SlideShare una empresa de Scribd logo
1 de 51
Descargar para leer sin conexión
1© Copyright 2013 EMC Corporation. All rights reserved.
Migration & Upgrades:
Best Practice Upgrade
Pathways to EMC
Documentum 7
2© Copyright 2013 EMC Corporation. All rights reserved.
•  This presentation contains “forward-looking statements” as defined under the US
Federal Securities Laws.
•  EMC makes no representation and undertakes no obligations with regard to product
planning information, anticipated product characteristics, performance
specifications, or anticipated release dates (collectively, “Roadmap Information”).
•  Roadmap Information is provided by EMC as an accommodation to the recipient
solely for purposes of discussion and without intending to be bound thereby, and is
subject to change without notice.
•  Roadmap information is EMC Confidential Information, and is provided under the
terms, conditions and restrictions defined in the EMC Non-Disclosure Agreement in
place with your organization.
Safe Harbor Disclaimer
3© Copyright 2013 EMC Corporation. All rights reserved.
We Want to Hear Your
Thoughts On This
Session!
OPTION 1:
OPTION 2:
Download the Momentum Mobile
App and take the Survey
Complete the Survey sent via Email
4© Copyright 2013 EMC Corporation. All rights reserved.
5© Copyright 2013 EMC Corporation. All rights reserved.
Agenda
Why Upgrade to Documentum 71
Planning2
Tools3
Scenarios4
6© Copyright 2013 EMC Corporation. All rights reserved.
Why Upgrade to Documentum 7
Ÿ  Platform Innovation
Ÿ  Access to new Client technologies and
functionality
Ÿ  Maintain Supportability for Fastest
Restoration Time
7© Copyright 2013 EMC Corporation. All rights reserved.
What’s New in Documentum 7
Lower
TCO
Higher
TCE
Enhanced
Trust &
Security
•  Reduced resource
utilization and increased
performance via
•  Intelligent Session
Management
•  Type Caching
•  FIPS 140-2 Level 1
Compliance
•  Centralized Key
Management
•  AES Encryption
•  Improved Content
Intelligence via
xPlore 1.3
•  Private Cloud
Deployment via xMS
8© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade for xCP 2.0:
Business User Productivity
Personalized and Role
Based Information
Views
Rich and Flexible
Layouts
All Available
Information
In Context
Rich in Context
Analytics
9© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade for xCP 2.0:
Solution Developer Productivity
Integrated Analytics and
Discovered Metadata
Flexible UI Composition
Data Services and Data
Driven UI
Model Complex
Business Processes
Information Modeling
and Relationships
10© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade for xCP 2.0: Mobile Devices
Safari on iPad supported
11© Copyright 2013 EMC Corporation. All rights reserved.
Documentum Support Timeline
Standard Support
Extended Support
Today	
  
D	
  6.5	
  -­‐	
  Extended	
   01-­‐Sep-­‐12	
  -­‐	
  31-­‐Aug-­‐14	
  
D	
  6.5	
  -­‐	
  Standard	
   31-­‐Jul-­‐08	
  -­‐	
  31-­‐Aug-­‐12	
  
D	
  6.6	
  -­‐	
  Extended	
   01-­‐Jul-­‐14	
  -­‐	
  30-­‐Jun-­‐16	
  
D	
  6.6	
  -­‐	
  Standard	
   15-­‐Jun-­‐10	
  -­‐	
  30-­‐Jun-­‐14	
  
D	
  6.7	
  -­‐	
  Extended	
   01-­‐May-­‐15	
  -­‐	
  30-­‐Apr-­‐17	
  
D	
  6.7	
  -­‐	
  Standard	
   29-­‐Apr-­‐11	
  -­‐	
  30-­‐Apr-­‐15	
  
D7.0	
  -­‐	
  Extended	
   01-­‐Dec-­‐15	
  -­‐	
  30-­‐Nov-­‐17	
  
D7.0	
  	
  -­‐	
  Standard	
   21-­‐Nov-­‐12	
  -­‐	
  30-­‐Nov-­‐15	
  
D	
  7.1	
  -­‐	
  Extended	
   	
  Q4	
  2016	
  –	
  Q4	
  2018	
  
D	
  7.1	
  -­‐	
  Standard	
   	
  Q4	
  2013	
  –	
  Q4	
  2016	
  
EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications,
or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of
discussion and without intending to be bound thereby, and is subject to change without notice.
D	
  6.0	
  -­‐	
  Extended	
   	
