SlideShare una empresa de Scribd logo
1 de 33
2014
                                                                                          Incheon
    2014 Incheon Asian Games differentiation, infrastructure
    operation/for-profit service model development proposal


                                                                                   Cisco Services APAC
                                                                                            March, 2011

Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential             1
Executive Summary


                                                            1
                                                                                                2
                                                                                                    3



Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential           2
Executive Summary

                                              1
                                                           • Ultra high definition & borderless video conversation

                                                           • Multi-language video translator




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                        3
Executive Summary

                                             2


                                       • Maximization of post-AG stadium usage
                                       •Utilization of all the available tangible/intangible property
                                       • leverage of non-sports area




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential           4
Executive Summary

                                              3
                                                                                                                    facility     integrated video
                                                            integrated                              automated
                                                                                                                  management       management/
                                                          management                                 day/night
                                                                                                                      DB             operation
                                                          infrastructure                           surveillance
                                                                                                                   interface         structure




                                                                                                • operation efficiency enhancement
                                                                                                • operation cost saving




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                5
Contents
                                                                                   1. Spread effect of mega sports event
                                                                                   2. Local public sports facilities operation
                                                                                   3. Overseas cases
                                                                                   4. Stadium operation & for-profit model plan




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                    6
Contents
                                                                                   1. Spread effect of mega sports event
                                                                                   2. Local public sports facilities operation
                                                                                   3. Overseas cases
                                                                                   4. Stadium operation & for-profit model plan




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                    7
Spread effect of mega sports event

       area                                                   positive spread effect                      negative spread effect

          social/cultural                        • increased interest in local events &          • commercially oriented event distorting original
                                                 heightened local participation                  purpose
                                                 • strengthened local tradition & value

                                                 • construction of new facilities                • environmental degradation
              physical
                                                 • local infrastructure improvement              • congestion

                                                • heightened international recognition           • labor exploitation of local residents
                                                on local value
               political                                                                         • politically directed event distorting original purpose
                                                • enhanced political value by residents/
                                                government
                                                 • Increased tourism activities                  • possible criticism from outside due to lack of event
            commercial                                                                           preparedness
                                                 • Increased local investment & commercial
                                                 activities
                                                                                                 • inflation/ speculative investment in real-estate
             economic                            • consumption increase, job creation


          psychological                          • strengthened community spirit                 • defensive attitude towards local citizens


 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                              8
Spread effect of mega sports event


                                    USD 6.5 billion
                                                            2000
                                           Sydney Olympic Games

                                                                                                  USD 5.1 billion
                                                                                                  1996
                                                                                                  Atlanta Olympic Games

                                    USD 2.6 billion
                                                              1988
                                              Seoul Olympic Games

                                                                                                  USD 2.3 billion
                                                                                                  1984
                                                                                                  LA Olympic Games

                   • 2002 Korea-Japan World Cup: 4 trillion won of value added
                   • Image enhancement for hosting nation/city, Nation’s international reputation improvement
                   • Contribution to national/local development

 Presentation_ID    © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                           9
Contents
                                                                                   1. Spread effect of mega sports event
                                                                                   2. Local public sports facilities operation
                                                                                   3. Overseas cases
                                                                                   4. Stadium operation & for-profit model plan




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                    10
Domestic public sports facility operation status
                                                It is a general term for a sports facility that has been built, operated and
 What is public sports                          maintained with the budget funded by the central government , local government
       facility ?                               or public agency to encourage the general public to take part in sports activities
                                                in a proactive & sound manner.

                   Facility                                Seoul                      Busan      Daegu   Incheon   Gyeonggi   Jeju

      Track and field stadium                                3                            3        3       3         30       12
           Soccer field                                     56                           15       12       9         75       20
           Hockey field                                      1                            1        1       1          2
          Baseball field                                     6                            2        3       2          8        2
          Cycle stadium                                      1                            1        1       1          1
            Tennis court                                    48                            3       10       4         84        4
      Korean wrestling stadium                               1                            1        1       1          3        1
          Temp play ground                                 1,669                         454      218     340       1,759     140
                 Gym                                        88                           11       13      11         80       18
           Ball game gym                                    14                            5        3       6         48       13
           Martial arts gym                                  4                            2        4       1          2        1
         Physical training gym                              70                            4        6       4         30        4
            Swimming pool                                   76                            2       11       6         40        2
           Roller skate rink                                14                            9        1       6         13        1
             Shooting field                                                               1                1          1
        Traditional archery field                             8                           2        2       7         31        2
             Archery field                                    1                           1        1       1          3
           Horse-riding filed                                 1                                    2                  1
              Golf course                                     20                                                      1        1
         Rowing/canoe facility                                                             1                          1
             Yacht facility                                                                1                          1
                Ice rink                                       4                           1       1                  6
 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                       11
Domestic public sports facility operation status

         Revenue/expense of public sports facilities                                                                          Operation of Sangam & Suwon
                       in Korea                                                                                                          stadiums
                                                                                    (unit:millionwon)
              Construc                2004                    2004
 Index                                                                             Difference                     Sangam                         Item                           Suwon
               t cost               revenue                 spending

 Seoul              203,300                  11,759                     6,248                 5,511                                           Total budget
                                                                                                            203.3 billion                                                252.2 billion

 Busan              226,818                       655                   2,743               -2,088                                          Stadium construction
                                                                                                              2001 Dec.                                                     2001 May
                                                                                                                                                 completion
 Daegu              283,600                       256                   3,448               -3,192        Retail store, movie theater,                           Sports center, drive-in theater, open
                                                                                                        shopping mall, sports sauna,                             area restaurant, museum, wedding
  Incheon           328,218                    1,723                    4,470               -2,747                                            Retail vendor
                                                                                                          wedding hallandwedding                                  hall, Suwon temporary Paldalgu
                                                                                                        reception, restaurant , hospital,                       office,Suwon broadcastingstation etc.
Kwangju             158,788                       220                   1,794               -1,574
                                                                                                          pharmacy and stores, etc.
                                                                                                                   130                         Number of                          18
Daejeon             121,700                       416                   1,530                -1,114                                             facilities
                                                                                                           25 ~ 30 thousand                  Number of daily               2 thousand
 Ulsan              151,420                    1,806                    2,923                -1,117
                                                                                                                                             average visitors

