PIPE RAMMING METHOD
      PRESENTER(S) NAMES
What is Pipe Ramming?
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of
                                       pipe installation.
PIPE RAMMING APPLICATIONS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT


                                       •Steel casing installation
                                       •Culvert replacement
                                       •Ram and swallow
                                       •Slick boring
                                       •Piling
                                       •HDD Assist
                                        –Wash-over casings
                                        –Stuck Bores
                                        –Removal of drill stem
                                        –Hydro-locked casings
Advantages
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Trenchless
                                       • Able to swallow rock as large as the
                                         inside diameter of the casing
                                       • Method does not remove soil until
                                         casing is installed
                                       • Minimizes voids
                                         –Roads
                                         –Railroads
                                       • Reduced soil compaction
Preferred for Adverse Soil Conditions
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Free flowing sand
                                       • Cobble conditions
                                       • Large rock formations
                                       • Excessive ground water
SWALLOWS LARGE OBSTRUCTIONS
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT


                                       • Rock swallowed during ram
                                       • Spoil removed post ram




                                       54” Casing
CULVERT SWALLOWING
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                       An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is
                                       removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted
                                       within.
TELESCOPING METHOD
PIPE RAMMING                           FOR LONGER DISTANCES
CULVERT INSTALLATION AND REPLACEMENT




                                       An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further
                                       progress is made with smaller casings installed within the oversized pipe in the same manner.
METHOD IMPLEMENTATION
Trenchless Culvert Replacement Under Railways with the Pipe Ramming Method
RAM SITE LAYOUT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                               Note: Follow local regulations for sloping or shoring of pit.
SITE PREP: CASING PLACEMENT
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT




                                        Rail system   I-beam   Pipe Mule™
                                                               Leveling System
STEEL CASING PREP
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       SOIL SHOE                                   LUBRICATION




                                         Steel Casing

                                                   Internal Shoe

                                                                   External Shoe

                                       Reinforces lead casing and provides an      Supplies lubricating fluid to OD and ID of
                                       annulus for lubrication.                    casing during installation.
COLLETS AND RAMMER
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT

                                       Install Pushing Collets/Collars                Install Rammer




                                       Collets and collars help to distribute the     The rammer is locked into the collets when
                                       ramming force to the face of the pipe.         the tool is started.
                                       The collets also lock the rammer into place.
SPOIL REMOVAL
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT

                                       Spoil removal for >30” and/or               Spoil removal <30” Casing
                                       large spoil/culverts




                                                                                                    Seal kit
                                       Manual excavation, HDD culvert cleaning     Air and/or water pressure. Seal kit for air
                                       tools, jet washing, auger boring wherever   pressure removal.
                                       applicable.
PIPE RAMMING CASE STUDIES
HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
NEW INSTALLATION – ROCKVILLE, MN
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –2 – drainage culverts under
                                         railroad
                                       • Pipe sizes
                                        –1-60” Casing
                                        –1-32” Casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 90’
                                        –1@ 195’
                                       • Free flowing sand
                                       • Holding grade
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT   NEW INSTALLATION – GRAND ISLAND, NE

                                       • Project
                                        –1 – drainage culvert under railroad
                                       • Pipe sizes
                                        –1-24” Casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 250’
                                       • Free flowing sand with loose coal
                                         dust and other materials
                                       • Installed with 2% grade
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT   NEW INSTALLATION – COUER D’ALENE, ID

                                       • Project
                                        –2 – drainage culverts under RR
                                         and Highway
                                       • Pipe sizes
                                        –2 - 48” casings
                                       • Equipment
                                        –23” Rammer
                                       • Ram distance
                                        –1 @ 190’
                                        –1@ 195’
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT   NEW INSTALLATIONS – MARICOPA CTY, AZ

                                       • New culvert installation under rail
                                         bed.
                                       • 84” steel casing
                                       • 24” HammerHead Pipe Rammer
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Collapsed 7’ casing, 164 feet long
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           First section of pipe installed.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Swallowing and removing sections.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Telescoping 60 feet down sized
                                                                           sections.
TELESCOPING METHOD – ALASKA
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Replacement of 84” dia. culvert
                                         drain with telescoping method
                                       • 96” steel casing, 164 feet.
                                       • 24” HammerHead Pipe Rammer




