Being involved in a great number of projects in IT for around 14 years allows me this
opportunity to share my thoughts on project communication. Based on my experience and
observation, one can always heavily rely on the technical skill sets the team members bring,
as well as the managerial competence the project manager has. But project stakeholders
should also take communication as one of the major aspects that determines whether the
project would be successful or not.
Communication aspect is very crucial. Trust me. It highly defines and influences the success
or failure of a project. Cliché yet still very, very relevant until now.
Like what matters most in mainstream communication, let’s go back to basics. We can follow
the principle “it takes two to tango.” The person who communicates is the “communicator”,
and naturally will speak with their language. The ideal thing is they should be able to
communicate with the “receiver” in a language they would be able to understand.
Comprehensively. Period.
Tons of surveys out there state the way they communicate, or the “method”, is far more
important than the content itself. I could safely say the percentage is 80:20. Indeed, the
method is the winner! Do always remember: communication means “constant”. There are
always people that didn’t hear, or heard but didn’t listen, or listened but were not fully aware
afterwards, didn’t understand, didn’t follow or made the connection when they heard it the
first time.
As a start, to put it in a concrete way, we must have an idea how this person would want to
receive our information. Communication is always and foremost about the other person. Do
remember that “u” is ahead of “i” in the word “communicate”. The clue is pretty simple. If
we want our message to be received, the best thing we could possibly do is present it as the
listener wants to hear it. If you are clueless, then it’s time to be proactive. Ask the person on
how they would like to receive the message: call, email, SMS, chat, or voice mail?
Digging in deeper, what’s actually inside the method? Some of you might be aware of this.
Language, media, and frequency are the elements we need to put our attention to the most,
while vertically, accuracy, completeness, presentation and clarity are extremely important
touch points to consider.

1|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
For local and national companies, they will have a local or national language in the countries
where they are based or headquartered at. Usually to communicate with another company –
principal, distributor, reseller, or partner – in particular, foreign businesses, the mutual
convention shall be agreed.
English as one of the top three most spoken languages is the preferred choice, but for specific
countries, it depends on the result they compromise on. Yet some companies with more
bargaining power prefer or even require their affiliations to be able to speak their languages.
At this extent, even though it only accounts for a small percentage of businesses, their partner
need to go extra miles, if there isn’t a workaround.
In a project, the Project Manager and the stakeholders at large need to have an agreed
language on how they will communicate with each other. More importantly they must have a
common view on terms because otherwise it will lead to confusion and misunderstanding
between the individuals, entities and firms involved. Pointing it out fast forward, failed
projects have failed simply because of this. One thing to take note is that all terms flying
within a project should be accommodated in the project plan and its subdomains too. In this
case, it’s the project communication plan.
Always pay attention to how people communicate to us. If we’ve already done it, take it more
seriously. In most circumstances, watch how people talk to you and respond the same way. If
our contractor texts us asking about their payment status then text them back. Or raise the
level of communication by replying through email. We might even want to do a phone call.
E-mail, phone call, SMS, chat, conference call, meeting, review, and audit are types of media
where we are concerned. Before the project starts, the Project Manager should prepare a
communication matrix. Literally, it’s a table of what kind of events the project will have, the
type of media suitable for each, and the persons involved in particular activities. Also
included is the frequency – once per week, bimonthly, semestral basis, upon project
completion and so on and so forth.

2|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
Example of Communication Media

