SlideShare una empresa de Scribd logo
1 de 42
Achieve Peak Performance Protect and Improve the Enterprise
Leverage Your Current Master Performers for Higher Performance!
performance-based
Curriculum
Architecture
Design
November 2010ISPI Hampton Roads
Curriculum Architecture
The conscious configuration
of instructional and informational content,
of many media types
at the Enterprise level
and at the Learner level
and at the Product and Subassembly level.
November 2010 2www.eppic.biz
Macro-level ISD “Design”
PACT:
- 3 levels of design
- Common Analysis
methods and tools
- Common Project
Management
methods and tools
November 2010 3www.eppic.biz
Curriculum Architecture Design
November 2010 4www.eppic.biz
Session Objectives Preview
At the conclusion of the session, participants
will be able to:
1. Describe the key Customer Outputs and
Benefits
2. Describe the key Supplier Outputs and
Benefits
3. Describe the Design Team Meeting Process
and the use of the analysis data
November 2010 5www.eppic.biz
November 2010 7www.eppic.biz
Year Client Target Audience(s)
1993 Abbott Laboratories Market, Product and Sales Management
1984 Alcoa Labs Laboratory Scientists, Engineers, Technicians, Admin Staff
1989 Ameritech Network Services Management
1989 Ameritech Distribution Services Second-level Management
1996 Amoco ISD Staff Coaching and Support
1996 Amoco Project BEST
1993 Amoco Team Training
1990 ARCO Alaska AMPS
1984 AT&T AETM
1984 AT&T Switching Technician
1988 AT&T Microelectronics Product Management
1994 AT&T Network Systems Global Contract Management
1993 AT&T Network Systems Product Management and Market Management
1991 AT&T Network Systems Marketing Personnel
1989 AT&T Network Systems Network Systems Sales
1988 AT&T Network Systems Switching Business Unit Sales
1986 AT&T Network Systems Product Manager
1996 Bandag, Inc. Franchise Dealership Management
1998 BankAmerica Corporation Financial Relationship Managers
1997 BankAmerica Corporation Retail Branch Personnel
1996 Bellcore Tech Web Masters
1991 British Petroleum—America Front-line Retail Personnel
1984 Burroughs Information Specialists
1983 Channel Gas Industries/Tenneco Fixed-rate Personnel
List of Guy Wallace’s 74 CAD Projects - Since 1982 – Page 1
List of Guy Wallace’s 74 CAD Projects - Since 1982 – Page 2
Year Client Target Audience(s)
1993 Commerce Clearing House (CCH) Sales Representative and Sales
1993 Data General Sales
1992 Detroit Ball Bearing Field Sales Managers
1991 Digital Equipment Corporation Program Management
1987 Dow Chemical Safety Training
1986 Dow Chemical Secretarial/Administrative
1986 Dow Chemical Top Operator
2004 Eli Lilly and Company Clinical Trials Process participants
1999 Eli Lilly and Company District Sales Managers
1997 Eli Lilly and Company Leadership and Management
1982 Exxon Exploration USA Geologists/Geophysicists
1992 Ford Design Institute Engineering
1994 Ford Motor Company Engineering
1991 General Dynamics Electrical/Electronics Assembly
1991 General Dynamics CATIA System Designers
1991 General Dynamics MRP II – Manufacturing Personnel
1991 General Dynamics Software Engineering
1990 General Dynamics Composites Bonding & Fabrication
1989 General Dynamics Quality
1997 General Motors Tool & Die Supervisors
1996 General Motors Product Engineers
1999 General Motors University Brand Management—Europe
1999 General Motors University Brand Management—North America
1998 General Motors University Internal Controls
1998 General Motors University MFD Area Managers
1998 General Motors University Global Dealer Auditors
2000 GTE Service Corporation/Verizon Wholesale Billing Call Center Personnel
List of Guy Wallace’s 74 CAD Projects - Since 1982 – Page 3
Year Client Target Audience(s)
1993 Hewlett Packard Order Fulfillment (Order Processing,
1991 Hewlett Packard Information Technologists
1989 Hewlett Packard Information Technologists