                                                                           Trenchless telescoped pipe.
NEW INSTALLATION – DALTON HWY, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Drainage culvert
                                       • Glacial til/new road bed
                                       • Service hwy between Prudhoe
                                         Bay oil reserves & Fairbanks
NEW INSTALLATION – DALTON HWY, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under service
                                         highway
                                       • Pipe sizes
                                        –1 - 36” casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 160’
NEW INSTALLATION – DALTON HWY, AK
PIPE RAMMING
CULVERT INSTALLATION AND REPLACEMENT



                                       • Project
                                        –1 – drainage culvert under service
                                         highway
                                       • Pipe sizes
                                        –1 - 36” casing
                                       • Equipment
                                        –24” Rammer
                                       • Ram distance
                                        –1 @ 160’
HDD ASSIST METHODS
     PIPE RAMMING
HDD RAM ASSIST

                       • When problems arise while
                         horizontal directional drilling
          HDD ASSIST

                         (HDD) costs begin to add up with
                         each tick of the clock.
PIPE RAMMING




                       • Quick reaction time and expert
                         technical support are critical to
                         salvaging a bore gone bad.
                       • The percussive power of pipe
                         rammers can help free stuck
                         product pipes, drill stems, and
                         help remove product pipes on
                         failed bores.
FOUR METHODS

                       •Washover casings
          HDD ASSIST


                       •Pull back assist
PIPE RAMMING




                       •Pipe extraction
                       •Drill stem recovery
WASHOVER CASING METHOD
          HDD ASSIST
PIPE RAMMING




                       • Used as a pilot for large HDD projects      • Makes a guide down hole for mud motors
                       • Casings are rammed through difficult soil   • Casing provides a path for drill fluid
                         conditions to rock or solid soil              recycling and reduces the loss of fluids
                                                                       in surface soils
ON THE JOB: WASHOVER CASINGS

                       • Hong Kong, China
                        –Wash over casing
          HDD ASSIST


                       • Pipe sizes
PIPE RAMMING




                        –2 – 54” casings
                       • Equipment
                        –24” Rammer
                       • Ram distance
                        –2 @ 66’
PULL BACK ASSIST METHOD
          HDD ASSIST
PIPE RAMMING




                       • Assist HDD when pullback is not possible      • Percussive power frees immobilized
                         and machine still has rotation capabilities     product pipes.
                       • Rammer attached to product pipe
PULLBACK ASSIST
          HDD ASSIST   CONNECTION METHOD STEEL
PIPE RAMMING




                       Rammer is locked into steel casing via collets. Steel casing is installed using
                       pullback force of HDD and percussive force of the rammer.
PULLBACK ASSSIST
                       CONNECTION METHOD HDPE
                       (OPTION 1)
          HDD ASSIST
PIPE RAMMING




                       Rammer is locked into steel casing via collets. The steel casing is connected to
                       the HDPE product pipe via steel to HDPE flange compression kit. HDD pull force
                       is used in conjunction with the rammer to install the pipe.
PULLBACK ASSIST
                       CONNECTION METHOD HDPE
                       (OPTION 2)
          HDD ASSIST
PIPE RAMMING




                       Rammer is locked into steel casing via collets. Steel casing is welded to
                       steel ring that is flush with HDPE face, and welded to steel sleeve. Steel
                       sleeve is bolted to HDPE product pipe. HDD pull force is used in conjunction
                       with the rammer to install the pipe.
ON THE JOB: PULLBACK ASSIST

                       • Normangee, TX
                        –Pullback Assist (pipe stuck for 4
          HDD ASSIST

                         days before start of assist)
                       • Reason for pullback failure –
PIPE RAMMING




                         excessive flooding in area
                         caused collapsed entry pit and
                         hole.
                       • HDD Rig
                        –500,000 lb pullback
                       • Pipe
                        –2,800’ of 36” casing
                       • Equipment
                        –24” Rammer
ON THE JOB: PULLBACK ASSIST

                       • Stewart, FL
                        –HDPE Pullback Assist, pipe sat
          HDD ASSIST

                         for more than two weeks before
                         assist could be started due to
PIPE RAMMING




