EXPLORATORY PHASE:  INQUIRE & IDENTIFY Week 11. Data Collation & Analysis BLUE PRINT
[object Object],[object Object],[object Object],Lesson Objectives
Part 1: Data Collation   Once you have collected the data from whatever source you selected, you will then have to bring the data together and present it in a manageable form. This process is called  collation . In order to enable easy interpretation and analysis, collation will usually involve  summarising  and tabulating the information. Sources Findings Cause & Effects Found Observation Scanning Secondary Research BLUE PRINT
  Long Queues at Photocopy Stations during Peak Hours Part 1: Data Collation Consider this AOC! BLUE PRINT
  AOC:   Long Queues at Photocopy Stations during Peak Hours Part 1: Data Collation Sources Summarised Findings Cause & Effects Found Observation Scanning Queues of 20-30 people between 12-1pm on weekdays Closer observations showed that only 8 photocopy machines are in operation during those times Machines often break down midway. Students rushing between classes to print materials Slowdown in turnover of machines between users. As a result, each student experienced an average waiting time of 22 minutes Students were printing an average of 9.5 pages each Secondary Research School Admin Records show that whilst student population increased by average 3.5% annually from 2006-2010, machines increased from 6 units to 8 ( over the same period) Heavy demand for printing hardcopies coupled with limited number of machines attributed to slowdown BLUE PRINT
Part 2: Data Analysis Tools   Tool 1: Cause & Effect Analysis A  Cause-and-Effect Diagram  (also known as a  "Fishbone Diagram" ) is a graphical technique for grouping people's ideas about the causes of a problem.  BLUE PRINT
Tool 2: The Multiple Whys The  Multiple Whys  is a simple problem-solving technique that helps you to get to the root of a problem quickly Multiple Whys  strategy involves looking at any problem and asking: "Why?" and "What caused this problem?“ Very often, the answer to the first "why" will prompt another "why" and the answer to the second "why" will prompt another and so on; hence the name the 5 Whys strategy. Benefits of the Multiple Whys include: It helps you to quickly determine the root cause of  a problem.  It's simple, and easy to learn and apply.
Tool 2: The Multiple Whys  (taught in Year 1 Idea Jumpstart) Example: Long Queues at the Photocopying Machines Using the Multiple Whys, you go through the following steps to  get to the cause of the problem: -Why are students unhappy when they go to use the  machines?  Because it takes too long a time. -Why does it take a long time?  Too much time taking to sign in to the machines -Why is that so?  Users need to sign in with their name and IDs to identify and track their usage. -Why did we not notice this before?  Because this problem has got incremental worse over time. We clearly need to review our user registration system.
Tool 3: Pareto Principle of Analysis Conceived by quality management guru Joseph M. Juran. Named after Italian Vilfredo Pareto, who in 1906 observed that 80% of income in Italy went to 20% of the population. Pareto later carried out surveys on a number of other countries and found to his surprise that a similar distribution applied. The 80/20 rule can be applied to almost anything: -80% of customer complaints arise from 20% of your products or services. -80% of delays in schedule arise from 20% of the possible causes of the delays. -20% of your products or services account for 80% of your profit. -20% of your sales-force produces 80% of your company revenues. -20% of a systems defects cause 80% of its problems. Source: http://www.projectsmart.co.uk/pareto-analysis-step-by-step.html
  Tool 3: Pareto Principle of Analysis The  Pareto Principle  states that only a  "vital few" factors  are responsible for producing most of the problems This principle can be applied to quality improvement to the extent that a great majority of problems (80%) are produced by a few key causes (20%). BLUE PRINT Order Responses % Cumulative %  Users have to sign in onto the machines  42 33.6 33.6 Machines should be dispersed across campus  33 26.5 60 Too many assignments in hardcopy  25 20 80 Staff assistants are not helpful  17 13.6 93.6 Students do not know how to operate the machines  7 5 99.2 Staff are not efficient 1 0.8 100 Total Responses 125 100% 100%
‘ Important Few, Trivial Many’
‘ Pareto’s Principle’: Example 2PHAT Clothing Store at Orchid Mall has been seeing a steady decline in business. The current store manager at the store has assumed that the decline has been due to customer dissatisfaction with the clothing line he is selling and he has blamed his the lack of quality/defects of the clothes and lack of availability of stock for customers.  He did a survey lasting 1 month, ranking responses for the 6 most common complaints for the store and solicited feedback from 293 2PHAT’s walk-in customers. Help him plot a Pareto’s curve to identify the key issues.  See the summary of data (next slide).
