providing connectivity with main roads
(vi) Drainage / nallah to drain out extra water in the water logged/flood
   prone areas
(vii) Dairy/Veterinary development infrastructure.
(viii) Erection of permanent /pucca embankment for flood protection
(IX) Small check dams, water conservation activities like digging of
   ponds/percolation tanks and de-silting of ponds
(x) Strengthening of marketing infrastructure at local Panchayat haats
   / market such as construction of permanent sheds and low cost
   community storage godowns for safe storage of goods etc.
(xi) Individual/community horticulture/social forestry development.
(xii) Any other facility considered essential on the local needs.


* - The above list of infrastructure is only illustrative and not
   exhaustive. It is possible that some of the above infrastructure may
   not be suitable for a particular state / district / panchayat but may
   be relevant in other. As such, the above list may be modified and
   prepared taking into account local needs and aspirations.
CHAPTER-III
   Details on Panchayat –wise (i) list of infrastructure already
    existing and (ii). List of infrastructure that are missing out
    of the list given at Section-B, Chapter –11 (iii)
    requirement of resources for creation of missing
    infrastructure along with Programme-wise inflow/share of
    the Panchayat out of all development programmes listed
    at Section-A of chapter-11 and (iv) estimated employment
    generation in terms of both self and wage employment
    while creating missing infrastructure .

   The above information is to be given year-wise.
   While assessing resource inflow from all sources, 15% for
    maintenance of assets already created /being created be
    shown separately and as such only 85% of the total inflow may
    be taken in to account for showing resource inflow for creation of
    assets.
   The above Panchayat–wise list of missing infrastructure
    have to be prepared in a manner that each missing infrastructure
    will give a clear cut idea under which Programme it is proposed
    with estimated cost and the number of expected beneficiaries to
    be covered under self and wage employment.
   Incase of wage employment, number of man-day’s generation is to
    be divided by 100 to arrive at number of persons to be employed.

   All activities /works shown under the existing Programme have to be
    implemented    in   accordance     with   their   respective   Programme
    guidelines. If any activity which is permissible under more than one
    Programme, it may be shown under that Programme which has
    larger share for that Panchayat.

   It should, however, be ensured that one activity is shown under one
    Programme only with the stipulation that is completed during one
    financial year it self. Spillover to the next year may be indicated in
    exceptional cases where inflow of resources is limited during the
    year.

   Estimated cost may be shown increased 5 to 10% every year while
    showing year-wise activities to be taken up.
   Programme      PMRY
   SGRY           REGP
   SGSY           MPLAD
   RSVY           MLALAD
   IWDP
                   Add more
   DPAP            scheme of
   DDP             Central/state if
                    any
Missing Infrastructure with Priority(Shelf of
  Projects)(for example)
   Check dam to store water
   Drainage/ Nallah to drain extra water in water
    logged/flood affected areas
   Digging of pond
   Land Development of Common Wasteland area
   Percolation Wells
   Storage Godown
   and so on.
   Employment Generation
   Under Self Employment Programmes (NO. of
    expected beneficiaries)
   Wage Employment Programmes
   a. Number of expected man days to be generated (in
    numbers)
   b. Number of expected beneficiaries getting employment (
    (a) above/100)
   Area development programme
   a) Number of expected beneficiaries (in Numbers)
    b) (i) Number of expected mandays generated (in
    numbers)
    b) (ii) Number expected mandays converted in to number
    of persons( (b) (i) above/100)
CHAPTER-IV
   Block-wise exercise by consolidating

    panchayat–wise information under respective

    Block (Mandal) may be take-up.

   Summary for each Block separately to indicate

    missing
       Infrastructure wise details giving

       Year wise cost estimates and

       Expected employment generation may be given
Missing Infrastructure
   Drainage (in waterlogged/flood affected areas) (in KM)
   Low cost community food grains storage godowns
   High school Building
    Strengthening/construction of permanent river
    embankment (In KM)
   Check dams
   Digging of ponds/desilting
   Horticulture/Social forestry
        (a)Individual
        (b)Community
   Dairy Development
   (and so on)
CHAPTER-V
   Annual Action plans for the NFFWP for
    the next five years based on the
    perspective plan.
   Segregate Panchayat-wise activities
    /works those indicated against the
    NFFWP quota.
   Panchayat-wise and year-wise
    works/activities to be taken up under
    the NFFWP with clear cut prioritization
    will have to be given.
Name of activities in priority order (for
    example)
   Checkdams
   Digging of ponds/desilting
   Drainage (in waterlogged/flood affected areas)
   Development & Bunding of degraded lands
   Other water harvesting structures (mention
    type of structure)
   (and so on)
CHAPTER-VI