                         excessive hurricane season.
                       • HDD Rig
                        –1.2 M lb custom drill rig
                       • Pipe size
                        –4,500’ of 24” HDPE pipe 80’
                         deep
                       • Equipment
                        –24” Rammer
PIPE EXTRACTION METHOD
          HDD ASSIST
PIPE RAMMING




                       • Remove stuck product pipe and bore      • Percussive action along with static
                         again                                     tension pulls product pipe, removing it
                       • Rammer is attached to product pipe by     from the bore
                         fabricating an adaptor
PIPE EXTRACTION
          HDD ASSIST   CONNECTION METHOD FOR STEEL CASING
PIPE RAMMING




                       Rammer is locked into steel casing that is welded onto the product casing.
                       Static pull force is used in conjunction with the rammer to extract the product
                       casing.
PIPE EXTRACTION
          HDD ASSIST   CONNECTION METHOD FOR HDPE
PIPE RAMMING




                       Rammer is locked into steel casing that is welded onto the steel
                       sleeve. Steel sleeve is bolted to HDPE product pipe. Static pull force
                       is used in conjunction with the rammer to extract the product casing.
ON THE JOB: PIPE EXTRACTION

                       • Orlando, FL
                        –HDPE Pipe Extraction
          HDD ASSIST


                       • Pipe size
PIPE RAMMING




                        –850’ extraction of 30” HDPE pipe
                       • Equipment
                        –16” Rammer
DRILL STEM RECOVERY METHOD
          HDD ASSIST
PIPE RAMMING




                       • Recover expensive stuck drill rod        • Kinetic energy is used to assist in
                       • Rammer is attached the to drill rod by     pulling or pushing rod out of the ground
                         fabricating an adaptor                     with the assist of static tension
ON THE JOB: DRILL STEM RECOVERY
          HDD ASSIST
PIPE RAMMING
RECOMMENDED HAMMERS
                                                                                                      Calculated
                         Rammer                                               Impact Rate                                     Pipe Diameter
                                                   HDD Class                                         Impact Force
                           Size                                                  BPM                                             Range
                                                                                                      at 1 ft/min*
          HDD ASSIST


                              7”                    24,000 lbs                       295                184,000 lbs                 8” – 16”
PIPE RAMMING




                                                 24,000; 33,000;
                              8”                                                     223                252,000 lbs                 8” – 24”
                                                    50,000 lbs
                                                 33,000; 50,000;
                             12”                                                     271                744,000 lbs                12” – 36”
                                                   80,000 lbs

                             16”                    80,000 lbs                       231              1,094,000 lbs                12” – 48”

                                                      80,000;
                             20”                                                     190              1,740,000 lbs                20” – 54”
                                                    150,000 lbs
                                                    150,000 lbs
                             24”                                                     177              2,020,000 lbs                24” – 72”
                                                    and larger
                       *The numbers shown here are based on calculation and are for comparative purposes only between various models of HammerHead
                       Rammers. The numbers are not intended for engineering applications.
THANK YOU

 FIRST NAME LAST NAME
 PRESENTER TITLE
 E: info@hammerheadmole.com
 P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068
 W: www.hammerheadtrenchless.com

Más contenido relacionado

La actualidad más candente

Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Hamed Zarei
 
Under ground dams design
Under ground dams designUnder ground dams design
Under ground dams designAmro Elfeki
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Bilal Mirani
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozerSATYANARAYANA I
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machineVISHAL KUMAR SINGH
 
seepage through earthen dam
seepage through earthen damseepage through earthen dam
seepage through earthen damNathanimahar
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...A Makwana
 
fastrack technologies in bridges ppt
fastrack technologies in bridges pptfastrack technologies in bridges ppt
fastrack technologies in bridges pptSrinivasulu Srinu
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnelspartha sharma
 
Design consideration Of Earth Dams
Design consideration Of Earth DamsDesign consideration Of Earth Dams
Design consideration Of Earth DamsRosul Ahmed
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing TechniqueSeminar Links
 

La actualidad más candente (20)

Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)Tunnel Boring Machines (TBM)
Tunnel Boring Machines (TBM)
 
