CCS Cost Workshop
Jean-François Léandri
IEA Paris
6-7/11/2013
Alstom : three main activities in four sectors
Equipment & services for power generation
Alstom Thermal Power

Equipment & services for power transmission
Alstom Grid

Alstom Renewable Power

Equipment & services for rail transport
Alstom Transport

Clean Power, Clear Solutions - 05/11/2013 – P 2
Portfolio of power technologies
GAS

COAL

OIL

HYDRO

NUCLEAR (conventional island)

WIND (offshore and
onshore)

SOLAR

GEOTHERMAL

BIOMASS

TIDAL

...for new plants or installed base

Clean Power, Clear Solutions - 05/11/2013 – P 3
Carbon Capture and Storage
OPERATING

TESTS COMPLETE
Completed

AEP Mountaineer
USA – 58 MWth
Chilled Ammonia, Coal

EoN Karlshamn
Sweden - 5 MWth
Chilled Ammonia, Fuel

WE - Energie
USA WI - 5 MWth
Chilled Ammonia, Coal

Vattenfall Schwarze Pumpe,
Germany
30 MWth, Oxy - Lignite

Total Lacq
France - 30 MWth
Oxy - Gas

Alstom BSF Windsor
US - 15 MWth
Oxy - Coals

2nd Gen

P4

DOW Chemical Co.
USA, WV
Adv. Amines - Coal

DOE/Alstom Windsor
US - 3 MWth
Chemical Looping, Coal

OPERATING

TCM Mongstad Norway
40 MWth, Chilled Ammonia, CHP
& Refinery Offgas (RCC)

OPERATING

Alstom GPU Pilot (Mobile)
0.3 MWth

Alstom Labs Växjö
Sweden – 0.25 MWth
Post C.-multi purpose

2nd Gen

RFCS EU - Darmstadt
Germany - 1 MWth
Chemical Looping - Coal

© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 4
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

EDF Le Havre
France - 5 MWth Adv.
Adv. Amines - Coal

LARGE-SCALE PROJECTS
(under development)

White Rose CCS Project
UK - 426 MWe
Oxy Hardcoal
Learning curve or not learning curve ?
Limitation of the learning curves
To what extend are the historical empirical data valid for CCS technologies?
Where to start on the curve when zero commercial units sold?

Source Global CCS Institute

P5
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 5
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Alstom approach to estimate cost of CCS technologies
Many factors involved in cost reductions:
technological advances, patchwork of technical fields
rapid changes in policies & regulations
economies of scale, process improvements,
…..

Conventional
scope

CCS
integration

Alstom approach:
CCS
Capture

Learning disaggregated into:
conventional and CCS plants
then into performance and volume

CCS CO2
Comp

then into CCS sub-systems
Estimations based on technical analysis and expert judgment
Detailed performance and cost analysis of each CCS sub-items
P6
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 6
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Conventional reference plant
Setting the stage for future evolutions
“Increasing intermittent Power ”
•
•

Will reduce thermal capacity factor
Efficiency at part load, emissions

Improvement net efficiency LHV vs load
(conventional hardcoal plant – Europe)
53%

Eff. @ 100% load
Eff. @ 60% load
Eff. @ 35% load

51%

“Unaffordable Fuel bill , too low elec. prices”
•
•

Increase efficiency
Fuel characteristics (carbon %, FHV)

49%
710g/KWh
47%
45%

“increasing water scarcity & cost of water”
•

Cooling temperature (ACC, hybrid CT)

745g/KWh
785g/KWh

43%
41%

“Budget squeeze & tougher access to capital”
•
•

Scaling-up size
Standardization & Modularization

875g/KWh
39%
37%
2010

2015

2020

2025

2030

2035

Fossil plant operation and performance could change several times over its lifetime
P7
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 7
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Conventional reference plant
Capex estimation
Capex
30
€/KWh

Flexibility

Volume

Size/Leadtime

25
Efficiency

20
15
10
5
0
Ref 15-20

Ref 30-35

Cost of efficiency and flexibility performance improvements
Volume effect (could also be negative: e.g. less coal PP w/o CCS sold)
Cost reduction through shorter lead time (design & manufacturing) and
size increase (exponential scaling factor)
P8

Flexibility will have a cost

© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 8
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Capture system