   The success of the program will be
    quantified based on the following type
    of parameters on pre (as on 2005) and
    post (as on 2010) perspective plan
    assessment.
Item (for Example)               Status at the    Estimated      Total
                                 time        of   status after   Increase/Decr
                                 preparation of   the            ease
                                 perspective      completion
                                 plan             of the five
Irrigated areas (In Ha.)                          year   plan
                                                  period
Water table (In Feet)                             (2010)

Agricultural     output     of
differenft crops (In per Ha)

Diversification of   area   to
cash crops (In Ha)

Nutrition level

Rural urban migration (In
persons)
Rural poverty ratio (In %
age)
Village   connectivity      to
Towns (in %age)

More Related Content

What's hot

Kotla mubarakpur (at a glance)
Kotla mubarakpur (at a glance)Kotla mubarakpur (at a glance)
Kotla mubarakpur (at a glance)Achint Miglani
 
Chandigarh city case study
Chandigarh city case studyChandigarh city case study
Chandigarh city case studySakshiGadakh
 
Review of Development Plans/ Master Plans of selected cities of India.
Review of Development Plans/ Master Plans of selected cities of India.Review of Development Plans/ Master Plans of selected cities of India.
Review of Development Plans/ Master Plans of selected cities of India.KARTHICK KRISHNA
 
Trends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
Trends of Urbanisation in Smart City of Faridabad: A Geographical PerspectiveTrends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
Trends of Urbanisation in Smart City of Faridabad: A Geographical PerspectiveApoorva Mathur
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)padamatikona swapnika
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning SandeEp VeRma
 
Concept of town planning development
Concept of town planning developmentConcept of town planning development
Concept of town planning developmentAlin Amalin
 
Greek town planning - A Case of Miletus
Greek town planning - A Case of MiletusGreek town planning - A Case of Miletus
Greek town planning - A Case of MiletusDhanya Pravin
 
RE developement of Bhindhi baazar
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazarYash Agrawal
 
Ancient town classifications
Ancient town classificationsAncient town classifications
Ancient town classificationsHareem Sheikh
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUttipec Dda
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master PlanSahil Kaundal
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) shrikrishna kesharwani
 

What's hot (20)

Kotla mubarakpur (at a glance)
Kotla mubarakpur (at a glance)Kotla mubarakpur (at a glance)
Kotla mubarakpur (at a glance)
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
 
Chandigarh city case study
Chandigarh city case studyChandigarh city case study
Chandigarh city case study
 
Ahmedabad cmp
Ahmedabad cmpAhmedabad cmp
Ahmedabad cmp
 
Review of Development Plans/ Master Plans of selected cities of India.
Review of Development Plans/ Master Plans of selected cities of India.Review of Development Plans/ Master Plans of selected cities of India.
Review of Development Plans/ Master Plans of selected cities of India.
 
Trends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
Trends of Urbanisation in Smart City of Faridabad: A Geographical PerspectiveTrends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
Trends of Urbanisation in Smart City of Faridabad: A Geographical Perspective
 
AMRUT MoUD
AMRUT MoUDAMRUT MoUD
AMRUT MoUD
 
Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)Aim, objective and methodology of transit oriented development (TOD)
Aim, objective and methodology of transit oriented development (TOD)
 
Chandigarh City Planning
Chandigarh City Planning Chandigarh City Planning
Chandigarh City Planning
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Concept of town planning development
Concept of town planning developmentConcept of town planning development
Concept of town planning development
 
URDPFI - 2016
URDPFI - 2016URDPFI - 2016
URDPFI - 2016
 
Patrick geddes theory
Patrick geddes theoryPatrick geddes theory
Patrick geddes theory
 
Greek town planning - A Case of Miletus
Greek town planning - A Case of MiletusGreek town planning - A Case of Miletus
Greek town planning - A Case of Miletus
 
Hriday
HridayHriday
Hriday
 
RE developement of Bhindhi baazar
RE developement of Bhindhi baazarRE developement of Bhindhi baazar
RE developement of Bhindhi baazar
 