Tunnel construction
Tunnel constructionTunnel construction
Tunnel construction
 
Under ground dams design
Under ground dams designUnder ground dams design
Under ground dams design
 
Design of stilling basin and roughness devices
Design of stilling basin and roughness devices Design of stilling basin and roughness devices
Design of stilling basin and roughness devices
 
Drilling equipments
Drilling equipmentsDrilling equipments
Drilling equipments
 
Scraper ripper-grader-dozer
Scraper ripper-grader-dozerScraper ripper-grader-dozer
Scraper ripper-grader-dozer
 
Tunneling by tunnel boring machine
Tunneling by tunnel boring machineTunneling by tunnel boring machine
Tunneling by tunnel boring machine
 
seepage through earthen dam
seepage through earthen damseepage through earthen dam
seepage through earthen dam
 
4880 4
4880 44880 4
4880 4
 
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
Tractor, bulldozer, scraper, ripper_Advanced Construction Technology (Semeste...
 
fastrack technologies in bridges ppt
fastrack technologies in bridges pptfastrack technologies in bridges ppt
fastrack technologies in bridges ppt
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Design consideration Of Earth Dams
Design consideration Of Earth DamsDesign consideration Of Earth Dams
Design consideration Of Earth Dams
 
Well foundations notes
 Well foundations notes Well foundations notes
Well foundations notes
 
Draglines
DraglinesDraglines
Draglines
 
Trixial test
Trixial testTrixial test
Trixial test
 
subsidence.ppt
subsidence.pptsubsidence.ppt
subsidence.ppt
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
Tunneling
TunnelingTunneling
Tunneling
 

Destacado

DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDeltares
 
Equipment For Compaction
Equipment For Compaction Equipment For Compaction
Equipment For Compaction rahuljatav67
 
Methods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing CapacityMethods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing CapacityVibhanshu Singh
 
Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1Anil Kumar S
 
Generation of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gasGeneration of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gasVel Murugan
 
Ppt on electricity generation from exhaust hot gases
Ppt on electricity generation from exhaust hot gasesPpt on electricity generation from exhaust hot gases
Ppt on electricity generation from exhaust hot gasesNitesh Prasad
 
Automatic-gear-shift-mechanism
 Automatic-gear-shift-mechanism Automatic-gear-shift-mechanism
Automatic-gear-shift-mechanismveeresh844
 
Lecture 7 stress distribution in soil
Lecture 7 stress distribution in soilLecture 7 stress distribution in soil
Lecture 7 stress distribution in soilDr.Abdulmannan Orabi
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 

Destacado (20)

Pneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case StudiesPneumatic Pipe Bursting Case Studies
Pneumatic Pipe Bursting Case Studies
 
Static Pipe Bursting Case Stidies
Static Pipe Bursting Case StidiesStatic Pipe Bursting Case Stidies
Static Pipe Bursting Case Stidies
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
 
Soil MEchanics
Soil MEchanicsSoil MEchanics
Soil MEchanics
 
Pipe Bursting
Pipe BurstingPipe Bursting
Pipe Bursting
 
Pipe Bursting Project Considerations
Pipe Bursting Project ConsiderationsPipe Bursting Project Considerations
Pipe Bursting Project Considerations
 
Equipment For Compaction
Equipment For Compaction Equipment For Compaction
Equipment For Compaction
 
AUE 893
AUE 893AUE 893
AUE 893
 
Compaction
CompactionCompaction
Compaction
 
compaction equipment
compaction equipmentcompaction equipment
compaction equipment
 
Methods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing CapacityMethods Of Improving Soil Bearing Capacity
Methods Of Improving Soil Bearing Capacity
 
Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1Soil compaction handbook_low_res_0212_data_id_59525_version_1
Soil compaction handbook_low_res_0212_data_id_59525_version_1
 
Generation of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gasGeneration of electricity using the flow or velocity of vehicle exhaust gas
Generation of electricity using the flow or velocity of vehicle exhaust gas
 
Ppt on electricity generation from exhaust hot gases
Ppt on electricity generation from exhaust hot gasesPpt on electricity generation from exhaust hot gases
Ppt on electricity generation from exhaust hot gases
 
