GONKA, established as a limited company in 1986 in Ostim, Ankara, has become one of the leading firms in Heating - Cooling - Air Conditioning - Ventilating Installation, with the high performance and disciplined working mentality of Halil GONCU (Mechanical engineer, BS MS ITU, 1975) and Salih KADAYIFCIOGLU (Mechanical Engineer, BS GU, 1982) within more than 23 years for both manufacturing and contracting.
GONKA Company, has been continuing its activities, in its factory located in Sincan Organized Industrial Area, since 1996. GONKA manufactures its products related to Heating - Cooling - Air Conditioning - Ventilating Installation in its factory in an area of 10.000 m2 and equipped with the latest technology.
GONKA, which is continuing its activities through its technical and managerial staff in its modern Directorate General Building in Cetin Emec Boulevard, Ankara which it has moved in 2002, has been replaced "GONKA Air Conditioning Installation Construction and Trade Joint-Stock Company" by transforming into "joint-stock company" in 2003.
GONKA enforces its activity in Turkey By serving through its network consisted of Istanbul and Ankara Region Offices and maintenance-repair services firms. In regions other than these, GONKA offers contact and service through local offices and central maintenance-repair crews.
GONKA; has KnowHow, especially about the field of "Clean Room" technology, which requires sterility in operating theatres and air conditioning-ventilating systems of environments such as operas, theatres, auditorium buildings, television studios which require silence.
GONKA has created "model company" profile in air conditioning sector through both manufacturing or supply of devices and its disciplined approach in mechanical operations by succeeding a lot of projects within last 23 years. GONKA, which has focused on internto 32 countries and succeeded many projects in Middle-East, Asia and Africa countries by its powerful foreign trade departmentational projects in last 15 years, gave representations
2. BÝlesuvar Olympic Training Complex
Bilesuvar Olympic Training Complex
The Whole Mechanical Contracting ; piping, duct work,
heating system, boiler room, cooling system, were
made by GONKA. All HVAC equipment is supplied by
GONKA.
Swimming pool & olympic training facilities are
completed in the complex the, finshed in 2008
Air Cooled Water Chillers
Fan Coils Ceiling & Wall Type
Air Handling Units
Are used in complex
2008
2/3
3.
4. 4/5
2008 Baku Turkish Anatolian High School
Baku Turkish Anatolian High School
6. Göyçay Olympic Training Complex
Göyçay Olympic Training Complex
The Mechanical Contracting ; piping, duct work, heating
system, boiler room, cooling system, were made by GONKA
Inc. All HVAC equipment is manufactured and supplied by
GÖNKA
Swimming pool, & olympic training facilities and remaining
works are completed in 2009
2009
6/7
7. Boiler room, pump station and piping. Ductwork
Air cooled water chillers
Fan Coils Ceiling & Wall Type
Air Handling Units
Are used in complex
8. 8/9
2009 Hövsan Olympic Training Complex
Hövsan Olympic Training Complex
9. Air cooled liquid chiller
GONKA Screw compressor air cooled water cooling groups, Evaporator; Shell- tube evaporator whose cooling liquid side Low noise level.
with its models in the range of high efficiency and high and water side have one-circuit, multiple transitional, two Multiple compressor, multiple cyclical, high efficiency.
capacity, are ideal for cooling operations related to comfort mirrored construction. %25-%100 continuous modulating capacity control in every
Refrigerating Circuit;Cooling Circuit; Cooling circuit and compressor.
and industrial purposes. R22 , R134a or R407c options.
circuit elements entirely independent for every compressor. Hardconstruction and long life. Easy handling, installation
Compressors; Half hermetic screw compressors. and service.
Electrical Screen and Control Board; board including switch
Compressors changing between 1 and 4 according to Effortless service.
and micro-processor controlled module and control cards
cooling capacity. Compatible with available BMS systems.
as well as elements such as systemic control elements and Meeting consumer requirements in the most suitable way
Condenser; Highly efficient, original condenser situated in V
f u s e , t h e r m i c m a g n e t i c s w i t c h a n d r e l a y. through broad accessory and option alternatives.
type and condensation provided through 900 cyclical and
Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP
low sound level axial fans situated in the open edge of the the cooling circuits. Connections on board through simplified value. Trouble-proof operations under high temperatures.
condenser. device failure follow-up and easily recognized electrical Rational control.
diagram.