Ancient town classifications
Ancient town classificationsAncient town classifications
Ancient town classifications
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master Plan
 
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals) UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
UJJAIN DEVELOPMENT PLAN (Transportation Proposals)
 

Viewers also liked

Education mangement powerpoint
Education mangement powerpointEducation mangement powerpoint
Education mangement powerpointEdward Phiri
 
role of voluntary organisation
role of voluntary organisationrole of voluntary organisation
role of voluntary organisationEagathagi Gandiban
 
Iii.1 educational management
Iii.1 educational managementIii.1 educational management
Iii.1 educational managementLyna An Na
 
Approaches to educational planning
Approaches to educational planningApproaches to educational planning
Approaches to educational planningwatsontamil
 
A trivariate causality test among economic growth, government expenditure and...
A trivariate causality test among economic growth, government expenditure and...A trivariate causality test among economic growth, government expenditure and...
A trivariate causality test among economic growth, government expenditure and...Alexander Decker
 
Business, Technology Intelligence
Business, Technology IntelligenceBusiness, Technology Intelligence
Business, Technology IntelligenceAndré Dubreuil
 
Agriculture plan
Agriculture planAgriculture plan
Agriculture planTrung Billy
 
Unit 31 Social Action and Community Media
Unit 31 Social Action and Community MediaUnit 31 Social Action and Community Media
Unit 31 Social Action and Community MediaMissOzzy
 
Rural development planning
Rural development planningRural development planning
Rural development planningM Usama Sehgal
 
Social action and community media - an introduction
Social action and community media - an introductionSocial action and community media - an introduction
Social action and community media - an introductioniain bruce
 
Social Action Theories
Social Action TheoriesSocial Action Theories
Social Action Theoriessmccormac7
 
23. Strategic Planning Outline
23. Strategic Planning Outline23. Strategic Planning Outline
23. Strategic Planning OutlineEarl Stevens
 
Module 6 Perspectives in Strategic Planning
Module 6 Perspectives in Strategic PlanningModule 6 Perspectives in Strategic Planning
Module 6 Perspectives in Strategic PlanningJo Balucanag - Bitonio
 

Viewers also liked (20)

Perspective Planning
Perspective PlanningPerspective Planning
Perspective Planning
 
Educational management planning
Educational management planningEducational management planning
Educational management planning
 
Perspective in Strategic Planning
Perspective in Strategic PlanningPerspective in Strategic Planning
Perspective in Strategic Planning
 
Education mangement powerpoint
Education mangement powerpointEducation mangement powerpoint
Education mangement powerpoint
 
role of voluntary organisation
role of voluntary organisationrole of voluntary organisation
role of voluntary organisation
 
Iii.1 educational management
Iii.1 educational managementIii.1 educational management
Iii.1 educational management
 
Approaches to educational planning
Approaches to educational planningApproaches to educational planning
Approaches to educational planning
 
Planning
PlanningPlanning
Planning
 
A trivariate causality test among economic growth, government expenditure and...
A trivariate causality test among economic growth, government expenditure and...A trivariate causality test among economic growth, government expenditure and...
A trivariate causality test among economic growth, government expenditure and...
 
Agricultural Performance and Food Security in Nepal: Constraints and Challenges
Agricultural Performance and Food Security in Nepal: Constraints and ChallengesAgricultural Performance and Food Security in Nepal: Constraints and Challenges
Agricultural Performance and Food Security in Nepal: Constraints and Challenges
 
Business, Technology Intelligence
Business, Technology IntelligenceBusiness, Technology Intelligence
Business, Technology Intelligence
 
BRM - Dr. TK - Characteristics of a Good Questionnaire
BRM - Dr. TK - Characteristics of a Good QuestionnaireBRM - Dr. TK - Characteristics of a Good Questionnaire
BRM - Dr. TK - Characteristics of a Good Questionnaire
 
Agriculture plan
Agriculture planAgriculture plan
Agriculture plan
 
Unit 31 Social Action and Community Media
Unit 31 Social Action and Community MediaUnit 31 Social Action and Community Media
Unit 31 Social Action and Community Media
 
Internal Rate of Return
Internal Rate of ReturnInternal Rate of Return
Internal Rate of Return
 
