2. Elliptical Mobile Solutions
2Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
“The Next Generation of Modular Data Centers”
C3
-S.P.E.A.R.
R.A.S.E.R.
S.P.E.A.R.
3. EMS Value Proposition
Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
3
• Capital Costs reduced 50 – 80%
• Operating Costs reduced 40 – 65%
• Modular Distributed Computing Platform
that is Vendor Neutral
• Turnkey Solutions
4. The Illustration Behind The
EMS Value Proposition
4
Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
=
5. EMS Products are “The Facilities” for your IT
Equipment
5
Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
EMS Provides:
•Cooling
•Security
•Fire Suppression
•Mobile Platform
You Provide:
•Electricity
•Connection to your network
•Any Equipment
6. EMS Product Line of
Micro-Modular Data Centers (MMDCs)
S.P.E.A.R. : 22U
Armored, Mobile , Power
Assisted Enclosure
R.A.S.E.R. :
42U Re-
locatable
Enclosure
C³-S.P.E.A.R.: 24U
Mobile, Power
Assisted Enclosure
6
Copyright Elliptical Mobile Solutions 2010, www.ellipticalmobilesolutions.com,
Small, scalable to
provide an affordable
data center, disaster
recovery or co-location
alternative.
Full height, 42U enclosure
designed specifically for
new data center builds or
data center expansions.
Designed for agile, high-
density computing
applications where mobility,
shielding, environmental
protection, and disaster
tolerance are priorities.
7. Industry Direction Change
Modular/Containerized Data Centers
• Benefits over Traditional Data Centers
Include:
– CAPEX savings of 35-50%
– OPEX savings of 20-30%
– Time to Deploy from years to 6-8 months
Micro-Modular Data Centers
• Benefits over Modular Data Centers
Include:
– CAPEX additional savings of 40-50%
– OPEX additional savings of 30-35%
– Significant Flexibility
– Time to Deploy to 2 months
Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
There is a paradigm shift occurring in today’s Data Center market. By definition, this is a
change from one way of thinking to another. It's a revolution, a transformation, a sort of
metamorphosis. It just does not happen, but rather it is driven by agents of change.
Why are companies like IBM, Microsoft, Sun, HP and Google all entering the
Modular/Containerized Data Center Market?
8. C³-S.P.E.A.R.
Product Features
• A Climate Controlled Campus-Self-Propelled,
Electronic, Adaptable Rack designed to protect
equipment from environments and situations that
would render standard rack mounted equipment
inoperable.
• C³-S.P.E.A.R. can be used to protect any combination
of rack mounted electronic equipment. The C³-
S.P.E.A.R. can deploy its stable and secure operating
environment virtually anywhere.
• The power assist makes for the first time 1,000 lbs of
sensitive equipment and cooling systems easily
portable by one person.Optional Upgrade Features:
3/8” square or 10-32 tapped rail
Programmable electronic locks with multi-tier security
and audit trail
Water Heat Exchanger
External RF Antennas
Pass-through Patch Panel
NEMA12 Environmental Package
FireTrace® active fire suppression with Novek® 1230
Technical Specifications:
Dimensions……..………60” tall x 24” wide x 66” long*
Weight…………………………………............. 400 lbs*
Capacity………………………………...... 1,000 lbs*
Mobility Range……………………………… 10 miles*
Speed……………………...................................2.6 mph
Operational temperature …………………. 0˚ to 120˚F*
Internal Storage Capacity……………………….. 24 U
Total Cooling Capacity…………..2.5 KW Single A/C
6.0 KW Dual A/C
* depending upon upgrade options selected
9. Patented Forced Air Convection Equipment
Cooling
Inside air and outside air never mix
All of our products allow
you to establish a
computing environment or
data center anywhere. All
that is needed is power
and connectivity.
Cooling, fire protection,
EMI shielding, security,
raised floor, hot and cold
aisle, are all self contained
in each enclosure
10. Portable Enterprise
Class Wireless Client
Support for Remote
Office Applications
Simplify and Secure
Infrastructure Support
for IT Equipment
11. R.A.S.E.R. - PERFECTLY SCALABLE
11
•Micro Modular Design
•42U Sealed Enclosure
•Vendor Neutral 19” Form Factor
•42,000 BTU HVAC
•Closed Loop Cooled
•Hot & Cold Aisle Containment
•Pre-engineered High Density
•Rack Level CyberLock Security
•Active Fire Suppression
•Mobility
•Easy Serviceability
Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
DATA CENTER “IN A BOX”
12. New Data Center Alternatives
Hybrid (Shared Space) High Density Zone
that needs no infrastructure
Shared Space
Example
•4 RASER Units
•224 Blade Servers
•1794 Cores
•960TB Storage
•PUE 1.5-1.1
•48-64KW IT Load
13. Equipment
Equipment
Equipment
Equipment
High powered fan will
continue to move air
during datacenter
power outage
Cool Ambient Air
Hot air from
equipment
Copyright Elliptical Mobile Solutions 2009 1
Mission Critical Venting
Close up view
Inside View
14. • Firetrace Systems provide Cost-
Effective, Stand-Alone, Automatic
Fire Suppression Systems for your
Critical Equipment,
Electrical/Technical Systems and
various types of enclosures.
