SlideShare una empresa de Scribd logo
1 de 8
Optimum Location of Motorway
Interchanges: Concessionaires’
Perspective
PhD student Hugo Repolho
University of Coimbra
PORTUGAL
Introduction (1)
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective
OBJECTIVE: develop an optimization model for assisting toll-motorway concessionaires in
the analysis of the most profitable solutions for Motorway Interchanges Location Problem.
The location of the interchanges strongly impacts the amount of traffic that the motorway
can capture from the existing road network.
In Europe most motorways are owned by the State but operated by private concessionaires.
The concessionaires may define certain design details for the motorway, namely the
motorway interchanges location (access and exit points).
Their profit comes from the application of a certain toll fee per mile to the motorway users.
Introduction (2)
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective
1 n m M
i
j
i
ASSUMPTIONS:
There are two types of routes to consider:
1. Routes through the existing road network (choice 1);
2. Routes through a combination of existing roadway segments and new motorway
segments (choice 2).
• People will travel through the least cost route;
• The proportion of people using the motorway increases as the travel costs decrease;
Choice 1Choice 2
MILM: model’s objective function
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective
       

Mm
m
Ji jiJj Mm amnMn
ijmnmnijmn wfyxdqtaMax
ijmn
ij
: 0and:
02
OBJECTIVE FUNCTION: expresses the profit for the concessionaire, given as the
difference between total toll fee revenue and fixed charges for installing and operating
the interchanges and constructing the motorway.
Total toll fee revenue Fixed charges
The MILM can be seen as a particular case of the p-hub median problem, which was
formulated by Campbell, 1994.
Portuguese case study
•Motorway A25 located in the center of Portugal
•Dataset : 55 centers and 33 candidate motorway interchanges;
ArcMap 9.2 Image
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective
Portuguese case study - Results
ArcMap 9.2 Image
1
3
4
6 7
9
11
13
18 2624
28
33
10
14 15 17
29
22 31
18227
36404
45974
53140
55109
49081
52703
54942
53192
36569
34342
32250
36910
30873 31369
26624
25026
0
10000
20000
30000
40000
50000
60000
0.03 0.04 0.045 0.049 0.05 0.051 0.053 0.054 0.055 0.056 0.06 0.065 0.07 0.08 0.085 0.09 0.1
Profit(€/day)
Toll fee (€/km)
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective
•The model was run for several Toll fee values.
Final Considerations
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective
The optimum location of motorway interchanges under the concessionaires’
perspective follows a previous work done under the users’ perspective, which
aimed to minimize travel costs.
We believe that the concessionaires’ perspective is the most relevant in real-
world applications.
The models presented are useful in toll-motorway concessionaires’ cost-benefit
analysis.
Users’ Perspective…
OptimumLocationofMotorwayInterchanges:
Concessionaires’Perspective

Más contenido relacionado

La actualidad más candente

Alan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speech
Alan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speechAlan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speech
Alan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speechEuropean Green Vehicle Initiative
 
ROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksEuropean Green Vehicle Initiative
 
Isf presentation telematics v1.0_final
Isf presentation telematics v1.0_finalIsf presentation telematics v1.0_final
Isf presentation telematics v1.0_finalVihar Shah
 
Bus Karo: Alternate Financing Mechanisms - Innovations
Bus Karo: Alternate Financing Mechanisms - Innovations Bus Karo: Alternate Financing Mechanisms - Innovations
Bus Karo: Alternate Financing Mechanisms - Innovations WRI India
 
Monopoly slides slg (1)
Monopoly slides slg (1)Monopoly slides slg (1)
Monopoly slides slg (1)sdwaltton
 
EV-STEP project presentation
EV-STEP project presentationEV-STEP project presentation
EV-STEP project presentationIEA-ETSAP
 
CV_PankajHandique_Dec2015
CV_PankajHandique_Dec2015CV_PankajHandique_Dec2015
CV_PankajHandique_Dec2015Pankaj Handique
 
Debate on Horizon 2020 and Space Research at the European Parliament
Debate on Horizon 2020 and Space Research at the European ParliamentDebate on Horizon 2020 and Space Research at the European Parliament
Debate on Horizon 2020 and Space Research at the European ParliamentAxelle Pomies
 
Maharashtra state road development corporation
Maharashtra state road development corporationMaharashtra state road development corporation
Maharashtra state road development corporationRajendra Inani
 
Da maharashtra state road development corporation
Da   maharashtra state road development corporationDa   maharashtra state road development corporation
Da maharashtra state road development corporationRajendra Inani
 
WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...
WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...
WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...European Green Vehicle Initiative
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Russell Publishing
 

La actualidad más candente (20)

Terminal presentation with new images 10 4-10
Terminal presentation with new images 10 4-10Terminal presentation with new images 10 4-10
Terminal presentation with new images 10 4-10
 
Innovation - A risk too far?
Innovation - A risk too far?Innovation - A risk too far?
Innovation - A risk too far?
 