1986 Illinois Bell Second-level Manager
1986 Illinois Bell Data Technician
1993 Imperial Bondware/Federal Paperboard Sales Training
1985 MCC Powers Fire and Security
1983 MCC Powers ATC Branch Personnel
1983 Motorola Design & Manufacturing Engineering
1986 Multigraphics In-Branch Sales Orientation
1987 NASA Middle Manager
1990 NCR Supply Line Management
2003 Norfolk Naval Shipyard Production Supervisors & Zone Managers
1988 Northern Trust Bank (Chicago) Trust and Financial Services
1994 Novacor, Corunna Site Operations Management and
1991 Occidental Petroleum Labs Laboratory Personnel
1998 Siemens Building Technologies, Inc. Sales Engineering
1993 Spartan Stores/ISSC Companywide
1996 Sphinx Pharmaceuticals Combinatorial Chemists
1990 Square D Quality Training
1995 Valuemetrics, Inc. Associate and Senior Associate
2001 Verizon Consumer Sales Call Centers
1983 Westinghouse Defense Electronics Technical Operators (WICAM/IAG)
November 2010 11www.eppic.biz
November 2010 12www.eppic.biz
November 2010 13www.eppic.biz
Event Info on the Learning Path/Menu
November 2010 14www.eppic.biz
The Beginning of the Path
The Beginning of Every Path…
…has its own
Beginning – Middle – End
Beginning… Middle… End…
almost
Beginning of the Beginning
 The “Architecture”
here reflects the
Organization chart,
plus - all assigned
Teams and others
Jobs that the target
audience will be
working with.
November 2010 17www.eppic.biz
Middle of the Beginning
 The “Architecture”
here reflects analysis
data from the
Performance Model
and can be created
immediately after
that analysis…using
standard templates
November 2010 18www.eppic.biz
End of the Beginning
 The “Architecture”
here reflects some or
all of the
Performance data,
and the linked
enabling K/S data – as
determined by the
Project Steering Team
and their handpicked
Design Team.
November 2010 19www.eppic.biz
One of 7 Paths produced in a combined CAD-MCD effort…
November 2010 20www.eppic.biz
Another of the 7 Paths produced in a combined CAD-MCD effort…
November 2010 21www.eppic.biz
November 2010 22www.eppic.biz
Whether the output is a Straight Path, a
Path of Menus, or a Menu…
…it should be “as rigid as required
and as flexible as feasible.”
Planning Guide
November 2010 25www.eppic.biz
The Analysis Data
1- Target Audience Data
2- Performance Data
3- Enabling K/S Data
4- Existing T&D
Assessments
(ETA) Data
November 2010 28www.eppic.biz
1- Target
Audience Data
November 2010 29www.eppic.biz
2- Performance Data
November 2010 30www.eppic.biz
Key Tasks
Describes the key
activities needed to
produce the outputs
Roles/Responsibilities
Clarifies who is typically
responsible for performing
the tasks
Deficiency
dE=Environment
dK=Knowledge/skill
dI=Individual
attribute/value
Key Outputs and
Metrics or Measures
Describes what is
produced from
doing the job tasks
and identifies key
performance
measures of each
output
Typical Performance Gaps
Identifies any typical ways
the output or task does not
meet performance
standards
Probable Gap Cause(s)
Identifies most likely causes
for each typical
performance issue/
deficiency
The Most Convenient Stores
Store Management
Performance Model
©2002 EPPIC, Inc.
Area of Performance:
• Key Outputs
- Measures Key Tasks
Probable Gap
Cause(s)
dE
dK
dI
Roles/Responsibilities
1 2 3 4
dE = deficiency - Environment
dK = deficiency - Knowledge/skill
dI = deficiency - Individual attribute/
value
Role: 1 =
2 =
3 =
4 =
Typical
Performance Gaps
Form Design ©2002 EPPIC, Inc. 12/02 Page 1
A. Staff Recruiting, Selection, and Training
1 = District Manager
2 = Store Manager
3 = Assistant Manager
4 = Clerk
• New staff hired
- Timely
- Qualified
•Identify need for
additional staff and
complete internal
paperwork
•Create and place
local ads
•Select candidates for
interviewing
•Interview and select
candidates for offer
•Make hiring offer(s)
•Complete paperwork
to fill the position
 





