SlideShare una empresa de Scribd logo
1 de 3
Descargar para leer sin conexión
FORM SSD / PDC / 1

                                      SEWERAGE SERVICES ACT 1993
                                SEWERAGE SYSTEMS AND SEPTIC TANKS


                          APPLICATION FOR SEWERAGE PLANNING APPROVAL

                                                                       Date :

To : The Director General of Sewerage Services

  I / We (the undersigned)

hereby apply for Sewerage Planning Approval to undertake the following sewerage works :




and submit the following particulars (see reverse of form):




Details of Land

Address of site or premises :




Lot No. of land occupied by sewerage works :

Area of land occupied by sewerage works :
        a) Sewage Treatment Plant                                      hectares
        b) Network Pumping Station                                     hectares

Details of Population Equivalent (PE)

             TYPE                                   TOTAL PE                       REMARKS
         RESIDENTIAL
         COMMERCIAL
        INSTITUTIONAL
          INDUSTRIAL
            OTHERS
    TOTAL DEVELOPMENT PE




           BORANG PDC 1
Address and Lot Nos of any affected by the sewerage works :
Signature of Owner

Name of Owner              :
(in block letters)
I.C No                     :

Address                    :




Telephone No               :

Fax No                     :

                                        Declaration by Qualified Person

I hereby certify that the details in the plans and engineering report are in accordance to the 'Guidelines for
Developers' , the MS1228 'Codes of Practice for Design and Installation of Sewerage Systems, and other
regulatory agencies requirements.




                                                                      Signature of Qualified Person


Name of Qualified         :
Person (in block letters)
I.C No.                   :
Address                   :


Telephone No               :
Fax No                     :

Qualifications and Registration particulars:

FOR OFFICE USE ONLY

Date received              :                                   Checked By :

Date replied               :                                      Ref. No. :


            BORANG PDC 1
                     DECLARATION FOR SEWERAGE WORKS PLANNING APPROVAL

SSD Regional Office        :                                                         Date :
File No.                    :

Project Title               :



License Land Surveyor :

Address                     :



Telephone / Fax             :

Lot No. / PT                :

Mukim / Village / Town :

District                    :

State                       :

Land Title No.              :

Area of STPs / NPS          :                           sq meter.

Land Status of STP          :                           State Land / Alienated Land / Reserved Land

Developer                   :

Consultant                  :

Proposed Treatment          :
System

Development Type            :

Population Equivalent       :
(PE)

Catchment                   :



                                         Declaration by Qualified Person

I hereby certify that all written information provided by me in this checklist is full, complete, true and correct
and are in accordance to the 'Guidelines of Developers' and with the MS1228 'Codes of Practice for Design
and Installation of Sewerage Systems.


Date :
                                                                                 (signature)

                                                                      Name :


             BORANG PDC 1

Más contenido relacionado

La actualidad más candente

Soil exploration lecture.
Soil exploration lecture.Soil exploration lecture.
Soil exploration lecture.Damii Abire
 
Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]Muhammad Irfan
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation Davis Ciprikis
 
Draft final present for study market (last and burn)
Draft final present for study market (last and burn)Draft final present for study market (last and burn)
Draft final present for study market (last and burn)FARID YUNOS
 
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]Muhammad Irfan
 
Pvd Soil Consolidation Design
Pvd Soil Consolidation DesignPvd Soil Consolidation Design
Pvd Soil Consolidation Designgeo synthetics
 
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1imtheking2088
 
03 drawings stormwater drainage
03 drawings   stormwater drainage03 drawings   stormwater drainage
03 drawings stormwater drainageSylvesterRakgate1
 
Standard penetration test (spt)
Standard penetration test (spt)Standard penetration test (spt)
Standard penetration test (spt)Faizan Tanoli
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Jannah Jailani
 
TENSILE STRENGTH OF FIBER REINFORCED SOIL
TENSILE STRENGTH OF FIBER REINFORCED SOILTENSILE STRENGTH OF FIBER REINFORCED SOIL
TENSILE STRENGTH OF FIBER REINFORCED SOILVibhanshu Singh
 
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]Muhammad Irfan
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)KHK karimi
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Muhammad Irfan
 
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Muhammad Irfan
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)helmie84
 
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERDesign of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERzafrin mohamed
 

La actualidad más candente (20)

Soil exploration lecture.
Soil exploration lecture.Soil exploration lecture.
Soil exploration lecture.
 
Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]Geotechnical Engineering-I [Lec #18: Consolidation-II]
Geotechnical Engineering-I [Lec #18: Consolidation-II]
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Draft final present for study market (last and burn)
Draft final present for study market (last and burn)Draft final present for study market (last and burn)
Draft final present for study market (last and burn)
 
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
Geotechnical Engineering-II [Lec #23: Rankine Earth Pressure Theory]
 
Pvd Soil Consolidation Design
Pvd Soil Consolidation DesignPvd Soil Consolidation Design
Pvd Soil Consolidation Design
 
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1Soil stab use of-new.ppt dr msa edusat.ppt rev 1
Soil stab use of-new.ppt dr msa edusat.ppt rev 1
 
Soil comp.ppt
Soil comp.pptSoil comp.ppt
Soil comp.ppt
 
03 drawings stormwater drainage
03 drawings   stormwater drainage03 drawings   stormwater drainage
03 drawings stormwater drainage
 
Standard penetration test (spt)
Standard penetration test (spt)Standard penetration test (spt)
Standard penetration test (spt)
 
Project management project 1 report (pr architects)
Project management project 1 report (pr architects)Project management project 1 report (pr architects)
Project management project 1 report (pr architects)
 
TENSILE STRENGTH OF FIBER REINFORCED SOIL
TENSILE STRENGTH OF FIBER REINFORCED SOILTENSILE STRENGTH OF FIBER REINFORCED SOIL
TENSILE STRENGTH OF FIBER REINFORCED SOIL
 
Development length
Development length Development length
Development length
 
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
Geotechnical Engineering-II [Lec #8: Boussinesq Method - Rectangular Areas]
 
Standard penetration test(spt)
Standard penetration test(spt)Standard penetration test(spt)
Standard penetration test(spt)
 
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
Geotechnical Engineering-II [Lec #28: Finite Slope Stability Analysis]
 
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
Geotechnical Engineering-I [Lec #29: Soil Exploration - II]
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)
 
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNERDesign of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
Design of 16 storied apartment using TEKLA STRUCTURAL DESIGNER
 

Más de hadypower

Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)hadypower
 
Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006hadypower
 

Más de hadypower (7)

Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)
 
Form G1 G21(Bm)
Form G1 G21(Bm)Form G1 G21(Bm)
Form G1 G21(Bm)
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 
Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006Manual Perolehan Perunding 2006
Manual Perolehan Perunding 2006
 

Pdc 1

  • 1. FORM SSD / PDC / 1 SEWERAGE SERVICES ACT 1993 SEWERAGE SYSTEMS AND SEPTIC TANKS APPLICATION FOR SEWERAGE PLANNING APPROVAL Date : To : The Director General of Sewerage Services I / We (the undersigned) hereby apply for Sewerage Planning Approval to undertake the following sewerage works : and submit the following particulars (see reverse of form): Details of Land Address of site or premises : Lot No. of land occupied by sewerage works : Area of land occupied by sewerage works : a) Sewage Treatment Plant hectares b) Network Pumping Station hectares Details of Population Equivalent (PE) TYPE TOTAL PE REMARKS RESIDENTIAL COMMERCIAL INSTITUTIONAL INDUSTRIAL OTHERS TOTAL DEVELOPMENT PE BORANG PDC 1 Address and Lot Nos of any affected by the sewerage works :
  • 2. Signature of Owner Name of Owner : (in block letters) I.C No : Address : Telephone No : Fax No : Declaration by Qualified Person I hereby certify that the details in the plans and engineering report are in accordance to the 'Guidelines for Developers' , the MS1228 'Codes of Practice for Design and Installation of Sewerage Systems, and other regulatory agencies requirements. Signature of Qualified Person Name of Qualified : Person (in block letters) I.C No. : Address : Telephone No : Fax No : Qualifications and Registration particulars: FOR OFFICE USE ONLY Date received : Checked By : Date replied : Ref. No. : BORANG PDC 1 DECLARATION FOR SEWERAGE WORKS PLANNING APPROVAL SSD Regional Office : Date :
  • 3. File No. : Project Title : License Land Surveyor : Address : Telephone / Fax : Lot No. / PT : Mukim / Village / Town : District : State : Land Title No. : Area of STPs / NPS : sq meter. Land Status of STP : State Land / Alienated Land / Reserved Land Developer : Consultant : Proposed Treatment : System Development Type : Population Equivalent : (PE) Catchment : Declaration by Qualified Person I hereby certify that all written information provided by me in this checklist is full, complete, true and correct and are in accordance to the 'Guidelines of Developers' and with the MS1228 'Codes of Practice for Design and Installation of Sewerage Systems. Date : (signature) Name : BORANG PDC 1