CCS
integration

Performance improvements - Auxiliary consumption
CCS
Capture

Analysis for each sub-systems

CCS CO2
Comp

(Hardcoal illustration)
100%

90%

80%

70%
2015

CCS Integration
ASU EPC
GPU
Post capture

2020

2025

2030

2035

Starting Point: system performance as at starting year
Rates: potential level of improvement from system experts: ex: analysis of post
capture GJ/tO2 achievable and requirements (roadmap, IB, risks…)
Rates applied in addition to efficiency improvement of the reference plant
Rates could be customised by region/coal type

P9

© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 9
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

-P9
Capture system
Consolidated energy penalty (Hardcoal PP)
28%

28%

EUROPE

% MWe net

% MWe net

Oxy

26%

NAM
Oxy

26%

Amines

Amines

24%

24%

22%

22%

20%

20%

18%

18%

16%

16%

14%
2005

2010

2015

2020

2025

2030

2035

• Amine: high starting point (3,5 GJ/tCO2)

14%
2015

2020

2030

2035

• Impact of higher cooling temperature
• Coal characteristics not as good as EUR

Note: Energy penalty = (Net Output Ref PP – Net Output CCS PP)/ Net Output Ref PP

P 10
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 10
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

- P 10

2025
Capture system

CCS
integration

Capex improvement
CCS
Capture
CCS CO2
Comp

CCS plant drivers

Volume effect applies differently on conventional scope and on capture scope
Starting point for the Capture scope: large scale demo or FoaK commercial
Optimum economical size for capture train and number of trains
Risk provisions on first of a kind technology
100%

Volume effect
Rate derived from installed base
volume forecast (linked to years)

90%
80%
70%

Specific rates considered by capture
sub-system (integration, ASU, GPU /
Compr. CO2, post capture)

CCS Integration
ASU

60%

GPU / Compression CO2
Adv. Amine

Same rates applied for all regions

50%
40%
2015

2020
IC0

P 11

2025
IC1

2030
IC2

Year
2035

IC3

Inst. capacity

© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 11
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

- P 11
Capture system
O&M cost improvement
First method: disaggregate and estimate of the different cost reductions
Variable O&M:
• lower solvent cost due to cheaper solvents
• less solvent consumed with better reclamation and reduced waste cost
Fixed O&M:
• less manual chemical lab services, less dedicated process operators
• more automated analysis & process

Second method (selected): apply a full and aggregated O&M learning curve
to all the incremental fix/variable O&M CCS cost (excl. conventional plant)
P 12
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 12
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
CCS Plant
LCoE – illustration hardcoal plant Europe
100

CoE €/KWh

(*) Excluding CO2 Transport & Storage

90
80
70
60
50
40

-15 %
+32 %

+ 240 %
(50€/t)

CO2 cost
(14 €/t)

Avoided
Incremental
CO2 cost
CCS cost *
90% capture

FUEL

Avoided
CO2 cost
90% capture

Incremental
CCS cost *

- 5%

30
20
10

OPEX

+ 1%

CAPEX

+ 7%

Efficiency, flexibility, lead time,
scaling-up, volume

0
Ref PP

CCS CO2

2015 - 2020
P 13

CCS Others

Ref PP

CCS CO2

CCS Others

2030 - 2035

Cost of CCS plant as a result of a full consolidation

© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 13
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
CCS Plant
Sensitivity LCoE – illustration hardcoal plant Europe (1/2)
CCS Opex

-20%

Re-boiler duty (1,8 GJ/tCO2)

1,75 GJ

CO2 compression

Economic life (25 yrs)
Fuel cost (78,2 €/t)

50%

Eff 49,4%

Eff 47,4%

-50%

50%

Rate 80%

Rate 92,7%
Wacc 7%

Wacc 5,5%
40 yrs

20 yrs
Conventional plant contribution

-25%

-10%

10%

-35%

Capex Transport (200 km)

WACC w/o inflation (6%)

10%

-10%

Capex Storage

Capture rate (90%)

2,0 GJ

-10%

CCS Capex

Ref plt net efficiency (48,4%)

5%

-5%

0%

5%

LCoE CCS PP 2030-35
Example: 74 €/KWh
(w no CO2 price applied)

P 14

Performance and cost of CCS Sub-systems to be put in
perspective with other dimensions ….

© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 14
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

CCS

+25%

10%
CCS Plant
Sensitivity LCoE – illustration hardcoal plant Europe (2/2)

50 €/t (+6,1%)

Applying CO2 Price in 2030-35
Plant load (100% load)

Conventional plant portion

103%

CF @ full load (7446 hrs) 8000

-5%

110 €/t Impact from the 10% CO2 not captured on CCS PP

30 €/t

Conventional plant portion

0%

5%

10%

CCS portion

CCS portion

15%

20%

25%

60%

5000

30%

35%

LCoE CCS PP 2030-35
Example: 74 €/KWh
(w no CO2 price applied)

….in particular with CO2 market price and trend for flexibility.
P 15
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 15
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

40%
Conclusions
Capex: Detailed performance and cost analysis of each CCS
sub-items
Opex: O&M learning curve applied
Benchmark with Learning curve method
CCS systems evaluated as part of a global gas or coal plant
Key trends in generation anticipated (intermittency,
environnement…)
Optimisation of the global performance and cost of the plant
CCS plant flexibility and its related cost will be key
P 16
© ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
Clean Power, Clear Solutions 05/11/2013 – P 16
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
www.alstom.com

Más contenido relacionado

La actualidad más candente

ModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehiclesModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehiclesLeonardo ENERGY
 
Drivers for H2 deployment in medium and short-term in the Portuguese energy s...
Drivers for H2 deployment in medium and short-term in the Portuguese energy s...Drivers for H2 deployment in medium and short-term in the Portuguese energy s...
Drivers for H2 deployment in medium and short-term in the Portuguese energy s...IEA-ETSAP
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Leonardo ENERGY
 
Ifac2016 49-369-76
Ifac2016 49-369-76Ifac2016 49-369-76
Ifac2016 49-369-76Ali Sirt
 
Status ETSAP_TIAM Git project and starting up ETSAP-TIAM update
Status ETSAP_TIAM Git project and starting up ETSAP-TIAM updateStatus ETSAP_TIAM Git project and starting up ETSAP-TIAM update
Status ETSAP_TIAM Git project and starting up ETSAP-TIAM updateIEA-ETSAP
 
JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...
JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...
JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...European Green Vehicle Initiative
 
CO2 emissions of vehicles: a broad and persistent problem
 CO2 emissions of vehicles: a broad and persistent problem CO2 emissions of vehicles: a broad and persistent problem
CO2 emissions of vehicles: a broad and persistent problemLeonardo ENERGY
 
Should the focus be on broader policy goals or on specific technology targets?
Should the focus be on broader policy goals or on specific technology targets?Should the focus be on broader policy goals or on specific technology targets?
Should the focus be on broader policy goals or on specific technology targets?IEA-ETSAP
 
EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...
EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...
EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...Machine Tool Systems Inc.
 
Explaining recent renewable energy auction outcomes in Europe
Explaining recent renewable energy auction outcomes in Europe Explaining recent renewable energy auction outcomes in Europe
Explaining recent renewable energy auction outcomes in Europe Leonardo ENERGY
 
Analysis of the relative roles of supply-side and demand-side measures in tac...
Analysis of the relative roles of supply-side and demand-side measures in tac...Analysis of the relative roles of supply-side and demand-side measures in tac...
Analysis of the relative roles of supply-side and demand-side measures in tac...IEA-ETSAP
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data availableIEA-ETSAP
 
Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...
Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...
Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...Altair
 
Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...Leonardo ENERGY
 
Pushing the limits of TIAM - Achieving well-below 2 degrees scenarios
Pushing the limits of TIAM - Achieving well-below 2 degrees scenariosPushing the limits of TIAM - Achieving well-below 2 degrees scenarios
Pushing the limits of TIAM - Achieving well-below 2 degrees scenariosIEA-ETSAP
 
Rare earth free motor designs - ReFreeDrive project
Rare earth free motor designs - ReFreeDrive projectRare earth free motor designs - ReFreeDrive project
Rare earth free motor designs - ReFreeDrive projectLeonardo ENERGY
 
Mitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMMitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMIEA-ETSAP
 
European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)
European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)
European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)Andrew Gelston
 