 Suwon              252,277                    3,879                     5,311              -1,432        Lease 7.3 billion                                           Lease 1.4 billion
                                                                                                        Admission fee/venue                   2003 revenue           Admission fee/venue
 Jeonju             136,875                       560                   1,888               -1,328      rental fee 5.7 billion                                      rental fee 5.7 billion
                                                                                                            Operation cost                       expense                  Operation cost
Seogwipo            112,500                       290                      742                 -452           7 billion                                                    4 billion
                                                                                                           6 billion in the black              balance                1.9billion in the red
 Total          1,975,491                    21,564                   31,079                -9,533                                              accounts


  Presentation_ID     © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                                                            12
Contents
                                                                                   1. Spread effect of mega sports event
                                                                                   2. Local public sports facilities operation
                                                                                   3. Overseas cases
                                                                                   4. Stadium operation & for-profit model plan




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                    13
Cases of post-event stadium usage
                                                    • Saddle Dome foundation was established and its management committee
  Calgary Olympic Games
                                                    consisting of city council members supports amateur sports with profits generated
                                                    from year-round lease of facilities for concert, rodeo, circus, shopping mall,
                                                    convention center & etc.
                                                    • The government sold the rights of operation and management to CODA ,
                                                    improving community sports facilities and making profits.
                                                    • opening/closing ceremony stadium: the business ownership of the stadium was
                                                    transferred to Calgary university and facilities were repaired and remodeled to a
                                                    football stadium, operating in the black.
                                                    • Naskiska sky resort: It is popular as it offers various programs including winter sports
                                                    & camping programs
                                                    The policy regarding the use of facilities after the Olympic Games was announced
   Beijing Olympic Games
                                                    by holding ‘the international forum on Olympic stadiums build & operation plan.’
                                                    •The swimming stadium is popular as citizen sports facility with various swimming
                                                    programs, expanding the customer base to high-income earners.
                                                    • The fitness club and banquet hall are run and various services are offered.
                                                    • Due to popularity of the culture and sports center, a complex town equipped with
                                                     culture, leisure & business facilities was built in a massive green area,



       Yokohama Stadium                             • budget planning for citizen facilities to improve health of citizens
                                                    • Average usage: 100 days per year


 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                         14
IT-enabled additional services
VIP Room operation




                                                                                                 WELCOME

                                                                                                       VIDEO

                                                                                                        FOOD
                                                                                                     MERCHANDISE




 Immersive HD video…                                                                Custom Premium    Extend the Experience
     Everywhere                                                                      Fan Services

 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                           15
IT-enabled additional services
VIP Room operation
                                                           • Luxury Suite(NY Yankees Stadium) deploy
                   Display #1                             <live game broadcasting>                      <bullpen screen>    <other stadiums’ game broadcasting>




                   Channel switching
                    & food ordering
                   w/ Cisco IP phone




                                                                       • control functions including channel switching & volume
                                                                         adjusting thru IP phone’s touch panel
                                                                         (diverse contents offering for luxury suite users)



             Display #2                                                                            • information on products & foods available at in-stadium
                                                                                                     shops & restaurants
                                                                                                   • foods & products ordering thru IP phone
                                                                                                   • service improvement for luxury suite users with delivery
                                                                                                     service
 Presentation_ID     © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                          16
IT-enabled additional services
Fan meeting thru TP




                                                                                                 NBA Star Tony Parker

                                        NBA Star Yao Ming




                                                                                                           NBA Legend Magic Johnson


 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                        17
Contents
                                                                                   1. Spread effect of mega sports event
                                                                                   2. Local public sports facilities operation
                                                                                   3. Overseas cases
                                                                                   4. Stadium operation & for-profit model plan




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                    18
Why differentiated & sustainable operation model ?

                                                                                              Event
                                                                                            completion



     Phase 1.                                                                                            Phase 2.
     Before & During Aisan Game                                                                          After Aisan Game


        Optimal operation infrastructure implementation
1       & differentiated service strategies development
        designing & building platform
                                                                                                         3   Sustainable operation strategies development
                                                                                                             Ensuring sustainability of services for
        & infrastructure which enable smart services                                                         stadiums and athletes’ village thru green
                                                                                                             and Community Connect services



                                                              2          Transition strategies development
                                                                         developing strategies in consideration of
                                                                         post-AG operation as well as the AG period operation.
                                                                         building service & infrastructure implementation
                                                                         strategies for athletes’ village and stadiums



 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                        19
Smart Connected model



                                                                                                               Smart Connected Stadium
                                                                                                                • saving operation costs with green
    sustainable stadium                                                                                           services & solutions
      operation model
                                                                                                                • delivering differentiated & video-enabled
                                                                                                                  services & solutions at anywhere, at
  • offering differentiated services                             Connected                                        anytime & with any devices
    during the AG period                                          Stadium
  • optimizing operation costs &                                                                               Smart Connected Data Center
    maximizing profit thru post-AG                                                               Connected
    services                                                                                     Data Center    • sharing Cisco’s video-enabled
                                                                                                                  infrastructure & services
                                                                                    S + CC                      • efficiently developing services &
    S+CC services                                                                                                 optimizing operation costs with platform
    deployment                                                                                                    sharing
    into athletes’ village                                           Connected
                                                                     Residence
 • giving differentiated image to                                                                              Smart Connected Residence
   athletes with S+CC services                                                                                  • saving build & operation costs with
   offering during the AG period                                                                                  Cisco’s integrated operation center
 • heightening brand image with                                                                                   infrastructure
   consistent services offering                                                                                 • ensuring sustainability with unified service
                                                                                                                  provider & infrastructure operator