  01-­‐Sep-­‐12	
  -­‐	
  31-­‐Aug-­‐13	
  
D	
  6.0	
  -­‐	
  Standard	
   21-­‐Aug-­‐08	
  -­‐	
  31-­‐Aug-­‐11	
  
12© Copyright 2013 EMC Corporation. All rights reserved.
Best Practices
© Copyright 2013 EMC Corporation. All rights reserved. 12
Planning your
Upgrade
Tools and
Programs
Scenarios
•  EMC Professional
Services Migration
Assessment
•  Upgrade vs. Migration
•  Private Cloud
•  OnDemand
•  Decoupling Clients
from Platform
•  Leap Frogging
•  Multistage Acceptance
•  Client Pathways
•  Upgrade Phases
•  xMS for Rapid
Provisioning
•  EMC Migration Appliance
•  Rapid Success Programs
and Early Adopter
Programs
13© Copyright 2013 EMC Corporation. All rights reserved.
Limited Time
Available through August 2013
FREE, one-week Migration
Assessment from EMC IIG
Professional Services
•  Deployment Analysis
•  Optimal upgrade/migration path
•  Focus in on key applications and
complex transitions for your
enterprise
How to Upgrade: EMC Migration
Assessment
14© Copyright 2013 EMC Corporation. All rights reserved.
Terminology: Upgrade vs Migration
•  Update Documentum products
•  May be “in-place” or move to new hardware (physical/virtual)Upgrade
•  Move Content or Services to new Infrastructure, possibly to
the Cloud
•  Transform or restructure Content and Metadata
•  More Planning and Time
Migration
15© Copyright 2013 EMC Corporation. All rights reserved.
Transformation Strategy
•  Virtualized Data Center
•  Leverage resources across your enterprise
•  Balance architecture against business demands
Consider Private Cloud
16© Copyright 2013 EMC Corporation. All rights reserved.
•  Predictable and repeatable implementations with automated, policy-based
provisioning (xMS)
•  Blueprints simplify deployments and reduce configuration errors
•  Rapid provisioning of Documentum products
•  Optimized for the private cloud
•  Integrated system monitoring
Private Cloud – Deploy up to 10x faster
17© Copyright 2013 EMC Corporation. All rights reserved.
excellence with enterprise
manageability
Operational
on business
requirements
Focus
deployment with
confidence
Solution
Proven TCO reduction
30%
60%
-
18© Copyright 2013 EMC Corporation. All rights reserved.
Best Practices
© Copyright 2013 EMC Corporation. All rights reserved. 18
Planning your
Upgrade
Tools and
Programs
Scenarios
•  EMC Professional
Services Migration
Assessment
•  Upgrade vs. Migration
•  Private Cloud
•  OnDemand
•  Decoupling Clients
from Platform
•  Leap Frogging
•  Multistage Acceptance
•  Client Pathways
•  Upgrade Phases
•  xMS for Rapid
Provisioning
•  EMC Migration Appliance
•  Rapid Success Programs
and Early Adopter
Programs
19© Copyright 2013 EMC Corporation. All rights reserved.
Development
Staging
Production
High Availability
Automatically provision &
configure Documentum and xCP
implementations
… using EMC recommended best
practices
With built-in and pre-configured
VMware Hyperic monitoring
D7.0 and xCP 2.0
blueprints
Windows
Content
Server
xPlore tcServer
Windows Windows
VMware Template
Provisioned Virtual
Environment
xCelerated Management System (xMS)
1.0
20© Copyright 2013 EMC Corporation. All rights reserved.
Documentum Enterprise Migration Appliance
(EMA)
Ÿ  Traditional API-based migration tools:
–  Bound by Documentum Business and Security rules
–  Export-Import cycle may require long engagements
Ÿ  EMA: New approach to migration
–  VMware appliance plus a methodology
–  1.2+ million documents / hour
EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications,
or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of
discussion and without intending to be bound thereby, and is subject to change without notice.
EMC CONFIDENTIAL — INTERNAL USE ONLY
21© Copyright 2013 EMC Corporation. All rights reserved.
EMA – Major Use Cases
DCM to D2 LS
Customer wants to migrate a legacy
DCM application (and data) to D2
LS solution
OnDemand and
Cloning
Customer wants to move from
on-prem to off-prem; or wants to
clone and upgrade a repository
Consolidation
Customer wants to consolidate their
repository footprint, combining
smaller repositories together
22© Copyright 2013 EMC Corporation. All rights reserved.
EMC Documentum 7.0
Rapid Success Program (D7RSP)
Participant Profile:
•  Must be an existing EMC customer,
partner or employee
•  Must be planning to move to D7 by
end of year
•  Must secure and commit resources to
support the project
•  Provide reference upon successful
deployment
Customer Benefits:
•  Upgrade Assessment
•  Accelerate your upgrade
or migration to D7
•  Receive Enhanced
Program Support from
EMC D7 team
•  Share best practices in
weekly usergroup forum
Space is Limited
Register Online by: May 17, 2013
http://bit.ly/D70RSP
For more information, please contact deployment_programs@emc.com
23© Copyright 2013 EMC Corporation. All rights reserved.
Partner Migration Tools
Ÿ  Large EMC Partner ecosystem (over 100 partners)
which can also help with migrations and upgrades
Ÿ  Examples:
fme AG
•  EMC Certified Solution called migration-center
•  Highly automated, Do-It-Yourself solution, Multiple data sources
•  Large volume document migrations without interruption of normal
business operations
euroscript
•  Documentum Select Services Team (SST) partner
•  Proven expertise in D2 and Documentum product stack
•  DC Map (Document Client Migration Assessment Plan)
24© Copyright 2013 EMC Corporation. All rights reserved.
Best Practices
© Copyright 2013 EMC Corporation. All rights reserved. 24
Planning your
Upgrade
Tools and
Programs
Scenarios
•  EMC Professional
Services Migration
Assessment
•  Upgrade vs. Migration
•  Private Cloud
•  OnDemand
•  Decoupling Clients from
Platform
•  Leap Frogging
•  Multistage Acceptance
•  Client Pathways
•  Upgrade Phases
•  xMS for Rapid
Provisioning
•  EMC Migration Appliance
•  Rapid Success Programs
and Early Adopter
Programs
25© Copyright 2013 EMC Corporation. All rights reserved.
D6.7
Platform
Decoupled Clients for Flexible Upgrades
D7
Platform
D6.7 SP2
Client
•  6.7SP2 clients are compatible with D7 Content Server
•  Upgrade client and server technologies separately
•  Protect your client investments and maintain your current user
experience
•  Upgrade to D7 platform to take advantage of TCO and other
improvements
Clients
Decoupled
from Platform
Versions
26© Copyright 2013 EMC Corporation. All rights reserved.
Content Server Compatibility
27© Copyright 2013 EMC Corporation. All rights reserved.
D6.7
Platform
Phased Upgrade Path to D7
6.7SP1
Client
Upgrade Clients to 6.7 SP2
•  Available in Q1 2013
•  Webtop certification for D7
6.7SP2 Client
xCP 1.6 SP2 (6.7 SP2)
28© Copyright 2013 EMC Corporation. All rights reserved.
D6.7
Platform
Phased Upgrade Path to D7
6.7SP1
Client
D7
Platform
6.7SP2 Client
xCP 1.6 SP2 (6.7 SP2)
Upgrade Platform to D7
•  Directly upgrade Content Server from
6.5, 6.6 or 6.7 to 7.0
Upgrade Clients to 6.7 SP2
•  Available in Q1 2013
•  Webtop certification for D7
29© Copyright 2013 EMC Corporation. All rights reserved.
D6.7
Platform
Phased Upgrade Path to D7
6.7SP1
Client
D7
Platform
6.7SP2 Client
XCP
2.0
xCP 1.6 SP2 (6.7 SP2)
D2 4.1
Upgrade Clients to 6.7 SP2 *
•  Available in Q1 2013
•  Webtop certification for D7
* 6.7 SP2 clients can not access xCP 2.0 data
Add New Client Solutions
•  Transition users to new solutions
based upon D2 or XCP 2.0
Upgrade Platform to D7
•  Directly upgrade Content Server from
6.5, 6.6 or 6.7 to 7.0
30© Copyright 2013 EMC Corporation. All rights reserved.
Coexistence of Clients with xCP 2.0
D7
Platform
Webtop
6.7 SP2
•  xCP 2.0 and 6.7 SP2 clients can run Side by Side
•  BUT xCP 2.0 and 6.7 SP2 clients can not share data
•  Interoperability will be available with Type Adoption in xCP 2.1
No need to
migrate your
client if you
don’t need to!
TaskSpace
6.7 SP2 D2 4.1 xCP 2.0
EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications,
or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of
discussion and without intending to be bound thereby, and is subject to change without notice.
EMC CONFIDENTIAL — INTERNAL USE ONLY
31© Copyright 2013 EMC Corporation. All rights reserved.
2013	
   Jan	
   Feb	
   Mar	
   Apr	
   May	
   Jun	
   Jul	
   Aug	
   Sep	
   Oct	
   Nov	
   Dec	
   2013	
  
Today	
  
Q4/	
  2013	
  
November	
  2013	
  
6.7	
  SP2	
  
February	
  2013	
  
Webtop 6.7 SP2
TaskSpace 6.7 Sp2
Digital Asset Manager 6.5 SP6
Media Workspacee 6.5 SP5
WebPublisher 6.5 SP7
CenterStage 1.2 SP2
More Client Support for D7
EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications,
or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of
discussion and without intending to be bound thereby, and is subject to change without notice.
EMC CONFIDENTIAL — INTERNAL USE ONLY
32© Copyright 2013 EMC Corporation. All rights reserved.
Leap Frog Upgrades
6.5 6.6 6.7 7.0
Content Server Installer supports in-place upgrades from 6.5 to 7.0
33© Copyright 2013 EMC Corporation. All rights reserved.
Multistage Acceptance
Reduce Downtime
6.7 7.x
1.  Build New System in Parallel
2.  Test Content Migration
•  Content Migration (or In
Place Upgrade)
•  Multipass Database
Upgrade and Validation
•  User Acceptance
3. System swap in quiet
period
34© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade & Migration Approaches
Side by Side
Minimum Impact
Separate Solutions
Separate Data
Maintain Current
Solutions
Enable New
Technology for
New Solutions
Strategies to reduce business impact while consolidating resources
35© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade & Migration Approaches
Strategies to reduce business impact while consolidating resources
Content
Interop
Transitional
Different Activities
Same Data
Augment or
Facilitate Existing
Solutions
Clear User or
Application
Definitions
36© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade & Migration Approaches
Strategies to reduce business impact while consolidating resources
Content
Interop
Transitional
Different Activities
Same Data
Extend or
Facilitate Existing
Solutions
Clear User or
Application
Definitions
37© Copyright 2013 EMC Corporation. All rights reserved.
Upgrade & Migration Approaches
Strategies to reduce business impact while consolidating resources
Migration
Disruptive
Replace Existing
Solutions
New Technology
capabilities align
with Business
Need
38© Copyright 2013 EMC Corporation. All rights reserved.
New Client Decision: D2 and/or xCP?
Criteria	
   D2	
   xCP	
  
What technology to
consider from
Webtop?
Common customizations
•  Menu configuration, search screens, property
screens, pick lists, naming rules, filing rules,
pre and post document import processing, etc.
Coded custom functionality
•  Custom application layout, business processes,
custom business logic that needs to be
surfaced to the user interface
Business problem	
  
Controlled documents
Content distribution	
  
Process-centric
Information intensive	
  
User experience	
  
Configured
User-Personalizable	
  
Custom	
  
Out-of-the-box
client	
  
Yes	
   No	
  
Core functionality	
  
Content / virtual documents / advanced
publishing
Basic workflow
Regulatory (document control)	
  
