A Sample filled in CSSBB affidavit
1. Six Sigma Project completed by John Q Public, 01000010
(applicant’s name, please print) (member number)
2. Six Sigma project title Reduction of XXX process Quality defects
3. Provide a brief description of the purpose of the project, and how it related to the business
objective:
The process XXX has been our bottle neck for over 6 months producing defects over 20 % of the
manufacturing volume. This excess defectives have resulted in customer complaints (Inspection
escape), inconsistent delivery, and increasing in manufacturing costs. This goal for this process
step is to keep the defectives under 5000 ppm (0.5%) The on-time delivery of correct quantity is
expected to be 99% or higher. By improving the process quality to less than 5000 ppm, and
building adequate controls in place, the number escape defects are expected to reduce to less
than 500 ppm.
4. Six Sigma project’s start and completion dates by month/year: Jan 2006- March 2006
5. Provide a brief description of applicant’s hands-on performance in completing Six Sigma
project. Please include specific examples of tools used, i.e., process maps, metrics (DPU, DPMO,
RTY), procedures, charts, etc. Do not send documentation.
As a Black belt, I was responsible for creating a project charter to define the project, NPV
financial sheet to calculate project financial gains, develop a comprehensive Project plan (Gantt).
I lead the team with a brainstorming session, consolidated the inputs to a cause and effect
diagram. The process map and initial data of process defect Pareto analysis were used during
the discussion. Prioritized causes were further investigated to identify the root causes.
Measurement system analysis was conducted to identify the measurement system error; a
factorial DOE was conducted to identify significant factors. A Response surface design was
further used to optimize the process settings. The process capability study was conducted and
the indices Cp, Cpk were meeting the process objectives. The team developed on the existing
PFMEA and updated the control plan for sustainability.
6. Provide a brief statement on the benefits achieved by the successful completion of the project,
including but not limited to financial savings, labor, material costs, cycle-time reduction, etc.
The process step with the initial process defectives at 20% was costing the organization $5000 /
Week (over $250,000 / year). This includes material costs and labor only. The lost machine
capacity in producing scrap is now effectively used for meeting tighter delivery deadlines. The
reduced escape defects and on-time delivery have improved our customer satisfaction from 3.5 to
4.0 in a 5 point scale.
The NPV, ROI, payback financial sheet were verified by MBB.
7. Verification of completion by project champion:
Verification form completed by:
Bruce Almighty 11th
April 2006
(project champion’s signature) (date signed)
Champion’s name: Bruce Almighty Job title Operations Director
Company name Never Fail Inc.
Address 1, Zero defect Lane, Road to success, Achievement Valley, California
Project champion’s e-mail address bruce.almighty@neverfail.com
Project champion’s telephone 408 1234567 Fax number 408 1234568.
Page 1 of 1
Author: Govind Ramu

Más contenido relacionado

La actualidad más candente

Six sigma green belt project template
Six sigma green belt project templateSix sigma green belt project template
Six sigma green belt project template
Shankaran Rd
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
Steven Bonacorsi
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
Steven Bonacorsi
 

La actualidad más candente (20)

S&OP, Kinaxis
S&OP, KinaxisS&OP, Kinaxis
S&OP, Kinaxis
 
Sales & Operations Planning (S&OP): An Introduction
Sales & Operations Planning (S&OP): An IntroductionSales & Operations Planning (S&OP): An Introduction
Sales & Operations Planning (S&OP): An Introduction
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Definition of kp is november 2016
Definition of kp is   november 2016Definition of kp is   november 2016
Definition of kp is november 2016
 
Advanced Pfmea
Advanced PfmeaAdvanced Pfmea
Advanced Pfmea
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Production preparation process 3P
Production preparation process  3PProduction preparation process  3P
Production preparation process 3P
 
Principles of Kanban - November 2016
Principles of Kanban - November 2016Principles of Kanban - November 2016
Principles of Kanban - November 2016
 
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%Project Storyboard: Reducing Cycle Time for Bid Tab Creationby 33%
Project Storyboard: Reducing Cycle Time for Bid Tab Creation by 33%
 
PMP_Project Risk Management
PMP_Project Risk ManagementPMP_Project Risk Management
PMP_Project Risk Management
 
Sales and Operations Planning (S&OP) Overview
Sales and Operations Planning (S&OP) OverviewSales and Operations Planning (S&OP) Overview
Sales and Operations Planning (S&OP) Overview
 
FMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysisFMEA - Failure mode and effects analysis
FMEA - Failure mode and effects analysis
 
Lean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence ConsultingLean Thinking by Operational Excellence Consulting
Lean Thinking by Operational Excellence Consulting
 
Six sigma green belt project template
Six sigma green belt project templateSix sigma green belt project template
Six sigma green belt project template
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
Lean Materials Management - Parts presentation at the line - November 2016
Lean Materials Management - Parts presentation at the line - November 2016Lean Materials Management - Parts presentation at the line - November 2016
Lean Materials Management - Parts presentation at the line - November 2016
 