Sensonor STIM318 Inertial Measurement Unit (IMU)
Sensonor STIM318 Inertial Measurement Unit (IMU)Sensonor STIM318 Inertial Measurement Unit (IMU)
Sensonor STIM318 Inertial Measurement Unit (IMU)system_plus
 

La actualidad más candente (20)

ModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehiclesModulED. Next generation powertrains for electric vehicles
ModulED. Next generation powertrains for electric vehicles
 
Drivers for H2 deployment in medium and short-term in the Portuguese energy s...
Drivers for H2 deployment in medium and short-term in the Portuguese energy s...Drivers for H2 deployment in medium and short-term in the Portuguese energy s...
Drivers for H2 deployment in medium and short-term in the Portuguese energy s...
 
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
Efficient motor systems for a Net Zero world, by Conrad U. Brunner - Impact E...
 
Ifac2016 49-369-76
Ifac2016 49-369-76Ifac2016 49-369-76
Ifac2016 49-369-76
 
Status ETSAP_TIAM Git project and starting up ETSAP-TIAM update
Status ETSAP_TIAM Git project and starting up ETSAP-TIAM updateStatus ETSAP_TIAM Git project and starting up ETSAP-TIAM update
Status ETSAP_TIAM Git project and starting up ETSAP-TIAM update
 
JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...
JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...
JOSPEL - Low energy passenger comfort systems based on the joule and peltier ...
 
CO2 emissions of vehicles: a broad and persistent problem
 CO2 emissions of vehicles: a broad and persistent problem CO2 emissions of vehicles: a broad and persistent problem
CO2 emissions of vehicles: a broad and persistent problem
 
Should the focus be on broader policy goals or on specific technology targets?
Should the focus be on broader policy goals or on specific technology targets?Should the focus be on broader policy goals or on specific technology targets?
Should the focus be on broader policy goals or on specific technology targets?
 
EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...
EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...
EOS Model M400 DMLS Client, Ruag Citim, antenna bracket for the Sentinel sate...
 
Explaining recent renewable energy auction outcomes in Europe
Explaining recent renewable energy auction outcomes in Europe Explaining recent renewable energy auction outcomes in Europe
Explaining recent renewable energy auction outcomes in Europe
 
Analysis of the relative roles of supply-side and demand-side measures in tac...
Analysis of the relative roles of supply-side and demand-side measures in tac...Analysis of the relative roles of supply-side and demand-side measures in tac...
Analysis of the relative roles of supply-side and demand-side measures in tac...
 
Status of US CCS projects and data available
Status of US CCS projects and data availableStatus of US CCS projects and data available
Status of US CCS projects and data available
 
Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...
Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...
Advance Electromangnetic Simulations and their Applications in Oil & Gas Indu...
 
Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...Next generation electric drivetrains for fully electric vehicles, focusing on...
Next generation electric drivetrains for fully electric vehicles, focusing on...
 
Pushing the limits of TIAM - Achieving well-below 2 degrees scenarios
Pushing the limits of TIAM - Achieving well-below 2 degrees scenariosPushing the limits of TIAM - Achieving well-below 2 degrees scenarios
Pushing the limits of TIAM - Achieving well-below 2 degrees scenarios
 
Rare earth free motor designs - ReFreeDrive project
Rare earth free motor designs - ReFreeDrive projectRare earth free motor designs - ReFreeDrive project
Rare earth free motor designs - ReFreeDrive project
 
Mitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAMMitigation Pathways to well below 2C in ETSAP-TIAM
Mitigation Pathways to well below 2C in ETSAP-TIAM
 
Derek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology AreaDerek Berry - IACMI/Wind Technology Area
Derek Berry - IACMI/Wind Technology Area
 
European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)
European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)
European Green Cars Initiative Projects HELIOS Proposal Paper (July 2012)
 
Sensonor STIM318 Inertial Measurement Unit (IMU)
Sensonor STIM318 Inertial Measurement Unit (IMU)Sensonor STIM318 Inertial Measurement Unit (IMU)
Sensonor STIM318 Inertial Measurement Unit (IMU)
 

Similar a Estimating the cost of a CCS System - Jean-François Léandri, Alstom

keppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporekeppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporeDaniel ANG
 
Digital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdfDigital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdfssuserfaf8d6
 
