World Bank Final Supervision and
Completion Mission
May 7, 2014
Particulars Surface Water Ground Water Total
Total Provision
(2006-14)
412.26 581.83 994.09
Total Expenditure
up to March 2014
394.07
(95.58%)
522.87
(89.87%)
916.94
(92.24%)
Likely expenditure
during 2014-15
(April To May)
3.25 5.00 8.25
Total Likely
cumulative
expenditure up to
May 2014
397.32
(96.38%)
527.87
(90.73%)
925.19
(93.07%)
Financial Target & Achievement
(Surface Water & Ground Water)
(Rs. in lakhs)
Total Provision (2006-14) 412.26
Total Expenditure up to March 2014 394.07 (95.58%)
Likely expenditure during 2014-15
(April To May)
3.25
Total Likely cumulative expenditure up
to May 2014
397.32 (96.38%)
Financial Target & Achievement
(Rs. in lakhs)
Surface Water
Total Provision (2006-14) 581.83
Total Expenditure up to March 2014 522.87 (89.87%)
Likely expenditure during 2014-15
(April To May)
5.00
Total Likely cumulative expenditure up
to May 2014
527.87 (90.73%)
Financial Target & Achievement
(Rs. in lakhs)
Ground Water
Detailed Cost
Project Cost
Expenditure
(Up to March 2014)
Investment Recurrent Total Investment Recurrent Total
A. COMPONENT I: Institutional Strengthening
I.A. Consolidation of HP I 99.12 5.70 104.82 97.34 5.65 102.99
I.B. Awareness, Dissemination
and Knowledge Sharing
24.99 27.98 52.97 21.69 27.98 49.67
I.C. Implementation Support 50.54 105.31 155.85 50.54 96.42 146.96
B. COMPONENT II: Vertical Extension
II.A. Hydrological Design Aids 0.00 3.63 3.63 0 3.63 3.63
II.B. Decision Support Systems 17.45 39.26 56.71 16.45 38.27 54.72
II.C. Purpose-Driven Studies 19.53 18.75 38.28 17.79 18.31 36.10
Total 211.63 200.63 412.26 203.81 190.26 394.07
Financial Target & Achievement (Surface Water)
(Rs. in lakhs)
Detailed Cost
Project Cost
Expenditure
(Up to March 2014)
Investment Recurrent Total Investment Recurrent Total
A. COMPONENT I: Institutional Strengthening
I.A. Consolidation of HP I 64.88 8.50 73.39 61.71 8.51 70.22
I.B. Awareness, Dissemination
and Knowledge Sharing
62.02 17.66 79.68 59.27 17.66 76.93
I.C. Implementation Support 35.08 250.91 285.99 28.08 228.62 256.70
B. COMPONENT II: Vertical Extension
II.A. Hydrological Design Aids 0.00 0.00 0.00 0.00 0.00 0.00
II.B. Decision Support Systems 97.55 41.66 139.20 73.79 41.66 115.45
II.C. Purpose-Driven Studies 3.57 0.00 3.57 3.57 0.00 3.57
Total 263.10 318.73 581.83 226.42 296.45 522.87
Financial Target & Achievement (Ground Water)
(Rs. in lakhs)
ITEM
Expenditure
(in Lakhs)
Classification
Preparation of Water Year Book 1.45 Goods
Preparation of Brochure 1.50 Training
Website development & maintenance 1.00 Consultancy
Procurement of Tipping Bucket
Raingauge sensor & with microcontroller
based data logger with 10 watt solar
pannel-19 nos.
12.97 goods
Training & workshop 5.71 Training
Recurring Cost 7.86 Operating Cost
TOTAL 30.49
Work completed in 2013-14 (Surface Water)
ITEM
Expenditure
(in Lakhs)
Classification
Software Training &
Awareness Workshop
2.79 Training
Up grading Hardware 4.50 Goods
Construction of Piezometer 48.25 Civil Work
Incremental staff cost, office
O/M
12.70 Operating cost
Total 68.24
Work completed in 2013-14 (Ground Water)
STATUS OF CLAIM
Surface Water & Ground water
(Up to March 2014)
Particular
Surface
water
Ground
Water
Total
Total Expenditure 394.07 522.87 916.94
Total reimbursement claim
submitted
337.87 436.07 773.94
Reimbursement claim
released
287.39 365.29 652.68
Reimbursement amount
adjusted against advance
50.48 70.78 121.26
(Rs. in lakhs)
FMR
Surface Water
Submitted up to March 2014
FMR
Ground Water
Submitted up to March 2014
Trainings & Workshops (Surface Water)
S.