13. The Mechanical Contracting ; piping, duct work, heating
system, boiler room, cooling system, were made by GONKA
Inc. All HVAC equipment is manufactured and supplied by
GÖNKA
Swimming pool, & olympic training facilities and remaining
works are completed in 2009
Chiller Air Cooled
Fan Coils Ceiling & Wall Type
Air Handling Units
Are used in complex
14. Baku Administration Of The National Archive Building
Baku Administration Of The National
Archive Building
2008
14/15
15. Air handling unit
Standard Accessories; Standard Series Optional Accessories;
! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder,
mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and
different productivity levels on demand. microprocessor control unit.
! 8 different models which provide required humidity
! Heating and Cooling Coils; Seamless cooper tubes. In and temperature by conditioning air volume in the ! Mufflers which are made up of coulisses to provide
heating coils, 4 options: warm water, vapor, hot water, required sound holding capacity.
range of 3000m³/h and 100.000 m³/h.
electrically heated; in cooling coils, 2 options: chilled
water and DX (direct expansion). ! The framework which is formed by combination of ! Plate heat exchanger or Heat recovery wheel for
! Dampers; Rigid aluminum frame in multi airfoil aluminum frames, which are connected specially, with recovery of the heat emitted with exhaust air.
structure which is the least resistant against airflow. plastic and aluminum comers. ! Electrical board.
Rubber gaskets which reduce air leakage through
blades to the minimum level. ! Boards which are made up of double skilled ! Frequency Converter
galvanized iron in a standard way.
! Fans; Statically and dynamically balanced aspirators
and ventilators in double inlet belt driven centrifugal ! Polyurethane insulated panels, which are 30 mm in
type. Forward curved fans in systems with low, medium thickness, for thermal and acoustic insulation in a
and high duct pressures,. standard way.
17. Packaged hygienic air conditioner Laminar flow air system
! Highly efficient filtration of supply and extract air. ! HEPA filters which clean filtrated air before going into
! Maximum function control: room temperature and operating room.
relative humidity control throughout the year.
! Mounting situated in ceiling of the operating theatre in
! Meeting fresh air that surgical operations require
such a way that it should locate over operating table.
! Quiet and non-vibrating operation that operating
theatres require. ! Stainless steel air distribution box, Hepa filters, transparent
! An independent system which is under direct control of air distributor (laminarizator) and pendant operating
authorized health staff.
table lighting connection.
! Pressure control in aseptic and septic surgical
operations. ! Easy maintenance and disinfection because of
! Continuous control of room temperature and humidity. transparent air distributor's being pulled down. Operating
! Quiet and non-vibrating operation. theatre lighting system made up of airproof
! Replacing the old installation in available places and construction.
generally, because their sizes are small, occupying less ! A laminar, vertical air flow from transparent air distributor
room than any time before, however available air canal
through operating table prevents turbulent air flow in
and water installation could be, easy erection in any
type of health institutions. conventional air systems and offers a high level
cleanliness class around the operating table during the
! In fan part, one or two directly actuated highly static
operati
pressurized fans to provide required air volumetric flow
rate even when filters are choked. ! The system which remove particulates and microbes
! Fans with inverter; St316 stainless steel fans which are from operation part due to laminar flow.
used as a higher standard in respect to epoxy dyed
! Special design for operation theatres which require
standard fans in terms of hygiene and endurance. With a
view to achieving continuous speed control, inverter especially high level sterilization in accordance with DIN
equipment in supply and extract fans. 1946.
! Air Filters; F5 class filter in fresh air input and F9 class filters ! Differential pressure sensors. Easy connection differential
on the extract side.
pressure sensors and leakage testing.
! Dx battery;
! Easy installation to all kinds of ceilings.
! Vapor humidifiers; Standard steam cylinder, dipping
electrodes, stainless steam distributor and micro-
process control.
! Compressor; 1 or 2 Scroll Compressors according to the
capacity.
! Electrical Board; All of the elements required for the
trouble-proof operation of master switch and device.
! Micro-processor; AC micro-processor control of
temperature and relative humidity over all of the
operation and safety functions integrally (I) or rational-
integrally (PI).
! PCO2 micro-processor of device control and
adjustment system which provides remote control
terminal with erection inside the clean room.
18. Baku Ministry Of Health Topçubaþov Hospital
Baku Ministry Of Health Topçubaþov Hospital
Laminar flow system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. Operating from operation part due to laminar flow.
theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with DIN
such a way that it should locate over operating table.