STMicroelectronics MASTERGAN1 Half-Bridge Driver
STMicroelectronics MASTERGAN1 Half-Bridge DriverSTMicroelectronics MASTERGAN1 Half-Bridge Driver
STMicroelectronics MASTERGAN1 Half-Bridge Driversystem_plus
 
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...Global CCS Institute
 
tuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-planttuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-plantDaniel ANG
 
The economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesThe economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesSentient Science
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen BroessDutch Power
 
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa
 
Ward gommeren | energieopslag op zee
Ward gommeren  | energieopslag op zeeWard gommeren  | energieopslag op zee
Ward gommeren | energieopslag op zeeGreenbridge nv
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...Forum for the Future
 
Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Global CCS Institute
 
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015Matthew Le Cordeur
 
Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)
Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)
Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)Esther Petrilli-Massey
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine FleetGE_India
 

Similar a Estimating the cost of a CCS System - Jean-François Léandri, Alstom (20)

keppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singaporekeppel-2-ka26-combined-cycle-power-plant-singapore
keppel-2-ka26-combined-cycle-power-plant-singapore
 
EWTEC_Presentation_v2
EWTEC_Presentation_v2EWTEC_Presentation_v2
EWTEC_Presentation_v2
 
EV Burner
EV BurnerEV Burner
EV Burner
 
Az-Zour
Az-ZourAz-Zour
Az-Zour
 
Digital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdfDigital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdf
 
STMicroelectronics MASTERGAN1 Half-Bridge Driver
STMicroelectronics MASTERGAN1 Half-Bridge DriverSTMicroelectronics MASTERGAN1 Half-Bridge Driver
STMicroelectronics MASTERGAN1 Half-Bridge Driver
 
Energy Economics Christian Feisst
Energy Economics Christian FeisstEnergy Economics Christian Feisst
Energy Economics Christian Feisst
 
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
From demonstrators to commercial CCS costs - Wilfried Maas, Shell & Member UK...
 
tuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-planttuas-ccp5-singapore-ka26-gas-combined-cycle-plant
tuas-ccp5-singapore-ka26-gas-combined-cycle-plant
 
The economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenuesThe economics of reducing the cost of energy by 13% revenues
The economics of reducing the cost of energy by 13% revenues
 
3. DNV GL - Koen Broess
3. DNV GL - Koen Broess3. DNV GL - Koen Broess
3. DNV GL - Koen Broess
 
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas IndustryYokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
Yokogawa's Vigilant Plant | Success Stories | Oil & Gas Industry
 
Folheto Petro-SIM
Folheto Petro-SIMFolheto Petro-SIM
Folheto Petro-SIM
 
Transformers
TransformersTransformers
Transformers
 
Ward gommeren | energieopslag op zee
Ward gommeren  | energieopslag op zeeWard gommeren  | energieopslag op zee
Ward gommeren | energieopslag op zee
 
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
SSI workstream - Accelerating the uptake of technology: Demonstrating the bus...
 
Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...
 
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
 
Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)
Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)
Flare reduction projects - issues underlying limited uptake - Steve Ross (SGS)
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
 

Más de Global CCS Institute

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Global CCS Institute
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSGlobal CCS Institute
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Global CCS Institute
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Global CCS Institute
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSGlobal CCS Institute
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Global CCS Institute
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationGlobal CCS Institute
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeGlobal CCS Institute
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Global CCS Institute
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Global CCS Institute
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Global CCS Institute
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsGlobal CCS Institute
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Global CCS Institute
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Global CCS Institute
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Global CCS Institute
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsGlobal CCS Institute
 

Más de Global CCS Institute (20)

Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project Northern Lights: A European CO2 transport and storage project
Northern Lights: A European CO2 transport and storage project
 
Webinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCSWebinar: Policy priorities to incentivise large scale deployment of CCS
Webinar: Policy priorities to incentivise large scale deployment of CCS
 
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
Telling the Norwegian CCS Story | PART II: CCS: the path to a sustainable and...
 
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
Telling the Norwegian CCS Story | PART I: CCS: the path to sustainable and em...
 
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCSDecarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
Decarbonizing Industry Using Carbon Capture: Norway Full Chain CCS
 
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
Cutting Cost of CO2 Capture in Process Industry (CO2stCap) Project overview &...
 