• Novaec 1230 is a dielectric
substance which is harmless to
electronic equipment even during
operation.
• Novaec 1230 is a totally “clean”
(non toxic) agent which eliminates
permitting issues and eliminates
clean up.
• A Firetrace System can be utilized
anywhere that a fire poses a risk,
and it is flexible enough for virtually
any Industrial Equipment.
Active Fire Suppression System
3M™ Novec™ 1230 Fluid
150,000 units installed worldwide
15. Fire Proofing Insulation
• Aerogel Insulation provides
thermal protection from external
or internal sources
• Air Tight RASER does not
support combustion.
Fires in the data center typically initiate through electrical equipment or
component failure…”-Lance Harry, business development manager for Fenwal Protection Systems
Self contained modules compartmentalize damage to overall Data Center
environment.
16. • Fully Customizable Encrypted
Security Access
– Limitation by time or day (9am –
5pm)
– Limitation by personnel (Network
Equipment Only or Servers
Only)
– Monthly Expiration and Renewal
• 4,000 user event auditable
trail – Track who opens what
and when.
• Field Programmable
CyberLock Multi-tier Security System
Integrated electronic security
4 levels of security access to the
enclosure. The patch panel, both
equipment doors, and propulsion
system are all secured with unique
keys
Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
17. Enclosed RASER ROOM or
“Pod”
Dedicated “make up”
air supply or high
volume adiabatic
cooling for
redundancy
RASER is free
standing Room
isolated so it can be
“pumped” effectively
20. Copyright Elliptical Mobile Solutions 2010 www.ellipticalmobilesolutions.com
Why EMS?
• Save Money
– Eliminate costly infrastructure with a self-contained, high-density, cost-effective and energy
efficient data center.
– Reduce the costs to plan, build and implement your data center
– Reduce overall operating expenses
• Save Energy
– Patented closed loop cooling dramatically cuts cooling and electrical costs
– Significantly reduce data center’s harmful carbon footprint
• Save Time
– Micro-Modular Data Centers can be built, fully populated and delivered in weeks vs. months
or years
– Have a fully functional data center when, where and for however long you need it
• Save Space
– Reduce your data center footprint by up to 70 percent
– EMS products can be located in a warehouse, garage, office or closet
22. EXAMPLE 2U
Network
patch Panel
Power/Data can enter the
top/bottom of sidecar or
through existing raised floor
Lockable/ Cyberlock
Access Door
•Protects patch area
•Reports access
Mix or match 4 Power/Data
Entry Grommet Gland
Locations
EXAMPLE
2U Media
Converter
Optional
4” Fan
Mounts
R.A.S.E.R. “Sidecar”
Power/Data can enter the
top/bottom or through
existing raised floor
Power/Data Entry
Knockouts/Grommets
Vertically mount
3 “2U” piece of
low density
network,
VIOP,etc
24. Expand Data Center Capacity with Energy Efficient High Density Zone
TOTAL: 300 TB OF STORAGE
“EXAMPLE SOLUTION”
“Future Growth”
160 TB
CISCO UCS
Blade Servers
NETAPP STORAGE
26. RASER’s offer a NEW LEVEL of RELIABILITY
Connect the COOLING AND IT load in the RASER to the UPS!
•Simplifies Electrical Cabling
•Increases Reliability
Traditional Way
Utility Power UPS ITTransfer Switch
CRACGenerator
Delay to
start
EMS Way
Utility Power UPS Cooling AND IT
Generator
•Complex wiring
•Generator may not start
•Generator delay causes
room temperature to rise
•Delay for Chiller/CRAC
to restart can cause
room temp to rise
•Simplified wiring
•Generator has time
•No Delay
•No Interruption
Transfer Switch
28. RETRO FIT your Data Center without disrupting
your current environment.
29. - Convert any location into
A high density Zone
- Streamline Project
Management
- Reduce Installation &
Design Costs
- Project finished in 10
weeks or less
“EXAMPLE SOLUTION”
“Future Growth”
160 TB
54KW TOTAL POWER DRAW AT CAPACITY
IT = 36 KW
A/C = 18 KW
12KW IT
6 KW A/C
12KW IT
6 KW A/C
12KW IT
6 KW A/C
*PUE 1.5
*PUE - power usage effectiveness
Notas del editor
Make pictures to scale….find a different pic of raser.