Abstract
AbstractAbstract
Abstract
 
Myth around the role of the PMO
Myth around the role of the PMOMyth around the role of the PMO
Myth around the role of the PMO
 
Alan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speech
Alan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speechAlan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speech
Alan HAIGH, Head of Department, Department H - Horizon 2020, INEA Opening speech
 
ROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR TrucksROADART - Research On Alternative Diversity Aspects foR Trucks
ROADART - Research On Alternative Diversity Aspects foR Trucks
 
Tom MacHugh
Tom MacHughTom MacHugh
Tom MacHugh
 
Isf presentation telematics v1.0_final
Isf presentation telematics v1.0_finalIsf presentation telematics v1.0_final
Isf presentation telematics v1.0_final
 
Bus Karo: Alternate Financing Mechanisms - Innovations
Bus Karo: Alternate Financing Mechanisms - Innovations Bus Karo: Alternate Financing Mechanisms - Innovations
Bus Karo: Alternate Financing Mechanisms - Innovations
 
Monopoly slides slg (1)
Monopoly slides slg (1)Monopoly slides slg (1)
Monopoly slides slg (1)
 
EV-STEP project presentation
EV-STEP project presentationEV-STEP project presentation
EV-STEP project presentation
 
CV_PankajHandique_Dec2015
CV_PankajHandique_Dec2015CV_PankajHandique_Dec2015
CV_PankajHandique_Dec2015
 
EBSF_2 - European Bus System of the Future 2
EBSF_2 - European Bus System of the Future 2EBSF_2 - European Bus System of the Future 2
EBSF_2 - European Bus System of the Future 2
 
ESPRIT – Easily 3istributed Personal RapId Transit
ESPRIT – Easily 3istributed Personal RapId TransitESPRIT – Easily 3istributed Personal RapId Transit
ESPRIT – Easily 3istributed Personal RapId Transit
 
Debate on Horizon 2020 and Space Research at the European Parliament
Debate on Horizon 2020 and Space Research at the European ParliamentDebate on Horizon 2020 and Space Research at the European Parliament
Debate on Horizon 2020 and Space Research at the European Parliament
 
Rehabilitation of disused railways
Rehabilitation of disused railwaysRehabilitation of disused railways
Rehabilitation of disused railways
 
Maharashtra state road development corporation
Maharashtra state road development corporationMaharashtra state road development corporation
Maharashtra state road development corporation
 
Da maharashtra state road development corporation
Da   maharashtra state road development corporationDa   maharashtra state road development corporation
Da maharashtra state road development corporation
 
WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...
WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...
WEEVIL – Ultralight and ultrasafe adaptable 3- wheeler Silver Stream – Social...
 
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
Antonio de Santiago Laporte, Industrial Technical Engineer, Madrid Metro & Co...
 

Destacado

Word web version
Word web versionWord web version
Word web versionkpcs2010
 
Motorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) WctrMotorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) Wctrhugorepolho
 
رفع الملفات
رفع الملفاترفع الملفات
رفع الملفاتahlam7000
 

Destacado (7)

Pagina web !
Pagina web !Pagina web !
Pagina web !
 
Word web version
Word web versionWord web version
Word web version
 
Motorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) WctrMotorway Interchange Location Model (10min Presentation) Wctr
Motorway Interchange Location Model (10min Presentation) Wctr
 
SAIProBEx INTRO
SAIProBEx INTROSAIProBEx INTRO
SAIProBEx INTRO
 
Dc
DcDc
Dc
 
Birthday
BirthdayBirthday
Birthday
 
رفع الملفات
رفع الملفاترفع الملفات
رفع الملفات
 

Similar a Motorway Interchange Location Model (Three Minutes Presentation)

Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Shyam Raman
 
Ports in Short Sea Shipping. A critical assessment of the European Maritime T...
Ports in Short Sea Shipping. A critical assessment of the European Maritime T...Ports in Short Sea Shipping. A critical assessment of the European Maritime T...
Ports in Short Sea Shipping. A critical assessment of the European Maritime T...Ancor Suárez Alemán
 
EMCC - European market integration and next steps - Enno Böttcher
EMCC - European market integration and next steps - Enno BöttcherEMCC - European market integration and next steps - Enno Böttcher
EMCC - European market integration and next steps - Enno BöttcherInnovation Norway
 
Analysis of the potential for electric buses
Analysis of the potential for electric busesAnalysis of the potential for electric buses
Analysis of the potential for electric busesLeonardo ENERGY
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesSYSTRA
 
3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx
3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx
3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docxgilbertkpeters11344
 
Railway view on spectrum sharing
Railway view on spectrum sharingRailway view on spectrum sharing
Railway view on spectrum sharingtechUK
 
L8 issues for people living in urban areas in rich countries traffic
L8 issues for people living in urban areas in rich countries   trafficL8 issues for people living in urban areas in rich countries   traffic
L8 issues for people living in urban areas in rich countries traffictudorgeog
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkMarkus Ossberger
 
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRail~Volution
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkTexxi Global
 
Heathrow booklet for release_final
Heathrow booklet for release_finalHeathrow booklet for release_final
Heathrow booklet for release_finalJessica Ryan
 
STEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in Emissions
STEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in EmissionsSTEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in Emissions
STEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in EmissionsSTEP_scotland
 
Hydrogen, fuel cells and Electro-mobility in European Regions
Hydrogen, fuel cells and  Electro-mobility in European Regions Hydrogen, fuel cells and  Electro-mobility in European Regions
Hydrogen, fuel cells and Electro-mobility in European Regions Redazione GreenLandMobility
 
Eu strategy for ertms deployment s. ouaki 2
Eu strategy for ertms deployment   s. ouaki 2Eu strategy for ertms deployment   s. ouaki 2
Eu strategy for ertms deployment s. ouaki 2European Commission
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications The European GNSS Agency (GSA)
 
Talk_SciEnvRes_Gombodshaw_Boß_0466122.pptx
Talk_SciEnvRes_Gombodshaw_Boß_0466122.pptxTalk_SciEnvRes_Gombodshaw_Boß_0466122.pptx
Talk_SciEnvRes_Gombodshaw_Boß_0466122.pptxGombo2
 

Similar a Motorway Interchange Location Model (Three Minutes Presentation) (20)

Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...Strategic analysis of communications based train control systems in the weste...
Strategic analysis of communications based train control systems in the weste...
 
Ports in Short Sea Shipping. A critical assessment of the European Maritime T...
Ports in Short Sea Shipping. A critical assessment of the European Maritime T...Ports in Short Sea Shipping. A critical assessment of the European Maritime T...
Ports in Short Sea Shipping. A critical assessment of the European Maritime T...
 
EMCC - European market integration and next steps - Enno Böttcher
EMCC - European market integration and next steps - Enno BöttcherEMCC - European market integration and next steps - Enno Böttcher
EMCC - European market integration and next steps - Enno Böttcher
 
Analysis of the potential for electric buses
Analysis of the potential for electric busesAnalysis of the potential for electric buses
Analysis of the potential for electric buses
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
 
3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx
3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx
3 2 2 Chapter 10 Managing IT Projects Discussion Questions.docx
 
Marco polo call 2013
Marco polo call 2013Marco polo call 2013
Marco polo call 2013
 
Railway view on spectrum sharing
Railway view on spectrum sharingRailway view on spectrum sharing
Railway view on spectrum sharing
 
L8 issues for people living in urban areas in rich countries traffic
L8 issues for people living in urban areas in rich countries   trafficL8 issues for people living in urban areas in rich countries   traffic
L8 issues for people living in urban areas in rich countries traffic
 
Managing Viennas Tram and Metro Network
Managing Viennas Tram and Metro NetworkManaging Viennas Tram and Metro Network
Managing Viennas Tram and Metro Network
 
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory ThompsonRV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
RV 2014: Complete Streets- From Policy to Implementation by Gregory Thompson
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing Work
 
ULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptxULTIMO-overviewV2.2.pptx
ULTIMO-overviewV2.2.pptx
 
