SlideShare una empresa de Scribd logo
1 de 29
Presentation prepared as per:
“IS 456 : 2000”
Presented by: Ravi Shankar Singh &
Pankaj Kumar
CONTENTS
• Introduction
• Important terms
• General considerations of design for slabs
• Examples
Introduction
• Slabs are plane structural members which are used
as floor and roof of buildings.
• The thickness of the slabs is quite small as
compare to its other dimensions.
One way slab:-
• One way slab is edge supported slab which
spanning in one direction.
• The ratio of long span to short span is greater
than or equal to 2.
• The main steel is provided in the direction of the
shorter span
• Slab supporting on four sides also behave as one
way slab if ratio of long span to short span is
greater than or equal to 2.
• The distribution steel should be tied above the
main steel, other wise the lever arm which is
measure upto the center of the main steel shall
be reduced resulting in the reduction of
moment of resistance.
Purpose of main steel:
• It take up all tensile stresses developed in the
structure.
• It increase the strength of concrete sections.
Purpose of distribution steel:
• It distribute the concentrated load on the slab.
• It guard against shrinkage and temperature
stress.
• It also keep the main reinforcement in position.
1. EFFECTIVE SPAN
(A) FOR SIMPLY SUPPORTED SLAB : DISTANCE BETWEEN CENTRE TO CENTRE OF
SUPPORT OR THE CLEAR DISTANCE BETWEEN SUPPORT PLUS THE EFFECTIVE DEPTH OF
THE SLAB WHICHEVER IS SMALLER .
(B) FOR CONTINUOUS SLAB : WIDTH OF SUPPORT < 1/12 OF CLEAR SPAN ,THE EFFECTIVE
SPAN SHALL WORK OUT AS ABOVE.
WHEN WIDTH GREATER THAN 1/12 OF CLEAR SPAN OR 600MM WHICHEVER IS SMALL
SHALL BE TAKEN
(1) FOR ONE END FIX AND OTHER END CONTINUOUS THE EFFECTIVE SPAN IS CLEAR SPAN.
(2) FOR ONE END FREE AND OTHER END CONTINUOUS ,THE EFFECTIVE SPAN SHALL BE
EQUAL TO CLEAR SPAN PLUS HALF THE EFFECTIVE DEPTH OR CLEAR SPAN PLUS HALF
THE WIDTH OF SUPPORT ,WHICHEVER IS SMALLER .
GENERAL CONSIDERATION OF DESIGN FOR SLAB
(2)For end span with one end free and other end continuous ,the
effective span shall be equal to clear span plus half of the
effective depth of the slab , or clear span plus half the with of
center to center of support or the clear distance between the
support plus the effective depth of the slab whichever is smaller.
For continuous slab: In case of a continuous slab ,where the width
of the support is less than 1/12 of the clear span ,the effective span
shall be worked as above.
In case the support are wider than 1/12 of the clear span , the
effective span shall be taken as under:
(1)For end span with one end fixed and other end continuous ,the
effective span shall be clear span.
(2)For end span with one end free and other end continuous ,the
effective span shall be equal to clear span plus half of the
effective depth of the slab , or clear span plus half the with of the
discontinuous slab, which ever is less.
2. DEFLECION CONTROL
The span to depth ratio are not greater than the value below
A) For span upto 10m
cantilever slab 7
Simply supported 20
Continuous 26
b) For span above 10m the value in para (a) may be
multiply by 10/span in meters
3.Reinforcement in slab
(A)Minimum reinforcement. The area of reinforcement in
either direction should not less than:
0.12% of the total cross-sectional area (for HYSD
bar)
0.15% of the total cross-sectional area (for Fe
250)
• (B) Maximum diameter : The maximum
diameter of reinforcing bar in a slab should not
exceed 1/8 of thickness of slab.
• (C) Cover to reinforcement :The cover of
concrete to reinforcement in different structural
members are following in table
Exposure minimum grade of concrete Nominal cover in mm not
less than
Mild M20 20
Moderate M25 30
Severe M30 45
Very severe M35 50
Extreme M40 75
(D) Spacing of reinforcement:
a. Minimum distance between individual bars:
(i) Minimum distance shall not less than diameter
of bar or 5mm more than the nominal max. size of
the bar whichever is greatest.
(ii)When we provide two or more layer of main
bars, the min. vertical clear distance between any
two layer of bar shall be 15mm or 2/3 the nominal
max. size of course aggregate or max. size of bar
whichever is greatest.
(b) Maximum distance between bars in tension :
(i)The pitch of the main tensile bars in slab should
not exceed three times the effective depth or
300mm whichever is smaller.
(ii) The pitch of distribution bars shall not exceed
five time the effective depth or 450 whichever is
smaller.
(E) Curtailment of main reinforcement.