Automatic-gear-shift-mechanism
 Automatic-gear-shift-mechanism Automatic-gear-shift-mechanism
Automatic-gear-shift-mechanism
 
casting ppt
casting pptcasting ppt
casting ppt
 
Casting
CastingCasting
Casting
 
Lecture 5 soil compaction
Lecture 5 soil compactionLecture 5 soil compaction
Lecture 5 soil compaction
 
Lecture 7 stress distribution in soil
Lecture 7 stress distribution in soilLecture 7 stress distribution in soil
Lecture 7 stress distribution in soil
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 

Similar a The Pipe Ramming Method

Trenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodTrenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodHammerHead Trenchless Equipment
 
underwater construction
underwater constructionunderwater construction
underwater constructionYasir Hashmi
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen damDivya Vishnoi
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochurecalvinschmidt
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridgesRana Ibrahim
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007yudi05
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...Dan Brown and Associates, PC
 
Metkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMetkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMFaridGeonova
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniquesjamali husain
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptxCarolTumaneng
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxodiliagilby
 
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsCEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsThe Howard Group Inc.
 

Similar a The Pipe Ramming Method (20)

Trenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming MethodTrenchless Installation of Drainage Culverts with Pipe Ramming Method
Trenchless Installation of Drainage Culverts with Pipe Ramming Method
 
underwater construction
underwater constructionunderwater construction
underwater construction
 
Failures of an earthen dam
Failures of an earthen damFailures of an earthen dam
Failures of an earthen dam
 
Qcs Product Brochure
Qcs Product BrochureQcs Product Brochure
Qcs Product Brochure
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
Alan sutton
Alan suttonAlan sutton
Alan sutton
 
03 drilling recent development ui 17 sep 2007
03 drilling recent development   ui 17 sep 200703 drilling recent development   ui 17 sep 2007
03 drilling recent development ui 17 sep 2007
 
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
TCD2011 - Kunne bedre kompetanse avverget Macondo-ulykken i Mexico-gulfen? v/...
 
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...CFA and DD Piles in Earthquake Country  - DM Holloway - SEAOSC Seminar - Long...
CFA and DD Piles in Earthquake Country - DM Holloway - SEAOSC Seminar - Long...
 
Drainage
DrainageDrainage
Drainage
 
Metkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdfMetkon Pipa Bawah Laut.pdf
Metkon Pipa Bawah Laut.pdf
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Newport Marina Presentation March 2015
Newport Marina Presentation March 2015Newport Marina Presentation March 2015
Newport Marina Presentation March 2015
 
1.Pile foundations 2021 (1).pptx
1.Pile foundations 2021 (1).pptx1.Pile foundations 2021 (1).pptx
1.Pile foundations 2021 (1).pptx
 
dewateringtechniques 2.pptx
dewateringtechniques 2.pptxdewateringtechniques 2.pptx
dewateringtechniques 2.pptx
 
pipes.pptx
pipes.pptxpipes.pptx
pipes.pptx
 
Your Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docxYour Score 1420Not bad. Your score means youre slightly bette.docx
Your Score 1420Not bad. Your score means youre slightly bette.docx
 
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) ApplicationsCEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
CEMATRIX Cellular Concrete - Wet Mix (Ready Mix) Applications
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 

Más de HammerHead Trenchless Equipment (10)

Static Pipe Bursting Systems
Static Pipe Bursting SystemsStatic Pipe Bursting Systems
Static Pipe Bursting Systems
 
Pneumatic Pipe Bursting Systems
Pneumatic Pipe Bursting SystemsPneumatic Pipe Bursting Systems
Pneumatic Pipe Bursting Systems
 
HammerHead Mole Piercing Tools
HammerHead Mole Piercing ToolsHammerHead Mole Piercing Tools
HammerHead Mole Piercing Tools
 
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projectsPipe bursting and Pre-chlorination_effectiveness on large scale projects
Pipe bursting and Pre-chlorination_effectiveness on large scale projects
 
HDD Assist Methods
HDD Assist MethodsHDD Assist Methods
HDD Assist Methods
 
Comparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement ApplicationsComparing Rehabilitation and Replacement Applications
Comparing Rehabilitation and Replacement Applications
 
HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3HammerHead PP Template, No Logo. 4:3
HammerHead PP Template, No Logo. 4:3
 
