PRESENTATION ON
IN-PLANT TRAINING
       DURATION:06-06-2011 to 02-07-2011

                 AT
  Kanti bijlee utpadan nigam ltd.
       (a jv of ntpc & bseb) By- Hari ohm Singh
            Kanti, Muzaffarpur, Bihar      Reg no:- 09bee020
History Of Development of Plant

            • Vaishali power generating company ltd.(VPGCL)
Formerly •Owned by “Bihar State Electricity Board”


            • Kanti Bijlee Utpadan Nigam Ltd.
Currently   • A joint venture of NTPC(51-74%) and BSEB(49-26%)


            • It is totally coal fired thermal power station.
Features


            • There are two units each of 110MW installed capacity.
Capacity    • Installed capacity= 2*110 MW
Step-1
       coal to steam


           Step-2
  steam to mechanical power

           Step-3
power generation , transmission &
distribution
•working fluid is pumped from low to high pressure.
Process
  1-2
          • high pressure liquid enters a boiler where it is
            heated at constant pressure by an external heat
Process
  2-3       source to become a dry saturated vapor.

          • The dry saturated vapor expands through
Process     a turbine, generating power.
  3-4


          • The wet vapor then enters a condenser where it is
Process     condensed at a constant temperature to become
  4-1       a saturated liquid.

          • After the vapor has passed through H.P. it is
            reheated before passing through I.P. turbine.
Process   • this prevents the vapor from condensing during its
  3-3’      expansion which can seriously damage the turbine
            blades, and improves the efficiency of the cycle
The coal is unloaded either manually or with the help of
wagon tippler into the hopper to the conveyer belt.
Coal is passed through metal detectors in order to remove
metals present in coal.
Stones from coal is removed manually in its journey through
conveyer belt.
Then the coal is passed through vibrating screen where coal
of 5mm is separated from large coals.
Then coal is crushed in crusher and passed through metal
detectors to remove iron particles.
Coal is then supplied from coal bunker to pulverizing mill.
Coal dust comes out of this mill.(KBUNL have ball mills)
At KBUNL water tube boiler is employed for steam
generation.

Fuel is burnt in furnace . The pulverized coal is dried by P.A fans and
secondary air is provided by F.D fan for pulverized coal combustion in
the furnace.

Water from boiler is passed through the down comers to the bottom
ring header. From bottom ring header water goes to water walls for
heat absorption and conversion in to steam.

Bottom of furnace is open to allow ash/clinkers to fall freely in to the
bottom ash hopper. And flue gas is used in economiser and reheaters.
Then it is discharged with the help of I.D fan in to atmosphere.
High pressure
turbine                  Intermediate
•It is of single flow    pressure turbine           Low pressure turbine
 design with eight       •Double flow design        •It is also of double
 stages of blading.       with seven stages of       flow design with 6
•Each stage has           blading on either side.    stages in front and
 moving and              •Each stage has             rear flow paths.
 stationary blades.       moving and stationary     •Each stage has
•Superheated              blades.                    moving and
 steam(at 1100⁰c) from   •Reheated steam(at          stationary blades.
 boiler drum enters in    535⁰ c) from H.P          •Stem out of I.P.
 to it.                   turbine outlet enters      turbine directly
•Speed-3000rpm            in to it.                  enters in to it.
                         •Speed-3000rpm             •Speed-3000rpm
Rating                   Continuous


Active Output            110 MW


Rated Voltage            11000+/-5%V


Rated Current            7220 A


Power Factor             0.8 lagging


Frequency                50 Hz


Excitation System        Static type


Field current at rated 1335 A
output

Type of cooling system   Hydrogen Cooled


Hydrogen Pressure        2 Ata


No. Of      H₂   cooled 06
elements

Cooling medium for H₂    Soft water
Mechanical power produced at the shaft of the turbine is
used to rotate rotor.
Rotating Magnetic flux produced by rotor cuts stator
conductor and from electromagnetic induction, electricity is
produced .
rotor runs at 3000 rpm, produces 3-phase voltage at 11kv ,
and of 50 HZ frequency.