Heathrow booklet for release_final
Heathrow booklet for release_finalHeathrow booklet for release_final
Heathrow booklet for release_final
 
The importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspectiveThe importance of Value of Time studies - a Dutch perspective
The importance of Value of Time studies - a Dutch perspective
 
STEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in Emissions
STEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in EmissionsSTEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in Emissions
STEP Summer Seminar 2017 - Johnathan Murray, Low CVP - Trends in Emissions
 
Hydrogen, fuel cells and Electro-mobility in European Regions
Hydrogen, fuel cells and  Electro-mobility in European Regions Hydrogen, fuel cells and  Electro-mobility in European Regions
Hydrogen, fuel cells and Electro-mobility in European Regions
 
Eu strategy for ertms deployment s. ouaki 2
Eu strategy for ertms deployment   s. ouaki 2Eu strategy for ertms deployment   s. ouaki 2
Eu strategy for ertms deployment s. ouaki 2
 
EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications EGNOS service for payment and liability critical road applications
EGNOS service for payment and liability critical road applications
 
Talk_SciEnvRes_Gombodshaw_Boß_0466122.pptx
Talk_SciEnvRes_Gombodshaw_Boß_0466122.pptxTalk_SciEnvRes_Gombodshaw_Boß_0466122.pptx
Talk_SciEnvRes_Gombodshaw_Boß_0466122.pptx
 

Motorway Interchange Location Model (Three Minutes Presentation)

  • 1. Optimum Location of Motorway Interchanges: Concessionaires’ Perspective PhD student Hugo Repolho University of Coimbra PORTUGAL
  • 2. Introduction (1) OptimumLocationofMotorwayInterchanges: Concessionaires’Perspective OBJECTIVE: develop an optimization model for assisting toll-motorway concessionaires in the analysis of the most profitable solutions for Motorway Interchanges Location Problem. The location of the interchanges strongly impacts the amount of traffic that the motorway can capture from the existing road network. In Europe most motorways are owned by the State but operated by private concessionaires. The concessionaires may define certain design details for the motorway, namely the motorway interchanges location (access and exit points). Their profit comes from the application of a certain toll fee per mile to the motorway users.
  • 3. Introduction (2) OptimumLocationofMotorwayInterchanges: Concessionaires’Perspective 1 n m M i j i ASSUMPTIONS: There are two types of routes to consider: 1. Routes through the existing road network (choice 1); 2. Routes through a combination of existing roadway segments and new motorway segments (choice 2). • People will travel through the least cost route; • The proportion of people using the motorway increases as the travel costs decrease; Choice 1Choice 2
  • 4. MILM: model’s objective function OptimumLocationofMotorwayInterchanges: Concessionaires’Perspective          Mm m Ji jiJj Mm amnMn ijmnmnijmn wfyxdqtaMax ijmn ij : 0and: 02 OBJECTIVE FUNCTION: expresses the profit for the concessionaire, given as the difference between total toll fee revenue and fixed charges for installing and operating the interchanges and constructing the motorway. Total toll fee revenue Fixed charges The MILM can be seen as a particular case of the p-hub median problem, which was formulated by Campbell, 1994.
  • 5. Portuguese case study •Motorway A25 located in the center of Portugal •Dataset : 55 centers and 33 candidate motorway interchanges; ArcMap 9.2 Image OptimumLocationofMotorwayInterchanges: Concessionaires’Perspective
  • 6. Portuguese case study - Results ArcMap 9.2 Image 1 3 4 6 7 9 11 13 18 2624 28 33 10 14 15 17 29 22 31 18227 36404 45974 53140 55109 49081 52703 54942 53192 36569 34342 32250 36910 30873 31369 26624 25026 0 10000 20000 30000 40000 50000 60000 0.03 0.04 0.045 0.049 0.05 0.051 0.053 0.054 0.055 0.056 0.06 0.065 0.07 0.08 0.085 0.09 0.1 Profit(€/day) Toll fee (€/km) OptimumLocationofMotorwayInterchanges: Concessionaires’Perspective •The model was run for several Toll fee values.
  • 7. Final Considerations OptimumLocationofMotorwayInterchanges: Concessionaires’Perspective The optimum location of motorway interchanges under the concessionaires’ perspective follows a previous work done under the users’ perspective, which aimed to minimize travel costs. We believe that the concessionaires’ perspective is the most relevant in real- world applications. The models presented are useful in toll-motorway concessionaires’ cost-benefit analysis.