SlideShare a Scribd company logo
1 of 25
Download to read offline
Daniel Bernoulli (Groningen, 8 February 1700
– Basel, 8 March 1782) was a Dutch-
Swiss mathematician and was one of the many
prominent mathematicians in the Bernoulli
family. He is particularly remembered for his
applications of mathematics to mechanics,
especially fluid mechanics, and for his
pioneering work in probability and statistics.
Bernoulli's work is still studied at length by
many schools of science throughout the world.


              2                    2
          u               u
y1  z1      y 2  z2 
              1
                              H12
                                   2
          2g              2g
0
Henry Philibert Gaspard Darcy (June 10,
1803 – January 3, 1858) was
a French engineer who made several
important contributions to hydraulics.


                L      u2
    ΔΗ f       
               4 R 2g

Julius Ludwig Weisbach (born 10 August 1806 in
Mittelschmiedeberg (now Mildenau), Erzgebirge,
died 24 February 1871, Freiberg) was a German
mathematician and engineer.



0
Antoine de Chézy (September 1, 1718
– October 5, 1798) was a French
hydraulics engineer. He is known for
the Chézy formula, which concerned
the velocity of pipe flow.[1] He died
in 1798 after being director of the École
nationale des ponts et chaussées for less
than a year.[2] His son was the
orientalist Antoine-Léonard de Chézy.




    𝑉= 𝐶∙       𝑅 ∙ 𝑆𝑓

http://chezy.sdsu.edu/

0
CU06997 Fluid Dynamics

 Sewer calculation
 12.1 Introduction (page 401)
 12.2 Design of a simple pipe system (page 401-404)
 12.3 Series, parallel and branched pipe systems (page 404-408)
 Reader : Sewer systems module for HPE (link on VLD)
 5.4 Hydraulics




1
Energy loss [m]          • Turbulent flow
                         • Friction loss (wrijvingsverlies)

                              Total Head
                              Pressure Head


                                                2        2
                                            L u        u
                                ΔΗ f           
                                           4 R 2g      2g

    Going to look at other formulas
    for calculating friction loss

                                   ΔH
1     𝑉= 𝐶∙     𝑅 ∙ 𝑆𝑓        𝑆𝑓 =
                                    𝐿
Combined sewer / gemengd rioolstelsel
                         Rain water       Rain
                         Waste water      Waste
                                          GL (ground level) +6.00 m
       P4                 P3               P2         P1 +5,5 m
                                           Ø500 concrete

                          Ø300 PVC

       Ø250 PVC                                      IL +4,00 m
                                       IL +3,90 m
                      IL +3,73 m
                           50 m
    pump

1   IL (Invert level) +3,53 m
Sewer
    Location
    Sewer
    Overflow




2
Chezy formula                                       𝑉= 𝐶∙        𝑅 ∙ 𝑆𝑓

Chezy formula describes the mean velocity of uniform, turbulent flow

                                        𝑉=     Mean Fluid Velocity [m/s]
                        Total Head      R=     Hydraulic Radius    [m]
                        Pressure Head   𝑆𝑓 =   Hydraulic gradient [1]
                                               8𝑔
                                        𝐶=          Chezy coefficient [m1/2/s]
                                                𝜆


                      ΔH
                 𝑆𝑓 =
                       𝐿
                                                                 ΔH
3                    Length
12𝑅
Chezy coefficient                         𝐶 = 18 ∙ 𝑙𝑜𝑔
                                                        𝑘
    C=     Chezy coefficient   [m1/2/s]
    R=     Hydraulic Radius    [m]
    kS =   surface roughness   [m]




3
Surface roughness kS [m]
                                             Equivalent Sand Roughness,
                           Material                  (ft)             (mm)
                       Copper, brass     1x10-4 - 3x10-3      3.05x10-2 - 0.9
                       Wrought iron,
                                         1.5x10-4 - 8x10-3    4.6x10-2 - 2.4
                       steel
                       Asphalt-lined
                                         4x10-4 - 7x10-3      0.1 - 2.1
                       cast iron
                                         3.3x10-4 - 1.5x10-
                       Galvanized iron   2                    0.102 - 4.6

                       Cast iron         8x10-4 - 1.8x10-2    0.2 - 5.5
                       Concrete          10-3   -   10-2      0.3 - 3.0
                       Uncoated Cast
                                         7.4x10-4             0.226
                       Iron
                       Coated Cast Iron 3.3x10-4              0.102
                       Coated Spun
                                         1.8x10-4             5.6x10-2
                       Iron
                       Cement            1.3x10-3 - 4x10-3    0.4 - 1.2s
                       Wrought Iron      1.7x10-4             5x10-2
                       Uncoated Steel    9.2x10-5             2.8x10-2
                       Coated Steel      1.8x10-4             5.8x10-2
                       Wood Stave        6x10-4 - 3x10-3      0.2 - 0.9
                       PVC               5x10-6               1.5x10-3
                       Compiled from Lamont (1981), Moody (1944), and
                       Mays (1999)