•Too few candidates
•Poor choice
•Poor recruiting
•Local economy
•Neglect to check
references
•References do not
provide key
information
dK
dE
dK
dE
3- Enabling Knowledge/ Skills
November 2010 31www.eppic.biz
4- Existing T&D
Assessments
November 2010 32www.eppic.biz
Alternatives…
T&D Path & Planning Guide
November 2010 36www.eppic.biz
For the Customer…
Event Specs and Mod Specs
November 2010 37www.eppic.biz
For the Supplier…
DEMO
Job Family: ______________________Sky Cap & Baggage Handler
1999 - Geary Rummler Review of lean-ISD
November 2010 39www.eppic.biz
1999
1999 - Miki Lane Review of lean-ISD
1999
November 2010 40www.eppic.biz
Some of the free CAD Resources from Guy…
November 2010 41www.eppic.biz
Book is available as a free 410 page
PDF download at www.eppic.biz
Audio Podcasts are available as free downloads at www.eppic.biz
Thank you…and please complete any Evaluations!
November 2010 42www.eppic.biz

Más contenido relacionado

Similar a Curriculum Architecture Design - November 2010

Agile London at Ticketmaster
Agile London at TicketmasterAgile London at Ticketmaster
Agile London at TicketmasterBilly Jenkins
 
Telelogic
TelelogicTelelogic
TelelogicUmesh
 
Ocm Manufacturing 2011
Ocm Manufacturing 2011Ocm Manufacturing 2011
Ocm Manufacturing 2011squareroots
 
Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016Joe Bruntz Daggett
 
CGartner Resume 2014
CGartner  Resume 2014CGartner  Resume 2014
CGartner Resume 2014Chris Gartner
 
1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdfKashifChangez
 
DanMikolaizik_Resume_Sept2015
DanMikolaizik_Resume_Sept2015DanMikolaizik_Resume_Sept2015
DanMikolaizik_Resume_Sept2015Daniel Mikolaizik
 
Dan mikolaizik resume_may2018
Dan mikolaizik resume_may2018Dan mikolaizik resume_may2018
Dan mikolaizik resume_may2018Daniel Mikolaizik
 
Push Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management SystemsPush Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management SystemsEPPIC Inc.
 
Hand r chap01_om
Hand r chap01_omHand r chap01_om
Hand r chap01_omAgunggung
 
Failed product presentation - Iridium Case
Failed product presentation - Iridium CaseFailed product presentation - Iridium Case
Failed product presentation - Iridium CaseAndres Quintanilla
 
Personal CV Jorge A Cortes (Ingles 1 )
Personal CV Jorge A  Cortes (Ingles 1 )Personal CV Jorge A  Cortes (Ingles 1 )
Personal CV Jorge A Cortes (Ingles 1 )Jorge Cortes
 
The Journey to Big Data Analytics
The Journey to Big Data AnalyticsThe Journey to Big Data Analytics
The Journey to Big Data AnalyticsDr.Stefan Radtke
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant ResumeMohamed Thalha
 
Roberto Mireles RESUME_2015 - Eng -
Roberto Mireles RESUME_2015 - Eng -Roberto Mireles RESUME_2015 - Eng -
Roberto Mireles RESUME_2015 - Eng -Roberto Mireles
 
Curriculum Vitae-Theodore Danker
Curriculum Vitae-Theodore DankerCurriculum Vitae-Theodore Danker
Curriculum Vitae-Theodore DankerTheodore Danker
 