Rural development planning
Rural development planningRural development planning
Rural development planning
 
Social action and community media - an introduction
Social action and community media - an introductionSocial action and community media - an introduction
Social action and community media - an introduction
 
Social Action Theories
Social Action TheoriesSocial Action Theories
Social Action Theories
 
23. Strategic Planning Outline
23. Strategic Planning Outline23. Strategic Planning Outline
23. Strategic Planning Outline
 
Module 6 Perspectives in Strategic Planning
Module 6 Perspectives in Strategic PlanningModule 6 Perspectives in Strategic Planning
Module 6 Perspectives in Strategic Planning
 

Similar to Perspective plan preparation 2

Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)malapatansarangani
 
Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910Aubry Fara-on
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WRI Ross Center for Sustainable Cities
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)urbanranchi
 
Agrikulturang pantawid pamilya pilipino tor ppt
Agrikulturang pantawid pamilya pilipino tor pptAgrikulturang pantawid pamilya pilipino tor ppt
Agrikulturang pantawid pamilya pilipino tor pptKaren Mabasa
 
AgWA Definition of a Country Support Tool (CST) - Andy Bullock
AgWA Definition of a Country Support Tool (CST) - Andy Bullock AgWA Definition of a Country Support Tool (CST) - Andy Bullock
AgWA Definition of a Country Support Tool (CST) - Andy Bullock CTA
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)hayat alishah
 
Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee CA Narinder Jit Singh
 
Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH IRC
 
DRR mainstreaming through Decentralized Planning with Panchayati Raj Institution
DRR mainstreaming through Decentralized Planning with Panchayati Raj InstitutionDRR mainstreaming through Decentralized Planning with Panchayati Raj Institution
DRR mainstreaming through Decentralized Planning with Panchayati Raj InstitutionMINTU DEBNATH
 
Session 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina fasoSession 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina fasoIRC
 
City development plan guwahati
City development plan guwahatiCity development plan guwahati
City development plan guwahatiAnupama Krishnan
 
Twelfth five year plan review
Twelfth five year plan reviewTwelfth five year plan review
Twelfth five year plan reviewSushant Karnik
 
Local Planning and Budgeting Linkage
Local Planning and Budgeting LinkageLocal Planning and Budgeting Linkage
Local Planning and Budgeting Linkageyee tandog
 

Similar to Perspective plan preparation 2 (20)

Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)Bu b fy2015 guidelines 0910(1)
Bu b fy2015 guidelines 0910(1)
 
Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910Bu b fy2015 guidelines 0910
Bu b fy2015 guidelines 0910
 
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
WEBINAR: Transforming India's Urban Infrastructure with Project AMRUT (Atal M...
 
Amrut by Gajanand Ram (Town Planner)
Amrut  by Gajanand  Ram (Town Planner)Amrut  by Gajanand  Ram (Town Planner)
Amrut by Gajanand Ram (Town Planner)
 
Agrikulturang pantawid pamilya pilipino tor ppt
Agrikulturang pantawid pamilya pilipino tor pptAgrikulturang pantawid pamilya pilipino tor ppt
Agrikulturang pantawid pamilya pilipino tor ppt
 
2015 bub
2015 bub2015 bub
2015 bub
 
Agriculture Public Expenditure Workshop Module 2
Agriculture Public Expenditure Workshop Module 2Agriculture Public Expenditure Workshop Module 2
Agriculture Public Expenditure Workshop Module 2
 
Perspective plan
Perspective planPerspective plan
Perspective plan
 
AgWA Definition of a Country Support Tool (CST) - Andy Bullock
AgWA Definition of a Country Support Tool (CST) - Andy Bullock AgWA Definition of a Country Support Tool (CST) - Andy Bullock
AgWA Definition of a Country Support Tool (CST) - Andy Bullock
 
Pc i (social sector)
Pc i (social sector)Pc i (social sector)
Pc i (social sector)
 
Water shed.ppt
Water shed.pptWater shed.ppt
Water shed.ppt
 
Pc i social sector
Pc i social sectorPc i social sector
Pc i social sector
 
Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee Mahatma Gandhi National Rural Employment Guarantee
Mahatma Gandhi National Rural Employment Guarantee
 
Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH Overview of enabling environment and implementation of climate resilient WASH
Overview of enabling environment and implementation of climate resilient WASH
 