3
Head loss sewer pipe
                                                                ∆𝐻
    Combine         𝑉= 𝐶∙     𝑅 ∙ 𝑆𝑓      𝑄= 𝑉∙ 𝐴      𝑆𝑓 = 𝑖 =
                                                                 𝐿


               𝑄2
    ∆𝐻 = 𝐿 2
           𝐶 ∙ 𝑅ℎ ∙ 𝐴2
                     𝑠
    ∆𝐻 = Head Loss, energy loss             [m]
    Q = discharge pipe                      [m3/s]
    L=      length of the pipe              [m]
    C = Chezy coefficient                   [m1/2/s]
    R = Hydraulic Radius                    [m]
    A = Wetted Area, flow surface           [m2]
3   Sf ,i = slope of hydraulic gradient     [-]
Overflow
                         Rain water       Rain
                         Waste water      Waste
                                          GL (ground level) +6.00 m
       P4                 P3               P2         P1 +5,5 m
                                           Ø500 concrete

                          Ø300 PVC

       Ø250 PVC                                      IL +4,00 m
                                       IL +3,90 m
                      IL +3,73 m
                           50 m
    pump

4   IL (Invert level) +3,53 m
3
Overflow / Weir                               𝑄= 𝑚∙ 𝐵∙           𝐻2
                  Q=     discharge overflow               [m3/s]
                  m=     runoff coefficient (1,5 – 1,8)   [m1/2/s]
                  B=     Width crest overflow             [m]
                  H=     Head at overflow                 [m]
                         measured from top crest!!
                                                      Energy line


    In example m = 1,8               H



4
Calculating sewer systems
                         Rain           Rain
                         Waste          Waste
                                        GL (ground level) +6.00 m
       P4                 P3             P2         P1 +5,5 m
                                         Ø500 concrete

                          Ø300 PVC

       Ø250 PVC                                    IL +4,00 m
                                     IL +3,90 m
                      IL +3,73 m
                           50 m
    pump

5   IL (Invert level) +3,53 m
Question 1
                     Rain          Rain
                     Waste         Waste
                                      GL +6.00 m
                                                    +5,5 m
       P4            P3             P2       P1
                                    Ø500 concrete

                     Ø300 PVC

       Ø250 PVC                              IL +4,00 m
                                IL +3,90 m
                  IL +3,73 m
                       50 m
    Pump

5   IL +3,53 m
Question 2
                      Rain=0           Rain=0
                      Waste=10l/s      Waste=10l/s
                                          GL +6.00 m
                                                        +5,5 m
       P4             P3                P2        P1
                                        Ø500 concrete
                       Q=10 l/s
        Q=20 l/s      Ø300 PVC

       Ø250 PVC                                   IL +4,00 m
                                    IL +3,90 m
                   IL +3,73 m
                        50 m
    Pump

5   IL +3,53 m
Partially filled pipe

                        𝑄 𝑝𝑎𝑟𝑡
                 𝐼𝑛𝑝𝑢𝑡:        = 0,17
                        𝑄 𝑓𝑢𝑙𝑙

                                                𝑢 𝑝𝑎𝑟𝑡
                                        𝑂𝑢𝑡𝑝𝑢𝑡:        = 0,75
                                                𝑢 𝑓𝑢𝑙𝑙
       ℎ
𝑂𝑢𝑡𝑝𝑢𝑡: = 0,27
        𝐷




5
Table




5
Question 3
                     Rain=66 l/s       Rain=225 l/s
                     Waste=10 l/s      Waste=10 l/s
                                          GL +6.00 m
       P4            P3                 P2        P1    +5,5 m
                                        Ø500 concrete

                     Ø300 PVC

       Ø250 PVC                                   IL +4,00 m
                                    IL +3,90 m
                  IL +3,73 m
                       50 m
    Pump=20 l/s

5   IL +3,53 m
Question 3b
                     Rain=66 l/s       Rain=225 l/s
                     Waste=10 l/s      Waste=10 l/s
                                          GL +6.00 m
                                                       P1
       P4            P3                 P2               +5,5 m
                                        Ø500 beton

                     Ø300 PVC

       Ø250 PVC                                  IL +4,00 m
                                    IL +3,90 m
                  IL +3,73 m
                       50 m
    Pump=20 l/s

5   IL +3,53 m
Question 3c
                  Rain=66 l/s      Rain=225 l/s
                  Waste=10 l/s     Waste=10 l/s
                                      GL +6.00 m   +5,5 m
      P4           P3         P2
                                    Ø500 beton

                   Ø300 PVC                           P1

      Ø250 PVC                        Q=291 l/s
                     Q=66 l/s

                    50 m
    Pump=20 l/s

5                                       In example m = 1,8
Strategy [situation with overflow]
Preparation
Information available for each pipe                12𝑅
- Diameter, R, L, k, C                𝐶 = 18 ∙ 𝑙𝑜𝑔
- Discharge and Velocity                            𝑘
Information Overflow / weir
- Width, m
- Discharge
- Level crest in m N.A.P.