Similar a Curriculum Architecture Design - November 2010 (20)

Agile London at Ticketmaster
Agile London at TicketmasterAgile London at Ticketmaster
Agile London at Ticketmaster
 
Telelogic
TelelogicTelelogic
Telelogic
 
Ocm Manufacturing 2011
Ocm Manufacturing 2011Ocm Manufacturing 2011
Ocm Manufacturing 2011
 
Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016Joe Daggett-Bruntz resume Rev1 2016
Joe Daggett-Bruntz resume Rev1 2016
 
CGartner Resume 2014
CGartner  Resume 2014CGartner  Resume 2014
CGartner Resume 2014
 
1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf1. OM-Week # 01, Intro.pdf
1. OM-Week # 01, Intro.pdf
 
DanMikolaizik_Resume_Sept2015
DanMikolaizik_Resume_Sept2015DanMikolaizik_Resume_Sept2015
DanMikolaizik_Resume_Sept2015
 
Dan mikolaizik resume_may2018
Dan mikolaizik resume_may2018Dan mikolaizik resume_may2018
Dan mikolaizik resume_may2018
 
Push Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management SystemsPush Pull KMS - Knowledge Management Systems
Push Pull KMS - Knowledge Management Systems
 
201606_ResumeCetinski
201606_ResumeCetinski201606_ResumeCetinski
201606_ResumeCetinski
 
Hand r chap01_om
Hand r chap01_omHand r chap01_om
Hand r chap01_om
 
Failed product presentation - Iridium Case
Failed product presentation - Iridium CaseFailed product presentation - Iridium Case
Failed product presentation - Iridium Case
 
Personal CV Jorge A Cortes (Ingles 1 )
Personal CV Jorge A  Cortes (Ingles 1 )Personal CV Jorge A  Cortes (Ingles 1 )
Personal CV Jorge A Cortes (Ingles 1 )
 
The Journey to Big Data Analytics
The Journey to Big Data AnalyticsThe Journey to Big Data Analytics
The Journey to Big Data Analytics
 
Abdus Salam
Abdus SalamAbdus Salam
Abdus Salam
 
complete resume
complete resumecomplete resume
complete resume
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant Resume
 
Precinmac
PrecinmacPrecinmac
Precinmac
 
Roberto Mireles RESUME_2015 - Eng -
Roberto Mireles RESUME_2015 - Eng -Roberto Mireles RESUME_2015 - Eng -
Roberto Mireles RESUME_2015 - Eng -
 
Curriculum Vitae-Theodore Danker
Curriculum Vitae-Theodore DankerCurriculum Vitae-Theodore Danker
Curriculum Vitae-Theodore Danker
 

Más de EPPIC Inc.

Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010EPPIC Inc.
 
The Customer Is KING - Not
The Customer Is KING - NotThe Customer Is KING - Not
The Customer Is KING - NotEPPIC Inc.
 
Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...EPPIC Inc.
 
Using HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise ProcessesUsing HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise ProcessesEPPIC Inc.
 
EPPI Review Presentation
EPPI Review PresentationEPPI Review Presentation
EPPI Review PresentationEPPIC Inc.
 
Establishing Areas of Performance
Establishing Areas of PerformanceEstablishing Areas of Performance
Establishing Areas of PerformanceEPPIC Inc.
 
T&D Systems View Assessment Workshop
T&D Systems View Assessment WorkshopT&D Systems View Assessment Workshop
T&D Systems View Assessment WorkshopEPPIC Inc.
 
Analysis for EPPI
Analysis for EPPIAnalysis for EPPI
Analysis for EPPIEPPIC Inc.
 
The Pact Processes - Overview
The Pact Processes - OverviewThe Pact Processes - Overview
The Pact Processes - OverviewEPPIC Inc.
 
Project Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT EffortsProject Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT EffortsEPPIC Inc.
 