HammerHead PP Template, 16:9
HammerHead PP Template, 16:9HammerHead PP Template, 16:9
HammerHead PP Template, 16:9
 
HammerHead PP Template, 4:3
HammerHead PP Template, 4:3HammerHead PP Template, 4:3
HammerHead PP Template, 4:3
 
HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9HammerHead PP Template, No Logo, 16:9
HammerHead PP Template, No Logo, 16:9
 

Último

AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 

Último (20)

AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 

The Pipe Ramming Method

  • 1. PIPE RAMMING METHOD PRESENTER(S) NAMES
  • 2. What is Pipe Ramming? PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT A pneumatic hammer installs an open ended steel casing that is cleaned out during and after completion of pipe installation.
  • 3. PIPE RAMMING APPLICATIONS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT •Steel casing installation •Culvert replacement •Ram and swallow •Slick boring •Piling •HDD Assist –Wash-over casings –Stuck Bores –Removal of drill stem –Hydro-locked casings
  • 4. Advantages PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Trenchless • Able to swallow rock as large as the inside diameter of the casing • Method does not remove soil until casing is installed • Minimizes voids –Roads –Railroads • Reduced soil compaction
  • 5. Preferred for Adverse Soil Conditions PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Free flowing sand • Cobble conditions • Large rock formations • Excessive ground water
  • 6. SWALLOWS LARGE OBSTRUCTIONS PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Rock swallowed during ram • Spoil removed post ram 54” Casing
  • 7. CULVERT SWALLOWING PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT An oversized casing is rammed over existing culvert. After installation is complete, old culvert and spoil is removed. Steel casing can serve as the drainage culvert or as a carrier pipe for another pipe inserted within.
  • 8. TELESCOPING METHOD PIPE RAMMING FOR LONGER DISTANCES CULVERT INSTALLATION AND REPLACEMENT An oversized pipe is rammed over the existing culvert until production ceases and is cleaned out. Further progress is made with smaller casings installed within the oversized pipe in the same manner.
  • 9. METHOD IMPLEMENTATION Trenchless Culvert Replacement Under Railways with the Pipe Ramming Method
  • 10. RAM SITE LAYOUT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Note: Follow local regulations for sloping or shoring of pit.
  • 11. SITE PREP: CASING PLACEMENT PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Rail system I-beam Pipe Mule™ Leveling System
  • 12. STEEL CASING PREP PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT SOIL SHOE LUBRICATION Steel Casing Internal Shoe External Shoe Reinforces lead casing and provides an Supplies lubricating fluid to OD and ID of annulus for lubrication. casing during installation.
  • 13. COLLETS AND RAMMER PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Install Pushing Collets/Collars Install Rammer Collets and collars help to distribute the The rammer is locked into the collets when ramming force to the face of the pipe. the tool is started. The collets also lock the rammer into place.
  • 14. SPOIL REMOVAL PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT Spoil removal for >30” and/or Spoil removal <30” Casing large spoil/culverts Seal kit Manual excavation, HDD culvert cleaning Air and/or water pressure. Seal kit for air tools, jet washing, auger boring wherever pressure removal. applicable.
  • 15. PIPE RAMMING CASE STUDIES HIGHWAY & RAILROAD CULVERT INSTALLATION & REPLACEMENT WITH PIPE RAMMING
  • 16. NEW INSTALLATION – ROCKVILLE, MN PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –2 – drainage culverts under railroad • Pipe sizes –1-60” Casing –1-32” Casing • Equipment –24” Rammer • Ram distance –1 @ 90’ –1@ 195’ • Free flowing sand • Holding grade
  • 17. PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT NEW INSTALLATION – GRAND ISLAND, NE • Project –1 – drainage culvert under railroad • Pipe sizes –1-24” Casing • Equipment –24” Rammer • Ram distance –1 @ 250’ • Free flowing sand with loose coal dust and other materials • Installed with 2% grade
  • 18. PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT NEW INSTALLATION – COUER D’ALENE, ID • Project –2 – drainage culverts under RR and Highway • Pipe sizes –2 - 48” casings • Equipment –23” Rammer • Ram distance –1 @ 190’ –1@ 195’
  • 19. PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT NEW INSTALLATIONS – MARICOPA CTY, AZ • New culvert installation under rail bed. • 84” steel casing • 24” HammerHead Pipe Rammer
  • 20. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Collapsed 7’ casing, 164 feet long
  • 21. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer First section of pipe installed.
  • 22. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Swallowing and removing sections.
  • 23. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Telescoping 60 feet down sized sections.
  • 24. TELESCOPING METHOD – ALASKA PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Replacement of 84” dia. culvert drain with telescoping method • 96” steel casing, 164 feet. • 24” HammerHead Pipe Rammer Trenchless telescoped pipe.