5
Strategy [situation with overflow]
    Steps
                        3
                                             𝑄2
     𝑄= 𝑚∙ 𝐵∙          𝐻2         ∆𝐻 = 𝐿 2
                                         𝐶 ∙ 𝑅ℎ ∙ 𝐴2
                                                   𝑠
    All levels in m N.A.P.

    1.   Calculate H at weir
    2.   Calculate ∆H each pipe
    3.   Water level at weir (P1) = level crest weir + H at weir
    4.   Water level at P2 = Water level at weir + ∆Hweir(p1) – p2
    5.   Water level at P3 = Water level at P2 + ∆H p2– p3
    6.   Water level at P4 = Water level at P3 + ∆H p3– p4


5
Strategy [situation with overflow]
    Remarks
    • In manhole velocity is low so water level (y) ≈ total head (H)
      Otherwise you have to take the velocity head (u2/2g) into
      account
    • Pipes are submerged
    • Steady situation
    • Turbulent flow
    • Subcritical flow [stromend] (discussed later, most of the time
      flow is subcritical


    With subcritical flow [stromend] the downstream situation affects
    the upstream situation. So that is why you start at the weir and
    work back to P3.
5
Question 3de
                   Rain=66 l/s     Rain=225 l/s
                   Waste=10 l/s    Waste=10 l/s
                                      GL +6.00 m   +5,5 m
      P4           P3         P2
       Q=0 l/s                      Ø500 beton
       v=0 m/s                                        P1
                   Ø300 PVC
       I=0
      Ø250 PVC                        Q=291 l/s
                     Q=66 l/s         v=1,48 m/s
                     v=0,93 m/s       I=1:166
    Pump=20 l/s      I=1:244


5                    50 m              In example m = 1,8

More Related Content

What's hot

Cu06997 lecture 12_sediment transport and back water
Cu06997 lecture 12_sediment transport and back waterCu06997 lecture 12_sediment transport and back water
Cu06997 lecture 12_sediment transport and back waterHenk Massink
 
Cu06997 lecture 8_exercise
Cu06997 lecture 8_exerciseCu06997 lecture 8_exercise
Cu06997 lecture 8_exerciseHenk Massink
 
Cu06997 lecture 4_bernoulli-17-2-2013
Cu06997 lecture 4_bernoulli-17-2-2013Cu06997 lecture 4_bernoulli-17-2-2013
Cu06997 lecture 4_bernoulli-17-2-2013Henk Massink
 
Cu06997 lecture 6_exercises
Cu06997 lecture 6_exercisesCu06997 lecture 6_exercises
Cu06997 lecture 6_exercisesHenk Massink
 
Cu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answerCu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answerHenk Massink
 
Cu06997 lecture 10_froude
Cu06997 lecture 10_froudeCu06997 lecture 10_froude
Cu06997 lecture 10_froudeHenk Massink
 
Cu06997 lecture 2_answer
Cu06997 lecture 2_answerCu06997 lecture 2_answer
Cu06997 lecture 2_answerHenk Massink
 
Design of pipe network
Design of pipe networkDesign of pipe network
Design of pipe networkManoj Mota
 
Cu06997 assignment 7 2013_new
Cu06997 assignment 7 2013_newCu06997 assignment 7 2013_new
Cu06997 assignment 7 2013_newHenk Massink
 
Local Energy (Head) Losses (Lecture notes 03)
Local Energy (Head) Losses (Lecture notes 03)Local Energy (Head) Losses (Lecture notes 03)
Local Energy (Head) Losses (Lecture notes 03)Shekh Muhsen Uddin Ahmed
 
Hydraulic analysis of complex piping systems (updated)
Hydraulic analysis of complex piping systems (updated)Hydraulic analysis of complex piping systems (updated)
Hydraulic analysis of complex piping systems (updated)Mohsin Siddique
 
Phase Change Material Based Solar Water Heater
Phase Change Material Based Solar Water HeaterPhase Change Material Based Solar Water Heater
Phase Change Material Based Solar Water Heaterinventionjournals
 