Business processes
Case Management
Analytics/Dashboards	
  
Documentum
Platform
Compatibility
Version 6.7 and 7.0
xCP 1.6 for 6.7 and 7.0
xCP 2.0 for 7.0
39© Copyright 2013 EMC Corporation. All rights reserved.
Content Server/xPlore Compatibility
6.6 6.7 6.7SP1 6.7SP2 D7
xPlore 1.1 Yes Yes
xPlore 1.2 Yes Yes Yes Yes Yes
xPlore 1.3 Yes Yes Yes Yes Yes
•  Upgrade from 1.0 to 1.3, requires re-indexing of content
•  Upgrade from 1.1 or 1.2 to 1.3 does not require re-index
40© Copyright 2013 EMC Corporation. All rights reserved.
Additional Challenges
•  Work to remove customizations using configurability
•  Rebuild essential customizations in D2/xCP 2.0
Customizations
•  3rd Party System Integrations, DRL references, WCM
Object ID
Retention
•  Some workflows may need to be closed out
•  Or run old/new clients in parallel
Running
Workflows
•  Docbasic scripts (32bit to 64bit)Recompilation
•  3DES to AES
•  Asynchronous update job
Content
Encryption
41© Copyright 2013 EMC Corporation. All rights reserved.
Phases of an Documentum Upgrade
Ÿ  Documentum upgrade is best
accomplished using the following phased approach
–  Planning phase
–  Development phase
–  Testing phase
–  Production phase
42© Copyright 2013 EMC Corporation. All rights reserved.
Development Environment Practices
1.  Install the new version of products
2.  Gain familiarity with new features and
performance aspects of the release
3.  Determine steps needed to migrate
customizations
4.  Test customizations in the new test installation
5.  Ensure that the right hardware resources are
available
43© Copyright 2013 EMC Corporation. All rights reserved.
Practicing the Upgrade
Ÿ  Practice with Test / Development Environment
Ÿ  Practice with a cloned system to avoid the
unexpected
–  Test applications and customizations against realistic data
–  Timing information
–  Errors due to consistency issues
–  Familiarity with the upgrade procedure for backups,
installations, upgrades and restores
44© Copyright 2013 EMC Corporation. All rights reserved.
Repository Consistency Checker
Ÿ  Examines Docbase metadata for inconsistencies
–  Users & Groups - Workflow
–  ACLs - Types
–  Sysobjects - Data Dictionary
–  Folders and Cabinets - Lifecycle
–  Documents & Content Objects
Ÿ  Issues “Warning” for Referential Integrity type problems
Ÿ  Issues “Error” for corruptions
Ÿ  Contact Technical Support/Powerlink for resolutions
45© Copyright 2013 EMC Corporation. All rights reserved.
Testing the Upgrade
Ÿ  Include test cases to validate the following
–  Jobs
–  Basic Administration
–  Workflows
–  Method Server
–  UCF content operations
–  ACS
–  BOCS
–  SBOs download and compatibility
–  Fulltext indexing and search
–  Custom functionality
Ÿ  Involve users in testing as early as possible
46© Copyright 2013 EMC Corporation. All rights reserved.
Testing Phase
Ÿ  During the testing phase, you will
–  Test that the various products and hardware and software
infrastructure work as a system
–  Engage some of the stakeholders to use the system as they
normally would in production
–  Conduct targeted testing and benchmarks for any known
risk areas
–  Test and document the upgrade process
47© Copyright 2013 EMC Corporation. All rights reserved.
Production Phase
Ÿ  Tweak the hardware environment based on what was
learned through testing
Ÿ  Ensuring that all automatic tasks are complete
before upgrading
Ÿ  Perform the production system upgrade
Ÿ  Test the upgraded production system
48© Copyright 2013 EMC Corporation. All rights reserved.
Next Steps
Ÿ  Visit the EMC Community Network
–  Learn more about how EMC customers
are using the latest releases
Ÿ  Momentum @ EMC World 2013
–  Migration/Upgrade track
(5 sessions)
▪  EMC Migration Appliance
(e.g., Webtop to D2, DCM to D2 Life
Sciences)
▪  D7 and xCP migration and upgrades
▪  Move to OnDemand
Ÿ  Contact your solutions principal
about the free Migration Assessment
Ÿ  Complete the upgrade survey (next
page)
49© Copyright 2013 EMC Corporation. All rights reserved.
When are you upgrading to D7?
Tell us your plans, take a quick survey and win some prizes!
Momentum Lounge:
Visit Social Media Center
http://bitly.com/dctmsurvey
Open only to residents of the 50 United States and D.C., and Canada (excluding Quebec).
Online entries deadline: May 25, 2013 11:59:59 PM Pacific Time
Mail-in entries: May 27, 2013
Prize Announcement: May 31, 2013
For Official Rules: https://community.emc.com/docs/DOC-23959
EMC CONFIDENTIAL — INTERNAL USE ONLY
50© Copyright 2013 EMC Corporation. All rights reserved.
STAY IN TOUCH!
emcMMTM
emcDocumentum
Syncplicity
emcDocSciences
emcCaptiva
EmcSoftware emc-mmtm EMC_Momentum
EMC_Documentum
Syncplicity
EMC_Captiva
EMC_DocSciences
go/MomentumECM
go/Documentum
emc_iig
facebook.com/ youtube.com/ linkd.in/ twitter.com/ community.emc.com/slideshare.net/
Come to the Social Media Center to play, win, learn and more.
Migration & upgrades   best practice upgrade pathways to emc documentum 7

Más contenido relacionado

La actualidad más candente

Understanding Security and Compliance in Microsoft Teams M365 North 2023
Understanding Security and Compliance in Microsoft Teams M365 North 2023Understanding Security and Compliance in Microsoft Teams M365 North 2023
Understanding Security and Compliance in Microsoft Teams M365 North 2023Chirag Patel
 
SAP Extended ECM by OpenText 10.0 - What's New?
SAP Extended ECM by OpenText 10.0 - What's New?SAP Extended ECM by OpenText 10.0 - What's New?
SAP Extended ECM by OpenText 10.0 - What's New?Thomas Demmler
 
Best practices for effective doors implementation-Ashwini Patil
Best practices for effective doors implementation-Ashwini PatilBest practices for effective doors implementation-Ashwini Patil
Best practices for effective doors implementation-Ashwini PatilRoopa Nadkarni
 
Building a Logical Data Fabric using Data Virtualization (ASEAN)
Building a Logical Data Fabric using Data Virtualization (ASEAN)Building a Logical Data Fabric using Data Virtualization (ASEAN)
Building a Logical Data Fabric using Data Virtualization (ASEAN)Denodo
 
Salesforce intro session_for_students_v2
Salesforce intro session_for_students_v2Salesforce intro session_for_students_v2
Salesforce intro session_for_students_v2Stephen Edache Paul
 
Introduction to Salesforce.com
Introduction to Salesforce.comIntroduction to Salesforce.com
Introduction to Salesforce.comEdureka!
 