‘ Pareto’s Principle’: Example Order Responses Percentage   Cumulative Percentage   Sizes Limited 27 9 9 Store Layout Confusing 32 11 20 Sales reps were rude 62 21 41 Clothing fades 21 7 48 Clothing shrinks 18 6 55 Parking to access store was difficult 88 30 85 Poor lighting in the store 45 15 100 Total  293 100% 100%
‘ Pareto’s Principle’: Step 1&2 Step 1.  Develop a list of possible problems, items, or causes to be compared. Step 2.  Tally, for each item, how often it occurred. Then add these amounts to determine the grand total for all items. Find the percent of each item in the grand total by taking the sum of the item, dividing it by the grand total, and multiplying by 100 Problems Responses Percentage   Cumulative Percentage   Sizes Limited 27 9 9 Store Layout Confusing 32 11 20 Sales reps were rude 62 21 41 Clothing fades 21 7 48 Clothing shrinks 18 6 55 Parking to access store was difficult 88 30 85 Poor lighting in the store 45 15 100 Total  293 100% 100%
‘ Pareto’s Principle’: Step 3 Step 3.  List the items being compared in decreasing order of the measure of comparison: e.g., the most frequent to the least frequent.  The cumulative percentage for an item is the sum of that item’s percent of the total and that of all the other items that come before it in the ordering by rank. ~100% ~100% 293 Total 99 6 18 Clothing shrinks 93 7 21 Clothing fades 86 9 27 Sizes limited 77 11 32 Store layout confusing 66 15 45 Poor lighting in the store 51 21 62 Sales reps were rude 30 30 88 Parking to access store was difficult Cumulative Percentage   Percentage   Responses Problems
‘ Pareto’s Principle’: Step 4 & 5 Step 4.  List the items on the horizontal axis of a graph from highest to lowest. Create 2 y-axes, one for the number of responses and another on percentages up to 100%. Draw in the bars for each item. Step 5.  Draw a line graph of the cumulative percentages. The first point on the line graph should line up with the top of the first bar.
‘ Pareto’s Principle’: Step 6 & 7 Step 6.  Draw a horizontal line from the 80% percentile on the y-axis to where it meets the curve of cumulative percentages. Step 7.  Analyze the diagram by identifying those items that appear to account for most of the difficulty. This is done by looking at the area labelled ‘Significant Few’. These are the vital factors to focus on.
‘ Pareto’s Principle’: Example After charting the frequency of the answers in his customer survey, however, it was very clear that the real reasons for the decline of his business had nothing to do with his supply chain.  By collecting data and displaying it in a Pareto chart, the manager could see which variables were having the most influence. In this example, parking difficulties, rude sales people and poor lighting were hurting his business most. Following the Pareto Principle, those are the areas where he should focus his attention to build his business back up. 
‘ Pareto’s Principle’: Activity There has been an increasing amount of students arriving late for lessons in your school. You have been tasked to investigate this phenomenon and try to recognise the key factors that contribute to this problem. You have just completed a survey of 365 students. Using Pareto’s Principle of analysis,  chart out and identify the key  contributing causes behind  this problem.  Reasons Responses Family problems 40 Sick 30 Traffic tie-up 160 Woke up late 100 Bad weather 15 Had to take the bus 20 TOTAL 365
Tool 4: Root Cause Analysis (RCA) Root Cause Analysis (RCA) is a popular and often-used technique that helps people answer the question of why the problem occurred in the first place.  Root Cause Analysis seeks to identify the origin of a problem. It uses a specific set of steps, with associated tools, to find the primary cause of the problem, so that you can: 1. Determine what happened.  2. Determine why it happened.  3. Figure out what to do to reduce the likelihood that it will happen again.  Source: http://www.thinkreliability.com/Root-Cause-Analysis-CM-Basics.aspx
Tool 4: Root Cause Analysis (RCA) The Root Cause Analysis Process Root Cause Analysis has five identifiable steps. Step One: Define the Problem What do you see happening?  What are the specific symptoms?  Step Two: Collect Data What proof do you have that the problem exists?  How long has the problem existed?  What is the impact of the problem?  Step Three: Identify Possible Causal Factors What sequence of events leads to the problem?  What conditions allow the problem to occur?  What other problems surround the occurrence of the central problem?  Step Four: Identify the Root Cause(s) Why does the causal factor exist?  What is the real reason the problem occurred?