 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                          20
Operation cost saving with integrated management




                   COMMUNICATION                                                               ENTERTAINMENT             OPERATIONS
             1     Phone                                                                  1       Ticketing          1 Parking

             2     Data/Email/Fax                                                         2       Digital Video      2 Video Surveillance

             3     Call Center                                                            3       Point-of-Sale      3 Energy Management

             4     Mobile                                                                  4      Event Promotions   4 Access Management


 Presentation_ID    © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                             21
New revenue-generating model development
Various sports marketing activities




              Selling stadium property naming rights                                                              Attracting retail vendors
           • Stadium naming rights                                                               • retail stores, movie theater, fitness center & etc.
           • station naming rights




                       Leasing stadium for events                                                                  Offering for-citizen services
        • attracting games & events                                                                 • sports & entertainment services
        • cultural events(concert, opera & etc.)                                                    • other services for revenue generation


 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                           22
New revenue generation model
Advertisement profit from Digital Signage

                                                                                                                                                 1 cycle
                                                                                                             Advertisement
                      A                                                                               C       sale unit: Slot
                                                                                                             (15 seconds)
                                                                                                                                                 1~12 Cycle
                                                                                                                                                  (1 hour
                                                                                                                                                   Before
                                                                                                                                                   Game)



                                                                       B                                                                1 slot
                                                                                                                                       2 slot
                                                                                                                                       3 slot
                                                                                                                                        4 slot
                                                                                                                                       5 slot
                                                                                                                                        6 slot
                                                                                                                                       7 slot
                                                                                                                                        8 slot




                                                                                                                            5분/cycle
                                                                                                                                       9 slot
                                                                                                                                       10 slot
                                                                                                                                       12 slot
                                                                                                                                                 13~48 Cycle


                                                                       D                                                               13 slot
                                                                                                                                       14 slot
                                                                                                                                       15 slot
                                                                                                                                       16 slot
                                                                                                                                       17 slot
                                                                                                                                                   (3 hours
                                                                                                                                                    During
                                                                                                                                                    Game)

                                                                                                                                       18 slot
                                                                                                                                       19 slot
                                                                                                                                       20 slot


                                                                                                              Advertisement cycle of DMS
                                                                                            Advertisement             (5 minutes)
           Sponsored Zone screen(52” HD)                                                    screen(52” HD)
                                                                                                                                                 48~60 Cycle
                                                                                                                                                   (1 hour
                                                                                                                                                    After
                                                                                                                                                   Game)

                                                                                                                        Advertisement during games
                                                                                                                                 (5 hours)

 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                         23
Dispersed Cloud data centers operation
CAPEX saving with public/private DCs

                                                                                                             Development/
                                                                         Public(common)                          test
                                                                             service                        resources pool
                                                                          resources pool

                                                                                                                                              IT operation
   AG games                                                                                                Backup                               manager
    operation                                                                                             resources                               (IDC)
  headquarters                                                          IT resources                         pool
                                                                  •server               •software
                   Service request                                •storage              •application                         Service request approval
                                                                  •network              •centerfacility
                    Service use                                                                                               Service management
                                                                               Service
            Service fee payment                                                                                                service fee charging
                                                                                   Network as a Platform

              IncheonIDC                                                                                  Private IDC (A)           PrivateIDC (B)




 Presentation_ID      © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                        24
Optimal IP infrastructure design
CAPEX / OPEX saving
                                 Considerations for IP                                                                                IP N/W design
                                     N/W design                                                                                           criteria
Req. #1 Tech. Trend
                                                                                                                                 “Future-oriented(2014) Network
                                       1. Wired & wireless broadband                                               standard1.
                 IP N/W                   network                                                                                 architecture design”
           Development                                                                                              Wired backbone N/W capacity(ready for 40G, 100G)
                                       2. converged services
               direction                                                                                            Wireless N/W preparation
                                                                                                                    IPv6-ready devices deployment (IPV4 address
                                      3. Green by IT, Green of IT
                                                                                                                     exhaustion in Jun. 2011)

Req. #2 Mega IT Trend
                converged              1. Large-volume Geo, Information                                            standard 2. “IP Network Convergence, Virtualization”
                ITservices
                                       2. Smart Phone, TV                                           implications    Quadruple Play Service (QPS) over IP converged
                                                                                                                     network, covering voice, video, data &FMC
                                       3. Mobile, FMC                                                               Shared infrastructure thru virtualization for multi-tenant
                                                                                                                     support & maximization of resource usage
                                       4. Virtualization



Req. #3 Design Factor
                                                                                                                   standard3. “Redundancy, 24x7 service continuity &
                                                                                                                                  stability”
                                       1. resident & service features
                    Structural                                                                                      Redundancy available for fault tolerance
                     features                                                                                       Stable connection with stadium backbone
                                       2. stability                                                                 DR center establishment: N/W architecture design
                                                                                                                     for business continuity
                                       3. optimized operation                                                       Service continuity thru control room multiplexing

  Presentation_ID     © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                                         25
Differentiated high-tech athletes’ village services



                   Advanced security                                                               Multi-language   High-definition
                                                                         Virtual
                       system                                           Concierge                   Home N/W              Video
                                                                                                      service       call/conference




 Presentation_ID     © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                      26
Differentiated high-tech athletes’ village services


                                                                                                   Multi-language   High-definition
                   Advanced security                                       Virtual
                                                                                                    Home N/W              Video
                       system                                             Concierge
                                                                                                      service       call/conference




 Presentation_ID     © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                      27
Differentiated high-tech athletes’ village services



                   Advanced security                                                               Multi-language   High-definition
                                                                         Virtual
                       system                                           Concierge                   Home N/W              Video
                                                                                                      service       call/conference




 Presentation_ID     © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                      28
Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential   29
Cisco’s consulting on operation/for-profit models
                                                                                                  • Developing optimal operation models based on
• Leveraging Cisco’s vast knowledge database
                                                                                                    local/overseas stadium operation cases
• Leading IT standardization / Deploying future
                                                                                                   (Yankee Stadium, Dallas Stadium & etc.)
   technologies & solutions
                                                                                                  •Developing for-profit portfolio models by utilizing IT
• Driving future IT trend
                                                                                                    and designing feasible architecture
                                                                                                  •Yankee Stadium, Dallas Stadium & etc.