  • 25. NEW INSTALLATION – DALTON HWY, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Drainage culvert • Glacial til/new road bed • Service hwy between Prudhoe Bay oil reserves & Fairbanks
  • 26. NEW INSTALLATION – DALTON HWY, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under service highway • Pipe sizes –1 - 36” casing • Equipment –24” Rammer • Ram distance –1 @ 160’
  • 27. NEW INSTALLATION – DALTON HWY, AK PIPE RAMMING CULVERT INSTALLATION AND REPLACEMENT • Project –1 – drainage culvert under service highway • Pipe sizes –1 - 36” casing • Equipment –24” Rammer • Ram distance –1 @ 160’
  • 28. HDD ASSIST METHODS PIPE RAMMING
  • 29. HDD RAM ASSIST • When problems arise while horizontal directional drilling HDD ASSIST (HDD) costs begin to add up with each tick of the clock. PIPE RAMMING • Quick reaction time and expert technical support are critical to salvaging a bore gone bad. • The percussive power of pipe rammers can help free stuck product pipes, drill stems, and help remove product pipes on failed bores.
  • 30. FOUR METHODS •Washover casings HDD ASSIST •Pull back assist PIPE RAMMING •Pipe extraction •Drill stem recovery
  • 31. WASHOVER CASING METHOD HDD ASSIST PIPE RAMMING • Used as a pilot for large HDD projects • Makes a guide down hole for mud motors • Casings are rammed through difficult soil • Casing provides a path for drill fluid conditions to rock or solid soil recycling and reduces the loss of fluids in surface soils
  • 32. ON THE JOB: WASHOVER CASINGS • Hong Kong, China –Wash over casing HDD ASSIST • Pipe sizes PIPE RAMMING –2 – 54” casings • Equipment –24” Rammer • Ram distance –2 @ 66’
  • 33. PULL BACK ASSIST METHOD HDD ASSIST PIPE RAMMING • Assist HDD when pullback is not possible • Percussive power frees immobilized and machine still has rotation capabilities product pipes. • Rammer attached to product pipe
  • 34. PULLBACK ASSIST HDD ASSIST CONNECTION METHOD STEEL PIPE RAMMING Rammer is locked into steel casing via collets. Steel casing is installed using pullback force of HDD and percussive force of the rammer.
  • 35. PULLBACK ASSSIST CONNECTION METHOD HDPE (OPTION 1) HDD ASSIST PIPE RAMMING Rammer is locked into steel casing via collets. The steel casing is connected to the HDPE product pipe via steel to HDPE flange compression kit. HDD pull force is used in conjunction with the rammer to install the pipe.
  • 36. PULLBACK ASSIST CONNECTION METHOD HDPE (OPTION 2) HDD ASSIST PIPE RAMMING Rammer is locked into steel casing via collets. Steel casing is welded to steel ring that is flush with HDPE face, and welded to steel sleeve. Steel sleeve is bolted to HDPE product pipe. HDD pull force is used in conjunction with the rammer to install the pipe.
  • 37. ON THE JOB: PULLBACK ASSIST • Normangee, TX –Pullback Assist (pipe stuck for 4 HDD ASSIST days before start of assist) • Reason for pullback failure – PIPE RAMMING excessive flooding in area caused collapsed entry pit and hole. • HDD Rig –500,000 lb pullback • Pipe –2,800’ of 36” casing • Equipment –24” Rammer
  • 38. ON THE JOB: PULLBACK ASSIST • Stewart, FL –HDPE Pullback Assist, pipe sat HDD ASSIST for more than two weeks before assist could be started due to PIPE RAMMING excessive hurricane season. • HDD Rig –1.2 M lb custom drill rig • Pipe size –4,500’ of 24” HDPE pipe 80’ deep • Equipment –24” Rammer
  • 39. PIPE EXTRACTION METHOD HDD ASSIST PIPE RAMMING • Remove stuck product pipe and bore • Percussive action along with static again tension pulls product pipe, removing it • Rammer is attached to product pipe by from the bore fabricating an adaptor
  • 40. PIPE EXTRACTION HDD ASSIST CONNECTION METHOD FOR STEEL CASING PIPE RAMMING Rammer is locked into steel casing that is welded onto the product casing. Static pull force is used in conjunction with the rammer to extract the product casing.
  • 41. PIPE EXTRACTION HDD ASSIST CONNECTION METHOD FOR HDPE PIPE RAMMING Rammer is locked into steel casing that is welded onto the steel sleeve. Steel sleeve is bolted to HDPE product pipe. Static pull force is used in conjunction with the rammer to extract the product casing.
  • 42. ON THE JOB: PIPE EXTRACTION • Orlando, FL –HDPE Pipe Extraction HDD ASSIST • Pipe size PIPE RAMMING –850’ extraction of 30” HDPE pipe • Equipment –16” Rammer
  • 43. DRILL STEM RECOVERY METHOD HDD ASSIST PIPE RAMMING • Recover expensive stuck drill rod • Kinetic energy is used to assist in • Rammer is attached the to drill rod by pulling or pushing rod out of the ground fabricating an adaptor with the assist of static tension
  • 44. ON THE JOB: DRILL STEM RECOVERY HDD ASSIST PIPE RAMMING
  • 45. RECOMMENDED HAMMERS Calculated Rammer Impact Rate Pipe Diameter HDD Class Impact Force Size BPM Range at 1 ft/min* HDD ASSIST 7” 24,000 lbs 295 184,000 lbs 8” – 16” PIPE RAMMING 24,000; 33,000; 8” 223 252,000 lbs 8” – 24” 50,000 lbs 33,000; 50,000; 12” 271 744,000 lbs 12” – 36” 80,000 lbs 16” 80,000 lbs 231 1,094,000 lbs 12” – 48” 80,000; 20” 190 1,740,000 lbs 20” – 54” 150,000 lbs 150,000 lbs 24” 177 2,020,000 lbs 24” – 72” and larger *The numbers shown here are based on calculation and are for comparative purposes only between various models of HammerHead Rammers. The numbers are not intended for engineering applications.
  • 46. THANK YOU FIRST NAME LAST NAME PRESENTER TITLE E: info@hammerheadmole.com P: 800.331.6653 | INT: +1.262.567.8833 | F: 262.567.5068 W: www.hammerheadtrenchless.com

