This document summarizes the operations of a battery manufacturing facility in India. The facility was commissioned in 2006, has a total constructed area of 1300 square meters, and was designed to produce 1200 devices and 800 batteries per day. It currently employs 171 people and has a daily production capacity of 5000 batteries. The facility produces components like carbon blocks, cartridges, and batteries through various manufacturing processes like mixing, curing, welding, and packing. Safety measures like training, audits, and mock drills are conducted regularly to ensure compliance with standards.