Extended ECM for SAP Solutions
Extended ECM for SAP SolutionsExtended ECM for SAP Solutions
Extended ECM for SAP SolutionsOpenText
 
EMC Documentum - xCP 2.x Troubleshooting
EMC Documentum - xCP 2.x TroubleshootingEMC Documentum - xCP 2.x Troubleshooting
EMC Documentum - xCP 2.x TroubleshootingHaytham Ghandour
 
Securing Team, SharePoint, and OneDrive in Microsoft 365 - M365VM
Securing Team, SharePoint, and OneDrive in Microsoft 365 - M365VMSecuring Team, SharePoint, and OneDrive in Microsoft 365 - M365VM
Securing Team, SharePoint, and OneDrive in Microsoft 365 - M365VMDrew Madelung
 
Salesforce Summer 22 Release Webinar
Salesforce Summer 22 Release WebinarSalesforce Summer 22 Release Webinar
Salesforce Summer 22 Release Webinarbrightgenss
 
Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...
Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...
Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...Joanne Klein
 
Sharepoint Document Management System (DMS) Features
Sharepoint Document Management System (DMS) Features Sharepoint Document Management System (DMS) Features
Sharepoint Document Management System (DMS) Features Nitin Gupta
 
What’s New in OpenText Content Suite 16 EP2
What’s New in OpenText Content Suite 16 EP2What’s New in OpenText Content Suite 16 EP2
What’s New in OpenText Content Suite 16 EP2OpenText
 
Data Management and Migration in Salesforce
Data Management and Migration in SalesforceData Management and Migration in Salesforce
Data Management and Migration in SalesforceSunil kumar
 
Master data management (mdm) & plm in context of enterprise product management
Master data management (mdm) & plm in context of enterprise product managementMaster data management (mdm) & plm in context of enterprise product management
Master data management (mdm) & plm in context of enterprise product managementTata Consultancy Services
 
SCCM Intune Windows 10 Co Management Architecture Decisions
SCCM Intune Windows 10 Co Management Architecture DecisionsSCCM Intune Windows 10 Co Management Architecture Decisions
SCCM Intune Windows 10 Co Management Architecture DecisionsAnoop Nair
 
Salesforce and conga composer integration
Salesforce and conga composer integrationSalesforce and conga composer integration
Salesforce and conga composer integrationCloud Analogy
 
Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...IBM Rational software
 

La actualidad más candente (20)

Understanding Security and Compliance in Microsoft Teams M365 North 2023
Understanding Security and Compliance in Microsoft Teams M365 North 2023Understanding Security and Compliance in Microsoft Teams M365 North 2023
Understanding Security and Compliance in Microsoft Teams M365 North 2023
 
SAP Extended ECM by OpenText 10.0 - What's New?
SAP Extended ECM by OpenText 10.0 - What's New?SAP Extended ECM by OpenText 10.0 - What's New?
SAP Extended ECM by OpenText 10.0 - What's New?
 
Best practices for effective doors implementation-Ashwini Patil
Best practices for effective doors implementation-Ashwini PatilBest practices for effective doors implementation-Ashwini Patil
Best practices for effective doors implementation-Ashwini Patil
 
Building a Logical Data Fabric using Data Virtualization (ASEAN)
Building a Logical Data Fabric using Data Virtualization (ASEAN)Building a Logical Data Fabric using Data Virtualization (ASEAN)
Building a Logical Data Fabric using Data Virtualization (ASEAN)
 
Architect day 20181128 - Afternoon Session
Architect day 20181128 - Afternoon SessionArchitect day 20181128 - Afternoon Session
Architect day 20181128 - Afternoon Session
 
Salesforce intro session_for_students_v2
Salesforce intro session_for_students_v2Salesforce intro session_for_students_v2
Salesforce intro session_for_students_v2
 
Introduction to Salesforce.com
Introduction to Salesforce.comIntroduction to Salesforce.com
Introduction to Salesforce.com
 
Extended ECM for SAP Solutions
Extended ECM for SAP SolutionsExtended ECM for SAP Solutions
Extended ECM for SAP Solutions
 
EMC Documentum - xCP 2.x Troubleshooting
EMC Documentum - xCP 2.x TroubleshootingEMC Documentum - xCP 2.x Troubleshooting
EMC Documentum - xCP 2.x Troubleshooting
 
Securing Team, SharePoint, and OneDrive in Microsoft 365 - M365VM
Securing Team, SharePoint, and OneDrive in Microsoft 365 - M365VMSecuring Team, SharePoint, and OneDrive in Microsoft 365 - M365VM
Securing Team, SharePoint, and OneDrive in Microsoft 365 - M365VM
 
Salesforce Summer 22 Release Webinar
Salesforce Summer 22 Release WebinarSalesforce Summer 22 Release Webinar
Salesforce Summer 22 Release Webinar
 
Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...
Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...
Taking a Crawl-Walk-Run Approach to Office 365 Retention - Ottawa SPUG (no de...
 
Sharepoint Document Management System (DMS) Features
Sharepoint Document Management System (DMS) Features Sharepoint Document Management System (DMS) Features
Sharepoint Document Management System (DMS) Features
 
What’s New in OpenText Content Suite 16 EP2
What’s New in OpenText Content Suite 16 EP2What’s New in OpenText Content Suite 16 EP2
What’s New in OpenText Content Suite 16 EP2
 
Data model in salesforce
Data model in salesforceData model in salesforce
Data model in salesforce
 
Data Management and Migration in Salesforce
Data Management and Migration in SalesforceData Management and Migration in Salesforce
Data Management and Migration in Salesforce
 
Master data management (mdm) & plm in context of enterprise product management
Master data management (mdm) & plm in context of enterprise product managementMaster data management (mdm) & plm in context of enterprise product management
Master data management (mdm) & plm in context of enterprise product management
 
SCCM Intune Windows 10 Co Management Architecture Decisions
SCCM Intune Windows 10 Co Management Architecture DecisionsSCCM Intune Windows 10 Co Management Architecture Decisions
SCCM Intune Windows 10 Co Management Architecture Decisions
 
Salesforce and conga composer integration
Salesforce and conga composer integrationSalesforce and conga composer integration
Salesforce and conga composer integration
 
Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...Factors to consider when starting a brand-new requirements management project...
Factors to consider when starting a brand-new requirements management project...
 

Destacado

Countrywide Option Arm Loans (Negative Amortization) July 26 2006
Countrywide Option Arm Loans (Negative Amortization) July 26 2006Countrywide Option Arm Loans (Negative Amortization) July 26 2006
Countrywide Option Arm Loans (Negative Amortization) July 26 2006Bitsytask
 
Using Web Services To Integrate a .NET Solution with EMC Documentum
Using Web Services To Integrate a .NET Solution with EMC DocumentumUsing Web Services To Integrate a .NET Solution with EMC Documentum
Using Web Services To Integrate a .NET Solution with EMC DocumentumBlueFish
 
Are You Afraid of Accounts Payable Pitfalls?
Are You Afraid of Accounts Payable Pitfalls?Are You Afraid of Accounts Payable Pitfalls?
Are You Afraid of Accounts Payable Pitfalls?Orienge
 
Documentum introduction
Documentum introductionDocumentum introduction
Documentum introductionotnawrup
 
Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0
Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0
Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0Haytham Ghandour
 
Design process & methods
Design process & methodsDesign process & methods
Design process & methodsLuca Galli
 

Destacado (6)

Countrywide Option Arm Loans (Negative Amortization) July 26 2006
Countrywide Option Arm Loans (Negative Amortization) July 26 2006Countrywide Option Arm Loans (Negative Amortization) July 26 2006
Countrywide Option Arm Loans (Negative Amortization) July 26 2006
 
Using Web Services To Integrate a .NET Solution with EMC Documentum
Using Web Services To Integrate a .NET Solution with EMC DocumentumUsing Web Services To Integrate a .NET Solution with EMC Documentum
Using Web Services To Integrate a .NET Solution with EMC Documentum
 
Are You Afraid of Accounts Payable Pitfalls?
Are You Afraid of Accounts Payable Pitfalls?Are You Afraid of Accounts Payable Pitfalls?
Are You Afraid of Accounts Payable Pitfalls?
 