DRR mainstreaming through Decentralized Planning with Panchayati Raj Institution
DRR mainstreaming through Decentralized Planning with Panchayati Raj InstitutionDRR mainstreaming through Decentralized Planning with Panchayati Raj Institution
DRR mainstreaming through Decentralized Planning with Panchayati Raj Institution
 
Session 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina fasoSession 3B Finance - Toro boro burkina faso
Session 3B Finance - Toro boro burkina faso
 
City development plan guwahati
City development plan guwahatiCity development plan guwahati
City development plan guwahati
 
Twelfth five year plan review
Twelfth five year plan reviewTwelfth five year plan review
Twelfth five year plan review
 
Local Planning and Budgeting Linkage
Local Planning and Budgeting LinkageLocal Planning and Budgeting Linkage
Local Planning and Budgeting Linkage
 
Agriculture Public Expenditure Workshop Module 1
Agriculture Public Expenditure Workshop Module 1Agriculture Public Expenditure Workshop Module 1
Agriculture Public Expenditure Workshop Module 1
 

More from geosaibhaskar

Our natural heritage local environment 2
Our natural heritage   local environment 2Our natural heritage   local environment 2
Our natural heritage local environment 2geosaibhaskar
 
Rainwater harvesting walamtari june12_1
Rainwater harvesting walamtari june12_1Rainwater harvesting walamtari june12_1
Rainwater harvesting walamtari june12_1geosaibhaskar
 
Understanding Prices
Understanding PricesUnderstanding Prices
Understanding Pricesgeosaibhaskar
 
Biochar global warming
Biochar global warmingBiochar global warming
Biochar global warminggeosaibhaskar
 
Stoves & biochar nabard chittore
Stoves & biochar nabard chittoreStoves & biochar nabard chittore
Stoves & biochar nabard chittoregeosaibhaskar
 
Saibhaskar The Hans India - news2
Saibhaskar The Hans India - news2Saibhaskar The Hans India - news2
Saibhaskar The Hans India - news2geosaibhaskar
 
Saibhaskar The Hans India - news1
Saibhaskar The Hans India - news1Saibhaskar The Hans India - news1
Saibhaskar The Hans India - news1geosaibhaskar
 
Climate Change Rainwater harvesting
Climate Change Rainwater harvestingClimate Change Rainwater harvesting
Climate Change Rainwater harvestinggeosaibhaskar
 
Groundwater project 8
Groundwater project 8Groundwater project 8
Groundwater project 8geosaibhaskar
 

More from geosaibhaskar (20)

Our natural heritage local environment 2
Our natural heritage   local environment 2Our natural heritage   local environment 2
Our natural heritage local environment 2
 
Rainwater harvesting walamtari june12_1
Rainwater harvesting walamtari june12_1Rainwater harvesting walamtari june12_1
Rainwater harvesting walamtari june12_1
 
Understanding Prices
Understanding PricesUnderstanding Prices
Understanding Prices
 
Biochar part 1
Biochar part 1Biochar part 1
Biochar part 1
 
Biochar part 2
Biochar part 2Biochar part 2
Biochar part 2
 
Biochar part 3
Biochar part 3Biochar part 3
Biochar part 3
 
Biochar part 4
Biochar part 4Biochar part 4
Biochar part 4
 
Good stoves part1
Good stoves part1Good stoves part1
Good stoves part1
 
Good stoves part2
Good stoves part2Good stoves part2
Good stoves part2
 
Good stoves part3
Good stoves part3Good stoves part3
Good stoves part3
 
Good stoves part4
Good stoves part4Good stoves part4
Good stoves part4
 
Biochar global warming
Biochar global warmingBiochar global warming
Biochar global warming
 
Green buildings 2
Green buildings 2Green buildings 2
Green buildings 2
 
Indoor Environment
Indoor EnvironmentIndoor Environment
Indoor Environment
 
GEO Spirit
GEO SpiritGEO Spirit
GEO Spirit
 
Stoves & biochar nabard chittore
Stoves & biochar nabard chittoreStoves & biochar nabard chittore
Stoves & biochar nabard chittore
 
Saibhaskar The Hans India - news2
Saibhaskar The Hans India - news2Saibhaskar The Hans India - news2
Saibhaskar The Hans India - news2
 