The main reinforcement in slab may be curtailed
or bent up ,beyond the point at which it is no
longer requirement to resist bending
The following equation can be used to find out the
point at which the bar can be curtailed or bend-up
x=l/2[Nx/Nc] ˄ ½
X=Distance from either side from centre of span.
Nc=Total no. of bar in tension
Nx=No. of bars which can be curtailed at any
distance x from the center of the span
4.Load on slabs.
The load on slab consists of:
(a) Live load
(b)External dead load
(c) Dead load of slab itself
EXAMPLE
Design a simply supported R.C.C slab to carry a
factored load of 15000N/m2 inclusive of its own
weight on an effective span of 3.1 m.
solution:-
Assume 1m width of slab.
b= 1m = 1000mm
fck = 20N/mm2
fy =415N/mm2
Effective span l=3.1m
Design factored load Wu=1500N/m2
=15000*1=15000
Depth of slab . Assume effective depth d=span/25
= 3100/25= 124mm or say 130mm
Overall depth D =130+30 =160mm
Ultimate max. bending moment
Mu =wl˄2/8
=(15000x3.1˄2)÷ 8
=18019 N-mm =18019x10˄3Nmm
Check for depth
The slab will be designed as a balance section
Mu =Mlim.
18019x10˄3 =0.138fckbd˄2
18019x10˄3 =0.138x20x1000xd˄2
d= [(18019x10˄3)÷(0.138x20x1000)] = 81mm<130mm
Adopt d=130mm and D=160mm
Reinforcement (main steel)
Mu =0.87fyAst [d-fy Ast ]
fck b
18019x10˄3 = 0.87x415xAst [130-415 x Ast ]
20 x 1000
49007 = 130Ast -0.021Ast˄2
Ast˄2- 6190Ast +2376524 =0
Ast =411mm˄2
Minimum area of steel for main bars =0.12bD÷100
=(0.12x1000x160)÷100 =192mm˄2
The area of steel provided is more than minimum
requirement.Hence ok
Provide 10mm ɸ bars for main reinforcement
Area of one 10 mm ɸ bar = π÷4x10˄2 = 78.5mm˄2
c/c spacing of 10mm ɸ bars =Area of one bar x b
Total area of steel
= 78.5 x 1000
=190MM
411
It should be less than:
(i) 3d = 3x130 = 390 mm
(ii) 300 mm
Provide main steel of 10mm ɸ @190 mm c/c
Clear spacing between bars = 190-10 = 180mm
It should be more than:
(i) Diameter of bar =10mm
(ii) Size of aggregate + 5 = 15+5 = 20
Provide 10 mm ɸ bar @190 mm c/c
Alternate bars are bent up near the supports
.These bars may be bent up at 0.10 l= 310 mm
from face of support .
Distribution steel
Area of distribution steel = 0.12bD/100
=(0.12x1000x160)/100
Provide 8mm ɸ bars as distribution steel
Area of one 8mm ɸ bars =π/4 x 8˄2 = 50.26 mm˄2
c/c spacing of 8mm ɸ bars = (50.26x1000)/192
=262mm say 260mm
It should less than :
(i) 5d =5x130 = 650mm
(ii) 450mm
Provide distribution steel of 8mm @260 mm c/c
Check for shear
The critical section for shear is at a distance d i.e. 130mm from inner face of support or
0.28 m [130 +300÷2=280 mm = 0.28m] from centre of support.
[Assume width of support =300]
Factored shear force at critical section V = wl/2 –wx
=15000x3.1)/2 – 15000x0.28
=23250-4200 = 19050 N
Nominal shear stress τ = V/bd
=19050/1000x130= 0.15 N/mm˄2 < 2.8N/mm˄2
[For M20 concrete τc max =2.8 N/mm˄2
P = 100As/bd = (100x206)/(1000x130 ) = 0.16%
[{ As =1/2(78.5x1000÷190) = 206 mm˄2},Alternate bars are bent–up ]
For P = 0.16% and M 20 concrete from table
τc = 0.29 N/mm˄2
For solid slab from table k= 1.28 (for overall depth of slab = 160mm)
τc < τv hence no reinforcement provided
Check for development length
Ld = (0.87fyɸ)/4τbd = (0.87x415x10)/4x1.92 = 470 mm
[For M20 concrete and Fe 415 steel, τbd = 1.6x1.2 = 1.92N/mm˄2]
As per code at the simply supported the bar must
extend beyond the face of support by a distance
not less than Ld/3 = 470/3 = 157 mm
Length available from the face of support =
support width – side cover =300-20 = 280 mm
Embedment length from center of support
Lo = 300/2-20 = 130mm
Since the slab is simply supported ,the
compressive reaction will confine the
reinforcement . Hence Ld ≤ 1.3M/V +Lo
M = moment of resistance provided by 10 mm ɸ
bars @380mm c/c
= 0.87fyAst[d- fy Ast ]
fck b
=0.87x415x206x[130 – 415x206] = 9351x10˄3Nmm
20x1000
[Ast =(78.5x1000/380) = 206 mm˄2]
V= Factored shear force at the centre of support
= wl/2 =15000x3.1/2 = 23250 N
1.3M/V + Lo = 1.3x9351x10˄3/23250 +130
=653mm >Ld
Hence development length requirement are
satisfied.
• Check for deflection
Pt = 100Ast/bd =(100x413)/(1000x130) = 0.32%
(Ast provided = 78.5x1000/190 = 413mm˄2)
Fs = 0.58fy [Area of steel required]
Area of steel provided
= 0.58x415x[411/413] = 240N/mm˄2
Modification factors
Kt = 1.5
Kc= 1.0 (No compression reinforcement provided)
Kf = 1.0 (slab section is rectangular)
(l/d)max = 20 x Kt x Kc x Kf = 20x1.5x1x1= 30
(l/d)provded = 3100/130 = 23.8<30
The slab will satisfied limit state of serviceability.
0 ne way slab
0 ne way slab