More Related Content

What's hot

Advance Statistics- An introduction
Advance  Statistics- An introductionAdvance  Statistics- An introduction
Advance Statistics- An introductionJohn Michael Gian
 
Cash and Cash equivalent
Cash and Cash equivalentCash and Cash equivalent
Cash and Cash equivalentZoey Zungit
 
2 5 rational equations word-problems
2 5 rational equations word-problems2 5 rational equations word-problems
2 5 rational equations word-problemsmath123b
 
1. introduction to business finance
1. introduction to business finance1. introduction to business finance
1. introduction to business financeAileen MANC
 
Aralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansa
Aralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansaAralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansa
Aralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansaEDITHA HONRADEZ
 
Ang ating kaugalian, paniniwala, at tradisyon
Ang ating kaugalian, paniniwala, at tradisyonAng ating kaugalian, paniniwala, at tradisyon
Ang ating kaugalian, paniniwala, at tradisyonStephanieEscanillas1
 
Business finance -Organizing a Business
Business finance -Organizing a BusinessBusiness finance -Organizing a Business
Business finance -Organizing a BusinessFelyn Denise Jover
 
Lecture 5 cost allocations- theory
Lecture 5 cost allocations- theoryLecture 5 cost allocations- theory
Lecture 5 cost allocations- theoryFrozen Corpse
 
Epp 6 he aralin 4- wastong pangangalaga ng kasuotan
Epp 6 he aralin 4- wastong pangangalaga ng kasuotanEpp 6 he aralin 4- wastong pangangalaga ng kasuotan
Epp 6 he aralin 4- wastong pangangalaga ng kasuotanArnel Bautista
 
Just in Time Cost
Just in Time CostJust in Time Cost
Just in Time Costacctg2012
 
Tb chapter-01
Tb chapter-01Tb chapter-01
Tb chapter-01delfin321
 
Financial analysis ppt
Financial analysis pptFinancial analysis ppt
Financial analysis pptdtouhey
 
Cash & cash equivalents
Cash & cash equivalentsCash & cash equivalents
Cash & cash equivalentsKarryl Ursua
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectLena Argosino
 
Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...
Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...
Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...DevadattaSai Cheedella
 

What's hot (20)

Tax tv
Tax tvTax tv
Tax tv
 
Advance Statistics- An introduction
Advance  Statistics- An introductionAdvance  Statistics- An introduction
Advance Statistics- An introduction
 
Cash and Cash equivalent
Cash and Cash equivalentCash and Cash equivalent
Cash and Cash equivalent
 
2 5 rational equations word-problems
2 5 rational equations word-problems2 5 rational equations word-problems
2 5 rational equations word-problems
 
Liham pangangalakal
Liham pangangalakalLiham pangangalakal
Liham pangangalakal
 
1. introduction to business finance
1. introduction to business finance1. introduction to business finance
1. introduction to business finance
 
Basics Of Accounting & Book Keeping
Basics Of Accounting & Book KeepingBasics Of Accounting & Book Keeping
Basics Of Accounting & Book Keeping
 
Aralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansa
Aralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansaAralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansa
Aralin 2 mga produkto at kalakal sa ibat ibang lokasyon ng bansa
 
Ang ating kaugalian, paniniwala, at tradisyon
Ang ating kaugalian, paniniwala, at tradisyonAng ating kaugalian, paniniwala, at tradisyon
Ang ating kaugalian, paniniwala, at tradisyon
 
Business finance -Organizing a Business
Business finance -Organizing a BusinessBusiness finance -Organizing a Business
Business finance -Organizing a Business
 
Lecture 5 cost allocations- theory
Lecture 5 cost allocations- theoryLecture 5 cost allocations- theory
Lecture 5 cost allocations- theory
 
Epp 6 he aralin 4- wastong pangangalaga ng kasuotan
Epp 6 he aralin 4- wastong pangangalaga ng kasuotanEpp 6 he aralin 4- wastong pangangalaga ng kasuotan
Epp 6 he aralin 4- wastong pangangalaga ng kasuotan
 
2. branches of accounting
2. branches of accounting2. branches of accounting
2. branches of accounting
 
Just in Time Cost
Just in Time CostJust in Time Cost
Just in Time Cost
 
Tb chapter-01
Tb chapter-01Tb chapter-01
Tb chapter-01
 
Halamang Ornamental
Halamang OrnamentalHalamang Ornamental
Halamang Ornamental
 
Financial analysis ppt
Financial analysis pptFinancial analysis ppt
Financial analysis ppt
 
Cash & cash equivalents
Cash & cash equivalentsCash & cash equivalents
Cash & cash equivalents
 
Feasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management AspectFeasibility Study: Marketing , Technical and Management Aspect
Feasibility Study: Marketing , Technical and Management Aspect
 
Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...
Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...
Trail balance, meaning, rules, proforma, transactions, journal entries, ledge...
 

Viewers also liked

Em In Awe Portfolio B Low Res
Em In Awe Portfolio B Low ResEm In Awe Portfolio B Low Res
Em In Awe Portfolio B Low ResEdrelyn Medina
 
Qualitative data analysis - Student L
Qualitative data analysis - Student LQualitative data analysis - Student L
Qualitative data analysis - Student LLee Cox
 
Print analysis
Print analysisPrint analysis
Print analysisLeahhBoyd
 
Logic Models and Theories of Change
Logic Models and Theories of ChangeLogic Models and Theories of Change
Logic Models and Theories of ChangeScot Evans
 
employee-turn-over-slide-share-by-chandan-jha
employee-turn-over-slide-share-by-chandan-jhaemployee-turn-over-slide-share-by-chandan-jha
employee-turn-over-slide-share-by-chandan-jhaChanand Jha
 
How to Reduce Employee Turnover
How to Reduce Employee TurnoverHow to Reduce Employee Turnover
How to Reduce Employee TurnoverShoplet_
 
Theory of Change and Outcome Mapping
Theory of Change and Outcome Mapping Theory of Change and Outcome Mapping
Theory of Change and Outcome Mapping ikmediaries
 
A Guide to Theories of Change
A Guide to Theories of ChangeA Guide to Theories of Change
A Guide to Theories of ChangeOlivier Serrat
 
Computer based information system
Computer based information systemComputer based information system
Computer based information systemshoaibzaheer1
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRYodhia Antariksa
 
Root cause analysis apr 2010
Root cause analysis apr 2010Root cause analysis apr 2010
Root cause analysis apr 2010Michael Sahota
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORspeedcars
 
TEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of WorkTEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of WorkVolker Hirsch
 

Viewers also liked (15)

Em In Awe Portfolio B Low Res
Em In Awe Portfolio B Low ResEm In Awe Portfolio B Low Res
Em In Awe Portfolio B Low Res
 
Qualitative data analysis - Student L
Qualitative data analysis - Student LQualitative data analysis - Student L
Qualitative data analysis - Student L
 