Saibhaskar The Hans India - news1
Saibhaskar The Hans India - news1Saibhaskar The Hans India - news1
Saibhaskar The Hans India - news1
 
Climate Change Rainwater harvesting
Climate Change Rainwater harvestingClimate Change Rainwater harvesting
Climate Change Rainwater harvesting
 
Groundwater project 8
Groundwater project 8Groundwater project 8
Groundwater project 8
 

Recently uploaded

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 

Recently uploaded (20)

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 

Perspective plan preparation 2

  • 1. GUIDELINES FOR PREPARATION OF PERSPECTIVE PLAN NATIONAL FOOD FOR WORK PROGRAMME (NFFWP) TRAINING OF TRAINERS Dr. N. Sai Bhaskar Reddy AMR-APARD, RAJENDRANAGAR, HYDERABAD
  • 2. Objective - comprehensive perspective plan of five years  That would enable develop all the Panchayats of the 150 most backward districts during the 5 years period of 2005-2010 in such a way that there is visible impact on the major problems of each Panchayat and a sound base is created for self sustaining economy to remove poverty and bring these Districts at least at par with other developed areas of the state and the country.
  • 3. It will facilitate optimizing all resources available under all the developmental programmes operational at the panchayat level  To provide best possible and meaningful option for convergence/dovetailing of all such programmes to derive maximum benefit in favour of the rural poor especially with regard to generation of employment opportunities both in terms of wage and self employment through creation of need based optimum infrastructure at the panchayat level in the short term and develop self sustaining robust panchayat economy In the long run.
  • 4. Preparing the Perspective Plan  Survey each village and panchayat in the district to collect data on A. Existing economy infrastructure needs and to B. Assess feasibility of projects to be included in the plan  Rough cost estimate for project/works suggested must be given based on acceptable parameters and they may be indicated in the plan document.
  • 5. The people involved in perspective plan preparation  Consolidation and preparation of final document – AMR-APARD  Training of trainers at District level (~40 officers) – AMR-APARD  TOTs – Senior Level Officers / special officers in the District  Training of Mandal level resource persons – ToTs  Perspective plan preparation of each village with the participation of primary stakeholders and facilitation by Mandal level resource persons.
  • 6. PERSPECTIVE PLAN OF THE DISTRICT The perspective plan will be a comprehensive document with several chapters CHAPTER-1 The information for the district as a whole on - demography - SC/ST, women and children population with work force divided into employed, semi-employed, unemployed, occupational distribution, month wise rainfall distribution, depth of water table, depletion rate, gender-wise illiteracy, main crops, number of crops per year, per hectare productivity, type of soil, agriculture productivity per worker, distribution of average land holding, average size of tilling, distribution of commercial/Regional Rural Bank, availability of bank branches per sq. km, potential occupation, service and industry.
  • 7. CHAPTER-II Scheme-wise availability of resources of the district as a whole in respect of all employment and development oriented Programme such as Swarnajayanti Gram Swarozgar Yojana (SGSY), Rashtriya Sam Vikas Yojana (RSVY), Watershed development programmes (such as IWDP, DPAP, DDP) PMRY (its share for rural segment), Rural Employment Generation Programme of KVIC, Sampoorna Grameena Rozgar Yojana (SGRY) MPLAD, MLALAD NFFWP and all other Centrally and state sponsored programmes
  • 8. Block-wise breakup of distribution/availability of resources under the above programmes along with the present status of number of persons unemployed/ semi- employed may be given.
  • 9. Location/area specific kinds/types of infrastructure, which are expected in the Panchayat. (i) One panchayat Ghar (ii) One primary/secondary school building sufficient for the number of children studying. (iii) One low cost storage go down for storing food grains (iv) Tube/open wells (whichever is relevant in that area) for drinking / irrigation purpose. (v) Internal roads providing connectivity with main roads (vi) Drainage / nallah to drain out extra water in the water logged/flood prone areas (vii) Dairy/Veterinary development infrastructure. (viii) Erection of permanent /pucca embankment for flood protection
  • 10. (IX) Small check dams, water conservation activities like digging of ponds/percolation tanks and de-silting of ponds (x) Strengthening of marketing infrastructure at local Panchayat haats / market such as construction of permanent sheds and low cost community storage godowns for safe storage of goods etc. (xi) Individual/community horticulture/social forestry development. (xii) Any other facility considered essential on the local needs. * - The above list of infrastructure is only illustrative and not exhaustive. It is possible that some of the above infrastructure may not be suitable for a particular state / district / panchayat but may be relevant in other. As such, the above list may be modified and prepared taking into account local needs and aspirations.