Más contenido relacionado

La actualidad más candente

Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
sarani_reza
 
Portal and cantilever method
Portal and cantilever methodPortal and cantilever method
Portal and cantilever method
Prionath Roy
 

La actualidad más candente (20)

Design of torsion reinforcement
 Design of torsion reinforcement Design of torsion reinforcement
Design of torsion reinforcement
 
Design of two-way slab
Design of two-way slabDesign of two-way slab
Design of two-way slab
 
Design of slabs 1
Design of slabs 1Design of slabs 1
Design of slabs 1
 
Design of columns as per IS 456-2000
Design of columns as per IS 456-2000Design of columns as per IS 456-2000
Design of columns as per IS 456-2000
 
Design of two way slab
Design of two way slabDesign of two way slab
Design of two way slab
 
SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM SINGLY REINFORCED BEAM
SINGLY REINFORCED BEAM
 
Singly Reinforce Concrete
Singly Reinforce ConcreteSingly Reinforce Concrete
Singly Reinforce Concrete
 
Counterfort Retaining Wall
Counterfort Retaining WallCounterfort Retaining Wall
Counterfort Retaining Wall
 
One Way Slabs
One Way SlabsOne Way Slabs
One Way Slabs
 
one way slab 10.01.03.162
one way slab 10.01.03.162one way slab 10.01.03.162
one way slab 10.01.03.162
 
Moment Distribution Method
Moment Distribution MethodMoment Distribution Method
Moment Distribution Method
 