Laminar Flow in pipes and Anuli Newtonian Fluids
Laminar Flow in pipes and Anuli Newtonian FluidsLaminar Flow in pipes and Anuli Newtonian Fluids
Laminar Flow in pipes and Anuli Newtonian FluidsUsman Shah
 
02 pipe networks
02 pipe networks02 pipe networks
02 pipe networksKriss Hung
 
Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...
Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...
Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...Usman Shah
 
assignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanicsassignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanicsasghar123456
 
Fluid ans t_1
Fluid ans t_1Fluid ans t_1
Fluid ans t_1dr walid
 
hydro chapter_4_b_pipe_network_by louy Al hami
hydro  chapter_4_b_pipe_network_by louy Al hami hydro  chapter_4_b_pipe_network_by louy Al hami
hydro chapter_4_b_pipe_network_by louy Al hami Louy Alhamy
 

What's hot (20)

Cu06997 lecture 12_sediment transport and back water
Cu06997 lecture 12_sediment transport and back waterCu06997 lecture 12_sediment transport and back water
Cu06997 lecture 12_sediment transport and back water
 
Cu06997 lecture 8_exercise
Cu06997 lecture 8_exerciseCu06997 lecture 8_exercise
Cu06997 lecture 8_exercise
 
Cu06997 lecture 4_bernoulli-17-2-2013
Cu06997 lecture 4_bernoulli-17-2-2013Cu06997 lecture 4_bernoulli-17-2-2013
Cu06997 lecture 4_bernoulli-17-2-2013
 
Cu06997 lecture 6_exercises
Cu06997 lecture 6_exercisesCu06997 lecture 6_exercises
Cu06997 lecture 6_exercises
 
Cu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answerCu06997 assignment 6 2014_answer
Cu06997 assignment 6 2014_answer
 
Cu06997 lecture 10_froude
Cu06997 lecture 10_froudeCu06997 lecture 10_froude
Cu06997 lecture 10_froude
 
Cu06997 lecture 2_answer
Cu06997 lecture 2_answerCu06997 lecture 2_answer
Cu06997 lecture 2_answer
 
Design of pipe network
Design of pipe networkDesign of pipe network
Design of pipe network
 
Hydraulic losses in pipe
Hydraulic losses in pipeHydraulic losses in pipe
Hydraulic losses in pipe
 
Cu06997 assignment 7 2013_new
Cu06997 assignment 7 2013_newCu06997 assignment 7 2013_new
Cu06997 assignment 7 2013_new
 
Local Energy (Head) Losses (Lecture notes 03)
Local Energy (Head) Losses (Lecture notes 03)Local Energy (Head) Losses (Lecture notes 03)
Local Energy (Head) Losses (Lecture notes 03)
 
Hydraulic analysis of complex piping systems (updated)
Hydraulic analysis of complex piping systems (updated)Hydraulic analysis of complex piping systems (updated)
Hydraulic analysis of complex piping systems (updated)
 
Phase Change Material Based Solar Water Heater
Phase Change Material Based Solar Water HeaterPhase Change Material Based Solar Water Heater
Phase Change Material Based Solar Water Heater
 
Laminar Flow in pipes and Anuli Newtonian Fluids
Laminar Flow in pipes and Anuli Newtonian FluidsLaminar Flow in pipes and Anuli Newtonian Fluids
Laminar Flow in pipes and Anuli Newtonian Fluids
 
02 pipe networks
02 pipe networks02 pipe networks
02 pipe networks
 
Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...
Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...
Calculation of Flowrate and Pressure Drop Relationship for Laminar Flow using...
 
assignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanicsassignment 1 properties of fluids-Fluid mechanics
assignment 1 properties of fluids-Fluid mechanics
 
Fluid ans t_1
Fluid ans t_1Fluid ans t_1
Fluid ans t_1
 
hydro chapter_4_b_pipe_network_by louy Al hami
hydro  chapter_4_b_pipe_network_by louy Al hami hydro  chapter_4_b_pipe_network_by louy Al hami
hydro chapter_4_b_pipe_network_by louy Al hami
 
Laminar turbulent
Laminar turbulentLaminar turbulent
Laminar turbulent
 

Similar to Cu06997 lecture 8_sewers

25. volume & surface area
25. volume & surface area25. volume & surface area
25. volume & surface areaAkhilesh Sharma
 
محاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdf
محاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdfمحاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdf
محاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdfn2002asr
 
Deduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingDeduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingYash Patel
 
Ch10 math
Ch10 mathCh10 math
Ch10 mathklivsie
 
010a (PPT) Flow through pipes.pdf .
010a (PPT) Flow through pipes.pdf          .010a (PPT) Flow through pipes.pdf          .
010a (PPT) Flow through pipes.pdf .happycocoman
 