Mode

Working
Committee
Meetings

Steering
Committee
Meetings

Announcement/
Reminders

Minutes/
Email

Minutes/
Email

On-Site

News
Bulletin

Personal
Update

Verbal
Hard Copies/
Email

Distribution
Meeting Modes

Status
Reports

Hard Copies/
Email

Verbal/
Email

On-Site

This matrix should be circulated not only to team members, but to the steering committee and
executives as well. All of them should be aware of it, not only know, and committed to roll it
out. Attaining bold support from top-level Board of Directors and executive management are
another side of this coin.
The most common way to communicate is over email. Don’t do any important thing unless
you receive an email saying so. Substitute words like “it”, “this”, “those”, or “that” with
complete words like “Purchase Order”, “quotation”, “report” or “launch date” to make sure
everyone is clear on what you are saying. Let the stakeholder know in advance, a week’s
notice at the very least, when a leave has been approved. Set your auto-responder on dates
that you won’t be available, and add whether you will have access to e-mail, the person-incharge during your leave, and when they could expect to hear back from you.
SMS is good for reminding someone on something they might forget. If it’s urgent, make a
phone call instead. Conversing over Skype or voice call at any other messaging platforms
such as Microsoft Office Communicator is today’s way people get connected to each other.
These days, who (really) needs a phone? As messaging apps are heating-up, SMS looks a bit
of “so yesterday”. Those living in rural areas, who often face difficulties in accessing the net,
might still need that.
Conference call is pretty common as time and expense of travel is no longer necessary. Listen
carefully to the dialogue taking place on intonation and clarity of the verbal message.
Nowadays there are quite a number of paid and free services that facilitate numbers to dial
into.

3|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
Example of Communication Matrix

I am seeing more and more projects capitalizing on Wikis. Content uploaded into the
respective platform is editable by anyone with particular permissions. It’s useful for
collaboration perusal for documents and information on any specific topic the project benefits
from. A blog is worth trying as another media to keep our team informed about updates,
changes and decisions.
Needless to ask, in-person meeting is the best method to do coordination. Gestures, body
language, expression, handshake, eye contact are the crucial aspects to help understand what
someone is trying to say, or reacting on something. It’s irreplaceable, especially the eyes. As
far as I’ve experienced, they always tell the truth. Yes, they are natural-born lie detectors! It’s
the best way as we have both verbal and non-verbal cues that enhance communication and
help avoid misinterpretation.
Don’t forget to set a clear agenda when calling for a meeting. Slate a clear outcome and send
the minutes out upon completion. Speaking about meetings, lunch meeting, having coffee
after work, and other casual environments could be great for strengthening relationships,
getting feedback, ideas, and gaining support. Even so, sports like tennis, golf, etc., are
informal ways to explore initiatives, do brainstorming, improving communication skills,
build rapport, and gain more support from the stakeholders.
Being swamped in a mission-critical and time-critical IT project reminds me the importance
of having emergency and alternative communication methods. The first is, for instance, when
natural disaster takes place, in order to update project status and progress, the project
4|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
members know who they should reach out to and which method they should use. Get used to
have another communication detail accessible for secret missions. Whenever there’s
something private and confidential, only person-to-person conversation is needed, and we all
know how to do it. Then just DO IT.
We also need to pay attention to the culture of our organization and the other parties involved
in our project. In some corporations, present time messaging has been flying around all days
for quite some time. But on the other hand, we are still witnessing numerous businesses
spreading their company information by voicemail, which the younger generation finds
ineffective. Always put in mind that information should be accurate, complete, clear, and
well-presented.
Good common sense tells us that any phase within the Project Life Cycle needs to have a
review. Starting from project initiation to implementation, we can continuously improve
processes, as well as do necessary actions, adjustments, and work-around to ensure it’s on the
right track.
Other things that correlate with communication are project template, documentation and
performance reporting. Keep all our project information in a central location and disseminate
where the location is to related stakeholders, as well as set-up its access (authorization and
authentication).
To manage information flow, it’s better for us to create a template for our status report so all
project members could easily use and take advantage of it. By having such standards, it will
also guarantee us the desired information we’d like to have and, even further, to bring it
forward by implementing document management systems for instance.
When communicating with stakeholders, what we could do first is to identify them for each
activity in the project by classifying them into two groups. Referring to RACI (Responsible,
Accountable, Consulted, and Informed), put the first group in those we need to consult with
and the latter as those who need to just be informed.
To make it more organized, don’t hesitate to create a distribution list of each category and
craft communication strategies if necessary. Please always be mindful in sending relevant
messages to relevant stakeholders. Don’t bother with Cc and Reply-All stuffs if we are eager
to streamline our communication over email.
You guessed it right! A plan will never be enough. For certain, it’s critical to understand what
5|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
our stakeholders want, need and desire, both spoken and unspoken. Their expectations should
be carefully managed from beginning till the end. Pick up the most advantageous
communication media and frequency, and make sure it’s going on efficiently and effectively.