Presentation on Slab, Beam & Column
Presentation on Slab, Beam & ColumnPresentation on Slab, Beam & Column
Presentation on Slab, Beam & Column
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000Design and Detailing of RC Deep beams as per IS 456-2000
Design and Detailing of RC Deep beams as per IS 456-2000
 
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
DESIGN OF CONNECTIONS IN STEEL  STRUCTURE   DESIGN OF CONNECTIONS IN STEEL  STRUCTURE
DESIGN OF CONNECTIONS IN STEEL STRUCTURE
 
Design of concrete Structure 2
Design of concrete Structure 2Design of concrete Structure 2
Design of concrete Structure 2
 
Design of beam
Design of beamDesign of beam
Design of beam
 
Portal and cantilever method
Portal and cantilever methodPortal and cantilever method
Portal and cantilever method
 
Two Way Slabs
Two Way SlabsTwo Way Slabs
Two Way Slabs
 
Column detailing, Session 14-15 (DUET)
Column detailing, Session 14-15 (DUET)Column detailing, Session 14-15 (DUET)
Column detailing, Session 14-15 (DUET)
 

Destacado (12)

I Download (1)
I Download (1)I Download (1)
I Download (1)
 
Design project
Design projectDesign project
Design project
 
T-Beam Design by WSD Method
T-Beam Design by WSD MethodT-Beam Design by WSD Method
T-Beam Design by WSD Method
 
T beam design by WSD method
T beam design by WSD methodT beam design by WSD method
T beam design by WSD method
 
Design of singly reinforced.
Design of singly reinforced.Design of singly reinforced.
Design of singly reinforced.
 
Design of Doubly Reinforced Beam
Design of Doubly Reinforced BeamDesign of Doubly Reinforced Beam
Design of Doubly Reinforced Beam
 
Lecture notes doubly reinforced beams
Lecture notes doubly reinforced beamsLecture notes doubly reinforced beams
Lecture notes doubly reinforced beams
 
Design of RCC Column footing
Design of RCC Column footingDesign of RCC Column footing
Design of RCC Column footing
 
Two way slab
Two way slabTwo way slab
Two way slab
 
Beam and slab design
Beam and slab designBeam and slab design
Beam and slab design
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
14 Principles of HENRI FAYOL project on KFC Class-XII
14 Principles of HENRI FAYOL  project on KFC Class-XII14 Principles of HENRI FAYOL  project on KFC Class-XII
14 Principles of HENRI FAYOL project on KFC Class-XII
 

Similar a 0 ne way slab

Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelines
Main Uddin
 

Similar a 0 ne way slab (20)

onw way slab design
onw way slab designonw way slab design
onw way slab design
 
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdfDiv_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
Div_Syd_detailing_of_reinforcement_in_concrete_structures.pdf
 
Esd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHODEsd ppt 150180106093,111,160183106008 GECDAHOD
Esd ppt 150180106093,111,160183106008 GECDAHOD
 
Isolated footing design
Isolated footing designIsolated footing design
Isolated footing design
 
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxxDSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
DSR chap4 shear and bond pdf.pptxxxxxxxxxxxxxxxxxxxxxx
 
Stepped footing
Stepped footingStepped footing
Stepped footing
 
Design of singly reinforced concrete
Design of singly reinforced concreteDesign of singly reinforced concrete
Design of singly reinforced concrete
 
Structural engineering basics
Structural engineering basicsStructural engineering basics
Structural engineering basics
 
lacing and battening .pptx
lacing and battening .pptxlacing and battening .pptx
lacing and battening .pptx
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Rcc slab design guidelines
Rcc slab design guidelinesRcc slab design guidelines
Rcc slab design guidelines
 
DACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptxDACS_UNIT-3- RCC Flat slab ARP.pptx
DACS_UNIT-3- RCC Flat slab ARP.pptx
 
Basic rules for rcc design
Basic rules for rcc designBasic rules for rcc design
Basic rules for rcc design
 