Define phase lean six sigma tollgate template
Define phase   lean six sigma tollgate templateDefine phase   lean six sigma tollgate template
Define phase lean six sigma tollgate template
 
Tips For Passing Asq Certification Exam Asq
Tips For Passing Asq Certification Exam AsqTips For Passing Asq Certification Exam Asq
Tips For Passing Asq Certification Exam Asq
 
Control phase lean six sigma tollgate template
Control phase   lean six sigma tollgate templateControl phase   lean six sigma tollgate template
Control phase lean six sigma tollgate template
 
Implementation of SAP BI in Coca Cola
Implementation of SAP BI in Coca ColaImplementation of SAP BI in Coca Cola
Implementation of SAP BI in Coca Cola
 

Destacado

211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)
Saieesha Chitoori
 
6 Sigma Catapult Project
6 Sigma Catapult Project6 Sigma Catapult Project
6 Sigma Catapult Project
trojanbrewer
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
John Smith
 
Affidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgmentAffidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgment
Cocoselul Inaripat
 
ASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black BeltASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black Belt
Lendell Hawley
 
PressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspxPressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspx
Johnny Pittman
 

Destacado (18)

211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)211344558 certified-six-sigma-black-belt-asq-cssbb (1)
211344558 certified-six-sigma-black-belt-asq-cssbb (1)
 
Six Sigma Sample Project
Six Sigma Sample ProjectSix Sigma Sample Project
Six Sigma Sample Project
 
Certified Six Sigma Black Belt
Certified Six Sigma Black BeltCertified Six Sigma Black Belt
Certified Six Sigma Black Belt
 
Affidavit format
Affidavit formatAffidavit format
Affidavit format
 
DMAIC implementation
DMAIC implementationDMAIC implementation
DMAIC implementation
 
Catapult DOE Case Study
Catapult DOE Case StudyCatapult DOE Case Study
Catapult DOE Case Study
 
6 Sigma Catapult Project
6 Sigma Catapult Project6 Sigma Catapult Project
6 Sigma Catapult Project
 
Six sigma full report
Six sigma full reportSix sigma full report
Six sigma full report
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Completed & Current LSS Projects
Completed & Current LSS ProjectsCompleted & Current LSS Projects
Completed & Current LSS Projects
 
Rutgers Green Belt
Rutgers Green BeltRutgers Green Belt
Rutgers Green Belt
 
My Projects Portfolio
My Projects PortfolioMy Projects Portfolio
My Projects Portfolio
 
Law audit
Law auditLaw audit
Law audit
 
Affidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgmentAffidavit in support of motion for summary judgment
Affidavit in support of motion for summary judgment
 
ASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black BeltASQ - Certified Six Sigma Black Belt
ASQ - Certified Six Sigma Black Belt
 
PressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspxPressRelease-ASQ-CQE Pittman.aspx
PressRelease-ASQ-CQE Pittman.aspx
 
Certified Quality Engineer Exam Overview
Certified Quality Engineer Exam OverviewCertified Quality Engineer Exam Overview
Certified Quality Engineer Exam Overview
 
5 C Template
5 C Template5 C Template
5 C Template
 

Similar a ASQ CSSBB Affidavit Example

Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
hallettfaustina
 
KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808
Gregory King II
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
PhngPhmTrung
 
Department Structure
Department StructureDepartment Structure
Department Structure
G.J. dePillis
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
todd771
 
IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8
Parag Kapile
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
vrickens
 

Similar a ASQ CSSBB Affidavit Example (20)

S3 p2 lee_kong_hui
S3 p2 lee_kong_huiS3 p2 lee_kong_hui
S3 p2 lee_kong_hui
 
Foods Case StudyWhat to coverExecuti.docx
            Foods Case StudyWhat to coverExecuti.docx            Foods Case StudyWhat to coverExecuti.docx
Foods Case StudyWhat to coverExecuti.docx
 
TS02
TS02TS02
TS02
 
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
An Application Of Six Sigma DMAIC Methodology In Outsourcing Management Proce...
 
150110746014
150110746014150110746014
150110746014
 
KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808KingGregory_ExpandedResume 20160808
KingGregory_ExpandedResume 20160808
 
Oscar Padilla, PMP
Oscar Padilla, PMPOscar Padilla, PMP
Oscar Padilla, PMP
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPM
 
DMAIC Report_v1(full)
DMAIC Report_v1(full)DMAIC Report_v1(full)
DMAIC Report_v1(full)
 
Six_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptxSix_Sigma_Report_Template_v2 (2).pptx
Six_Sigma_Report_Template_v2 (2).pptx
 
olivier_a.pdf
olivier_a.pdfolivier_a.pdf
olivier_a.pdf
 
PM
PMPM
PM
 
Department Structure
Department StructureDepartment Structure
Department Structure
 
Projects summary
Projects summaryProjects summary
Projects summary
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
 
IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8IE7610_REPORT_GROUP_8
IE7610_REPORT_GROUP_8
 
Six sigma ajal
Six sigma ajalSix sigma ajal
Six sigma ajal
 
IOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docxIOP Conference Series Materials Science and EngineeringPA.docx
IOP Conference Series Materials Science and EngineeringPA.docx
 
Optimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value ChainOptimizing Product Realization Costs Across the Value Chain
Optimizing Product Realization Costs Across the Value Chain
 

Más de Govind Ramu

Más de Govind Ramu (12)

Demystifying Cost of Quality.pdf
Demystifying Cost of Quality.pdfDemystifying Cost of Quality.pdf
Demystifying Cost of Quality.pdf
 
Quality Management - Guidelines for realizing financial and economic benefits
Quality Management - Guidelines for realizing financial and economic benefitsQuality Management - Guidelines for realizing financial and economic benefits
Quality Management - Guidelines for realizing financial and economic benefits
 
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
Integrated Management Systems ASQ Silicon Valley section 0613 april 2017_gr c...
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
ISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and ImplementationISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and Implementation
 
Overview of the proposed Photovoltaic Solar Quality Management System standard
Overview of the proposed Photovoltaic Solar Quality Management System standardOverview of the proposed Photovoltaic Solar Quality Management System standard
Overview of the proposed Photovoltaic Solar Quality Management System standard
 
Future of-quality asq 042011-govind
Future of-quality asq 042011-govindFuture of-quality asq 042011-govind
Future of-quality asq 042011-govind
 
Prioritizing Process Improvements
Prioritizing Process ImprovementsPrioritizing Process Improvements
Prioritizing Process Improvements
 
Innovative Approach to FMEA Facilitation
Innovative Approach to FMEA FacilitationInnovative Approach to FMEA Facilitation
Innovative Approach to FMEA Facilitation
 
Quality In Outsourcing
Quality In OutsourcingQuality In Outsourcing
Quality In Outsourcing
 
Iso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis GovindIso9001 2008 Change Analysis Govind
Iso9001 2008 Change Analysis Govind
 
Iso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq GovindIso9001 2008 Transition Asq Govind
Iso9001 2008 Transition Asq Govind
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Último (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 

ASQ CSSBB Affidavit Example

  • 1. A Sample filled in CSSBB affidavit 1. Six Sigma Project completed by John Q Public, 01000010 (applicant’s name, please print) (member number) 2. Six Sigma project title Reduction of XXX process Quality defects 3. Provide a brief description of the purpose of the project, and how it related to the business objective: The process XXX has been our bottle neck for over 6 months producing defects over 20 % of the manufacturing volume. This excess defectives have resulted in customer complaints (Inspection escape), inconsistent delivery, and increasing in manufacturing costs. This goal for this process step is to keep the defectives under 5000 ppm (0.5%) The on-time delivery of correct quantity is expected to be 99% or higher. By improving the process quality to less than 5000 ppm, and building adequate controls in place, the number escape defects are expected to reduce to less than 500 ppm. 4. Six Sigma project’s start and completion dates by month/year: Jan 2006- March 2006 5. Provide a brief description of applicant’s hands-on performance in completing Six Sigma project. Please include specific examples of tools used, i.e., process maps, metrics (DPU, DPMO, RTY), procedures, charts, etc. Do not send documentation. As a Black belt, I was responsible for creating a project charter to define the project, NPV financial sheet to calculate project financial gains, develop a comprehensive Project plan (Gantt). I lead the team with a brainstorming session, consolidated the inputs to a cause and effect diagram. The process map and initial data of process defect Pareto analysis were used during the discussion. Prioritized causes were further investigated to identify the root causes. Measurement system analysis was conducted to identify the measurement system error; a factorial DOE was conducted to identify significant factors. A Response surface design was further used to optimize the process settings. The process capability study was conducted and the indices Cp, Cpk were meeting the process objectives. The team developed on the existing PFMEA and updated the control plan for sustainability. 6. Provide a brief statement on the benefits achieved by the successful completion of the project, including but not limited to financial savings, labor, material costs, cycle-time reduction, etc. The process step with the initial process defectives at 20% was costing the organization $5000 / Week (over $250,000 / year). This includes material costs and labor only. The lost machine capacity in producing scrap is now effectively used for meeting tighter delivery deadlines. The reduced escape defects and on-time delivery have improved our customer satisfaction from 3.5 to 4.0 in a 5 point scale. The NPV, ROI, payback financial sheet were verified by MBB. 7. Verification of completion by project champion: Verification form completed by: Bruce Almighty 11th April 2006 (project champion’s signature) (date signed) Champion’s name: Bruce Almighty Job title Operations Director Company name Never Fail Inc. Address 1, Zero defect Lane, Road to success, Achievement Valley, California Project champion’s e-mail address bruce.almighty@neverfail.com Project champion’s telephone 408 1234567 Fax number 408 1234568. Page 1 of 1 Author: Govind Ramu