Performance Modeling
Performance ModelingPerformance Modeling
Performance ModelingEPPIC Inc.
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & ManagementEPPIC Inc.
 
Performance-based Curriculum Architecture Design
Performance-based Curriculum Architecture DesignPerformance-based Curriculum Architecture Design
Performance-based Curriculum Architecture DesignEPPIC Inc.
 
Modeling Mastery Performance
Modeling Mastery PerformanceModeling Mastery Performance
Modeling Mastery PerformanceEPPIC Inc.
 
Changing Human Performance to Improve Business Processes
Changing Human Performance to Improve Business ProcessesChanging Human Performance to Improve Business Processes
Changing Human Performance to Improve Business ProcessesEPPIC Inc.
 

Más de EPPIC Inc. (15)

Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010Enterprise Process Performance Improvement - November 2010
Enterprise Process Performance Improvement - November 2010
 
The Customer Is KING - Not
The Customer Is KING - NotThe Customer Is KING - Not
The Customer Is KING - Not
 
Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...Performance-based Employee Qualification/ Certification Systems and Performan...
Performance-based Employee Qualification/ Certification Systems and Performan...
 
Using HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise ProcessesUsing HPT To Improve Your Enterprise Processes
Using HPT To Improve Your Enterprise Processes
 
EPPI Review Presentation
EPPI Review PresentationEPPI Review Presentation
EPPI Review Presentation
 
Establishing Areas of Performance
Establishing Areas of PerformanceEstablishing Areas of Performance
Establishing Areas of Performance
 
T&D Systems View Assessment Workshop
T&D Systems View Assessment WorkshopT&D Systems View Assessment Workshop
T&D Systems View Assessment Workshop
 
Analysis for EPPI
Analysis for EPPIAnalysis for EPPI
Analysis for EPPI
 
The Pact Processes - Overview
The Pact Processes - OverviewThe Pact Processes - Overview
The Pact Processes - Overview
 
Project Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT EffortsProject Project Planning & Management for ISD and HPT Efforts
Project Project Planning & Management for ISD and HPT Efforts
 
Performance Modeling
Performance ModelingPerformance Modeling
Performance Modeling
 
Project Planning & Management
Project Planning & ManagementProject Planning & Management
Project Planning & Management
 
Performance-based Curriculum Architecture Design
Performance-based Curriculum Architecture DesignPerformance-based Curriculum Architecture Design
Performance-based Curriculum Architecture Design
 
Modeling Mastery Performance
Modeling Mastery PerformanceModeling Mastery Performance
Modeling Mastery Performance
 
Changing Human Performance to Improve Business Processes
Changing Human Performance to Improve Business ProcessesChanging Human Performance to Improve Business Processes
Changing Human Performance to Improve Business Processes
 