Structure report final
Structure report finalStructure report final
Structure report finaltristan yu
 
L21 MOS OCT 2020.pptx .
L21 MOS OCT 2020.pptx                           .L21 MOS OCT 2020.pptx                           .
L21 MOS OCT 2020.pptx .happycocoman
 
Transition.pptx
Transition.pptxTransition.pptx
Transition.pptx211Aqib
 
C21 21.1
C21 21.1C21 21.1
C21 21.1BGEsp1
 
hydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialshydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialsbakhoyaagnes
 
F L U I D M E C H A N I C S A N D H E A T T R A N S F E R J N T U M O D...
F L U I D  M E C H A N I C S  A N D  H E A T  T R A N S F E R  J N T U  M O D...F L U I D  M E C H A N I C S  A N D  H E A T  T R A N S F E R  J N T U  M O D...
F L U I D M E C H A N I C S A N D H E A T T R A N S F E R J N T U M O D...guest3f9c6b
 
fluid_mechanics_notes.pdf
fluid_mechanics_notes.pdffluid_mechanics_notes.pdf
fluid_mechanics_notes.pdfTalkingYRwe
 
Design and Manufacturing of Press Tools for Compressor Shell
Design and Manufacturing of Press Tools for Compressor ShellDesign and Manufacturing of Press Tools for Compressor Shell
Design and Manufacturing of Press Tools for Compressor ShellINFOGAIN PUBLICATION
 
Manufacture of nitrobenzene
Manufacture of nitrobenzeneManufacture of nitrobenzene
Manufacture of nitrobenzeneparthdhurvey
 
Design of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumDesign of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumIRJET Journal
 

Similar to Cu06997 lecture 8_sewers (20)

Laminar flow
Laminar flowLaminar flow
Laminar flow
 
25. volume & surface area
25. volume & surface area25. volume & surface area
25. volume & surface area
 
محاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdf
محاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdfمحاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdf
محاضرة هيدروليك هندسة مدني(2) 26-2-2022.pdf
 
Deduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending SchedulingDeduction of opening , Number of bars and Bar Bending Scheduling
Deduction of opening , Number of bars and Bar Bending Scheduling
 
Ch10 math
Ch10 mathCh10 math
Ch10 math
 
010a (PPT) Flow through pipes.pdf .
010a (PPT) Flow through pipes.pdf          .010a (PPT) Flow through pipes.pdf          .
010a (PPT) Flow through pipes.pdf .
 
Structure report final
Structure report finalStructure report final
Structure report final
 
L21 MOS OCT 2020.pptx .
L21 MOS OCT 2020.pptx                           .L21 MOS OCT 2020.pptx                           .
L21 MOS OCT 2020.pptx .
 
material 9.pptx
material 9.pptxmaterial 9.pptx
material 9.pptx
 
Transition.pptx
Transition.pptxTransition.pptx
Transition.pptx
 
Design of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti villageDesign of weir on river cauvery near thottilpatti village
Design of weir on river cauvery near thottilpatti village
 
Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
 
C21 21.1
C21 21.1C21 21.1
C21 21.1
 
hydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorialshydraulics and advanced hydraulics solved tutorials
hydraulics and advanced hydraulics solved tutorials
 
Solution manual 17 19
Solution manual 17 19Solution manual 17 19
Solution manual 17 19
 
F L U I D M E C H A N I C S A N D H E A T T R A N S F E R J N T U M O D...
F L U I D  M E C H A N I C S  A N D  H E A T  T R A N S F E R  J N T U  M O D...F L U I D  M E C H A N I C S  A N D  H E A T  T R A N S F E R  J N T U  M O D...
F L U I D M E C H A N I C S A N D H E A T T R A N S F E R J N T U M O D...
 
fluid_mechanics_notes.pdf
fluid_mechanics_notes.pdffluid_mechanics_notes.pdf
fluid_mechanics_notes.pdf
 
Design and Manufacturing of Press Tools for Compressor Shell
Design and Manufacturing of Press Tools for Compressor ShellDesign and Manufacturing of Press Tools for Compressor Shell
Design and Manufacturing of Press Tools for Compressor Shell
 
Manufacture of nitrobenzene
Manufacture of nitrobenzeneManufacture of nitrobenzene
Manufacture of nitrobenzene
 
Design of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumDesign of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an Auditorium
 

More from Henk Massink

Cu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulationCu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulationHenk Massink
 
Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015Henk Massink
 
Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015Henk Massink
 
Cu07821 7 culverts new
Cu07821 7 culverts newCu07821 7 culverts new
Cu07821 7 culverts newHenk Massink
 