Documentum introduction
Documentum introductionDocumentum introduction
Documentum introduction
 
Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0
Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0
Best Practices & Lessons Learned from the field on EMC Documentum xCP 2.0
 
Design process & methods
Design process & methodsDesign process & methods
Design process & methods
 

Similar a Migration & upgrades best practice upgrade pathways to emc documentum 7

IT Ops Mgmt in the New Virtualized, Software-defined World
IT Ops Mgmt in the New Virtualized, Software-defined WorldIT Ops Mgmt in the New Virtualized, Software-defined World
IT Ops Mgmt in the New Virtualized, Software-defined WorldEMC
 
EMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPR
EMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPREMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPR
EMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPRServiceMesh
 
HP Discover - Developing new applications for the cloud
HP Discover - Developing new applications for the cloudHP Discover - Developing new applications for the cloud
HP Discover - Developing new applications for the cloudBart Blommaerts
 
Datasheet datapowerpluginforrd
Datasheet datapowerpluginforrdDatasheet datapowerpluginforrd
Datasheet datapowerpluginforrdMidVision
 
EMC's IT Transformation Journey ( EMC Forum 2014 )
EMC's IT Transformation Journey ( EMC Forum 2014 )EMC's IT Transformation Journey ( EMC Forum 2014 )
EMC's IT Transformation Journey ( EMC Forum 2014 )EMC
 
DHPA Techday 2015 - Johan Benning - HP Mobility
DHPA Techday 2015 - Johan Benning - HP MobilityDHPA Techday 2015 - Johan Benning - HP Mobility
DHPA Techday 2015 - Johan Benning - HP MobilitySplend
 
Smarter z/OS Software Delivery using Rational Enterprise Cloud Solutions
Smarter z/OS Software Delivery using Rational Enterprise Cloud SolutionsSmarter z/OS Software Delivery using Rational Enterprise Cloud Solutions
Smarter z/OS Software Delivery using Rational Enterprise Cloud SolutionsJean-Yves Rigolet
 
Enterprise Cloud Management - 2013 EMC World presentation
Enterprise Cloud Management - 2013 EMC World presentationEnterprise Cloud Management - 2013 EMC World presentation
Enterprise Cloud Management - 2013 EMC World presentationServiceMesh
 
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...Kiko Monteverde
 
Improving Software Delivery with DevOps & Software Defined Environments
Improving Software Delivery with DevOps & Software Defined EnvironmentsImproving Software Delivery with DevOps & Software Defined Environments
Improving Software Delivery with DevOps & Software Defined EnvironmentsMichael Elder
 
Enterprise DevOps Transformation
Enterprise DevOps TransformationEnterprise DevOps Transformation
Enterprise DevOps TransformationBart Driscoll
 
Improving Software Delivery with DevOps & Software Defined Environments | The...
Improving Software Delivery with DevOps & Software Defined Environments | The...Improving Software Delivery with DevOps & Software Defined Environments | The...
Improving Software Delivery with DevOps & Software Defined Environments | The...IBM UrbanCode Products
 
PLM World Conference 2007
PLM World Conference 2007PLM World Conference 2007
PLM World Conference 2007Matt Tremmel
 
M.S. Dissertation in Salesforce on Force.com
M.S. Dissertation in Salesforce on Force.comM.S. Dissertation in Salesforce on Force.com
M.S. Dissertation in Salesforce on Force.comArun Somu Panneerselvam
 
Applying lean, dev ops, and cloud for better business outcomes
Applying lean, dev ops, and cloud for better business outcomesApplying lean, dev ops, and cloud for better business outcomes
Applying lean, dev ops, and cloud for better business outcomesKartik Kanakasabesan
 
Eplexity Managed Service for Health Care using Private and Public Clouds
Eplexity Managed Service for Health Care using Private and Public CloudsEplexity Managed Service for Health Care using Private and Public Clouds
Eplexity Managed Service for Health Care using Private and Public Cloudseplexity
 
Switch Automation Case study v2.0
Switch Automation Case study v2.0Switch Automation Case study v2.0
Switch Automation Case study v2.0Oleh Mykhaylovych
 
Agile application delivery trio webinar
Agile application delivery trio webinarAgile application delivery trio webinar
Agile application delivery trio webinarSkytap Cloud
 
Zaptz Legacy App to Cloud
Zaptz Legacy App to CloudZaptz Legacy App to Cloud
Zaptz Legacy App to CloudStephen Burke
 

Similar a Migration & upgrades best practice upgrade pathways to emc documentum 7 (20)

IT Ops Mgmt in the New Virtualized, Software-defined World
IT Ops Mgmt in the New Virtualized, Software-defined WorldIT Ops Mgmt in the New Virtualized, Software-defined World
IT Ops Mgmt in the New Virtualized, Software-defined World
 
EMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPR
EMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPREMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPR
EMCWorld 2013 -ServiceMesh Agility Platform: Cloud-based DevOps with ViPR
 
Jobs in the Cloud
 Jobs in the Cloud Jobs in the Cloud
Jobs in the Cloud
 
HP Discover - Developing new applications for the cloud
HP Discover - Developing new applications for the cloudHP Discover - Developing new applications for the cloud
HP Discover - Developing new applications for the cloud
 
Datasheet datapowerpluginforrd
Datasheet datapowerpluginforrdDatasheet datapowerpluginforrd
Datasheet datapowerpluginforrd
 
EMC's IT Transformation Journey ( EMC Forum 2014 )
EMC's IT Transformation Journey ( EMC Forum 2014 )EMC's IT Transformation Journey ( EMC Forum 2014 )
EMC's IT Transformation Journey ( EMC Forum 2014 )
 
DHPA Techday 2015 - Johan Benning - HP Mobility
DHPA Techday 2015 - Johan Benning - HP MobilityDHPA Techday 2015 - Johan Benning - HP Mobility
DHPA Techday 2015 - Johan Benning - HP Mobility
 
Smarter z/OS Software Delivery using Rational Enterprise Cloud Solutions
Smarter z/OS Software Delivery using Rational Enterprise Cloud SolutionsSmarter z/OS Software Delivery using Rational Enterprise Cloud Solutions
Smarter z/OS Software Delivery using Rational Enterprise Cloud Solutions
 
Enterprise Cloud Management - 2013 EMC World presentation
Enterprise Cloud Management - 2013 EMC World presentationEnterprise Cloud Management - 2013 EMC World presentation
Enterprise Cloud Management - 2013 EMC World presentation
 
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
Plastic SCM: Entreprise Version Control Platform for Modern Applications and ...
 
Improving Software Delivery with DevOps & Software Defined Environments
Improving Software Delivery with DevOps & Software Defined EnvironmentsImproving Software Delivery with DevOps & Software Defined Environments
Improving Software Delivery with DevOps & Software Defined Environments
 
Enterprise DevOps Transformation
Enterprise DevOps TransformationEnterprise DevOps Transformation
Enterprise DevOps Transformation
 
Improving Software Delivery with DevOps & Software Defined Environments | The...
Improving Software Delivery with DevOps & Software Defined Environments | The...Improving Software Delivery with DevOps & Software Defined Environments | The...
Improving Software Delivery with DevOps & Software Defined Environments | The...
 
PLM World Conference 2007
PLM World Conference 2007PLM World Conference 2007
PLM World Conference 2007
 
M.S. Dissertation in Salesforce on Force.com
M.S. Dissertation in Salesforce on Force.comM.S. Dissertation in Salesforce on Force.com
M.S. Dissertation in Salesforce on Force.com
 
Applying lean, dev ops, and cloud for better business outcomes
Applying lean, dev ops, and cloud for better business outcomesApplying lean, dev ops, and cloud for better business outcomes
Applying lean, dev ops, and cloud for better business outcomes
 
Eplexity Managed Service for Health Care using Private and Public Clouds
Eplexity Managed Service for Health Care using Private and Public CloudsEplexity Managed Service for Health Care using Private and Public Clouds
Eplexity Managed Service for Health Care using Private and Public Clouds
 
Switch Automation Case study v2.0
Switch Automation Case study v2.0Switch Automation Case study v2.0
Switch Automation Case study v2.0
 
Agile application delivery trio webinar
Agile application delivery trio webinarAgile application delivery trio webinar
Agile application delivery trio webinar
 
Zaptz Legacy App to Cloud
Zaptz Legacy App to CloudZaptz Legacy App to Cloud
Zaptz Legacy App to Cloud
 

Más de Haytham Ghandour

EMC Documentum - xCP.x Updating Endpoint
EMC Documentum - xCP.x Updating EndpointEMC Documentum - xCP.x Updating Endpoint
EMC Documentum - xCP.x Updating EndpointHaytham Ghandour
 
EMC Documentum - xCP 2.x Updating Java Services
EMC Documentum - xCP 2.x Updating Java ServicesEMC Documentum - xCP 2.x Updating Java Services
EMC Documentum - xCP 2.x Updating Java ServicesHaytham Ghandour
 