Print analysis
Print analysisPrint analysis
Print analysis
 
Logic Models and Theories of Change
Logic Models and Theories of ChangeLogic Models and Theories of Change
Logic Models and Theories of Change
 
employee-turn-over-slide-share-by-chandan-jha
employee-turn-over-slide-share-by-chandan-jhaemployee-turn-over-slide-share-by-chandan-jha
employee-turn-over-slide-share-by-chandan-jha
 
How to Reduce Employee Turnover
How to Reduce Employee TurnoverHow to Reduce Employee Turnover
How to Reduce Employee Turnover
 
Theory of Change and Outcome Mapping
Theory of Change and Outcome Mapping Theory of Change and Outcome Mapping
Theory of Change and Outcome Mapping
 
A Guide to Theories of Change
A Guide to Theories of ChangeA Guide to Theories of Change
A Guide to Theories of Change
 
THEORY OF CHANGE
THEORY OF CHANGE THEORY OF CHANGE
THEORY OF CHANGE
 
Computer based information system
Computer based information systemComputer based information system
Computer based information system
 
KPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HRKPI for HR Manager - Sample of KPIs for HR
KPI for HR Manager - Sample of KPIs for HR
 
Root cause analysis apr 2010
Root cause analysis apr 2010Root cause analysis apr 2010
Root cause analysis apr 2010
 
Project Management KPIs
Project Management KPIsProject Management KPIs
Project Management KPIs
 
KEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATORKEY PERFORMANCE INDICATOR
KEY PERFORMANCE INDICATOR
 
TEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of WorkTEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of Work
 

Similar to Week 11 data collation & analysis

Root Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdfRoot Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdfRohitLakhotia12
 
Conquer Process Improvement With These 9 Lean Six Sigma Tools
Conquer Process Improvement With These 9 Lean Six Sigma ToolsConquer Process Improvement With These 9 Lean Six Sigma Tools
Conquer Process Improvement With These 9 Lean Six Sigma ToolsQuekelsBaro
 
Pareto Chart Explained with Example With Excel Template.pdf
Pareto Chart Explained with Example With Excel Template.pdfPareto Chart Explained with Example With Excel Template.pdf
Pareto Chart Explained with Example With Excel Template.pdfVkAn2
 
Total Quality Management Principles
Total Quality Management PrinciplesTotal Quality Management Principles
Total Quality Management PrinciplesAmmar Mubarak
 
Process Improvement Tools Daniel Pirzada
Process Improvement Tools Daniel PirzadaProcess Improvement Tools Daniel Pirzada
Process Improvement Tools Daniel PirzadaAbdullahTariq648768
 
Seven Basic Tools of QC and their Applications
Seven Basic Tools of QC and their ApplicationsSeven Basic Tools of QC and their Applications
Seven Basic Tools of QC and their ApplicationsDrJayantaKumarMahato1
 
Pareto and Flowchart Problem Analysis Tools
Pareto and Flowchart Problem Analysis ToolsPareto and Flowchart Problem Analysis Tools
Pareto and Flowchart Problem Analysis ToolsJo Balucanag - Bitonio
 
How to Enter the Data Analytics Industry?
How to Enter the Data Analytics Industry?How to Enter the Data Analytics Industry?
How to Enter the Data Analytics Industry?Ganes Kesari
 
TQM Tools and Techniques. ( PDFDrive ).pptx
TQM Tools and Techniques. ( PDFDrive ).pptxTQM Tools and Techniques. ( PDFDrive ).pptx
TQM Tools and Techniques. ( PDFDrive ).pptxOSWALDOAUGUSTOGONZAL1
 
Seven Statistical tools for Quality Management
Seven Statistical tools for Quality ManagementSeven Statistical tools for Quality Management
Seven Statistical tools for Quality ManagementShilpi Arora
 
7 QC(Quality Control) Tools
7 QC(Quality Control) Tools7 QC(Quality Control) Tools
7 QC(Quality Control) Toolsmanju3426
 
Corrective and preventive action
Corrective  and preventive actionCorrective  and preventive action
Corrective and preventive actionSnehaGhadigaonkar
 
Improvement 7 tools
Improvement 7 toolsImprovement 7 tools
Improvement 7 toolsAhmed Nady
 