6|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/

More Related Content

Viewers also liked

Conducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and FraudConducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and FraudGoutama Bachtiar
 
State of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and SolutionsState of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and SolutionsGoutama Bachtiar
 
OPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan Upaya
OPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan UpayaOPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan Upaya
OPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan UpayaDadang Solihin
 
Enterprise Information Technology Risk Assessment Form
Enterprise Information Technology Risk Assessment FormEnterprise Information Technology Risk Assessment Form
Enterprise Information Technology Risk Assessment FormGoutama Bachtiar
 
Inovasi Pelayanan Publik berbasis Teknologi Informasi
Inovasi Pelayanan Publik berbasis Teknologi InformasiInovasi Pelayanan Publik berbasis Teknologi Informasi
Inovasi Pelayanan Publik berbasis Teknologi InformasiDadang Solihin
 
Governance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 FrameworkGovernance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 FrameworkGoutama Bachtiar
 
Data Governance: Keystone of Information Management Initiatives
Data Governance: Keystone of Information Management InitiativesData Governance: Keystone of Information Management Initiatives
Data Governance: Keystone of Information Management InitiativesAlan McSweeney
 

Viewers also liked (7)

Conducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and FraudConducting Digital Forensics against Crime and Fraud
Conducting Digital Forensics against Crime and Fraud
 
State of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and SolutionsState of Cyber Crime in Banking Sector Today: Threats and Solutions
State of Cyber Crime in Banking Sector Today: Threats and Solutions
 
OPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan Upaya
OPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan UpayaOPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan Upaya
OPTIMALISASI OTONOMI DAERAH: Kebijakan, Strategi, dan Upaya
 
Enterprise Information Technology Risk Assessment Form
Enterprise Information Technology Risk Assessment FormEnterprise Information Technology Risk Assessment Form
Enterprise Information Technology Risk Assessment Form
 
Inovasi Pelayanan Publik berbasis Teknologi Informasi
Inovasi Pelayanan Publik berbasis Teknologi InformasiInovasi Pelayanan Publik berbasis Teknologi Informasi
Inovasi Pelayanan Publik berbasis Teknologi Informasi
 
Governance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 FrameworkGovernance and Management of Enterprise IT with COBIT 5 Framework
Governance and Management of Enterprise IT with COBIT 5 Framework
 
Data Governance: Keystone of Information Management Initiatives
Data Governance: Keystone of Information Management InitiativesData Governance: Keystone of Information Management Initiatives
Data Governance: Keystone of Information Management Initiatives
 

More from Goutama Bachtiar

Crypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and BlockchainCrypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and BlockchainGoutama Bachtiar
 
Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018Goutama Bachtiar
 
Blockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking IndustryBlockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking IndustryGoutama Bachtiar
 
Delving into Fintech
Delving into FintechDelving into Fintech
Delving into FintechGoutama Bachtiar
 
Leveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumLeveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumGoutama Bachtiar
 
Library of Information Technology Icons
Library of Information Technology IconsLibrary of Information Technology Icons
Library of Information Technology IconsGoutama Bachtiar
 
PMBOK 6th vs 5th Edition
PMBOK 6th vs 5th EditionPMBOK 6th vs 5th Edition
PMBOK 6th vs 5th EditionGoutama Bachtiar
 
Dealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking SphereDealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking SphereGoutama Bachtiar
 
IS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New EconomyIS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New EconomyGoutama Bachtiar
 
Utilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and InvestigationUtilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and InvestigationGoutama Bachtiar
 
Managing IT Risks in Internet Banking
Managing IT Risks in Internet BankingManaging IT Risks in Internet Banking
Managing IT Risks in Internet BankingGoutama Bachtiar
 
Electronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment IndustryElectronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment IndustryGoutama Bachtiar
 
The State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and ChallengesThe State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and ChallengesGoutama Bachtiar
 
Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Goutama Bachtiar
 
Implementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft VisioImplementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft VisioGoutama Bachtiar
 
Understanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor RelationshipsUnderstanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor RelationshipsGoutama Bachtiar
 
Valuing Information Management and IT Architecture
Valuing Information Management and IT ArchitectureValuing Information Management and IT Architecture
Valuing Information Management and IT ArchitectureGoutama Bachtiar
 