EMC Documentum xCP 2.x Tips for application migration v1.1
EMC Documentum xCP 2.x Tips for application migration v1.1EMC Documentum xCP 2.x Tips for application migration v1.1
EMC Documentum xCP 2.x Tips for application migration v1.1Haytham Ghandour
 
Crystal Report Configuration Using xCP Designer 2.1
Crystal Report Configuration Using xCP Designer 2.1Crystal Report Configuration Using xCP Designer 2.1
Crystal Report Configuration Using xCP Designer 2.1Haytham Ghandour
 
Type Adoption in xCP 2.1 Applications
Type Adoption in xCP 2.1 ApplicationsType Adoption in xCP 2.1 Applications
Type Adoption in xCP 2.1 ApplicationsHaytham Ghandour
 
Alerts in EMC Documentum xCP 2.1
Alerts in EMC Documentum xCP 2.1Alerts in EMC Documentum xCP 2.1
Alerts in EMC Documentum xCP 2.1Haytham Ghandour
 
xCP2 0 Performance Best Practices and Guidelines
xCP2 0 Performance Best Practices and GuidelinesxCP2 0 Performance Best Practices and Guidelines
xCP2 0 Performance Best Practices and GuidelinesHaytham Ghandour
 
EMC Documentum xCP 2.0 Design Patterns
EMC Documentum xCP 2.0 Design PatternsEMC Documentum xCP 2.0 Design Patterns
EMC Documentum xCP 2.0 Design PatternsHaytham Ghandour
 

Más de Haytham Ghandour (9)

EMC Documentum - xCP.x Updating Endpoint
EMC Documentum - xCP.x Updating EndpointEMC Documentum - xCP.x Updating Endpoint
EMC Documentum - xCP.x Updating Endpoint
 
EMC Documentum - xCP 2.x Updating Java Services
EMC Documentum - xCP 2.x Updating Java ServicesEMC Documentum - xCP 2.x Updating Java Services
EMC Documentum - xCP 2.x Updating Java Services
 
EMC Documentum xCP 2.x Tips for application migration v1.1
EMC Documentum xCP 2.x Tips for application migration v1.1EMC Documentum xCP 2.x Tips for application migration v1.1
EMC Documentum xCP 2.x Tips for application migration v1.1
 
Crystal Report Configuration Using xCP Designer 2.1
Crystal Report Configuration Using xCP Designer 2.1Crystal Report Configuration Using xCP Designer 2.1
Crystal Report Configuration Using xCP Designer 2.1
 
xCP Pattern Library 3.3
xCP Pattern Library 3.3xCP Pattern Library 3.3
xCP Pattern Library 3.3
 
Type Adoption in xCP 2.1 Applications
Type Adoption in xCP 2.1 ApplicationsType Adoption in xCP 2.1 Applications
Type Adoption in xCP 2.1 Applications
 
Alerts in EMC Documentum xCP 2.1
Alerts in EMC Documentum xCP 2.1Alerts in EMC Documentum xCP 2.1
Alerts in EMC Documentum xCP 2.1
 
xCP2 0 Performance Best Practices and Guidelines
xCP2 0 Performance Best Practices and GuidelinesxCP2 0 Performance Best Practices and Guidelines
xCP2 0 Performance Best Practices and Guidelines
 
EMC Documentum xCP 2.0 Design Patterns
EMC Documentum xCP 2.0 Design PatternsEMC Documentum xCP 2.0 Design Patterns
EMC Documentum xCP 2.0 Design Patterns
 