Presentationt design and analysis of multistorey building
Presentationt design and analysis of multistorey buildingPresentationt design and analysis of multistorey building
Presentationt design and analysis of multistorey building
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Rectangular tank
Rectangular tankRectangular tank
Rectangular tank
 
Footing design
Footing designFooting design
Footing design
 
Compression member
Compression memberCompression member
Compression member
 
Design of column base plates anchor bolt
Design of column base plates anchor boltDesign of column base plates anchor bolt
Design of column base plates anchor bolt
 
Conceps of RCC-PCC.pptx
Conceps of RCC-PCC.pptxConceps of RCC-PCC.pptx
Conceps of RCC-PCC.pptx
 

Último

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 

Último (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 

0 ne way slab

  • 1. Presentation prepared as per: “IS 456 : 2000” Presented by: Ravi Shankar Singh & Pankaj Kumar
  • 2. CONTENTS • Introduction • Important terms • General considerations of design for slabs • Examples
  • 3. Introduction • Slabs are plane structural members which are used as floor and roof of buildings. • The thickness of the slabs is quite small as compare to its other dimensions.
  • 4. One way slab:- • One way slab is edge supported slab which spanning in one direction. • The ratio of long span to short span is greater than or equal to 2. • The main steel is provided in the direction of the shorter span • Slab supporting on four sides also behave as one way slab if ratio of long span to short span is greater than or equal to 2.
  • 5.
  • 6.
  • 7. • The distribution steel should be tied above the main steel, other wise the lever arm which is measure upto the center of the main steel shall be reduced resulting in the reduction of moment of resistance. Purpose of main steel: • It take up all tensile stresses developed in the structure. • It increase the strength of concrete sections. Purpose of distribution steel: • It distribute the concentrated load on the slab. • It guard against shrinkage and temperature stress. • It also keep the main reinforcement in position.
  • 8.
  • 9. 1. EFFECTIVE SPAN (A) FOR SIMPLY SUPPORTED SLAB : DISTANCE BETWEEN CENTRE TO CENTRE OF SUPPORT OR THE CLEAR DISTANCE BETWEEN SUPPORT PLUS THE EFFECTIVE DEPTH OF THE SLAB WHICHEVER IS SMALLER . (B) FOR CONTINUOUS SLAB : WIDTH OF SUPPORT < 1/12 OF CLEAR SPAN ,THE EFFECTIVE SPAN SHALL WORK OUT AS ABOVE. WHEN WIDTH GREATER THAN 1/12 OF CLEAR SPAN OR 600MM WHICHEVER IS SMALL SHALL BE TAKEN (1) FOR ONE END FIX AND OTHER END CONTINUOUS THE EFFECTIVE SPAN IS CLEAR SPAN. (2) FOR ONE END FREE AND OTHER END CONTINUOUS ,THE EFFECTIVE SPAN SHALL BE EQUAL TO CLEAR SPAN PLUS HALF THE EFFECTIVE DEPTH OR CLEAR SPAN PLUS HALF THE WIDTH OF SUPPORT ,WHICHEVER IS SMALLER . GENERAL CONSIDERATION OF DESIGN FOR SLAB
  • 10.
  • 11. (2)For end span with one end free and other end continuous ,the effective span shall be equal to clear span plus half of the effective depth of the slab , or clear span plus half the with of center to center of support or the clear distance between the support plus the effective depth of the slab whichever is smaller. For continuous slab: In case of a continuous slab ,where the width of the support is less than 1/12 of the clear span ,the effective span shall be worked as above. In case the support are wider than 1/12 of the clear span , the effective span shall be taken as under: (1)For end span with one end fixed and other end continuous ,the effective span shall be clear span. (2)For end span with one end free and other end continuous ,the effective span shall be equal to clear span plus half of the effective depth of the slab , or clear span plus half the with of the discontinuous slab, which ever is less. 2. DEFLECION CONTROL The span to depth ratio are not greater than the value below