Cu07821 6 pumping stations_update
Cu07821 6 pumping stations_updateCu07821 6 pumping stations_update
Cu07821 6 pumping stations_updateHenk Massink
 
Cu07821 5 drainage
Cu07821 5 drainageCu07821 5 drainage
Cu07821 5 drainageHenk Massink
 
Cu07821 3 precipitation and evapotranspiration
Cu07821 3  precipitation and evapotranspirationCu07821 3  precipitation and evapotranspiration
Cu07821 3 precipitation and evapotranspirationHenk Massink
 
Cu07821 1 intro_1415
Cu07821 1 intro_1415Cu07821 1 intro_1415
Cu07821 1 intro_1415Henk Massink
 
Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015Henk Massink
 
Research portfolio da arc 2014-2015 s1
Research portfolio da arc  2014-2015 s1Research portfolio da arc  2014-2015 s1
Research portfolio da arc 2014-2015 s1Henk Massink
 
Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014Henk Massink
 
Presentatie AET voor scholieren 15-11-2013
Presentatie AET voor scholieren 15-11-2013Presentatie AET voor scholieren 15-11-2013
Presentatie AET voor scholieren 15-11-2013Henk Massink
 
Final presentation spain quattro
Final presentation spain quattroFinal presentation spain quattro
Final presentation spain quattroHenk Massink
 
Final presentation group 3
Final presentation group 3Final presentation group 3
Final presentation group 3Henk Massink
 

More from Henk Massink (20)

Cu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulationCu07821 ppt9 recapitulation
Cu07821 ppt9 recapitulation
 
Gastcollege mli
Gastcollege mliGastcollege mli
Gastcollege mli
 
Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015Cu07821 10management and maintenance2015
Cu07821 10management and maintenance2015
 
Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015Cu07821 9 zoning plan2015
Cu07821 9 zoning plan2015
 
Cu07821 8 weirs
Cu07821 8 weirsCu07821 8 weirs
Cu07821 8 weirs
 
Cu07821 7 culverts new
Cu07821 7 culverts newCu07821 7 culverts new
Cu07821 7 culverts new
 
Cu07821 6 pumping stations_update
Cu07821 6 pumping stations_updateCu07821 6 pumping stations_update
Cu07821 6 pumping stations_update
 
Cu07821 5 drainage
Cu07821 5 drainageCu07821 5 drainage
Cu07821 5 drainage
 
Cu07821 4 soil
Cu07821 4 soilCu07821 4 soil
Cu07821 4 soil
 
Cu07821 3 precipitation and evapotranspiration
Cu07821 3  precipitation and evapotranspirationCu07821 3  precipitation and evapotranspiration
Cu07821 3 precipitation and evapotranspiration
 
Cu07821 2 help
Cu07821 2 helpCu07821 2 help
Cu07821 2 help
 
Cu07821 1 intro_1415
Cu07821 1 intro_1415Cu07821 1 intro_1415
Cu07821 1 intro_1415
 
Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015Research portfolio delta_academy_s2_2014_2015
Research portfolio delta_academy_s2_2014_2015
 
Research portfolio da arc 2014-2015 s1
Research portfolio da arc  2014-2015 s1Research portfolio da arc  2014-2015 s1
Research portfolio da arc 2014-2015 s1
 
Jacobapolder
JacobapolderJacobapolder
Jacobapolder
 
Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014Research portfolios1 2013_2014 jan july 2014
Research portfolios1 2013_2014 jan july 2014
 
Presentatie AET voor scholieren 15-11-2013
Presentatie AET voor scholieren 15-11-2013Presentatie AET voor scholieren 15-11-2013
Presentatie AET voor scholieren 15-11-2013
 
Vision group1(5)
Vision group1(5)Vision group1(5)
Vision group1(5)
 
Final presentation spain quattro
Final presentation spain quattroFinal presentation spain quattro
Final presentation spain quattro
 
Final presentation group 3
Final presentation group 3Final presentation group 3
Final presentation group 3
 

Recently uploaded

USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxJanEmmanBrigoli
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxruthvilladarez
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 

Recently uploaded (20)

USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Millenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptxMillenials and Fillennials (Ethical Challenge and Responses).pptx
Millenials and Fillennials (Ethical Challenge and Responses).pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
TEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docxTEACHER REFLECTION FORM (NEW SET........).docx
TEACHER REFLECTION FORM (NEW SET........).docx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 