Migration & upgrades best practice upgrade pathways to emc documentum 7

  • 1. 1© Copyright 2013 EMC Corporation. All rights reserved. Migration & Upgrades: Best Practice Upgrade Pathways to EMC Documentum 7
  • 2. 2© Copyright 2013 EMC Corporation. All rights reserved. •  This presentation contains “forward-looking statements” as defined under the US Federal Securities Laws. •  EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications, or anticipated release dates (collectively, “Roadmap Information”). •  Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of discussion and without intending to be bound thereby, and is subject to change without notice. •  Roadmap information is EMC Confidential Information, and is provided under the terms, conditions and restrictions defined in the EMC Non-Disclosure Agreement in place with your organization. Safe Harbor Disclaimer
  • 3. 3© Copyright 2013 EMC Corporation. All rights reserved. We Want to Hear Your Thoughts On This Session! OPTION 1: OPTION 2: Download the Momentum Mobile App and take the Survey Complete the Survey sent via Email
  • 4. 4© Copyright 2013 EMC Corporation. All rights reserved.
  • 5. 5© Copyright 2013 EMC Corporation. All rights reserved. Agenda Why Upgrade to Documentum 71 Planning2 Tools3 Scenarios4
  • 6. 6© Copyright 2013 EMC Corporation. All rights reserved. Why Upgrade to Documentum 7 Ÿ  Platform Innovation Ÿ  Access to new Client technologies and functionality Ÿ  Maintain Supportability for Fastest Restoration Time
  • 7. 7© Copyright 2013 EMC Corporation. All rights reserved. What’s New in Documentum 7 Lower TCO Higher TCE Enhanced Trust & Security •  Reduced resource utilization and increased performance via •  Intelligent Session Management •  Type Caching •  FIPS 140-2 Level 1 Compliance •  Centralized Key Management •  AES Encryption •  Improved Content Intelligence via xPlore 1.3 •  Private Cloud Deployment via xMS
  • 8. 8© Copyright 2013 EMC Corporation. All rights reserved. Upgrade for xCP 2.0: Business User Productivity Personalized and Role Based Information Views Rich and Flexible Layouts All Available Information In Context Rich in Context Analytics
  • 9. 9© Copyright 2013 EMC Corporation. All rights reserved. Upgrade for xCP 2.0: Solution Developer Productivity Integrated Analytics and Discovered Metadata Flexible UI Composition Data Services and Data Driven UI Model Complex Business Processes Information Modeling and Relationships
  • 10. 10© Copyright 2013 EMC Corporation. All rights reserved. Upgrade for xCP 2.0: Mobile Devices Safari on iPad supported
  • 11. 11© Copyright 2013 EMC Corporation. All rights reserved. Documentum Support Timeline Standard Support Extended Support Today   D  6.5  -­‐  Extended   01-­‐Sep-­‐12  -­‐  31-­‐Aug-­‐14   D  6.5  -­‐  Standard   31-­‐Jul-­‐08  -­‐  31-­‐Aug-­‐12   D  6.6  -­‐  Extended   01-­‐Jul-­‐14  -­‐  30-­‐Jun-­‐16   D  6.6  -­‐  Standard   15-­‐Jun-­‐10  -­‐  30-­‐Jun-­‐14   D  6.7  -­‐  Extended   01-­‐May-­‐15  -­‐  30-­‐Apr-­‐17   D  6.7  -­‐  Standard   29-­‐Apr-­‐11  -­‐  30-­‐Apr-­‐15   D7.0  -­‐  Extended   01-­‐Dec-­‐15  -­‐  30-­‐Nov-­‐17   D7.0    -­‐  Standard   21-­‐Nov-­‐12  -­‐  30-­‐Nov-­‐15   D  7.1  -­‐  Extended    Q4  2016  –  Q4  2018   D  7.1  -­‐  Standard    Q4  2013  –  Q4  2016   EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications, or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of discussion and without intending to be bound thereby, and is subject to change without notice. D  6.0  -­‐  Extended    01-­‐Sep-­‐12  -­‐  31-­‐Aug-­‐13   D  6.0  -­‐  Standard   21-­‐Aug-­‐08  -­‐  31-­‐Aug-­‐11  
  • 12. 12© Copyright 2013 EMC Corporation. All rights reserved. Best Practices © Copyright 2013 EMC Corporation. All rights reserved. 12 Planning your Upgrade Tools and Programs Scenarios •  EMC Professional Services Migration Assessment •  Upgrade vs. Migration •  Private Cloud •  OnDemand •  Decoupling Clients from Platform •  Leap Frogging •  Multistage Acceptance •  Client Pathways •  Upgrade Phases •  xMS for Rapid Provisioning •  EMC Migration Appliance •  Rapid Success Programs and Early Adopter Programs
  • 13. 13© Copyright 2013 EMC Corporation. All rights reserved. Limited Time Available through August 2013 FREE, one-week Migration Assessment from EMC IIG Professional Services •  Deployment Analysis •  Optimal upgrade/migration path •  Focus in on key applications and complex transitions for your enterprise How to Upgrade: EMC Migration Assessment
  • 14. 14© Copyright 2013 EMC Corporation. All rights reserved. Terminology: Upgrade vs Migration •  Update Documentum products •  May be “in-place” or move to new hardware (physical/virtual)Upgrade •  Move Content or Services to new Infrastructure, possibly to the Cloud •  Transform or restructure Content and Metadata •  More Planning and Time Migration
  • 15. 15© Copyright 2013 EMC Corporation. All rights reserved. Transformation Strategy •  Virtualized Data Center •  Leverage resources across your enterprise •  Balance architecture against business demands Consider Private Cloud
  • 16. 16© Copyright 2013 EMC Corporation. All rights reserved. •  Predictable and repeatable implementations with automated, policy-based provisioning (xMS) •  Blueprints simplify deployments and reduce configuration errors •  Rapid provisioning of Documentum products •  Optimized for the private cloud •  Integrated system monitoring Private Cloud – Deploy up to 10x faster
  • 17. 17© Copyright 2013 EMC Corporation. All rights reserved. excellence with enterprise manageability Operational on business requirements Focus deployment with confidence Solution Proven TCO reduction 30% 60% -
  • 18. 18© Copyright 2013 EMC Corporation. All rights reserved. Best Practices © Copyright 2013 EMC Corporation. All rights reserved. 18 Planning your Upgrade Tools and Programs Scenarios •  EMC Professional Services Migration Assessment •  Upgrade vs. Migration •  Private Cloud •  OnDemand •  Decoupling Clients from Platform •  Leap Frogging •  Multistage Acceptance •  Client Pathways •  Upgrade Phases •  xMS for Rapid Provisioning •  EMC Migration Appliance •  Rapid Success Programs and Early Adopter Programs
  • 19. 19© Copyright 2013 EMC Corporation. All rights reserved. Development Staging Production High Availability Automatically provision & configure Documentum and xCP implementations … using EMC recommended best practices With built-in and pre-configured VMware Hyperic monitoring D7.0 and xCP 2.0 blueprints Windows Content Server xPlore tcServer Windows Windows VMware Template Provisioned Virtual Environment xCelerated Management System (xMS) 1.0
  • 20. 20© Copyright 2013 EMC Corporation. All rights reserved. Documentum Enterprise Migration Appliance (EMA) Ÿ  Traditional API-based migration tools: –  Bound by Documentum Business and Security rules –  Export-Import cycle may require long engagements Ÿ  EMA: New approach to migration –  VMware appliance plus a methodology –  1.2+ million documents / hour EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications, or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of discussion and without intending to be bound thereby, and is subject to change without notice. EMC CONFIDENTIAL — INTERNAL USE ONLY
  • 21. 21© Copyright 2013 EMC Corporation. All rights reserved. EMA – Major Use Cases DCM to D2 LS Customer wants to migrate a legacy DCM application (and data) to D2 LS solution OnDemand and Cloning Customer wants to move from on-prem to off-prem; or wants to clone and upgrade a repository Consolidation Customer wants to consolidate their repository footprint, combining smaller repositories together
  • 22. 22© Copyright 2013 EMC Corporation. All rights reserved. EMC Documentum 7.0 Rapid Success Program (D7RSP) Participant Profile: •  Must be an existing EMC customer, partner or employee •  Must be planning to move to D7 by end of year •  Must secure and commit resources to support the project •  Provide reference upon successful deployment Customer Benefits: •  Upgrade Assessment •  Accelerate your upgrade or migration to D7 •  Receive Enhanced Program Support from EMC D7 team •  Share best practices in weekly usergroup forum Space is Limited Register Online by: May 17, 2013 http://bit.ly/D70RSP For more information, please contact deployment_programs@emc.com
  • 23. 23© Copyright 2013 EMC Corporation. All rights reserved. Partner Migration Tools Ÿ  Large EMC Partner ecosystem (over 100 partners) which can also help with migrations and upgrades Ÿ  Examples: fme AG •  EMC Certified Solution called migration-center •  Highly automated, Do-It-Yourself solution, Multiple data sources •  Large volume document migrations without interruption of normal business operations euroscript •  Documentum Select Services Team (SST) partner •  Proven expertise in D2 and Documentum product stack •  DC Map (Document Client Migration Assessment Plan)
  • 24. 24© Copyright 2013 EMC Corporation. All rights reserved. Best Practices © Copyright 2013 EMC Corporation. All rights reserved. 24 Planning your Upgrade Tools and Programs Scenarios •  EMC Professional Services Migration Assessment •  Upgrade vs. Migration •  Private Cloud •  OnDemand •  Decoupling Clients from Platform •  Leap Frogging •  Multistage Acceptance •  Client Pathways •  Upgrade Phases •  xMS for Rapid Provisioning •  EMC Migration Appliance •  Rapid Success Programs and Early Adopter Programs
  • 25. 25© Copyright 2013 EMC Corporation. All rights reserved. D6.7 Platform Decoupled Clients for Flexible Upgrades D7 Platform D6.7 SP2 Client •  6.7SP2 clients are compatible with D7 Content Server •  Upgrade client and server technologies separately •  Protect your client investments and maintain your current user experience •  Upgrade to D7 platform to take advantage of TCO and other improvements Clients Decoupled from Platform Versions
  • 26. 26© Copyright 2013 EMC Corporation. All rights reserved. Content Server Compatibility