No
Type of Training
No. of
training
Courses
No. of participant
attended training
Courses
1 Inhouse training
27 1093
2
Domestic training at
NIH, NWA, ASCI etc 35 72
3 International training 1 1
Trainings & Workshops (Ground Water)
S.
No
Type of Training
No. of
training
Courses
No. of participant
attended training
Courses
1 Inhouse training
24 707
2 Workshop 96 4908
3
Domestic training at
NIH, NWA, ASCI etc
73 96
Major Physical Achievement & Outcome
Surface Water
Major Physical Achievement & Outcome
Existing State Data
Centre Meeting hall
constructed in HP-I,
upgraded with
1.Overhead projector
2. Improved sound &
light system
3. Wooden wall
paneling
4. Interactive white
board
5. Desktop projection
system
Major Physical Achievement & Outcome
Existing conference hall constructed in HP-I, upgraded with
1. Overhead projector
2. Sound and light system.
Major Physical Achievement & Outcome
Divisional, 5 nos. Sub Divisional, & State Data Centre equipped with new
computers, printers , scanner etc. to facilitate data entry & processing activities.
Major Physical Achievement & Outcome
DSS hardware & software installed at State Data Centre Raipur
Major Physical Achievement & Outcome
Tipping Bucket Rain gauge installed at 35 nos. G-D station
Major Physical Achievement & Outcome
Mini Gym established at State Data Centre Raipur
Major Physical Achievement & Outcome
Web site hydrologyproject.cgwrd.in have been launched
to disseminate HIS.
Major Physical Achievement & Outcome
Water year books published to disseminate the data.
Brochure published for awareness raising
Major Physical Achievement & Outcome
Major Physical Achievement & Outcome
Data generated under the Project is being used in –
•Planning of Irrigation projects.
•Designing of highway structures.
•Crop insurance schemes.
•Data used by Army in Naxal affected areas.
•Preparing project feasibility report for new industries like
thermal power station, cement plants, power transmission
system etc.
Major Physical Achievement & Outcome
The project has provided extensive skill building of staff in
HIS. About 1170 participants attended training courses.
Major Physical Achievement & Outcome
Ground Water
Major Physical Achievement & Outcome
Ground Water Divisional Data Centre Bilaspur, upgraded with new
training hall equipped with projector & sound system.
Major Physical Achievement & Outcome
Divisional Data Centre equipped with new computers, printers , scanner etc. to
facilitate data entry & processing activities.
Major Physical Achievement & Outcome
Sub Divisional Data Centre equipped with new computers, printers , scanner etc.
to facilitate data entry & processing activities.
Major Physical Achievement & Outcome
Piezometer (58 nos) constructed for monitoring of Ground water level.
S.N. District No of
Peizometer
1 Durg 05
2 Balod 05
3 Bemetara 05
4 Raipur 03
5 Balodabazar 06
6 Dhamtari 01
7 Kawardha 05
8 Rajnandgaon 10
9 Bilaspur 09
10 Janjgir-Champa 01
11 Korba 01
12 Mungeli 07
Major Physical Achievement & Outcome
Ground Water Year Books published to disseminate the
data.
Major Physical Achievement & Outcome (Ground Water)
Data generated under the project has been used in -
•Water Resources planning.
•Academic / Scientific investigation.
•Environmental Impact Assessment.
•Crop production schemes.
•Watershed planning
•Site selection plan for sugar factory, Hospital etc.
•Planning & implementation of various schemes under
MGNREGA
Major Physical Achievement & Outcome
The project has provided extensive skill building of staff in
HIS. About 803 participants attended training courses.
Major Physical Achievement & Outcome
The project has provided extensive Awareness workshop at village, blocks &
District level. About 4908 Participant attended Various workshop .