 • Joint operation &service business model development
 withpartners
 • Experienced consultants                                                                                       • Stadium solution (Stadium Vision)
                                                                                                                 • Various references
                                                                                                                 • Experienced human resources


                                      • TFT setup with personnel from relevant agencies
                                      • Consulting team setup with personnel from Cisco & partners

  Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                        30
Cisco’s consulting on operation/for-profit models


                                                      Financially self-sustaining stadium operation


                                                                                                 strategies

                                      • Developing customer service portfolio by leveraging IT technologies
                                      • Deploying IT technologies for operation cost minimization
                                      • Strengthening marketing activities for increased stadium usage




                           Typical revenue                                                                               Additional revenue
                          generation models                                                                              generation model
           • Stadium lease for games                                                                          • Outdoor media advertisement with LED, DMS
           • Long-term stadium lease for professional                                                          & digital devices
             baseball/soccer games                                                                            • Facility upgrade including VIP room(Skybox)
           • Lease of in-stadium retail stores                                                                • Kid keeper service, kids play room operation & etc.
           • Fence advertisement                                                                              • Stadium lease for events including concert, opera & etc.
                                                                                                              • Additional services offering to increase lease fees for
                                                                                                                in-stadium retail stores

 Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                                             31
Cisco’s consulting on operation/for-profit models


                          Offer a consulting service to develop a cost-saving model with efficient operation and
                         management on stadiums and athletes’village after a successful 2014 Asian Games hosting


                                         Phase 1 review scope                                                    Phase 2 support scope
Execution
 phase




                         Case study on                                      Draft model                       Model                      IT deployment
                     stadium/athletes’village                              development                      confirmation              for model realization
                           operation                                based on local characteristics


                                                                    ① Draft model                     ① Final model             ① High -level architecture
activities




             ① Case studyonstadium                                    development based                 confirmation based on     drawing for realization of
  Main




               operationafterlocal/international                      on local                          operation/service         confirmed model
               games/events                                           characteristics and               models selected
                                                                      case study                                                ② Design of main
             ② Casestudy onfor-profit models                                                                                      components
             ③ Casestudy onoperation                                ② Final short-list
               budgetsources                                          development based                                         ③ Detailed operation
                                                                      on review of various                                        scenario development
                                                                      for-profit models
                                                                                                                                ④ Additional funding plan




   Presentation_ID      © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential                                                           32
Thank you.




Presentation_ID   © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential   33

Más contenido relacionado

Destacado

Therapy Through Love (td)
Therapy Through Love (td)Therapy Through Love (td)
Therapy Through Love (td)Thuydy
 
Dress for Success Crowdfunding
Dress for Success Crowdfunding Dress for Success Crowdfunding
Dress for Success Crowdfunding Michal Zajac
 
Philosophy for oldage - georgecarlin ( thuydy )
Philosophy for oldage - georgecarlin ( thuydy )Philosophy for oldage - georgecarlin ( thuydy )
Philosophy for oldage - georgecarlin ( thuydy )Thuydy
 
Surfers In A Dress 2013 :: Campaign Overview & Results
Surfers In A Dress 2013 :: Campaign Overview & ResultsSurfers In A Dress 2013 :: Campaign Overview & Results
Surfers In A Dress 2013 :: Campaign Overview & ResultsGreg Beazley
 
Binny Profile
Binny ProfileBinny Profile
Binny ProfileBinny Ad
 
Spandana Foundation Presentation
Spandana Foundation PresentationSpandana Foundation Presentation
Spandana Foundation Presentationguest43ebed5
 

Destacado (8)

Therapy Through Love (td)
Therapy Through Love (td)Therapy Through Love (td)
Therapy Through Love (td)
 
PORTFOLIO
PORTFOLIOPORTFOLIO
PORTFOLIO
 
Dress for Success Crowdfunding
Dress for Success Crowdfunding Dress for Success Crowdfunding
Dress for Success Crowdfunding
 
Philosophy for oldage - georgecarlin ( thuydy )
Philosophy for oldage - georgecarlin ( thuydy )Philosophy for oldage - georgecarlin ( thuydy )
Philosophy for oldage - georgecarlin ( thuydy )
 
Surfers In A Dress 2013 :: Campaign Overview & Results
Surfers In A Dress 2013 :: Campaign Overview & ResultsSurfers In A Dress 2013 :: Campaign Overview & Results
Surfers In A Dress 2013 :: Campaign Overview & Results
 
Binny Profile
Binny ProfileBinny Profile
Binny Profile
 
Spandana Foundation Presentation
Spandana Foundation PresentationSpandana Foundation Presentation
Spandana Foundation Presentation
 
Blood donation
Blood donationBlood donation
Blood donation
 

Similar a 2014 incheon asian game smart sustainable mega sport event

Enabling the Borderless Organization
Enabling the Borderless OrganizationEnabling the Borderless Organization
Enabling the Borderless OrganizationCisco Canada
 
Cisco it collaboration for blue chip 03 2011
Cisco it collaboration for blue chip 03 2011Cisco it collaboration for blue chip 03 2011
Cisco it collaboration for blue chip 03 2011bluechipper
 
CISCO Flexible Work / Telework Presentation for RDASI
CISCO Flexible Work / Telework Presentation for RDASICISCO Flexible Work / Telework Presentation for RDASI
CISCO Flexible Work / Telework Presentation for RDASIRichard Everson
 