  • 12. A) For span upto 10m cantilever slab 7 Simply supported 20 Continuous 26 b) For span above 10m the value in para (a) may be multiply by 10/span in meters 3.Reinforcement in slab (A)Minimum reinforcement. The area of reinforcement in either direction should not less than: 0.12% of the total cross-sectional area (for HYSD bar) 0.15% of the total cross-sectional area (for Fe 250)
  • 13. • (B) Maximum diameter : The maximum diameter of reinforcing bar in a slab should not exceed 1/8 of thickness of slab. • (C) Cover to reinforcement :The cover of concrete to reinforcement in different structural members are following in table Exposure minimum grade of concrete Nominal cover in mm not less than Mild M20 20 Moderate M25 30 Severe M30 45 Very severe M35 50 Extreme M40 75
  • 14. (D) Spacing of reinforcement: a. Minimum distance between individual bars: (i) Minimum distance shall not less than diameter of bar or 5mm more than the nominal max. size of the bar whichever is greatest. (ii)When we provide two or more layer of main bars, the min. vertical clear distance between any two layer of bar shall be 15mm or 2/3 the nominal max. size of course aggregate or max. size of bar whichever is greatest. (b) Maximum distance between bars in tension : (i)The pitch of the main tensile bars in slab should not exceed three times the effective depth or 300mm whichever is smaller.
  • 15. (ii) The pitch of distribution bars shall not exceed five time the effective depth or 450 whichever is smaller. (E) Curtailment of main reinforcement. The main reinforcement in slab may be curtailed or bent up ,beyond the point at which it is no longer requirement to resist bending
  • 16. The following equation can be used to find out the point at which the bar can be curtailed or bend-up x=l/2[Nx/Nc] ˄ ½ X=Distance from either side from centre of span. Nc=Total no. of bar in tension Nx=No. of bars which can be curtailed at any distance x from the center of the span 4.Load on slabs. The load on slab consists of: (a) Live load (b)External dead load (c) Dead load of slab itself
  • 17. EXAMPLE Design a simply supported R.C.C slab to carry a factored load of 15000N/m2 inclusive of its own weight on an effective span of 3.1 m. solution:- Assume 1m width of slab. b= 1m = 1000mm fck = 20N/mm2 fy =415N/mm2 Effective span l=3.1m Design factored load Wu=1500N/m2 =15000*1=15000 Depth of slab . Assume effective depth d=span/25
  • 18. = 3100/25= 124mm or say 130mm Overall depth D =130+30 =160mm Ultimate max. bending moment Mu =wl˄2/8 =(15000x3.1˄2)÷ 8 =18019 N-mm =18019x10˄3Nmm Check for depth The slab will be designed as a balance section Mu =Mlim. 18019x10˄3 =0.138fckbd˄2 18019x10˄3 =0.138x20x1000xd˄2 d= [(18019x10˄3)÷(0.138x20x1000)] = 81mm<130mm Adopt d=130mm and D=160mm
  • 19. Reinforcement (main steel) Mu =0.87fyAst [d-fy Ast ] fck b 18019x10˄3 = 0.87x415xAst [130-415 x Ast ] 20 x 1000 49007 = 130Ast -0.021Ast˄2 Ast˄2- 6190Ast +2376524 =0 Ast =411mm˄2 Minimum area of steel for main bars =0.12bD÷100 =(0.12x1000x160)÷100 =192mm˄2 The area of steel provided is more than minimum requirement.Hence ok
  • 20. Provide 10mm ɸ bars for main reinforcement Area of one 10 mm ɸ bar = π÷4x10˄2 = 78.5mm˄2 c/c spacing of 10mm ɸ bars =Area of one bar x b Total area of steel = 78.5 x 1000 =190MM 411 It should be less than: (i) 3d = 3x130 = 390 mm (ii) 300 mm Provide main steel of 10mm ɸ @190 mm c/c Clear spacing between bars = 190-10 = 180mm
  • 21. It should be more than: (i) Diameter of bar =10mm (ii) Size of aggregate + 5 = 15+5 = 20 Provide 10 mm ɸ bar @190 mm c/c Alternate bars are bent up near the supports .These bars may be bent up at 0.10 l= 310 mm from face of support . Distribution steel Area of distribution steel = 0.12bD/100 =(0.12x1000x160)/100 Provide 8mm ɸ bars as distribution steel Area of one 8mm ɸ bars =π/4 x 8˄2 = 50.26 mm˄2