Oil shielded hydrogen is used for the cooling purpose of
generator.
In case of any fault if production of plants stops then bearing motor
rotates rotor shaft of turbine continuously at 65 rpm. This is because if
shaft doesn’t rotate then due to load it may bend.
KBUNL has a capacity to generate 220 MW of electricity
but only one unit is working and another is under R&M
process. 90 MW is generated out of 110 MW.

The transmission is done through 3-phase , double circuit system.


With the help of station transformer 11kv is step up to 220 kv and
fed to substation.
It is the brain of any substation. All necessary steps about Transmission ,
protection, Charging e.t.c are carried out in the control room.
Measuring instruments of the control room:-

                 Relay circuit
                 •A protective device that operate during faulty condition and gives command to
                  circuit breaker to trip. Mainly the electromagnetic induction relays are used.




                 Fault locator
                 By comparing voltage and current the relay measures the line
                 impedance up to the point of fault and locate the position of
                 fault from the previous knowledge of line impedance.

                 Switch gear
                 • Switches used in substation for making or breaking the
                   electrical contacts in convenient way. There are two
                   type of switches air switch and oil switch.
Voltmeter and ammeter
•As the names imply they are used for measuring voltage and
 current respectively.

Power meter
•Used to measure the power in standard unit of MW or KW.



Crt screen
•A computer arrangement in which current information about
 transmission line is seen.


Battery room
Consists of several batteries and chargers for emergency
purpose.
It consists of following equipments :-
   transformer
   •The autotransformer used in power station. It has three windings primary,
    secondary and tertiary. The 220kv voltage is fed as input to primary by step
    down 132kv fed to KBUNL as input.


   circuit breaker(sf6 at KBUNL)
   •Used for closing or opening an electrical circuit under normal or abnormal
    conditions. These circuit breakers are equipped with trip coil connected to relay,
    design to open breaker automatically


   tower
   •We have suspension type tower called as ‘A’ type tower. The peak point angle is
    0⁰ to 2⁰. In this type conductor is suspended with an insulator.
   •Guard ring Is used to balance the capacitive current in transmission lines.
Current transformer
•Used to reduce the current level such that it can be measured easily.



Bus isolators
•Used to isolate bus bars.



Lightning arrestor
•Used to protect the transmission line and connected equipment during
 lightening .


Wave trap
wave trap which changes the frequency 50Hz to 500Hz can be
used for communicate between power plants.
• A controlled quantity of crushed coal is fed to each bowl mill (pulveriser) by its
           respective feeders and primary air is supplied from the primary air fans which drives
           the coal as it is being pulverized and transports the pulverized coal through the coal
Step-1     piping system to the coal burner.



         •The pulverized coal and air discharge from the coal burners is directed
          towards the centre of furnace to form fire ball.
Step-2

         •The secondary air heating system supplies secondary air for combustion
          in the furnace around the pulverized coal burners and through auxiliary
Step-3    air compartments ,directly adjacent to the coal burner compartments.


         •Above a predictable minimum loading condition, the ignition becomes
          self-sustaining. Combustion is completed as the gases spiral up in the
Step-4    furnace.
•The terminal voltage of alternator must be equal to the bus-bar voltage.
Step-1

         •The running speed frequency must be equal to the bus-bar frequency.
         •( Ns=120f/P ) => ( f=PN/120 )
Step-2   •Where, f= frequency,P= no. Of poles ,N= speed of alternator



         •The phase sequence of the incoming unit must be same as that of the
          existing bus bar to which the generator is to be synchronized.
Step-3
thermal power station

Más contenido relacionado

La actualidad más candente

Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
Vikas Gupta
 

La actualidad más candente (20)

Harsh ntpc
Harsh ntpcHarsh ntpc
Harsh ntpc
 
Power plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikasPower plant ppt on kalisindh by vikas
Power plant ppt on kalisindh by vikas
 
Lovely Amit
Lovely AmitLovely Amit
Lovely Amit
 
Kstps ppt
Kstps pptKstps ppt
Kstps ppt
 
NTPC DADRI.
NTPC DADRI.NTPC DADRI.
NTPC DADRI.
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)Kalisindh thermal power project jhalawar (keshav)
Kalisindh thermal power project jhalawar (keshav)
 