Using Social Media at Events: Best Practices
Using Social Media at Events: Best PracticesUsing Social Media at Events: Best Practices
Using Social Media at Events: Best PracticesAmy Lewis
 
Cisco Cloud Briefing and Experiences for Cloud Slam 2011
Cisco Cloud Briefing and Experiences for Cloud Slam 2011Cisco Cloud Briefing and Experiences for Cloud Slam 2011
Cisco Cloud Briefing and Experiences for Cloud Slam 2011Cisco Collaboration
 
Enterprise IPv6 Deployment
Enterprise IPv6 Deployment Enterprise IPv6 Deployment
Enterprise IPv6 Deployment Cisco Canada
 
Delivering business value through transformative networking 20012011
Delivering business value through transformative networking 20012011Delivering business value through transformative networking 20012011
Delivering business value through transformative networking 20012011fuckGK
 
Cisco small business_communicate_by_leah_davis
Cisco small business_communicate_by_leah_davisCisco small business_communicate_by_leah_davis
Cisco small business_communicate_by_leah_davisgkmurase
 
Smart+Connected Communities Canada
Smart+Connected Communities CanadaSmart+Connected Communities Canada
Smart+Connected Communities CanadaCisco Canada
 
Internet of Everything (IoE) Economy
Internet of Everything (IoE) EconomyInternet of Everything (IoE) Economy
Internet of Everything (IoE) EconomyCisco Services
 
Webinar: Move Your Business Forward with Cisco VOIP for SMB
Webinar: Move Your Business Forward with Cisco VOIP for SMBWebinar: Move Your Business Forward with Cisco VOIP for SMB
Webinar: Move Your Business Forward with Cisco VOIP for SMBAdvanced Logic Industries
 
Cloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data Center
Cloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data CenterCloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data Center
Cloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data CenterCisco Service Provider
 
The telework revolution: time to put Dracula in charge of the bloodbank
The telework revolution:  time to put Dracula in charge of the bloodbankThe telework revolution:  time to put Dracula in charge of the bloodbank
The telework revolution: time to put Dracula in charge of the bloodbankAnna Cashman
 
Big Data, Analytics, Cloud..and Smart+Connected Communities
Big Data, Analytics, Cloud..and Smart+Connected CommunitiesBig Data, Analytics, Cloud..and Smart+Connected Communities
Big Data, Analytics, Cloud..and Smart+Connected CommunitiesRick Huijbregts
 
ReadyCloud Collaboration, a Cisco Powered service
ReadyCloud Collaboration, a Cisco Powered serviceReadyCloud Collaboration, a Cisco Powered service
ReadyCloud Collaboration, a Cisco Powered serviceGen-i
 

Similar a 2014 incheon asian game smart sustainable mega sport event (20)

01
0101
01
 
Enabling the Borderless Organization
Enabling the Borderless OrganizationEnabling the Borderless Organization
Enabling the Borderless Organization
 
Cisco it collaboration for blue chip 03 2011
Cisco it collaboration for blue chip 03 2011Cisco it collaboration for blue chip 03 2011
Cisco it collaboration for blue chip 03 2011
 
CISCO Flexible Work / Telework Presentation for RDASI
CISCO Flexible Work / Telework Presentation for RDASICISCO Flexible Work / Telework Presentation for RDASI
CISCO Flexible Work / Telework Presentation for RDASI
 
Using Social Media at Events: Best Practices
Using Social Media at Events: Best PracticesUsing Social Media at Events: Best Practices
Using Social Media at Events: Best Practices
 
Cisco Cloud Briefing and Experiences for Cloud Slam 2011
Cisco Cloud Briefing and Experiences for Cloud Slam 2011Cisco Cloud Briefing and Experiences for Cloud Slam 2011
Cisco Cloud Briefing and Experiences for Cloud Slam 2011
 
Enterprise IPv6 Deployment
Enterprise IPv6 Deployment Enterprise IPv6 Deployment
Enterprise IPv6 Deployment
 
Cisco
CiscoCisco
Cisco
 
Delivering business value through transformative networking 20012011
Delivering business value through transformative networking 20012011Delivering business value through transformative networking 20012011
Delivering business value through transformative networking 20012011
 
Cisco small business_communicate_by_leah_davis
Cisco small business_communicate_by_leah_davisCisco small business_communicate_by_leah_davis
Cisco small business_communicate_by_leah_davis
 
Telcom Offshoring
Telcom OffshoringTelcom Offshoring
Telcom Offshoring
 
Cisco Localisation Toolkit
Cisco Localisation ToolkitCisco Localisation Toolkit
Cisco Localisation Toolkit
 
Cisco VXI--Desktop Virtualization
Cisco VXI--Desktop VirtualizationCisco VXI--Desktop Virtualization
Cisco VXI--Desktop Virtualization
 
Smart+Connected Communities Canada
Smart+Connected Communities CanadaSmart+Connected Communities Canada
Smart+Connected Communities Canada
 
Internet of Everything (IoE) Economy
Internet of Everything (IoE) EconomyInternet of Everything (IoE) Economy
Internet of Everything (IoE) Economy
 
Webinar: Move Your Business Forward with Cisco VOIP for SMB
Webinar: Move Your Business Forward with Cisco VOIP for SMBWebinar: Move Your Business Forward with Cisco VOIP for SMB
Webinar: Move Your Business Forward with Cisco VOIP for SMB
 
Cloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data Center
Cloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data CenterCloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data Center
Cloud Connect 2011 - Cisco and the Cloud: Within and Beyond the Data Center
 
The telework revolution: time to put Dracula in charge of the bloodbank
The telework revolution:  time to put Dracula in charge of the bloodbankThe telework revolution:  time to put Dracula in charge of the bloodbank
The telework revolution: time to put Dracula in charge of the bloodbank
 