Curriculum Architecture Design - November 2010

  • 1. Achieve Peak Performance Protect and Improve the Enterprise Leverage Your Current Master Performers for Higher Performance! performance-based Curriculum Architecture Design November 2010ISPI Hampton Roads
  • 2. Curriculum Architecture The conscious configuration of instructional and informational content, of many media types at the Enterprise level and at the Learner level and at the Product and Subassembly level. November 2010 2www.eppic.biz
  • 3. Macro-level ISD “Design” PACT: - 3 levels of design - Common Analysis methods and tools - Common Project Management methods and tools November 2010 3www.eppic.biz
  • 5. Session Objectives Preview At the conclusion of the session, participants will be able to: 1. Describe the key Customer Outputs and Benefits 2. Describe the key Supplier Outputs and Benefits 3. Describe the Design Team Meeting Process and the use of the analysis data November 2010 5www.eppic.biz
  • 6.
  • 8. Year Client Target Audience(s) 1993 Abbott Laboratories Market, Product and Sales Management 1984 Alcoa Labs Laboratory Scientists, Engineers, Technicians, Admin Staff 1989 Ameritech Network Services Management 1989 Ameritech Distribution Services Second-level Management 1996 Amoco ISD Staff Coaching and Support 1996 Amoco Project BEST 1993 Amoco Team Training 1990 ARCO Alaska AMPS 1984 AT&T AETM 1984 AT&T Switching Technician 1988 AT&T Microelectronics Product Management 1994 AT&T Network Systems Global Contract Management 1993 AT&T Network Systems Product Management and Market Management 1991 AT&T Network Systems Marketing Personnel 1989 AT&T Network Systems Network Systems Sales 1988 AT&T Network Systems Switching Business Unit Sales 1986 AT&T Network Systems Product Manager 1996 Bandag, Inc. Franchise Dealership Management 1998 BankAmerica Corporation Financial Relationship Managers 1997 BankAmerica Corporation Retail Branch Personnel 1996 Bellcore Tech Web Masters 1991 British Petroleum—America Front-line Retail Personnel 1984 Burroughs Information Specialists 1983 Channel Gas Industries/Tenneco Fixed-rate Personnel List of Guy Wallace’s 74 CAD Projects - Since 1982 – Page 1
  • 9. List of Guy Wallace’s 74 CAD Projects - Since 1982 – Page 2 Year Client Target Audience(s) 1993 Commerce Clearing House (CCH) Sales Representative and Sales 1993 Data General Sales 1992 Detroit Ball Bearing Field Sales Managers 1991 Digital Equipment Corporation Program Management 1987 Dow Chemical Safety Training 1986 Dow Chemical Secretarial/Administrative 1986 Dow Chemical Top Operator 2004 Eli Lilly and Company Clinical Trials Process participants 1999 Eli Lilly and Company District Sales Managers 1997 Eli Lilly and Company Leadership and Management 1982 Exxon Exploration USA Geologists/Geophysicists 1992 Ford Design Institute Engineering 1994 Ford Motor Company Engineering 1991 General Dynamics Electrical/Electronics Assembly 1991 General Dynamics CATIA System Designers 1991 General Dynamics MRP II – Manufacturing Personnel 1991 General Dynamics Software Engineering 1990 General Dynamics Composites Bonding & Fabrication 1989 General Dynamics Quality 1997 General Motors Tool & Die Supervisors 1996 General Motors Product Engineers 1999 General Motors University Brand Management—Europe 1999 General Motors University Brand Management—North America 1998 General Motors University Internal Controls 1998 General Motors University MFD Area Managers 1998 General Motors University Global Dealer Auditors 2000 GTE Service Corporation/Verizon Wholesale Billing Call Center Personnel
  • 10. List of Guy Wallace’s 74 CAD Projects - Since 1982 – Page 3 Year Client Target Audience(s) 1993 Hewlett Packard Order Fulfillment (Order Processing, 1991 Hewlett Packard Information Technologists 1989 Hewlett Packard Information Technologists 1986 Illinois Bell Second-level Manager 1986 Illinois Bell Data Technician 1993 Imperial Bondware/Federal Paperboard Sales Training 1985 MCC Powers Fire and Security 1983 MCC Powers ATC Branch Personnel 1983 Motorola Design & Manufacturing Engineering 1986 Multigraphics In-Branch Sales Orientation 1987 NASA Middle Manager 1990 NCR Supply Line Management 2003 Norfolk Naval Shipyard Production Supervisors & Zone Managers 1988 Northern Trust Bank (Chicago) Trust and Financial Services 1994 Novacor, Corunna Site Operations Management and 1991 Occidental Petroleum Labs Laboratory Personnel 1998 Siemens Building Technologies, Inc. Sales Engineering 1993 Spartan Stores/ISSC Companywide 1996 Sphinx Pharmaceuticals Combinatorial Chemists 1990 Square D Quality Training 1995 Valuemetrics, Inc. Associate and Senior Associate 2001 Verizon Consumer Sales Call Centers 1983 Westinghouse Defense Electronics Technical Operators (WICAM/IAG)