Cu06997 lecture 8_sewers

  • 1. Daniel Bernoulli (Groningen, 8 February 1700 – Basel, 8 March 1782) was a Dutch- Swiss mathematician and was one of the many prominent mathematicians in the Bernoulli family. He is particularly remembered for his applications of mathematics to mechanics, especially fluid mechanics, and for his pioneering work in probability and statistics. Bernoulli's work is still studied at length by many schools of science throughout the world. 2 2 u u y1  z1   y 2  z2  1  H12 2 2g 2g 0
  • 2. Henry Philibert Gaspard Darcy (June 10, 1803 – January 3, 1858) was a French engineer who made several important contributions to hydraulics. L u2 ΔΗ f     4 R 2g Julius Ludwig Weisbach (born 10 August 1806 in Mittelschmiedeberg (now Mildenau), Erzgebirge, died 24 February 1871, Freiberg) was a German mathematician and engineer. 0
  • 3. Antoine de Chézy (September 1, 1718 – October 5, 1798) was a French hydraulics engineer. He is known for the Chézy formula, which concerned the velocity of pipe flow.[1] He died in 1798 after being director of the École nationale des ponts et chaussées for less than a year.[2] His son was the orientalist Antoine-Léonard de Chézy. 𝑉= 𝐶∙ 𝑅 ∙ 𝑆𝑓 http://chezy.sdsu.edu/ 0
  • 4. CU06997 Fluid Dynamics Sewer calculation 12.1 Introduction (page 401) 12.2 Design of a simple pipe system (page 401-404) 12.3 Series, parallel and branched pipe systems (page 404-408) Reader : Sewer systems module for HPE (link on VLD) 5.4 Hydraulics 1
  • 5. Energy loss [m] • Turbulent flow • Friction loss (wrijvingsverlies) Total Head Pressure Head 2 2 L u u ΔΗ f       4 R 2g 2g Going to look at other formulas for calculating friction loss ΔH 1 𝑉= 𝐶∙ 𝑅 ∙ 𝑆𝑓 𝑆𝑓 = 𝐿
  • 6. Combined sewer / gemengd rioolstelsel Rain water Rain Waste water Waste GL (ground level) +6.00 m P4 P3 P2 P1 +5,5 m Ø500 concrete Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m pump 1 IL (Invert level) +3,53 m
  • 7. Sewer Location Sewer Overflow 2
  • 8. Chezy formula 𝑉= 𝐶∙ 𝑅 ∙ 𝑆𝑓 Chezy formula describes the mean velocity of uniform, turbulent flow 𝑉= Mean Fluid Velocity [m/s] Total Head R= Hydraulic Radius [m] Pressure Head 𝑆𝑓 = Hydraulic gradient [1] 8𝑔 𝐶= Chezy coefficient [m1/2/s] 𝜆 ΔH 𝑆𝑓 = 𝐿 ΔH 3 Length
  • 9. 12𝑅 Chezy coefficient 𝐶 = 18 ∙ 𝑙𝑜𝑔 𝑘 C= Chezy coefficient [m1/2/s] R= Hydraulic Radius [m] kS = surface roughness [m] 3
  • 10. Surface roughness kS [m] Equivalent Sand Roughness, Material (ft) (mm) Copper, brass 1x10-4 - 3x10-3 3.05x10-2 - 0.9 Wrought iron, 1.5x10-4 - 8x10-3 4.6x10-2 - 2.4 steel Asphalt-lined 4x10-4 - 7x10-3 0.1 - 2.1 cast iron 3.3x10-4 - 1.5x10- Galvanized iron 2 0.102 - 4.6 Cast iron 8x10-4 - 1.8x10-2 0.2 - 5.5 Concrete 10-3 - 10-2 0.3 - 3.0 Uncoated Cast 7.4x10-4 0.226 Iron Coated Cast Iron 3.3x10-4 0.102 Coated Spun 1.8x10-4 5.6x10-2 Iron Cement 1.3x10-3 - 4x10-3 0.4 - 1.2s Wrought Iron 1.7x10-4 5x10-2 Uncoated Steel 9.2x10-5 2.8x10-2 Coated Steel 1.8x10-4 5.8x10-2 Wood Stave 6x10-4 - 3x10-3 0.2 - 0.9 PVC 5x10-6 1.5x10-3 Compiled from Lamont (1981), Moody (1944), and Mays (1999) 3