Global CCS Institute Presentation
Global CCS Institute PresentationGlobal CCS Institute Presentation
Global CCS Institute Presentation
 
ION Engineering Presentation
ION Engineering PresentationION Engineering Presentation
ION Engineering Presentation
 
Membrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) PresentationMembrane Technology & Research (MTR) Presentation
Membrane Technology & Research (MTR) Presentation
 
Mission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation ChallengeMission Innovation: Carbon Capture Innovation Challenge
Mission Innovation: Carbon Capture Innovation Challenge
 
Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?Can the United States Achieve a Low Carbon Economy by 2050?
Can the United States Achieve a Low Carbon Economy by 2050?
 
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
Webinar Series: Carbon Sequestration Leadership Forum Part 1. CCUS in the Uni...
 
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
Energy Security and Prosperity in Australia: A roadmap for carbon capture and...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
Webinar Series: Public engagement, education and outreach for CCS. Part 5: So...
 
Managing carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basinsManaging carbon geological storage and natural resources in sedimentary basins
Managing carbon geological storage and natural resources in sedimentary basins
 
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
Mercury and other trace metals in the gas from an oxy-combustion demonstratio...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
Webinar Series: Public engagement, education and outreach for CCS. Part 4: Is...
 
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
Laboratory-scale geochemical and geomechanical testing of near wellbore CO2 i...
 
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
Webinar Series: Public engagement, education and outreach for CCS. Part 3: Ca...
 
Water use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systemsWater use of thermal power plants equipped with CO2 capture systems
Water use of thermal power plants equipped with CO2 capture systems
 

Último

Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex
 
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Sonam Pathan
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...Henry Tapper
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfMichael Silva
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)twfkn8xj
 
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...Amil Baba Dawood bangali
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTharshitverma1762
 
The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...AES International
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...yordanosyohannes2
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithAdamYassin2
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfHenry Tapper
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...Amil baba
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfMichael Silva
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Sonam Pathan
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxuzma244191
 

Último (20)

Bladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results PresentationBladex 1Q24 Earning Results Presentation
Bladex 1Q24 Earning Results Presentation
 
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
Call Girls Near Golden Tulip Essential Hotel, New Delhi 9873777170
 
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
letter-from-the-chair-to-the-fca-relating-to-british-steel-pensions-scheme-15...
 
Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024Monthly Economic Monitoring of Ukraine No 231, April 2024
Monthly Economic Monitoring of Ukraine No 231, April 2024
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth AdvisorsQ1 2024 Newsletter | Financial Synergies Wealth Advisors
Q1 2024 Newsletter | Financial Synergies Wealth Advisors
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdf
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)
 
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACTGOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
GOODSANDSERVICETAX IN INDIAN ECONOMY IMPACT
 
The AES Investment Code - the go-to counsel for the most well-informed, wise...
The AES Investment Code -  the go-to counsel for the most well-informed, wise...The AES Investment Code -  the go-to counsel for the most well-informed, wise...
The AES Investment Code - the go-to counsel for the most well-informed, wise...
 
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
AfRESFullPaper22018EmpiricalPerformanceofRealEstateInvestmentTrustsandShareho...
 
Classical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam SmithClassical Theory of Macroeconomics by Adam Smith
Classical Theory of Macroeconomics by Adam Smith
 
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdfBPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
BPPG response - Options for Defined Benefit schemes - 19Apr24.pdf
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdf
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
 
Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptx
 

Estimating the cost of a CCS System - Jean-François Léandri, Alstom

  • 1. CCS Cost Workshop Jean-François Léandri IEA Paris 6-7/11/2013
  • 2. Alstom : three main activities in four sectors Equipment & services for power generation Alstom Thermal Power Equipment & services for power transmission Alstom Grid Alstom Renewable Power Equipment & services for rail transport Alstom Transport Clean Power, Clear Solutions - 05/11/2013 – P 2
  • 3. Portfolio of power technologies GAS COAL OIL HYDRO NUCLEAR (conventional island) WIND (offshore and onshore) SOLAR GEOTHERMAL BIOMASS TIDAL ...for new plants or installed base Clean Power, Clear Solutions - 05/11/2013 – P 3
  • 4. Carbon Capture and Storage OPERATING TESTS COMPLETE Completed AEP Mountaineer USA – 58 MWth Chilled Ammonia, Coal EoN Karlshamn Sweden - 5 MWth Chilled Ammonia, Fuel WE - Energie USA WI - 5 MWth Chilled Ammonia, Coal Vattenfall Schwarze Pumpe, Germany 30 MWth, Oxy - Lignite Total Lacq France - 30 MWth Oxy - Gas Alstom BSF Windsor US - 15 MWth Oxy - Coals 2nd Gen P4 DOW Chemical Co. USA, WV Adv. Amines - Coal DOE/Alstom Windsor US - 3 MWth Chemical Looping, Coal OPERATING TCM Mongstad Norway 40 MWth, Chilled Ammonia, CHP & Refinery Offgas (RCC) OPERATING Alstom GPU Pilot (Mobile) 0.3 MWth Alstom Labs Växjö Sweden – 0.25 MWth Post C.-multi purpose 2nd Gen RFCS EU - Darmstadt Germany - 1 MWth Chemical Looping - Coal © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 4 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. EDF Le Havre France - 5 MWth Adv. Adv. Amines - Coal LARGE-SCALE PROJECTS (under development) White Rose CCS Project UK - 426 MWe Oxy Hardcoal
  • 5. Learning curve or not learning curve ? Limitation of the learning curves To what extend are the historical empirical data valid for CCS technologies? Where to start on the curve when zero commercial units sold? Source Global CCS Institute P5 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 5 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 6. Alstom approach to estimate cost of CCS technologies Many factors involved in cost reductions: technological advances, patchwork of technical fields rapid changes in policies & regulations economies of scale, process improvements, ….. Conventional scope CCS integration Alstom approach: CCS Capture Learning disaggregated into: conventional and CCS plants then into performance and volume CCS CO2 Comp then into CCS sub-systems Estimations based on technical analysis and expert judgment Detailed performance and cost analysis of each CCS sub-items P6 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 6 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 7. Conventional reference plant Setting the stage for future evolutions “Increasing intermittent Power ” • • Will reduce thermal capacity factor Efficiency at part load, emissions Improvement net efficiency LHV vs load (conventional hardcoal plant – Europe) 53% Eff. @ 100% load Eff. @ 60% load Eff. @ 35% load 51% “Unaffordable Fuel bill , too low elec. prices” • • Increase efficiency Fuel characteristics (carbon %, FHV) 49% 710g/KWh 47% 45% “increasing water scarcity & cost of water” • Cooling temperature (ACC, hybrid CT) 745g/KWh 785g/KWh 43% 41% “Budget squeeze & tougher access to capital” • • Scaling-up size Standardization & Modularization 875g/KWh 39% 37% 2010 2015 2020 2025 2030 2035 Fossil plant operation and performance could change several times over its lifetime P7 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 7 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 8. Conventional reference plant Capex estimation Capex 30 €/KWh Flexibility Volume Size/Leadtime 25 Efficiency 20 15 10 5 0 Ref 15-20 Ref 30-35 Cost of efficiency and flexibility performance improvements Volume effect (could also be negative: e.g. less coal PP w/o CCS sold) Cost reduction through shorter lead time (design & manufacturing) and size increase (exponential scaling factor) P8 Flexibility will have a cost © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 8 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 9. Capture system CCS integration Performance improvements - Auxiliary consumption CCS Capture Analysis for each sub-systems CCS CO2 Comp (Hardcoal illustration) 100% 90% 80% 70% 2015 CCS Integration ASU EPC GPU Post capture 2020 2025 2030 2035 Starting Point: system performance as at starting year Rates: potential level of improvement from system experts: ex: analysis of post capture GJ/tO2 achievable and requirements (roadmap, IB, risks…) Rates applied in addition to efficiency improvement of the reference plant Rates could be customised by region/coal type P9 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 9 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. -P9