Similar to Week 11 data collation & analysis (20)

Pareto analysis
Pareto analysisPareto analysis
Pareto analysis
 
Root Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdfRoot Cause Analysis Guide Book.pdf
Root Cause Analysis Guide Book.pdf
 
Conquer Process Improvement With These 9 Lean Six Sigma Tools
Conquer Process Improvement With These 9 Lean Six Sigma ToolsConquer Process Improvement With These 9 Lean Six Sigma Tools
Conquer Process Improvement With These 9 Lean Six Sigma Tools
 
Pareto Chart Explained with Example With Excel Template.pdf
Pareto Chart Explained with Example With Excel Template.pdfPareto Chart Explained with Example With Excel Template.pdf
Pareto Chart Explained with Example With Excel Template.pdf
 
Pareto analysis
Pareto analysisPareto analysis
Pareto analysis
 
Total Quality Management Principles
Total Quality Management PrinciplesTotal Quality Management Principles
Total Quality Management Principles
 
Presentacion 1
Presentacion 1Presentacion 1
Presentacion 1
 
Process Improvement Tools Daniel Pirzada
Process Improvement Tools Daniel PirzadaProcess Improvement Tools Daniel Pirzada
Process Improvement Tools Daniel Pirzada
 
CAPA
CAPACAPA
CAPA
 
Seven Basic Tools of QC and their Applications
Seven Basic Tools of QC and their ApplicationsSeven Basic Tools of QC and their Applications
Seven Basic Tools of QC and their Applications
 
SQT.ppt
SQT.pptSQT.ppt
SQT.ppt
 
Ch04 spc
Ch04 spcCh04 spc
Ch04 spc
 
Pareto and Flowchart Problem Analysis Tools
Pareto and Flowchart Problem Analysis ToolsPareto and Flowchart Problem Analysis Tools
Pareto and Flowchart Problem Analysis Tools
 
Qc
QcQc
Qc
 
How to Enter the Data Analytics Industry?
How to Enter the Data Analytics Industry?How to Enter the Data Analytics Industry?
How to Enter the Data Analytics Industry?
 
TQM Tools and Techniques. ( PDFDrive ).pptx
TQM Tools and Techniques. ( PDFDrive ).pptxTQM Tools and Techniques. ( PDFDrive ).pptx
TQM Tools and Techniques. ( PDFDrive ).pptx
 
Seven Statistical tools for Quality Management
Seven Statistical tools for Quality ManagementSeven Statistical tools for Quality Management
Seven Statistical tools for Quality Management
 
7 QC(Quality Control) Tools
7 QC(Quality Control) Tools7 QC(Quality Control) Tools
7 QC(Quality Control) Tools
 
Corrective and preventive action
Corrective  and preventive actionCorrective  and preventive action
Corrective and preventive action
 
Improvement 7 tools
Improvement 7 toolsImprovement 7 tools
Improvement 7 tools
 

Recently uploaded

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 

Recently uploaded (20)

Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

Week 11 data collation & analysis

  • 1. EXPLORATORY PHASE: INQUIRE & IDENTIFY Week 11. Data Collation & Analysis BLUE PRINT
  • 2.
  • 3. Part 1: Data Collation   Once you have collected the data from whatever source you selected, you will then have to bring the data together and present it in a manageable form. This process is called collation . In order to enable easy interpretation and analysis, collation will usually involve summarising and tabulating the information. Sources Findings Cause & Effects Found Observation Scanning Secondary Research BLUE PRINT
  • 4.   Long Queues at Photocopy Stations during Peak Hours Part 1: Data Collation Consider this AOC! BLUE PRINT
  • 5.   AOC: Long Queues at Photocopy Stations during Peak Hours Part 1: Data Collation Sources Summarised Findings Cause & Effects Found Observation Scanning Queues of 20-30 people between 12-1pm on weekdays Closer observations showed that only 8 photocopy machines are in operation during those times Machines often break down midway. Students rushing between classes to print materials Slowdown in turnover of machines between users. As a result, each student experienced an average waiting time of 22 minutes Students were printing an average of 9.5 pages each Secondary Research School Admin Records show that whilst student population increased by average 3.5% annually from 2006-2010, machines increased from 6 units to 8 ( over the same period) Heavy demand for printing hardcopies coupled with limited number of machines attributed to slowdown BLUE PRINT
  • 6. Part 2: Data Analysis Tools   Tool 1: Cause & Effect Analysis A Cause-and-Effect Diagram (also known as a "Fishbone Diagram" ) is a graphical technique for grouping people's ideas about the causes of a problem. BLUE PRINT
  • 7. Tool 2: The Multiple Whys The Multiple Whys is a simple problem-solving technique that helps you to get to the root of a problem quickly Multiple Whys strategy involves looking at any problem and asking: "Why?" and "What caused this problem?“ Very often, the answer to the first "why" will prompt another "why" and the answer to the second "why" will prompt another and so on; hence the name the 5 Whys strategy. Benefits of the Multiple Whys include: It helps you to quickly determine the root cause of a problem. It's simple, and easy to learn and apply.
  • 8. Tool 2: The Multiple Whys (taught in Year 1 Idea Jumpstart) Example: Long Queues at the Photocopying Machines Using the Multiple Whys, you go through the following steps to get to the cause of the problem: -Why are students unhappy when they go to use the machines? Because it takes too long a time. -Why does it take a long time? Too much time taking to sign in to the machines -Why is that so? Users need to sign in with their name and IDs to identify and track their usage. -Why did we not notice this before? Because this problem has got incremental worse over time. We clearly need to review our user registration system.
  • 9. Tool 3: Pareto Principle of Analysis Conceived by quality management guru Joseph M. Juran. Named after Italian Vilfredo Pareto, who in 1906 observed that 80% of income in Italy went to 20% of the population. Pareto later carried out surveys on a number of other countries and found to his surprise that a similar distribution applied. The 80/20 rule can be applied to almost anything: -80% of customer complaints arise from 20% of your products or services. -80% of delays in schedule arise from 20% of the possible causes of the delays. -20% of your products or services account for 80% of your profit. -20% of your sales-force produces 80% of your company revenues. -20% of a systems defects cause 80% of its problems. Source: http://www.projectsmart.co.uk/pareto-analysis-step-by-step.html
  • 10.   Tool 3: Pareto Principle of Analysis The Pareto Principle states that only a "vital few" factors are responsible for producing most of the problems This principle can be applied to quality improvement to the extent that a great majority of problems (80%) are produced by a few key causes (20%). BLUE PRINT Order Responses % Cumulative % Users have to sign in onto the machines 42 33.6 33.6 Machines should be dispersed across campus 33 26.5 60 Too many assignments in hardcopy 25 20 80 Staff assistants are not helpful 17 13.6 93.6 Students do not know how to operate the machines 7 5 99.2 Staff are not efficient 1 0.8 100 Total Responses 125 100% 100%
  • 11. ‘ Important Few, Trivial Many’
  • 12. ‘ Pareto’s Principle’: Example 2PHAT Clothing Store at Orchid Mall has been seeing a steady decline in business. The current store manager at the store has assumed that the decline has been due to customer dissatisfaction with the clothing line he is selling and he has blamed his the lack of quality/defects of the clothes and lack of availability of stock for customers. He did a survey lasting 1 month, ranking responses for the 6 most common complaints for the store and solicited feedback from 293 2PHAT’s walk-in customers. Help him plot a Pareto’s curve to identify the key issues. See the summary of data (next slide).