NTPC,Dadri Training presentation
NTPC,Dadri Training presentationNTPC,Dadri Training presentation
NTPC,Dadri Training presentation
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
 
NTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPTNTPC DADRI THERMAL PLANT PPT
NTPC DADRI THERMAL PLANT PPT
 
H.T.P.S., Korba West
H.T.P.S., Korba WestH.T.P.S., Korba West
H.T.P.S., Korba West
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
NTPC Dadri Gas plant
NTPC Dadri Gas plantNTPC Dadri Gas plant
NTPC Dadri Gas plant
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
Ntpc ppt complete
Ntpc ppt completeNtpc ppt complete
Ntpc ppt complete
 
project -2
project -2project -2
project -2
 
NTPC MECANICAL SUMMER REPORT
NTPC MECANICAL  SUMMER REPORTNTPC MECANICAL  SUMMER REPORT
NTPC MECANICAL SUMMER REPORT
 
Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)Ppt on ntpc dadri created vikas gujjar(IET lko)
Ppt on ntpc dadri created vikas gujjar(IET lko)
 

Destacado

Coal power plant
Coal power plantCoal power plant
Coal power plant
Anum Mairaj
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
SHIVAJI CHOUDHURY
 
Noise control in IC engine
Noise control in IC engine Noise control in IC engine
Noise control in IC engine
Bhargav A
 
School management system
School management systemSchool management system
School management system
Soumya Behera
 
Wireless communication
Wireless communicationWireless communication
Wireless communication
Darshan Maru
 
Recent Trends In Power Generation
Recent Trends In Power GenerationRecent Trends In Power Generation
Recent Trends In Power Generation
Gowtham MG
 

Destacado (20)

Ultracane
Ultracane Ultracane
Ultracane
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 
Infrared thermography in civil engianeering
Infrared thermography in civil engianeeringInfrared thermography in civil engianeering
Infrared thermography in civil engianeering
 
Soil Compaction: A case study of Anpara Thermal Power Plant, Uttar Pradesh
Soil Compaction: A case study of Anpara Thermal Power Plant, Uttar PradeshSoil Compaction: A case study of Anpara Thermal Power Plant, Uttar Pradesh
Soil Compaction: A case study of Anpara Thermal Power Plant, Uttar Pradesh
 
Marketing Management
Marketing ManagementMarketing Management
Marketing Management
 
Coal power plant
Coal power plantCoal power plant
Coal power plant
 
ONLINE COMPLAINT MANAGEMENT SYSTEM
ONLINE COMPLAINT MANAGEMENT SYSTEMONLINE COMPLAINT MANAGEMENT SYSTEM
ONLINE COMPLAINT MANAGEMENT SYSTEM
 
Automatic railway gate control
Automatic railway gate controlAutomatic railway gate control
Automatic railway gate control
 
TVS Motors _ Summer Intern PPt
TVS Motors _ Summer Intern PPtTVS Motors _ Summer Intern PPt
TVS Motors _ Summer Intern PPt
 
Condenser in thermal power plants
Condenser in thermal power plantsCondenser in thermal power plants
Condenser in thermal power plants
 
Noise control in IC engine
Noise control in IC engine Noise control in IC engine
Noise control in IC engine
 
School management system
School management systemSchool management system
School management system
 
Arm7 Interfacing examples
Arm7   Interfacing examples Arm7   Interfacing examples
Arm7 Interfacing examples
 
Project Report And Market Survey of McDonald’s- Cbse class 12 Entrepreneurshi...
Project Report And Market Survey of McDonald’s- Cbse class 12 Entrepreneurshi...Project Report And Market Survey of McDonald’s- Cbse class 12 Entrepreneurshi...
Project Report And Market Survey of McDonald’s- Cbse class 12 Entrepreneurshi...
 