Riding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information TechnologyRiding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information TechnologyGoutama Bachtiar
 
The Current and Future State of Internet of Things: Unveiling the Opportunities
The Current and Future State of Internet of Things: Unveiling the OpportunitiesThe Current and Future State of Internet of Things: Unveiling the Opportunities
The Current and Future State of Internet of Things: Unveiling the OpportunitiesGoutama Bachtiar
 
Crafting and Delivering Effective Business Pitch to Investors
Crafting and Delivering Effective Business Pitch to InvestorsCrafting and Delivering Effective Business Pitch to Investors
Crafting and Delivering Effective Business Pitch to InvestorsGoutama Bachtiar
 

More from Goutama Bachtiar (20)

Crypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and BlockchainCrypto Currency, Bitcoin and Blockchain
Crypto Currency, Bitcoin and Blockchain
 
Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018Information Security Management System with ISO/IEC 27000:2018
Information Security Management System with ISO/IEC 27000:2018
 
Blockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking IndustryBlockchain Essentials - Harnessing the Technology for Banking Industry
Blockchain Essentials - Harnessing the Technology for Banking Industry
 
Delving into Fintech
Delving into FintechDelving into Fintech
Delving into Fintech
 
Leveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumLeveraging Agile Project Management with Scrum
Leveraging Agile Project Management with Scrum
 
Library of Information Technology Icons
Library of Information Technology IconsLibrary of Information Technology Icons
Library of Information Technology Icons
 
PMBOK 6th vs 5th Edition
PMBOK 6th vs 5th EditionPMBOK 6th vs 5th Edition
PMBOK 6th vs 5th Edition
 
Dealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking SphereDealing with Fraud in E-Banking Sphere
Dealing with Fraud in E-Banking Sphere
 
IS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New EconomyIS and IT Auditor Roles in Today's New Economy
IS and IT Auditor Roles in Today's New Economy
 
Utilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and InvestigationUtilizing Internet for Fraud Examination and Investigation
Utilizing Internet for Fraud Examination and Investigation
 
Managing IT Risks in Internet Banking
Managing IT Risks in Internet BankingManaging IT Risks in Internet Banking
Managing IT Risks in Internet Banking
 
Electronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment IndustryElectronic Payment Fundamentals: When Tech Embracing Payment Industry
Electronic Payment Fundamentals: When Tech Embracing Payment Industry
 
The State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and ChallengesThe State of ERP in Indonesia: Trends, Opportunities and Challenges
The State of ERP in Indonesia: Trends, Opportunities and Challenges
 
Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)Developing and Managing Business Continuity Plan (BCP)
Developing and Managing Business Continuity Plan (BCP)
 
Implementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft VisioImplementing BPMN 2.0 with Microsoft Visio
Implementing BPMN 2.0 with Microsoft Visio
 
Understanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor RelationshipsUnderstanding IT Strategy, Sourcing and Vendor Relationships
Understanding IT Strategy, Sourcing and Vendor Relationships
 
Valuing Information Management and IT Architecture
Valuing Information Management and IT ArchitectureValuing Information Management and IT Architecture
Valuing Information Management and IT Architecture
 
Riding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information TechnologyRiding and Capitalizing the Next Wave of Information Technology
Riding and Capitalizing the Next Wave of Information Technology
 
The Current and Future State of Internet of Things: Unveiling the Opportunities
The Current and Future State of Internet of Things: Unveiling the OpportunitiesThe Current and Future State of Internet of Things: Unveiling the Opportunities
The Current and Future State of Internet of Things: Unveiling the Opportunities
 
Crafting and Delivering Effective Business Pitch to Investors
Crafting and Delivering Effective Business Pitch to InvestorsCrafting and Delivering Effective Business Pitch to Investors
Crafting and Delivering Effective Business Pitch to Investors
 

Recently uploaded

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
掟版1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻ
掟版1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻćŽŸç‰ˆ1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻ
掟版1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻjdkhjh
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 

Recently uploaded (18)

Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
掟版1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻ
掟版1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻćŽŸç‰ˆ1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻ
掟版1:1ć€ćˆ»ćŻ†è„żè„żæŻ”ć€§ć­ŠæŻ•äžšèŻMississippiæŻ•äžšèŻç•™äżĄć­ŠćŽ†èź€èŻ
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 