Big Data, Analytics, Cloud..and Smart+Connected Communities
Big Data, Analytics, Cloud..and Smart+Connected CommunitiesBig Data, Analytics, Cloud..and Smart+Connected Communities
Big Data, Analytics, Cloud..and Smart+Connected Communities
 
ReadyCloud Collaboration, a Cisco Powered service
ReadyCloud Collaboration, a Cisco Powered serviceReadyCloud Collaboration, a Cisco Powered service
ReadyCloud Collaboration, a Cisco Powered service
 

Último

JORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docxJORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docxArturo Pacheco Alvarez
 
PPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports RivalryPPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports Rivalryanirbannath184
 
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdfJORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdfArturo Pacheco Alvarez
 
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...World Wide Tickets And Hospitality
 
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024DONAL88 GACOR
 
Project & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWEProject & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWEDeShawn Ellis
 
Benifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptxBenifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptxsherrymieg19
 
Introduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint PresentationIntroduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint PresentationJuliusMacaballug
 
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docxItaly Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docxWorld Wide Tickets And Hospitality
 
Clash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdfClash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdfMuhammad Hashim
 

Último (11)

JORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docxJORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
JORNADA 2 LIGA MUROBASQUETBOL1 2024.docx
 
PPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports RivalryPPT on INDIA VS PAKISTAN - A Sports Rivalry
PPT on INDIA VS PAKISTAN - A Sports Rivalry
 
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdfJORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
JORNADA 3 LIGA MURO 2024GHGHGHGHGHGH.pdf
 
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
Spain Vs Italy Showdown Between Italy and Spain Could Determine UEFA Euro 202...
 
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
DONAL88 >LINK SLOT PG SOFT TERGACOR 2024
 
Project & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWEProject & Portfolio, Market Analysis: WWE
Project & Portfolio, Market Analysis: WWE
 
NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9
NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9
NATIONAL SPORTS DAY WRITTEN QUIZ by QUI9
 
Benifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptxBenifits of Individual And Team Sports-Group 7.pptx
Benifits of Individual And Team Sports-Group 7.pptx
 
Introduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint PresentationIntroduction to Basketball-PowerPoint Presentation
Introduction to Basketball-PowerPoint Presentation
 
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docxItaly Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
Italy Vs Albania Euro Cup 2024 Italy's Strategy for Success.docx
 
Clash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdfClash of Titans_ PSG vs Barcelona (1).pdf
Clash of Titans_ PSG vs Barcelona (1).pdf
 