  • 10. Capture system Consolidated energy penalty (Hardcoal PP) 28% 28% EUROPE % MWe net % MWe net Oxy 26% NAM Oxy 26% Amines Amines 24% 24% 22% 22% 20% 20% 18% 18% 16% 16% 14% 2005 2010 2015 2020 2025 2030 2035 • Amine: high starting point (3,5 GJ/tCO2) 14% 2015 2020 2030 2035 • Impact of higher cooling temperature • Coal characteristics not as good as EUR Note: Energy penalty = (Net Output Ref PP – Net Output CCS PP)/ Net Output Ref PP P 10 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 10 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. - P 10 2025
  • 11. Capture system CCS integration Capex improvement CCS Capture CCS CO2 Comp CCS plant drivers Volume effect applies differently on conventional scope and on capture scope Starting point for the Capture scope: large scale demo or FoaK commercial Optimum economical size for capture train and number of trains Risk provisions on first of a kind technology 100% Volume effect Rate derived from installed base volume forecast (linked to years) 90% 80% 70% Specific rates considered by capture sub-system (integration, ASU, GPU / Compr. CO2, post capture) CCS Integration ASU 60% GPU / Compression CO2 Adv. Amine Same rates applied for all regions 50% 40% 2015 2020 IC0 P 11 2025 IC1 2030 IC2 Year 2035 IC3 Inst. capacity © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 11 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. - P 11
  • 12. Capture system O&M cost improvement First method: disaggregate and estimate of the different cost reductions Variable O&M: • lower solvent cost due to cheaper solvents • less solvent consumed with better reclamation and reduced waste cost Fixed O&M: • less manual chemical lab services, less dedicated process operators • more automated analysis & process Second method (selected): apply a full and aggregated O&M learning curve to all the incremental fix/variable O&M CCS cost (excl. conventional plant) P 12 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 12 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 13. CCS Plant LCoE – illustration hardcoal plant Europe 100 CoE €/KWh (*) Excluding CO2 Transport & Storage 90 80 70 60 50 40 -15 % +32 % + 240 % (50€/t) CO2 cost (14 €/t) Avoided Incremental CO2 cost CCS cost * 90% capture FUEL Avoided CO2 cost 90% capture Incremental CCS cost * - 5% 30 20 10 OPEX + 1% CAPEX + 7% Efficiency, flexibility, lead time, scaling-up, volume 0 Ref PP CCS CO2 2015 - 2020 P 13 CCS Others Ref PP CCS CO2 CCS Others 2030 - 2035 Cost of CCS plant as a result of a full consolidation © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 13 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
  • 14. CCS Plant Sensitivity LCoE – illustration hardcoal plant Europe (1/2) CCS Opex -20% Re-boiler duty (1,8 GJ/tCO2) 1,75 GJ CO2 compression Economic life (25 yrs) Fuel cost (78,2 €/t) 50% Eff 49,4% Eff 47,4% -50% 50% Rate 80% Rate 92,7% Wacc 7% Wacc 5,5% 40 yrs 20 yrs Conventional plant contribution -25% -10% 10% -35% Capex Transport (200 km) WACC w/o inflation (6%) 10% -10% Capex Storage Capture rate (90%) 2,0 GJ -10% CCS Capex Ref plt net efficiency (48,4%) 5% -5% 0% 5% LCoE CCS PP 2030-35 Example: 74 €/KWh (w no CO2 price applied) P 14 Performance and cost of CCS Sub-systems to be put in perspective with other dimensions …. © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 14 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. CCS +25% 10%
  • 15. CCS Plant Sensitivity LCoE – illustration hardcoal plant Europe (2/2) 50 €/t (+6,1%) Applying CO2 Price in 2030-35 Plant load (100% load) Conventional plant portion 103% CF @ full load (7446 hrs) 8000 -5% 110 €/t Impact from the 10% CO2 not captured on CCS PP 30 €/t Conventional plant portion 0% 5% 10% CCS portion CCS portion 15% 20% 25% 60% 5000 30% 35% LCoE CCS PP 2030-35 Example: 74 €/KWh (w no CO2 price applied) ….in particular with CO2 market price and trend for flexibility. P 15 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 15 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. 40%
  • 16. Conclusions Capex: Detailed performance and cost analysis of each CCS sub-items Opex: O&M learning curve applied Benchmark with Learning curve method CCS systems evaluated as part of a global gas or coal plant Key trends in generation anticipated (intermittency, environnement…) Optimisation of the global performance and cost of the plant CCS plant flexibility and its related cost will be key P 16 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will-apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without Clean Power, Clear Solutions 05/11/2013 – P 16 liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.