  • 22. c/c spacing of 8mm ɸ bars = (50.26x1000)/192 =262mm say 260mm It should less than : (i) 5d =5x130 = 650mm (ii) 450mm Provide distribution steel of 8mm @260 mm c/c Check for shear The critical section for shear is at a distance d i.e. 130mm from inner face of support or 0.28 m [130 +300÷2=280 mm = 0.28m] from centre of support. [Assume width of support =300] Factored shear force at critical section V = wl/2 –wx =15000x3.1)/2 – 15000x0.28 =23250-4200 = 19050 N Nominal shear stress τ = V/bd =19050/1000x130= 0.15 N/mm˄2 < 2.8N/mm˄2 [For M20 concrete τc max =2.8 N/mm˄2 P = 100As/bd = (100x206)/(1000x130 ) = 0.16% [{ As =1/2(78.5x1000÷190) = 206 mm˄2},Alternate bars are bent–up ] For P = 0.16% and M 20 concrete from table τc = 0.29 N/mm˄2 For solid slab from table k= 1.28 (for overall depth of slab = 160mm) τc < τv hence no reinforcement provided Check for development length Ld = (0.87fyɸ)/4τbd = (0.87x415x10)/4x1.92 = 470 mm [For M20 concrete and Fe 415 steel, τbd = 1.6x1.2 = 1.92N/mm˄2]
  • 23.
  • 24. As per code at the simply supported the bar must extend beyond the face of support by a distance not less than Ld/3 = 470/3 = 157 mm Length available from the face of support = support width – side cover =300-20 = 280 mm Embedment length from center of support Lo = 300/2-20 = 130mm Since the slab is simply supported ,the compressive reaction will confine the reinforcement . Hence Ld ≤ 1.3M/V +Lo M = moment of resistance provided by 10 mm ɸ bars @380mm c/c
  • 25.
  • 26. = 0.87fyAst[d- fy Ast ] fck b =0.87x415x206x[130 – 415x206] = 9351x10˄3Nmm 20x1000 [Ast =(78.5x1000/380) = 206 mm˄2] V= Factored shear force at the centre of support = wl/2 =15000x3.1/2 = 23250 N 1.3M/V + Lo = 1.3x9351x10˄3/23250 +130 =653mm >Ld Hence development length requirement are satisfied.
  • 27. • Check for deflection Pt = 100Ast/bd =(100x413)/(1000x130) = 0.32% (Ast provided = 78.5x1000/190 = 413mm˄2) Fs = 0.58fy [Area of steel required] Area of steel provided = 0.58x415x[411/413] = 240N/mm˄2 Modification factors Kt = 1.5 Kc= 1.0 (No compression reinforcement provided) Kf = 1.0 (slab section is rectangular) (l/d)max = 20 x Kt x Kc x Kf = 20x1.5x1x1= 30 (l/d)provded = 3100/130 = 23.8<30 The slab will satisfied limit state of serviceability.

Notas del editor

  1. This template can be used as a starter file for presenting training materials in a group setting.SectionsRight-click on a slide to add sections. Sections can help to organize your slides or facilitate collaboration between multiple authors.NotesUse the Notes section for delivery notes or to provide additional details for the audience. View these notes in Presentation View during your presentation. Keep in mind the font size (important for accessibility, visibility, videotaping, and online production)Coordinated colors Pay particular attention to the graphs, charts, and text boxes.Consider that attendees will print in black and white or grayscale. Run a test print to make sure your colors work when printed in pure black and white and grayscale.Graphics, tables, and graphsKeep it simple: If possible, use consistent, non-distracting styles and colors.Label all graphs and tables.
  2. Give a brief overview of the presentation. Describe the major focus of the presentation and why it is important.Introduce each of the major topics.To provide a road map for the audience, you can repeat this Overview slide throughout the presentation, highlighting the particular topic you will discuss next.
  3. This is another option for an Overview slides using transitions.
  4. Keep it brief. Make your text as brief as possible to maintain a larger font size.