2014 incheon asian game smart sustainable mega sport event

  • 1. 2014 Incheon 2014 Incheon Asian Games differentiation, infrastructure operation/for-profit service model development proposal Cisco Services APAC March, 2011 Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 1
  • 2. Executive Summary 1 2 3 Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 2
  • 3. Executive Summary 1 • Ultra high definition & borderless video conversation • Multi-language video translator Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 3
  • 4. Executive Summary 2 • Maximization of post-AG stadium usage •Utilization of all the available tangible/intangible property • leverage of non-sports area Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 4
  • 5. Executive Summary 3 facility integrated video integrated automated management management/ management day/night DB operation infrastructure surveillance interface structure • operation efficiency enhancement • operation cost saving Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 5
  • 6. Contents 1. Spread effect of mega sports event 2. Local public sports facilities operation 3. Overseas cases 4. Stadium operation & for-profit model plan Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6
  • 7. Contents 1. Spread effect of mega sports event 2. Local public sports facilities operation 3. Overseas cases 4. Stadium operation & for-profit model plan Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 7
  • 8. Spread effect of mega sports event area positive spread effect negative spread effect social/cultural • increased interest in local events & • commercially oriented event distorting original heightened local participation purpose • strengthened local tradition & value • construction of new facilities • environmental degradation physical • local infrastructure improvement • congestion • heightened international recognition • labor exploitation of local residents on local value political • politically directed event distorting original purpose • enhanced political value by residents/ government • Increased tourism activities • possible criticism from outside due to lack of event commercial preparedness • Increased local investment & commercial activities • inflation/ speculative investment in real-estate economic • consumption increase, job creation psychological • strengthened community spirit • defensive attitude towards local citizens Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8
  • 9. Spread effect of mega sports event USD 6.5 billion 2000 Sydney Olympic Games USD 5.1 billion 1996 Atlanta Olympic Games USD 2.6 billion 1988 Seoul Olympic Games USD 2.3 billion 1984 LA Olympic Games • 2002 Korea-Japan World Cup: 4 trillion won of value added • Image enhancement for hosting nation/city, Nation’s international reputation improvement • Contribution to national/local development Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 9
  • 10. Contents 1. Spread effect of mega sports event 2. Local public sports facilities operation 3. Overseas cases 4. Stadium operation & for-profit model plan Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 10
  • 11. Domestic public sports facility operation status It is a general term for a sports facility that has been built, operated and What is public sports maintained with the budget funded by the central government , local government facility ? or public agency to encourage the general public to take part in sports activities in a proactive & sound manner. Facility Seoul Busan Daegu Incheon Gyeonggi Jeju Track and field stadium 3 3 3 3 30 12 Soccer field 56 15 12 9 75 20 Hockey field 1 1 1 1 2 Baseball field 6 2 3 2 8 2 Cycle stadium 1 1 1 1 1 Tennis court 48 3 10 4 84 4 Korean wrestling stadium 1 1 1 1 3 1 Temp play ground 1,669 454 218 340 1,759 140 Gym 88 11 13 11 80 18 Ball game gym 14 5 3 6 48 13 Martial arts gym 4 2 4 1 2 1 Physical training gym 70 4 6 4 30 4 Swimming pool 76 2 11 6 40 2 Roller skate rink 14 9 1 6 13 1 Shooting field 1 1 1 Traditional archery field 8 2 2 7 31 2 Archery field 1 1 1 1 3 Horse-riding filed 1 2 1 Golf course 20 1 1 Rowing/canoe facility 1 1 Yacht facility 1 1 Ice rink 4 1 1 6 Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 11
  • 12. Domestic public sports facility operation status Revenue/expense of public sports facilities Operation of Sangam & Suwon in Korea stadiums (unit:millionwon) Construc 2004 2004 Index Difference Sangam Item Suwon t cost revenue spending Seoul 203,300 11,759 6,248 5,511 Total budget 203.3 billion 252.2 billion Busan 226,818 655 2,743 -2,088 Stadium construction 2001 Dec. 2001 May completion Daegu 283,600 256 3,448 -3,192 Retail store, movie theater, Sports center, drive-in theater, open shopping mall, sports sauna, area restaurant, museum, wedding Incheon 328,218 1,723 4,470 -2,747 Retail vendor wedding hallandwedding hall, Suwon temporary Paldalgu reception, restaurant , hospital, office,Suwon broadcastingstation etc. Kwangju 158,788 220 1,794 -1,574 pharmacy and stores, etc. 130 Number of 18 Daejeon 121,700 416 1,530 -1,114 facilities 25 ~ 30 thousand Number of daily 2 thousand Ulsan 151,420 1,806 2,923 -1,117 average visitors Suwon 252,277 3,879 5,311 -1,432 Lease 7.3 billion Lease 1.4 billion Admission fee/venue 2003 revenue Admission fee/venue Jeonju 136,875 560 1,888 -1,328 rental fee 5.7 billion rental fee 5.7 billion Operation cost expense Operation cost Seogwipo 112,500 290 742 -452 7 billion 4 billion 6 billion in the black balance 1.9billion in the red Total 1,975,491 21,564 31,079 -9,533 accounts Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 12
  • 13. Contents 1. Spread effect of mega sports event 2. Local public sports facilities operation 3. Overseas cases 4. Stadium operation & for-profit model plan Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13
  • 14. Cases of post-event stadium usage • Saddle Dome foundation was established and its management committee Calgary Olympic Games consisting of city council members supports amateur sports with profits generated from year-round lease of facilities for concert, rodeo, circus, shopping mall, convention center & etc. • The government sold the rights of operation and management to CODA , improving community sports facilities and making profits. • opening/closing ceremony stadium: the business ownership of the stadium was transferred to Calgary university and facilities were repaired and remodeled to a football stadium, operating in the black. • Naskiska sky resort: It is popular as it offers various programs including winter sports & camping programs The policy regarding the use of facilities after the Olympic Games was announced Beijing Olympic Games by holding ‘the international forum on Olympic stadiums build & operation plan.’ •The swimming stadium is popular as citizen sports facility with various swimming programs, expanding the customer base to high-income earners. • The fitness club and banquet hall are run and various services are offered. • Due to popularity of the culture and sports center, a complex town equipped with culture, leisure & business facilities was built in a massive green area, Yokohama Stadium • budget planning for citizen facilities to improve health of citizens • Average usage: 100 days per year Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 14
  • 15. IT-enabled additional services VIP Room operation WELCOME VIDEO FOOD MERCHANDISE Immersive HD video… Custom Premium Extend the Experience Everywhere Fan Services Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 15
  • 16. IT-enabled additional services VIP Room operation • Luxury Suite(NY Yankees Stadium) deploy Display #1 <live game broadcasting> <bullpen screen> <other stadiums’ game broadcasting> Channel switching & food ordering w/ Cisco IP phone • control functions including channel switching & volume adjusting thru IP phone’s touch panel (diverse contents offering for luxury suite users) Display #2 • information on products & foods available at in-stadium shops & restaurants • foods & products ordering thru IP phone • service improvement for luxury suite users with delivery service Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 16
  • 17. IT-enabled additional services Fan meeting thru TP NBA Star Tony Parker NBA Star Yao Ming NBA Legend Magic Johnson Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 17
  • 18. Contents 1. Spread effect of mega sports event 2. Local public sports facilities operation 3. Overseas cases 4. Stadium operation & for-profit model plan Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 18
  • 19. Why differentiated & sustainable operation model ? Event completion Phase 1. Phase 2. Before & During Aisan Game After Aisan Game Optimal operation infrastructure implementation 1 & differentiated service strategies development designing & building platform 3 Sustainable operation strategies development Ensuring sustainability of services for & infrastructure which enable smart services stadiums and athletes’ village thru green and Community Connect services 2 Transition strategies development developing strategies in consideration of post-AG operation as well as the AG period operation. building service & infrastructure implementation strategies for athletes’ village and stadiums Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 19