How to Communicate Effectively in IT Projects

  • 1. Being involved in a great number of projects in IT for around 14 years allows me this opportunity to share my thoughts on project communication. Based on my experience and observation, one can always heavily rely on the technical skill sets the team members bring, as well as the managerial competence the project manager has. But project stakeholders should also take communication as one of the major aspects that determines whether the project would be successful or not. Communication aspect is very crucial. Trust me. It highly defines and influences the success or failure of a project. ClichĂ© yet still very, very relevant until now. Like what matters most in mainstream communication, let’s go back to basics. We can follow the principle “it takes two to tango.” The person who communicates is the “communicator”, and naturally will speak with their language. The ideal thing is they should be able to communicate with the “receiver” in a language they would be able to understand. Comprehensively. Period. Tons of surveys out there state the way they communicate, or the “method”, is far more important than the content itself. I could safely say the percentage is 80:20. Indeed, the method is the winner! Do always remember: communication means “constant”. There are always people that didn’t hear, or heard but didn’t listen, or listened but were not fully aware afterwards, didn’t understand, didn’t follow or made the connection when they heard it the first time. As a start, to put it in a concrete way, we must have an idea how this person would want to receive our information. Communication is always and foremost about the other person. Do remember that “u” is ahead of “i” in the word “communicate”. The clue is pretty simple. If we want our message to be received, the best thing we could possibly do is present it as the listener wants to hear it. If you are clueless, then it’s time to be proactive. Ask the person on how they would like to receive the message: call, email, SMS, chat, or voice mail? Digging in deeper, what’s actually inside the method? Some of you might be aware of this. Language, media, and frequency are the elements we need to put our attention to the most, while vertically, accuracy, completeness, presentation and clarity are extremely important touch points to consider. 1|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
  • 2. For local and national companies, they will have a local or national language in the countries where they are based or headquartered at. Usually to communicate with another company – principal, distributor, reseller, or partner – in particular, foreign businesses, the mutual convention shall be agreed. English as one of the top three most spoken languages is the preferred choice, but for specific countries, it depends on the result they compromise on. Yet some companies with more bargaining power prefer or even require their affiliations to be able to speak their languages. At this extent, even though it only accounts for a small percentage of businesses, their partner need to go extra miles, if there isn’t a workaround. In a project, the Project Manager and the stakeholders at large need to have an agreed language on how they will communicate with each other. More importantly they must have a common view on terms because otherwise it will lead to confusion and misunderstanding between the individuals, entities and firms involved. Pointing it out fast forward, failed projects have failed simply because of this. One thing to take note is that all terms flying within a project should be accommodated in the project plan and its subdomains too. In this case, it’s the project communication plan. Always pay attention to how people communicate to us. If we’ve already done it, take it more seriously. In most circumstances, watch how people talk to you and respond the same way. If our contractor texts us asking about their payment status then text them back. Or raise the level of communication by replying through email. We might even want to do a phone call. E-mail, phone call, SMS, chat, conference call, meeting, review, and audit are types of media where we are concerned. Before the project starts, the Project Manager should prepare a communication matrix. Literally, it’s a table of what kind of events the project will have, the type of media suitable for each, and the persons involved in particular activities. Also included is the frequency – once per week, bimonthly, semestral basis, upon project completion and so on and so forth. 2|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
  • 3. Example of Communication Media Mode Working Committee Meetings Steering Committee Meetings Announcement/ Reminders Minutes/ Email Minutes/ Email On-Site News Bulletin Personal Update Verbal Hard Copies/ Email Distribution Meeting Modes Status Reports Hard Copies/ Email Verbal/ Email On-Site This matrix should be circulated not only to team members, but to the steering committee and executives as well. All of them should be aware of it, not only know, and committed to roll it out. Attaining bold support from top-level Board of Directors and executive management are another side of this coin. The most common way to communicate is over email. Don’t do any important thing unless you receive an email saying so. Substitute words like “it”, “this”, “those”, or “that” with complete words like “Purchase Order”, “quotation”, “report” or “launch date” to make sure everyone is clear on what you are saying. Let the stakeholder know in advance, a week’s notice at the very least, when a leave has been