Wireless communication
Wireless communicationWireless communication
Wireless communication
 
Disease Detection Using BioRobotics
Disease Detection Using BioRoboticsDisease Detection Using BioRobotics
Disease Detection Using BioRobotics
 
Bio Robotics
Bio RoboticsBio Robotics
Bio Robotics
 
Chemistry in our daily life
Chemistry in our daily lifeChemistry in our daily life
Chemistry in our daily life
 
Recent Trends In Power Generation
Recent Trends In Power GenerationRecent Trends In Power Generation
Recent Trends In Power Generation
 

Similar a thermal power station

Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
Nipak Banerjee
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
richa khatri
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
Utsav Yagnik
 

Similar a thermal power station (20)

KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptx
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Richappt
RichapptRichappt
Richappt
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 
Boilers
BoilersBoilers
Boilers
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 
kstps training report
kstps training reportkstps training report
kstps training report
 

Último

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
dlhescort
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Último (20)

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort ServiceMalegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
Malegaon Call Girls Service ☎ ️82500–77686 ☎️ Enjoy 24/7 Escort Service
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

thermal power station

  • 1. PRESENTATION ON IN-PLANT TRAINING DURATION:06-06-2011 to 02-07-2011 AT Kanti bijlee utpadan nigam ltd. (a jv of ntpc & bseb) By- Hari ohm Singh Kanti, Muzaffarpur, Bihar Reg no:- 09bee020
  • 2. History Of Development of Plant • Vaishali power generating company ltd.(VPGCL) Formerly •Owned by “Bihar State Electricity Board” • Kanti Bijlee Utpadan Nigam Ltd. Currently • A joint venture of NTPC(51-74%) and BSEB(49-26%) • It is totally coal fired thermal power station. Features • There are two units each of 110MW installed capacity. Capacity • Installed capacity= 2*110 MW
  • 3. Step-1 coal to steam Step-2 steam to mechanical power Step-3 power generation , transmission & distribution
  • 4. •working fluid is pumped from low to high pressure. Process 1-2 • high pressure liquid enters a boiler where it is heated at constant pressure by an external heat Process 2-3 source to become a dry saturated vapor. • The dry saturated vapor expands through Process a turbine, generating power. 3-4 • The wet vapor then enters a condenser where it is Process condensed at a constant temperature to become 4-1 a saturated liquid. • After the vapor has passed through H.P. it is reheated before passing through I.P. turbine. Process • this prevents the vapor from condensing during its 3-3’ expansion which can seriously damage the turbine blades, and improves the efficiency of the cycle
  • 5. The coal is unloaded either manually or with the help of wagon tippler into the hopper to the conveyer belt. Coal is passed through metal detectors in order to remove metals present in coal. Stones from coal is removed manually in its journey through conveyer belt. Then the coal is passed through vibrating screen where coal of 5mm is separated from large coals. Then coal is crushed in crusher and passed through metal detectors to remove iron particles. Coal is then supplied from coal bunker to pulverizing mill. Coal dust comes out of this mill.(KBUNL have ball mills)
  • 6.
  • 7. At KBUNL water tube boiler is employed for steam generation. Fuel is burnt in furnace . The pulverized coal is dried by P.A fans and secondary air is provided by F.D fan for pulverized coal combustion in the furnace. Water from boiler is passed through the down comers to the bottom ring header. From bottom ring header water goes to water walls for heat absorption and conversion in to steam. Bottom of furnace is open to allow ash/clinkers to fall freely in to the bottom ash hopper. And flue gas is used in economiser and reheaters. Then it is discharged with the help of I.D fan in to atmosphere.
  • 8.
  • 9.
  • 10. High pressure turbine Intermediate •It is of single flow pressure turbine Low pressure turbine design with eight •Double flow design •It is also of double stages of blading. with seven stages of flow design with 6 •Each stage has blading on either side. stages in front and moving and •Each stage has rear flow paths. stationary blades. moving and stationary •Each stage has •Superheated blades. moving and steam(at 1100⁰c) from •Reheated steam(at stationary blades. boiler drum enters in 535⁰ c) from H.P •Stem out of I.P. to it. turbine outlet enters turbine directly •Speed-3000rpm in to it. enters in to it. •Speed-3000rpm •Speed-3000rpm