  • 27. 27© Copyright 2013 EMC Corporation. All rights reserved. D6.7 Platform Phased Upgrade Path to D7 6.7SP1 Client Upgrade Clients to 6.7 SP2 •  Available in Q1 2013 •  Webtop certification for D7 6.7SP2 Client xCP 1.6 SP2 (6.7 SP2)
  • 28. 28© Copyright 2013 EMC Corporation. All rights reserved. D6.7 Platform Phased Upgrade Path to D7 6.7SP1 Client D7 Platform 6.7SP2 Client xCP 1.6 SP2 (6.7 SP2) Upgrade Platform to D7 •  Directly upgrade Content Server from 6.5, 6.6 or 6.7 to 7.0 Upgrade Clients to 6.7 SP2 •  Available in Q1 2013 •  Webtop certification for D7
  • 29. 29© Copyright 2013 EMC Corporation. All rights reserved. D6.7 Platform Phased Upgrade Path to D7 6.7SP1 Client D7 Platform 6.7SP2 Client XCP 2.0 xCP 1.6 SP2 (6.7 SP2) D2 4.1 Upgrade Clients to 6.7 SP2 * •  Available in Q1 2013 •  Webtop certification for D7 * 6.7 SP2 clients can not access xCP 2.0 data Add New Client Solutions •  Transition users to new solutions based upon D2 or XCP 2.0 Upgrade Platform to D7 •  Directly upgrade Content Server from 6.5, 6.6 or 6.7 to 7.0
  • 30. 30© Copyright 2013 EMC Corporation. All rights reserved. Coexistence of Clients with xCP 2.0 D7 Platform Webtop 6.7 SP2 •  xCP 2.0 and 6.7 SP2 clients can run Side by Side •  BUT xCP 2.0 and 6.7 SP2 clients can not share data •  Interoperability will be available with Type Adoption in xCP 2.1 No need to migrate your client if you don’t need to! TaskSpace 6.7 SP2 D2 4.1 xCP 2.0 EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications, or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of discussion and without intending to be bound thereby, and is subject to change without notice. EMC CONFIDENTIAL — INTERNAL USE ONLY
  • 31. 31© Copyright 2013 EMC Corporation. All rights reserved. 2013   Jan   Feb   Mar   Apr   May   Jun   Jul   Aug   Sep   Oct   Nov   Dec   2013   Today   Q4/  2013   November  2013   6.7  SP2   February  2013   Webtop 6.7 SP2 TaskSpace 6.7 Sp2 Digital Asset Manager 6.5 SP6 Media Workspacee 6.5 SP5 WebPublisher 6.5 SP7 CenterStage 1.2 SP2 More Client Support for D7 EMC makes no representation and undertakes no obligations with regard to product planning information, anticipated product characteristics, performance specifications, or anticipated release dates (collectively, “Roadmap Information”). Roadmap Information is provided by EMC as an accommodation to the recipient solely for purposes of discussion and without intending to be bound thereby, and is subject to change without notice. EMC CONFIDENTIAL — INTERNAL USE ONLY
  • 32. 32© Copyright 2013 EMC Corporation. All rights reserved. Leap Frog Upgrades 6.5 6.6 6.7 7.0 Content Server Installer supports in-place upgrades from 6.5 to 7.0
  • 33. 33© Copyright 2013 EMC Corporation. All rights reserved. Multistage Acceptance Reduce Downtime 6.7 7.x 1.  Build New System in Parallel 2.  Test Content Migration •  Content Migration (or In Place Upgrade) •  Multipass Database Upgrade and Validation •  User Acceptance 3. System swap in quiet period
  • 34. 34© Copyright 2013 EMC Corporation. All rights reserved. Upgrade & Migration Approaches Side by Side Minimum Impact Separate Solutions Separate Data Maintain Current Solutions Enable New Technology for New Solutions Strategies to reduce business impact while consolidating resources
  • 35. 35© Copyright 2013 EMC Corporation. All rights reserved. Upgrade & Migration Approaches Strategies to reduce business impact while consolidating resources Content Interop Transitional Different Activities Same Data Augment or Facilitate Existing Solutions Clear User or Application Definitions
  • 36. 36© Copyright 2013 EMC Corporation. All rights reserved. Upgrade & Migration Approaches Strategies to reduce business impact while consolidating resources Content Interop Transitional Different Activities Same Data Extend or Facilitate Existing Solutions Clear User or Application Definitions
  • 37. 37© Copyright 2013 EMC Corporation. All rights reserved. Upgrade & Migration Approaches Strategies to reduce business impact while consolidating resources Migration Disruptive Replace Existing Solutions New Technology capabilities align with Business Need
  • 38. 38© Copyright 2013 EMC Corporation. All rights reserved. New Client Decision: D2 and/or xCP? Criteria   D2   xCP   What technology to consider from Webtop? Common customizations •  Menu configuration, search screens, property screens, pick lists, naming rules, filing rules, pre and post document import processing, etc. Coded custom functionality •  Custom application layout, business processes, custom business logic that needs to be surfaced to the user interface Business problem   Controlled documents Content distribution   Process-centric Information intensive   User experience   Configured User-Personalizable   Custom   Out-of-the-box client   Yes   No   Core functionality   Content / virtual documents / advanced publishing Basic workflow Regulatory (document control)   Business processes Case Management Analytics/Dashboards   Documentum Platform Compatibility Version 6.7 and 7.0 xCP 1.6 for 6.7 and 7.0 xCP 2.0 for 7.0
  • 39. 39© Copyright 2013 EMC Corporation. All rights reserved. Content Server/xPlore Compatibility 6.6 6.7 6.7SP1 6.7SP2 D7 xPlore 1.1 Yes Yes xPlore 1.2 Yes Yes Yes Yes Yes xPlore 1.3 Yes Yes Yes Yes Yes •  Upgrade from 1.0 to 1.3, requires re-indexing of content •  Upgrade from 1.1 or 1.2 to 1.3 does not require re-index
  • 40. 40© Copyright 2013 EMC Corporation. All rights reserved. Additional Challenges •  Work to remove customizations using configurability •  Rebuild essential customizations in D2/xCP 2.0 Customizations •  3rd Party System Integrations, DRL references, WCM Object ID Retention •  Some workflows may need to be closed out •  Or run old/new clients in parallel Running Workflows •  Docbasic scripts (32bit to 64bit)Recompilation •  3DES to AES •  Asynchronous update job Content Encryption
  • 41. 41© Copyright 2013 EMC Corporation. All rights reserved. Phases of an Documentum Upgrade Ÿ  Documentum upgrade is best accomplished using the following phased approach –  Planning phase –  Development phase –  Testing phase –  Production phase
  • 42. 42© Copyright 2013 EMC Corporation. All rights reserved. Development Environment Practices 1.  Install the new version of products 2.  Gain familiarity with new features and performance aspects of the release 3.  Determine steps needed to migrate customizations 4.  Test customizations in the new test installation 5.  Ensure that the right hardware resources are available
  • 43. 43© Copyright 2013 EMC Corporation. All rights reserved. Practicing the Upgrade Ÿ  Practice with Test / Development Environment Ÿ  Practice with a cloned system to avoid the unexpected –  Test applications and customizations against realistic data –  Timing information –  Errors due to consistency issues –  Familiarity with the upgrade procedure for backups, installations, upgrades and restores
  • 44. 44© Copyright 2013 EMC Corporation. All rights reserved. Repository Consistency Checker Ÿ  Examines Docbase metadata for inconsistencies –  Users & Groups - Workflow –  ACLs - Types –  Sysobjects - Data Dictionary –  Folders and Cabinets - Lifecycle –  Documents & Content Objects Ÿ  Issues “Warning” for Referential Integrity type problems Ÿ  Issues “Error” for corruptions Ÿ  Contact Technical Support/Powerlink for resolutions
  • 45. 45© Copyright 2013 EMC Corporation. All rights reserved. Testing the Upgrade Ÿ  Include test cases to validate the following –  Jobs –  Basic Administration –  Workflows –  Method Server –  UCF content operations –  ACS –  BOCS –  SBOs download and compatibility –  Fulltext indexing and search –  Custom functionality Ÿ  Involve users in testing as early as possible
  • 46. 46© Copyright 2013 EMC Corporation. All rights reserved. Testing Phase Ÿ  During the testing phase, you will –  Test that the various products and hardware and software infrastructure work as a system –  Engage some of the stakeholders to use the system as they normally would in production –  Conduct targeted testing and benchmarks for any known risk areas –  Test and document the upgrade process
  • 47. 47© Copyright 2013 EMC Corporation. All rights reserved. Production Phase Ÿ  Tweak the hardware environment based on what was learned through testing Ÿ  Ensuring that all automatic tasks are complete before upgrading Ÿ  Perform the production system upgrade Ÿ  Test the upgraded production system
  • 48. 48© Copyright 2013 EMC Corporation. All rights reserved. Next Steps Ÿ  Visit the EMC Community Network –  Learn more about how EMC customers are using the latest releases Ÿ  Momentum @ EMC World 2013 –  Migration/Upgrade track (5 sessions) ▪  EMC Migration Appliance (e.g., Webtop to D2, DCM to D2 Life Sciences) ▪  D7 and xCP migration and upgrades ▪  Move to OnDemand Ÿ  Contact your solutions principal about the free Migration Assessment Ÿ  Complete the upgrade survey (next page)
  • 49. 49© Copyright 2013 EMC Corporation. All rights reserved. When are you upgrading to D7? Tell us your plans, take a quick survey and win some prizes! Momentum Lounge: Visit Social Media Center http://bitly.com/dctmsurvey Open only to residents of the 50 United States and D.C., and Canada (excluding Quebec). Online entries deadline: May 25, 2013 11:59:59 PM Pacific Time Mail-in entries: May 27, 2013 Prize Announcement: May 31, 2013 For Official Rules: https://community.emc.com/docs/DOC-23959 EMC CONFIDENTIAL — INTERNAL USE ONLY
  • 50. 50© Copyright 2013 EMC Corporation. All rights reserved. STAY IN TOUCH! emcMMTM emcDocumentum Syncplicity emcDocSciences emcCaptiva EmcSoftware emc-mmtm EMC_Momentum EMC_Documentum Syncplicity EMC_Captiva EMC_DocSciences go/MomentumECM go/Documentum emc_iig facebook.com/ youtube.com/ linkd.in/ twitter.com/ community.emc.com/slideshare.net/ Come to the Social Media Center to play, win, learn and more.