  • 20. Smart Connected model Smart Connected Stadium • saving operation costs with green sustainable stadium services & solutions operation model • delivering differentiated & video-enabled services & solutions at anywhere, at • offering differentiated services Connected anytime & with any devices during the AG period Stadium • optimizing operation costs & Smart Connected Data Center maximizing profit thru post-AG Connected services Data Center • sharing Cisco’s video-enabled infrastructure & services S + CC • efficiently developing services & S+CC services optimizing operation costs with platform deployment sharing into athletes’ village Connected Residence • giving differentiated image to Smart Connected Residence athletes with S+CC services • saving build & operation costs with offering during the AG period Cisco’s integrated operation center • heightening brand image with infrastructure consistent services offering • ensuring sustainability with unified service provider & infrastructure operator Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 20
  • 21. Operation cost saving with integrated management COMMUNICATION ENTERTAINMENT OPERATIONS 1 Phone 1 Ticketing 1 Parking 2 Data/Email/Fax 2 Digital Video 2 Video Surveillance 3 Call Center 3 Point-of-Sale 3 Energy Management 4 Mobile 4 Event Promotions 4 Access Management Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 21
  • 22. New revenue-generating model development Various sports marketing activities Selling stadium property naming rights Attracting retail vendors • Stadium naming rights • retail stores, movie theater, fitness center & etc. • station naming rights Leasing stadium for events Offering for-citizen services • attracting games & events • sports & entertainment services • cultural events(concert, opera & etc.) • other services for revenue generation Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 22
  • 23. New revenue generation model Advertisement profit from Digital Signage 1 cycle Advertisement A C sale unit: Slot (15 seconds) 1~12 Cycle (1 hour Before Game) B 1 slot 2 slot 3 slot 4 slot 5 slot 6 slot 7 slot 8 slot 5분/cycle 9 slot 10 slot 12 slot 13~48 Cycle D 13 slot 14 slot 15 slot 16 slot 17 slot (3 hours During Game) 18 slot 19 slot 20 slot Advertisement cycle of DMS Advertisement (5 minutes) Sponsored Zone screen(52” HD) screen(52” HD) 48~60 Cycle (1 hour After Game) Advertisement during games (5 hours) Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 23
  • 24. Dispersed Cloud data centers operation CAPEX saving with public/private DCs Development/ Public(common) test service resources pool resources pool IT operation AG games Backup manager operation resources (IDC) headquarters IT resources pool •server •software Service request •storage •application Service request approval •network •centerfacility Service use Service management Service Service fee payment service fee charging Network as a Platform IncheonIDC Private IDC (A) PrivateIDC (B) Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 24
  • 25. Optimal IP infrastructure design CAPEX / OPEX saving Considerations for IP IP N/W design N/W design criteria Req. #1 Tech. Trend “Future-oriented(2014) Network 1. Wired & wireless broadband standard1. IP N/W network architecture design” Development  Wired backbone N/W capacity(ready for 40G, 100G) 2. converged services direction  Wireless N/W preparation  IPv6-ready devices deployment (IPV4 address 3. Green by IT, Green of IT exhaustion in Jun. 2011) Req. #2 Mega IT Trend converged 1. Large-volume Geo, Information standard 2. “IP Network Convergence, Virtualization” ITservices 2. Smart Phone, TV implications  Quadruple Play Service (QPS) over IP converged network, covering voice, video, data &FMC 3. Mobile, FMC  Shared infrastructure thru virtualization for multi-tenant support & maximization of resource usage 4. Virtualization Req. #3 Design Factor standard3. “Redundancy, 24x7 service continuity & stability” 1. resident & service features Structural  Redundancy available for fault tolerance features  Stable connection with stadium backbone 2. stability  DR center establishment: N/W architecture design for business continuity 3. optimized operation  Service continuity thru control room multiplexing Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 25
  • 26. Differentiated high-tech athletes’ village services Advanced security Multi-language High-definition Virtual system Concierge Home N/W Video service call/conference Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 26
  • 27. Differentiated high-tech athletes’ village services Multi-language High-definition Advanced security Virtual Home N/W Video system Concierge service call/conference Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 27
  • 28. Differentiated high-tech athletes’ village services Advanced security Multi-language High-definition Virtual system Concierge Home N/W Video service call/conference Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 28
  • 29. Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 29
  • 30. Cisco’s consulting on operation/for-profit models • Developing optimal operation models based on • Leveraging Cisco’s vast knowledge database local/overseas stadium operation cases • Leading IT standardization / Deploying future (Yankee Stadium, Dallas Stadium & etc.) technologies & solutions •Developing for-profit portfolio models by utilizing IT • Driving future IT trend and designing feasible architecture •Yankee Stadium, Dallas Stadium & etc. • Joint operation &service business model development withpartners • Experienced consultants • Stadium solution (Stadium Vision) • Various references • Experienced human resources • TFT setup with personnel from relevant agencies • Consulting team setup with personnel from Cisco & partners Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 30
  • 31. Cisco’s consulting on operation/for-profit models Financially self-sustaining stadium operation strategies • Developing customer service portfolio by leveraging IT technologies • Deploying IT technologies for operation cost minimization • Strengthening marketing activities for increased stadium usage Typical revenue Additional revenue generation models generation model • Stadium lease for games • Outdoor media advertisement with LED, DMS • Long-term stadium lease for professional & digital devices baseball/soccer games • Facility upgrade including VIP room(Skybox) • Lease of in-stadium retail stores • Kid keeper service, kids play room operation & etc. • Fence advertisement • Stadium lease for events including concert, opera & etc. • Additional services offering to increase lease fees for in-stadium retail stores Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 31
  • 32. Cisco’s consulting on operation/for-profit models Offer a consulting service to develop a cost-saving model with efficient operation and management on stadiums and athletes’village after a successful 2014 Asian Games hosting Phase 1 review scope Phase 2 support scope Execution phase Case study on Draft model Model IT deployment stadium/athletes’village development confirmation for model realization operation based on local characteristics ① Draft model ① Final model ① High -level architecture activities ① Case studyonstadium development based confirmation based on drawing for realization of Main operationafterlocal/international on local operation/service confirmed model games/events characteristics and models selected case study ② Design of main ② Casestudy onfor-profit models components ③ Casestudy onoperation ② Final short-list budgetsources development based ③ Detailed operation on review of various scenario development for-profit models ④ Additional funding plan Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 32
  • 33. Thank you. Presentation_ID © 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 33

Notas del editor

  1. You can now customize experiences further for fans and empower them in entirely new ways. Let’s look at an example of luxury suite offerings to create a premium experience for this fan segment:When a fan enters, they can be greeted by a custom greeting on the display(s) to provide a unique touchThese fans can be prompted to take advantage of a touch screen Cisco IP Phone that will be available for concierge, safety and security and even business purposes to enjoy a new set of experiences. It’s not just for voice services anymore, and a converged network makes all of this possible.Video control – produce your own experiences by selecting from any of the channels available on the network. This provides unique opportunities to take advantage of in house feeds to create unique perspectives via alternate anglesCommerce – ordering food and beverage and merchandise can now be as easy as selecting from items on the phone that are displayed on one of the tvs in the suite. Note: these are just examples…you can include game statistics, weather, etc as relevant.The Connected Stadium powers the customization of these services and enables integration with related systems like Point of Sale with concessions and merchandise vendors.