2008
! A laminar, vertical air flow from transparent air distributor 1946.
through operating table prevents turbulent air flow in
! Stainless steel air distribution box, Hepa filters, transparent Differential pressure sensors. Easy connection differential
conventional air systems and offers a high level !
air distributor (laminarizator) and pendant operating cleanliness class around the operating table during the pressure sensors and leakage testing.
table lighting connection. operatic
! Easy installation to all kinds of ceilings.
18/19
22. Serin Hospital Azerbaijan
Packaged hygienic air conditioner
! Highly efficient filtration of supply and extract air. ! Replacing the old installation in available places and ! Dx battery;
generally, because their sizes are small, occupying less Vapor humidifiers; Standard steam cylinder, dipping
! Maximum function control: room temperature and !
room than any time before, however available air canal electrodes, stainless steam distributor and micro-
relative humidity control throughout the year.
and water installation could be, easy erection in any process control.
! Meeting fresh air that surgical operations require type of health institutions.
! Compressor; 1 or 2 Scroll Compressors according to the
! Quiet and non-vibrating operation that operating ! In fan part, one or two directly actuated highly static capacity.
theatres require. pressurized fans to provide required air volumetric flow
rate even when filters are choked. ! Electrical Board; All of the elements required for the
! An independent system which is under direct control of trouble-proof operation of master switch and device.
authorized health staff. ! Fans with inverter; St316 stainless steel fans which are
used as a higher standard in respect to epoxy dyed ! Micro-processor; AC micro-processor control of
! Pressure control in aseptic and septic surgical temperature and relative humidity over all of the
standard fans in terms of hygiene and endurance. With a
2008
operations. operation and safety functions integrally (I) or rational-
view to achieving continuous speed control, inverter
! Continuous control of room temperature and humidity. integrally (PI).
equipment in supply and extract fans.
! Quiet and non-vibrating operation. ! PCO2 micro-processor of device control and
! Air Filters; F5 class filter in fresh air input and F9 class filters adjustment system which provides remote control
on the extract side. terminal with erection inside the clean room.
22/23
26. Azerbaijan Military Hospital 300 Bed
Azerbaijan Military Hospital 300 Bed
Laminar flow system
! HEPA filters which clean filtrated air before going into ! Easy maintenance and disinfection because of ! The system which remove particulates and microbes
operating room. transparent air distributor's being pulled down. Operating from operation part due to laminar flow.
theatre lighting system made up of airproof
! Mounting situated in ceiling of the operating theatre in construction. ! Special design for operation theatres which require
especially high level sterilization in accordance with DIN
such a way that it should locate over operating table.
2007
! A laminar, vertical air flow from transparent air distributor 1946.
through operating table prevents turbulent air flow in
! Stainless steel air distribution box, Hepa filters, transparent ! Differential pressure sensors. Easy connection differential
conventional air systems and offers a high level
air distributor (laminarizator) and pendant operating cleanliness class around the operating table during the pressure sensors and leakage testing.
table lighting connection. operati
! Easy installation to all kinds of ceilings.
26/27
28. Central Bank of Azerbaijan Republic
Central Bank of Azerbaijan Republic
HVAC equipment periodic maintenance are being provided
by GONKA Inc.
2009
28/29
30. Azerbaijan Mc Donald’s
Azerbaijan Mc Donald’s
Centrifugal roof extracts
Technical specification The manufactured centrifugal roof Body It is designed according to the bat environment Fan has dense fimed, low sound level and
extract unit has been designed for the effective exhaust. it is conditions Galvanized stell frame, aluminium upper cover highperformance.It is easy to open the fan and clean the
possible to montage in the desired angle with the small are used. Moto-fan group Cenrifugal ventilatör is statically fin at shot notice. By the help aof special protection cover,
sound Ievel it may be used in for the industrial applications and dynamically balanced.Motor serves 380V/50 Hz 900- itwork many years without any problem. Centrifugal roof
and kitchens. It has been designed for Iong service Iife 1400d/d as astandard and directly coupled with d-phase extract units designed as direct extraction or combined
without maintenance. The manufacturing range 500- electirical motor.By this way, it works quitely and without with a duct type.
12.000 m³/h air and 0-50 mmSS pressure. vibration.
2002
30/31
33. Air handling unit
Standard Accessories; Standard Series
! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools,
mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants.
different productivity levels on demand.
! Heating and Cooling Coils; Seamless cooper tubes. In ! 8 different models which provide required humidity and Optional Accessories;
heating coils, 4 options: warm water, vapor, hot water, temperature by conditioning air volume in the range of
! GONKA vapor humidifier, standard vapor cylinder,
electrically heated; in cooling coils, 2 options: chilled 3000m³/h and 100.000 m³/h. immersion electrodes, stainless vapor distributor and
water and DX (direct expansion). microprocessor control unit.