approved. Set your auto-responder on dates that you won’t be available, and add whether you will have access to e-mail, the person-incharge during your leave, and when they could expect to hear back from you. SMS is good for reminding someone on something they might forget. If it’s urgent, make a phone call instead. Conversing over Skype or voice call at any other messaging platforms such as Microsoft Office Communicator is today’s way people get connected to each other. These days, who (really) needs a phone? As messaging apps are heating-up, SMS looks a bit of “so yesterday”. Those living in rural areas, who often face difficulties in accessing the net, might still need that. Conference call is pretty common as time and expense of travel is no longer necessary. Listen carefully to the dialogue taking place on intonation and clarity of the verbal message. Nowadays there are quite a number of paid and free services that facilitate numbers to dial into. 3|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
  • 4. Example of Communication Matrix I am seeing more and more projects capitalizing on Wikis. Content uploaded into the respective platform is editable by anyone with particular permissions. It’s useful for collaboration perusal for documents and information on any specific topic the project benefits from. A blog is worth trying as another media to keep our team informed about updates, changes and decisions. Needless to ask, in-person meeting is the best method to do coordination. Gestures, body language, expression, handshake, eye contact are the crucial aspects to help understand what someone is trying to say, or reacting on something. It’s irreplaceable, especially the eyes. As far as I’ve experienced, they always tell the truth. Yes, they are natural-born lie detectors! It’s the best way as we have both verbal and non-verbal cues that enhance communication and help avoid misinterpretation. Don’t forget to set a clear agenda when calling for a meeting. Slate a clear outcome and send the minutes out upon completion. Speaking about meetings, lunch meeting, having coffee after work, and other casual environments could be great for strengthening relationships, getting feedback, ideas, and gaining support. Even so, sports like tennis, golf, etc., are informal ways to explore initiatives, do brainstorming, improving communication skills, build rapport, and gain more support from the stakeholders. Being swamped in a mission-critical and time-critical IT project reminds me the importance of having emergency and alternative communication methods. The first is, for instance, when natural disaster takes place, in order to update project status and progress, the project 4|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
  • 5. members know who they should reach out to and which method they should use. Get used to have another communication detail accessible for secret missions. Whenever there’s something private and confidential, only person-to-person conversation is needed, and we all know how to do it. Then just DO IT. We also need to pay attention to the culture of our organization and the other parties involved in our project. In some corporations, present time messaging has been flying around all days for quite some time. But on the other hand, we are still witnessing numerous businesses spreading their company information by voicemail, which the younger generation finds ineffective. Always put in mind that information should be accurate, complete, clear, and well-presented. Good common sense tells us that any phase within the Project Life Cycle needs to have a review. Starting from project initiation to implementation, we can continuously improve processes, as well as do necessary actions, adjustments, and work-around to ensure it’s on the right track. Other things that correlate with communication are project template, documentation and performance reporting. Keep all our project information in a central location and disseminate where the location is to related stakeholders, as well as set-up its access (authorization and authentication). To manage information flow, it’s better for us to create a template for our status report so all project members could easily use and take advantage of it. By having such standards, it will also guarantee us the desired information we’d like to have and, even further, to bring it forward by implementing document management systems for instance. When communicating with stakeholders, what we could do first is to identify them for each activity in the project by classifying them into two groups. Referring to RACI (Responsible, Accountable, Consulted, and Informed), put the first group in those we need to consult with and the latter as those who need to just be informed. To make it more organized, don’t hesitate to create a distribution list of each category and craft communication strategies if necessary. Please always be mindful in sending relevant messages to relevant stakeholders. Don’t bother with Cc and Reply-All stuffs if we are eager to streamline our communication over email. You guessed it right! A plan will never be enough. For certain, it’s critical to understand what 5|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/
  • 6. our stakeholders want, need and desire, both spoken and unspoken. Their expectations should be carefully managed from beginning till the end. Pick up the most advantageous communication media and frequency, and make sure it’s going on efficiently and effectively. 6|h t t p : //r e s o ur c es .i n t e n s es c h o ol . c o m/h o w- t o -c om m u n ic at e - e f f ec ti v elyi n-i t-pr ojects/