Notas del editor

  1. When installing a steel pipe, it is usually a simple matter of inserting a set of collets into the pipe which allow the hammer to lock into the casing. In some instances, the pipe may need to be reinforced, or a fabricated adapter may be needed to match the size of the available collets to the size of the product pipe.
  2. When installing HDPE pipe, an adapter will be needed to allow the connection of the hammer to the pipe. The easiest is a flange adapter that is fused to the pipe string, then a steel casing is added to the flange adapter, and the whole assembly is bolted up. This provides a stub of casing for the collets, which in turn, lock the hammer.
  3. A second alternative is to fabricate a sleeve which should just fit over the HDPE. The sleeve is then bolted into the HDPE pipe. At the end of the sleeve is a plate that will butt up against the back of the HDPE. Then a casing is welded and gusseted to the plate to provide a receiver for the collets and ramming tool.
  4. The adapter for steel casing is the easiest; it is simply a piece of casing, which need not be the same size as the pipe being installed, it can be sized to whichever set of collets is most convenient. The piece of casing is welded on top of the product, then gussets are added for increased strength. The collets will go on the front side of the arrangement so that the hammer is pounding the pipe out of the bore.
  5. For HDPE, a steel sleeve will need to be fabricated to fit more or less snugly over the HDPE, then bolted to the pipe. A piece of casing is welded to the top of the sleeve just like for the steel extraction adapter, to act as a receiver for the ramming tool and collets.