! The framework which is formed by combination of
! Dampers; Rigid aluminum frame in multi airfoil structure aluminum frames, which are connected specially, with ! Mufflers which are made up of coulisses to provide
which is the least resistant against airflow. Rubber gaskets
plastic and aluminum comers. required sound holding capacity.
which reduce air leakage through blades to the
minimum level. ! Boards which are made up of double skilled galvanized ! Plate heat exchanger or Heat recovery wheel for
! Fans; Statically and dynamically balanced aspirators iron in a standard way. recovery of the heat emitted with exhaust air.
and ventilators in double inlet belt driven centrifugal ! Electrical board.
type. Forward curved fans in systems with low, medium ! Polyurethane insulated panels, which are 30 mm in
and high duct pressures,. thickness, for thermal and acoustic insulation in a ! Frequency Converter
standard way.
35. Fan coil units
! The most important feature of decorative type Fan-Coil ! Low sound level; quality is high level for providing quiet ! Internal frame; Mounting upon originally designed
units is their use both with casing and without casing study environment. framework made from galvanized steel together with
! Ideal acoustic and thermal insulation.
(concealed) in every position. While ceiling cabinet and battery, fan, motor group, dried pan and dropper.
! Functional remote control.
cabinet floor types are mounted inside the room,
! 2 or 3-way On/ Off or rational control. ! Battery; Copper pipe, aluminum fins.
concealed types are mounted within ceilings or walls.
! Outer casing; It is made from DKP sheet steel, outside ! Fan and engine group; 1 or 2 fans to provide required
Unit models which operate both heating and cooling or
and inside of the unit are painted with electrostatic
capacity in devices in accordance with capacity table.
only heating are available. powder paint against rust and external effects.
38. Hasanoglu Furniture Factory
Hasanoglu Furniture Factory
Air Cooled Water Chillers, Chambered Exhaust Fans, Air
Handling Units, Roof Extract Fans are manufactured, supplied
and installed by GONKA Inc.
2009-2010
38/39
39. Unit heaters with radial fan
GÖNKA GDA series unit heaters are designed to meet the Technical specification Casing Manufactured from In case fresh air intake is necessary, a mixing box is mounted
heating requirements of workshops, warehouses, factories, phosphatized steel sheets finished with oven baked on the air inlet to provide the required air mixture.Air
stores, garages, sporting halls etc. They are manufactured so discharge louvers In order to direct the airflow to desired
electrostatic paint. Centrifugal fan-motor group As a
direction adjustable discharge louvers, consisting of parallel
as to be connected either to hot water, superheated water or standard the centrifugal fans are directly coupled to three-
moving flaps and frames, are used. Coil connections
steam lines. There are 13 models in order to handle heating phase electric motor, which has high starting torque. The fans Connection of the coils to the hot water or steam lines is done
capacities between 4.000-60.000Kcal/h and they are are statically and dynamically balanced to ensure vibration easily via coil union stems, manufactured to fit standard
available in two types; wall mounted and ceiling. and noise free operation. Air mixing box pipes
40. GÖNKA Azerbaijan References
- Hövsan Olympic Training Complex
- Baku Turkish Anatolian High School
- Göyçay Olympic Training Complex
- Serin Hotel Baku
- Balaken Olympic Structure
- BÝlesuvar Olympic Structure
- Baku Administration Of The National
Archive Building
- Hb Clinique Baku
- Azerbaijan Baku Endos. Hospital
- Azerbaijan Military Hospital 300 Bed
- Karwan Mtk Azerbaijan
- Ata Okul Azerbaijan
- Serin Hospital Azerbaijan
- Baku Ministry Of Health Topçubaþov
Hospital
- Baku State University Kitchen And
Restaurant
FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE
Organize Sanayi Bölgesi Nerimanov rayonu, 117 Tsereteli avenue
Göktürk C ad. N o:6 Y. V. Çemenzeminli Sok. Tbilisi - GEORGIA
Sincan / ANKARA / TURKEY 1996-cý mahalle AFEN Plaza Tel: (00 995) 32 921 821
Tel :0 312 267 09 90 (pbx) Baku - AZERBAIJAN Fax:(00 995) 32 941 120
Fax:0 312 267 09 93 Tel / Fax: (00 994) 12 564 07 04