  • 11. CHAPTER-III  Details on Panchayat –wise (i) list of infrastructure already existing and (ii). List of infrastructure that are missing out of the list given at Section-B, Chapter –11 (iii) requirement of resources for creation of missing infrastructure along with Programme-wise inflow/share of the Panchayat out of all development programmes listed at Section-A of chapter-11 and (iv) estimated employment generation in terms of both self and wage employment while creating missing infrastructure .  The above information is to be given year-wise.
  • 12. While assessing resource inflow from all sources, 15% for maintenance of assets already created /being created be shown separately and as such only 85% of the total inflow may be taken in to account for showing resource inflow for creation of assets.  The above Panchayat–wise list of missing infrastructure have to be prepared in a manner that each missing infrastructure will give a clear cut idea under which Programme it is proposed with estimated cost and the number of expected beneficiaries to be covered under self and wage employment.
  • 13. Incase of wage employment, number of man-day’s generation is to be divided by 100 to arrive at number of persons to be employed.  All activities /works shown under the existing Programme have to be implemented in accordance with their respective Programme guidelines. If any activity which is permissible under more than one Programme, it may be shown under that Programme which has larger share for that Panchayat.  It should, however, be ensured that one activity is shown under one Programme only with the stipulation that is completed during one financial year it self. Spillover to the next year may be indicated in exceptional cases where inflow of resources is limited during the year.  Estimated cost may be shown increased 5 to 10% every year while showing year-wise activities to be taken up.
  • 14. Programme  PMRY  SGRY  REGP  SGSY  MPLAD  RSVY  MLALAD  IWDP  Add more  DPAP scheme of  DDP Central/state if any
  • 15. Missing Infrastructure with Priority(Shelf of Projects)(for example)  Check dam to store water  Drainage/ Nallah to drain extra water in water logged/flood affected areas  Digging of pond  Land Development of Common Wasteland area  Percolation Wells  Storage Godown  and so on.
  • 16. Employment Generation  Under Self Employment Programmes (NO. of expected beneficiaries)  Wage Employment Programmes  a. Number of expected man days to be generated (in numbers)  b. Number of expected beneficiaries getting employment ( (a) above/100)  Area development programme  a) Number of expected beneficiaries (in Numbers)  b) (i) Number of expected mandays generated (in numbers)  b) (ii) Number expected mandays converted in to number of persons( (b) (i) above/100)
  • 17. CHAPTER-IV  Block-wise exercise by consolidating panchayat–wise information under respective Block (Mandal) may be take-up.  Summary for each Block separately to indicate missing  Infrastructure wise details giving  Year wise cost estimates and  Expected employment generation may be given
  • 18. Missing Infrastructure  Drainage (in waterlogged/flood affected areas) (in KM)  Low cost community food grains storage godowns  High school Building  Strengthening/construction of permanent river embankment (In KM)  Check dams  Digging of ponds/desilting  Horticulture/Social forestry (a)Individual (b)Community  Dairy Development  (and so on)
  • 19. CHAPTER-V  Annual Action plans for the NFFWP for the next five years based on the perspective plan.  Segregate Panchayat-wise activities /works those indicated against the NFFWP quota.  Panchayat-wise and year-wise works/activities to be taken up under the NFFWP with clear cut prioritization will have to be given.
  • 20. Name of activities in priority order (for example)  Checkdams  Digging of ponds/desilting  Drainage (in waterlogged/flood affected areas)  Development & Bunding of degraded lands  Other water harvesting structures (mention type of structure)  (and so on)
  • 21. CHAPTER-VI  The success of the program will be quantified based on the following type of parameters on pre (as on 2005) and post (as on 2010) perspective plan assessment.
  • 22. Item (for Example) Status at the Estimated Total time of status after Increase/Decr preparation of the ease perspective completion plan of the five Irrigated areas (In Ha.) year plan period Water table (In Feet) (2010) Agricultural output of differenft crops (In per Ha) Diversification of area to cash crops (In Ha) Nutrition level Rural urban migration (In persons) Rural poverty ratio (In % age) Village connectivity to Towns (in %age)