  • 14. Event Info on the Learning Path/Menu November 2010 14www.eppic.biz
  • 15. The Beginning of the Path
  • 16. The Beginning of Every Path… …has its own Beginning – Middle – End Beginning… Middle… End… almost
  • 17. Beginning of the Beginning  The “Architecture” here reflects the Organization chart, plus - all assigned Teams and others Jobs that the target audience will be working with. November 2010 17www.eppic.biz
  • 18. Middle of the Beginning  The “Architecture” here reflects analysis data from the Performance Model and can be created immediately after that analysis…using standard templates November 2010 18www.eppic.biz
  • 19. End of the Beginning  The “Architecture” here reflects some or all of the Performance data, and the linked enabling K/S data – as determined by the Project Steering Team and their handpicked Design Team. November 2010 19www.eppic.biz
  • 20. One of 7 Paths produced in a combined CAD-MCD effort… November 2010 20www.eppic.biz
  • 21. Another of the 7 Paths produced in a combined CAD-MCD effort… November 2010 21www.eppic.biz
  • 23.
  • 24. Whether the output is a Straight Path, a Path of Menus, or a Menu… …it should be “as rigid as required and as flexible as feasible.”
  • 25. Planning Guide November 2010 25www.eppic.biz
  • 26.
  • 27.
  • 28. The Analysis Data 1- Target Audience Data 2- Performance Data 3- Enabling K/S Data 4- Existing T&D Assessments (ETA) Data November 2010 28www.eppic.biz
  • 29. 1- Target Audience Data November 2010 29www.eppic.biz
  • 30. 2- Performance Data November 2010 30www.eppic.biz Key Tasks Describes the key activities needed to produce the outputs Roles/Responsibilities Clarifies who is typically responsible for performing the tasks Deficiency dE=Environment dK=Knowledge/skill dI=Individual attribute/value Key Outputs and Metrics or Measures Describes what is produced from doing the job tasks and identifies key performance measures of each output Typical Performance Gaps Identifies any typical ways the output or task does not meet performance standards Probable Gap Cause(s) Identifies most likely causes for each typical performance issue/ deficiency The Most Convenient Stores Store Management Performance Model ©2002 EPPIC, Inc. Area of Performance: • Key Outputs - Measures Key Tasks Probable Gap Cause(s) dE dK dI Roles/Responsibilities 1 2 3 4 dE = deficiency - Environment dK = deficiency - Knowledge/skill dI = deficiency - Individual attribute/ value Role: 1 = 2 = 3 = 4 = Typical Performance Gaps Form Design ©2002 EPPIC, Inc. 12/02 Page 1 A. Staff Recruiting, Selection, and Training 1 = District Manager 2 = Store Manager 3 = Assistant Manager 4 = Clerk • New staff hired - Timely - Qualified •Identify need for additional staff and complete internal paperwork •Create and place local ads •Select candidates for interviewing •Interview and select candidates for offer •Make hiring offer(s) •Complete paperwork to fill the position        •Too few candidates •Poor choice •Poor recruiting •Local economy •Neglect to check references •References do not provide key information dK dE dK dE
  • 31. 3- Enabling Knowledge/ Skills November 2010 31www.eppic.biz
  • 32. 4- Existing T&D Assessments November 2010 32www.eppic.biz
  • 33.
  • 34.
  • 36. T&D Path & Planning Guide November 2010 36www.eppic.biz For the Customer…
  • 37. Event Specs and Mod Specs November 2010 37www.eppic.biz For the Supplier…
  • 39. 1999 - Geary Rummler Review of lean-ISD November 2010 39www.eppic.biz 1999
  • 40. 1999 - Miki Lane Review of lean-ISD 1999 November 2010 40www.eppic.biz
  • 41. Some of the free CAD Resources from Guy… November 2010 41www.eppic.biz Book is available as a free 410 page PDF download at www.eppic.biz Audio Podcasts are available as free downloads at www.eppic.biz
  • 42. Thank you…and please complete any Evaluations! November 2010 42www.eppic.biz