  • 11. Head loss sewer pipe ∆𝐻 Combine 𝑉= 𝐶∙ 𝑅 ∙ 𝑆𝑓 𝑄= 𝑉∙ 𝐴 𝑆𝑓 = 𝑖 = 𝐿 𝑄2 ∆𝐻 = 𝐿 2 𝐶 ∙ 𝑅ℎ ∙ 𝐴2 𝑠 ∆𝐻 = Head Loss, energy loss [m] Q = discharge pipe [m3/s] L= length of the pipe [m] C = Chezy coefficient [m1/2/s] R = Hydraulic Radius [m] A = Wetted Area, flow surface [m2] 3 Sf ,i = slope of hydraulic gradient [-]
  • 12. Overflow Rain water Rain Waste water Waste GL (ground level) +6.00 m P4 P3 P2 P1 +5,5 m Ø500 concrete Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m pump 4 IL (Invert level) +3,53 m
  • 13. 3 Overflow / Weir 𝑄= 𝑚∙ 𝐵∙ 𝐻2 Q= discharge overflow [m3/s] m= runoff coefficient (1,5 – 1,8) [m1/2/s] B= Width crest overflow [m] H= Head at overflow [m] measured from top crest!! Energy line In example m = 1,8 H 4
  • 14. Calculating sewer systems Rain Rain Waste Waste GL (ground level) +6.00 m P4 P3 P2 P1 +5,5 m Ø500 concrete Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m pump 5 IL (Invert level) +3,53 m
  • 15. Question 1 Rain Rain Waste Waste GL +6.00 m +5,5 m P4 P3 P2 P1 Ø500 concrete Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m Pump 5 IL +3,53 m
  • 16. Question 2 Rain=0 Rain=0 Waste=10l/s Waste=10l/s GL +6.00 m +5,5 m P4 P3 P2 P1 Ø500 concrete Q=10 l/s Q=20 l/s Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m Pump 5 IL +3,53 m
  • 17. Partially filled pipe 𝑄 𝑝𝑎𝑟𝑡 𝐼𝑛𝑝𝑢𝑡: = 0,17 𝑄 𝑓𝑢𝑙𝑙 𝑢 𝑝𝑎𝑟𝑡 𝑂𝑢𝑡𝑝𝑢𝑡: = 0,75 𝑢 𝑓𝑢𝑙𝑙 ℎ 𝑂𝑢𝑡𝑝𝑢𝑡: = 0,27 𝐷 5
  • 19. Question 3 Rain=66 l/s Rain=225 l/s Waste=10 l/s Waste=10 l/s GL +6.00 m P4 P3 P2 P1 +5,5 m Ø500 concrete Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m Pump=20 l/s 5 IL +3,53 m
  • 20. Question 3b Rain=66 l/s Rain=225 l/s Waste=10 l/s Waste=10 l/s GL +6.00 m P1 P4 P3 P2 +5,5 m Ø500 beton Ø300 PVC Ø250 PVC IL +4,00 m IL +3,90 m IL +3,73 m 50 m Pump=20 l/s 5 IL +3,53 m
  • 21. Question 3c Rain=66 l/s Rain=225 l/s Waste=10 l/s Waste=10 l/s GL +6.00 m +5,5 m P4 P3 P2 Ø500 beton Ø300 PVC P1 Ø250 PVC Q=291 l/s Q=66 l/s 50 m Pump=20 l/s 5 In example m = 1,8
  • 22. Strategy [situation with overflow] Preparation Information available for each pipe 12𝑅 - Diameter, R, L, k, C 𝐶 = 18 ∙ 𝑙𝑜𝑔 - Discharge and Velocity 𝑘 Information Overflow / weir - Width, m - Discharge - Level crest in m N.A.P. 5
  • 23. Strategy [situation with overflow] Steps 3 𝑄2 𝑄= 𝑚∙ 𝐵∙ 𝐻2 ∆𝐻 = 𝐿 2 𝐶 ∙ 𝑅ℎ ∙ 𝐴2 𝑠 All levels in m N.A.P. 1. Calculate H at weir 2. Calculate ∆H each pipe 3. Water level at weir (P1) = level crest weir + H at weir 4. Water level at P2 = Water level at weir + ∆Hweir(p1) – p2 5. Water level at P3 = Water level at P2 + ∆H p2– p3 6. Water level at P4 = Water level at P3 + ∆H p3– p4 5
  • 24. Strategy [situation with overflow] Remarks • In manhole velocity is low so water level (y) ≈ total head (H) Otherwise you have to take the velocity head (u2/2g) into account • Pipes are submerged • Steady situation • Turbulent flow • Subcritical flow [stromend] (discussed later, most of the time flow is subcritical With subcritical flow [stromend] the downstream situation affects the upstream situation. So that is why you start at the weir and work back to P3. 5
  • 25. Question 3de Rain=66 l/s Rain=225 l/s Waste=10 l/s Waste=10 l/s GL +6.00 m +5,5 m P4 P3 P2 Q=0 l/s Ø500 beton v=0 m/s P1 Ø300 PVC I=0 Ø250 PVC Q=291 l/s Q=66 l/s v=1,48 m/s v=0,93 m/s I=1:166 Pump=20 l/s I=1:244 5 50 m In example m = 1,8