  • 13. ‘ Pareto’s Principle’: Example Order Responses Percentage Cumulative Percentage Sizes Limited 27 9 9 Store Layout Confusing 32 11 20 Sales reps were rude 62 21 41 Clothing fades 21 7 48 Clothing shrinks 18 6 55 Parking to access store was difficult 88 30 85 Poor lighting in the store 45 15 100 Total 293 100% 100%
  • 14. ‘ Pareto’s Principle’: Step 1&2 Step 1. Develop a list of possible problems, items, or causes to be compared. Step 2. Tally, for each item, how often it occurred. Then add these amounts to determine the grand total for all items. Find the percent of each item in the grand total by taking the sum of the item, dividing it by the grand total, and multiplying by 100 Problems Responses Percentage Cumulative Percentage Sizes Limited 27 9 9 Store Layout Confusing 32 11 20 Sales reps were rude 62 21 41 Clothing fades 21 7 48 Clothing shrinks 18 6 55 Parking to access store was difficult 88 30 85 Poor lighting in the store 45 15 100 Total 293 100% 100%
  • 15. ‘ Pareto’s Principle’: Step 3 Step 3. List the items being compared in decreasing order of the measure of comparison: e.g., the most frequent to the least frequent. The cumulative percentage for an item is the sum of that item’s percent of the total and that of all the other items that come before it in the ordering by rank. ~100% ~100% 293 Total 99 6 18 Clothing shrinks 93 7 21 Clothing fades 86 9 27 Sizes limited 77 11 32 Store layout confusing 66 15 45 Poor lighting in the store 51 21 62 Sales reps were rude 30 30 88 Parking to access store was difficult Cumulative Percentage Percentage Responses Problems
  • 16. ‘ Pareto’s Principle’: Step 4 & 5 Step 4. List the items on the horizontal axis of a graph from highest to lowest. Create 2 y-axes, one for the number of responses and another on percentages up to 100%. Draw in the bars for each item. Step 5. Draw a line graph of the cumulative percentages. The first point on the line graph should line up with the top of the first bar.
  • 17. ‘ Pareto’s Principle’: Step 6 & 7 Step 6. Draw a horizontal line from the 80% percentile on the y-axis to where it meets the curve of cumulative percentages. Step 7. Analyze the diagram by identifying those items that appear to account for most of the difficulty. This is done by looking at the area labelled ‘Significant Few’. These are the vital factors to focus on.
  • 18. ‘ Pareto’s Principle’: Example After charting the frequency of the answers in his customer survey, however, it was very clear that the real reasons for the decline of his business had nothing to do with his supply chain. By collecting data and displaying it in a Pareto chart, the manager could see which variables were having the most influence. In this example, parking difficulties, rude sales people and poor lighting were hurting his business most. Following the Pareto Principle, those are the areas where he should focus his attention to build his business back up. 
  • 19. ‘ Pareto’s Principle’: Activity There has been an increasing amount of students arriving late for lessons in your school. You have been tasked to investigate this phenomenon and try to recognise the key factors that contribute to this problem. You have just completed a survey of 365 students. Using Pareto’s Principle of analysis, chart out and identify the key contributing causes behind this problem. Reasons Responses Family problems 40 Sick 30 Traffic tie-up 160 Woke up late 100 Bad weather 15 Had to take the bus 20 TOTAL 365
  • 20. Tool 4: Root Cause Analysis (RCA) Root Cause Analysis (RCA) is a popular and often-used technique that helps people answer the question of why the problem occurred in the first place. Root Cause Analysis seeks to identify the origin of a problem. It uses a specific set of steps, with associated tools, to find the primary cause of the problem, so that you can: 1. Determine what happened. 2. Determine why it happened. 3. Figure out what to do to reduce the likelihood that it will happen again. Source: http://www.thinkreliability.com/Root-Cause-Analysis-CM-Basics.aspx
  • 21. Tool 4: Root Cause Analysis (RCA) The Root Cause Analysis Process Root Cause Analysis has five identifiable steps. Step One: Define the Problem What do you see happening? What are the specific symptoms? Step Two: Collect Data What proof do you have that the problem exists? How long has the problem existed? What is the impact of the problem? Step Three: Identify Possible Causal Factors What sequence of events leads to the problem? What conditions allow the problem to occur? What other problems surround the occurrence of the central problem? Step Four: Identify the Root Cause(s) Why does the causal factor exist? What is the real reason the problem occurred?