  • 11. Rating Continuous Active Output 110 MW Rated Voltage 11000+/-5%V Rated Current 7220 A Power Factor 0.8 lagging Frequency 50 Hz Excitation System Static type Field current at rated 1335 A output Type of cooling system Hydrogen Cooled Hydrogen Pressure 2 Ata No. Of H₂ cooled 06 elements Cooling medium for H₂ Soft water
  • 12. Mechanical power produced at the shaft of the turbine is used to rotate rotor. Rotating Magnetic flux produced by rotor cuts stator conductor and from electromagnetic induction, electricity is produced . rotor runs at 3000 rpm, produces 3-phase voltage at 11kv , and of 50 HZ frequency. Oil shielded hydrogen is used for the cooling purpose of generator. In case of any fault if production of plants stops then bearing motor rotates rotor shaft of turbine continuously at 65 rpm. This is because if shaft doesn’t rotate then due to load it may bend.
  • 13. KBUNL has a capacity to generate 220 MW of electricity but only one unit is working and another is under R&M process. 90 MW is generated out of 110 MW. The transmission is done through 3-phase , double circuit system. With the help of station transformer 11kv is step up to 220 kv and fed to substation.
  • 14. It is the brain of any substation. All necessary steps about Transmission , protection, Charging e.t.c are carried out in the control room. Measuring instruments of the control room:- Relay circuit •A protective device that operate during faulty condition and gives command to circuit breaker to trip. Mainly the electromagnetic induction relays are used. Fault locator By comparing voltage and current the relay measures the line impedance up to the point of fault and locate the position of fault from the previous knowledge of line impedance. Switch gear • Switches used in substation for making or breaking the electrical contacts in convenient way. There are two type of switches air switch and oil switch.
  • 15. Voltmeter and ammeter •As the names imply they are used for measuring voltage and current respectively. Power meter •Used to measure the power in standard unit of MW or KW. Crt screen •A computer arrangement in which current information about transmission line is seen. Battery room Consists of several batteries and chargers for emergency purpose.
  • 16. It consists of following equipments :- transformer •The autotransformer used in power station. It has three windings primary, secondary and tertiary. The 220kv voltage is fed as input to primary by step down 132kv fed to KBUNL as input. circuit breaker(sf6 at KBUNL) •Used for closing or opening an electrical circuit under normal or abnormal conditions. These circuit breakers are equipped with trip coil connected to relay, design to open breaker automatically tower •We have suspension type tower called as ‘A’ type tower. The peak point angle is 0⁰ to 2⁰. In this type conductor is suspended with an insulator. •Guard ring Is used to balance the capacitive current in transmission lines.
  • 17. Current transformer •Used to reduce the current level such that it can be measured easily. Bus isolators •Used to isolate bus bars. Lightning arrestor •Used to protect the transmission line and connected equipment during lightening . Wave trap wave trap which changes the frequency 50Hz to 500Hz can be used for communicate between power plants.
  • 18. • A controlled quantity of crushed coal is fed to each bowl mill (pulveriser) by its respective feeders and primary air is supplied from the primary air fans which drives the coal as it is being pulverized and transports the pulverized coal through the coal Step-1 piping system to the coal burner. •The pulverized coal and air discharge from the coal burners is directed towards the centre of furnace to form fire ball. Step-2 •The secondary air heating system supplies secondary air for combustion in the furnace around the pulverized coal burners and through auxiliary Step-3 air compartments ,directly adjacent to the coal burner compartments. •Above a predictable minimum loading condition, the ignition becomes self-sustaining. Combustion is completed as the gases spiral up in the Step-4 furnace.
  • 19. •The terminal voltage of alternator must be equal to the bus-bar voltage. Step-1 •The running speed frequency must be equal to the bus-bar frequency. •( Ns=120f/P ) => ( f=PN/120 ) Step-2 •Where, f= frequency,P= no. Of poles ,N= speed of alternator •The phase sequence of the incoming unit must be same as that of the existing bus bar to which the generator is to be synchronized. Step-3