GROUND WATER STATUS
OF
CHHATTISGARH
Major Physical Achievement & Outcome
Total
replenishable
GW
Available
GW leaving
apart
natural
losses
Ground
Water
Draft
Allocation
for Domestic
/Industrial
use
Balance GW
for future
development
State of
development
in %
12.22 11.58 3.60 0.64 7.85 31.08
Out of 146 blocks of the state 14 blocks assessed as Semi-critical block,
crossed 70% stage of GW development.
Name of Semi-critical blocks are Balod, Bemetara, Dhamdha, Durg, Gurur, Patan,
Saja, Belha, Dhamtari, Kurud, Nagari, Pandariya, Baramkela & Rajnandgaon.
Durg District have highest stage of Ground Water development 68.81%
Bijapur District have lowest stage of Ground Water development 1.59%
Rest of 132 blocks of State have assessed as Safe from Ground Water development
point of view.
Blocks categorized as semi-critical and caution needs to be exercised prior to
additional withdrawal.
31.08% of Present GW development in state indicates brighter scope for future
development .
(in BCM)
GROUND WATER RESOURCES OF STATE
(As on 2009)
COMPARISON OF SEMI- CRITICAL BLOCKS - 2004 Vs 2009
Comparison of Assessment of Dynamic Ground Water Resources of
Chhattisgarh ,for the Period 2004 - 2009 -2011 (Block Wise)
Year Safe Semi-Cretical Critical Over-Exploited
2004 138 8 0 0
2009 132 14 0 0
2011 125 18 2 1
HYDROLOGICAL DESIGN AIDS (HDA)
Officials (2 nos.) nominated for HDA work. Officials attended
training courses at NWA, Pune. They are practicing on MAP
WINDOW, HDA & MWSWAT Software.
Training Courses-
• Advanced Techniques/Models for Hydrological Design Aids
(21-25 May 2012).
• HDA 1 – Assessment of Water Resources Potential
availability / Yield assessment (10-15 Sep. 2012).
• HAD 2 – Estimation of Design Flood (07-12 Jan. 2013).
Total Provision – 57.71 Lakhs
Expenditure – 54.60 Lakhs
DECISION SUPPORT SYSTEM
(Planning)
Surface Water
Ground Water
Total Provision – 139.21 Lakhs
Expenditure – 115.48 Lakhs
Seonath Sub Basin
C H H A T T I S G A R H
Seonath Sub Basin
is selected for
Conjunctive Use
under DSS Planning
Catchment
Area
30860 Sq.km.
Length of
river
375.79 km.
Normal
Annual
Rainfall
Varies 900 mm
to 1200 mm
• Server and Front End Computers installed at State Data Centre Raipur.
•DSS Application is made for Intra Basin transfer of water from Ravishankar
Reservoir to Tandula Reservoir.
 DSS Software updated to latest version 4.0
 Model and Interface for conjunctive use in Tandula Complex is finalised.
Model and Interface for seasonal planning in Tandula Complex is finalised.
DSS (P) Implementation
DSS Application
Intra Basin Transfer of Water
MIKE BASIN Network of the Ravishankar
and Tandula Reservoirs Systems
Intra Basin Transfer of Surplus Water
Ravishankar Sagar
Project (RSP)
Tandula
Reservoir
New Link Canal
Proposed cost of Link Canal Project Rs 350.00 Crores
Length of Canal 54.50 Km
Capacity of Canal 47 Cumecs
Proposed Yearly Surplus water
transfer to Tandula Reservoir
85 MCM
Continue
This Project is under scrutiny at CWC, New Delhi for
pre feasibility clearance.
Mike Basin Model is developed for Intra Basin Transfer of
Spill water from Ravishankar Sagar Project.
• Mike Basin Model is developed for Intra Basin Transfer
of Spill water.
• 10 Simulations (period 6 Years) carried out for canal
capacity 25-250 cumecs to calculate-
Total number of days when RSP spills.
Quantity of spill water of RSP.
Total No of days water Transfer to Tandula Reservoir in
One year.
Quantity of water transfer to Tandula Reservoir in One
year
Continue
Intra Basin Transfer of Spill Water
Discription Unit
Scenario
1
Scenario
2
Scenario
3
Scenario
4
Scenario
5
Scenario
6
Scenario
7
Scenario
8
Scenario
9
Scenario
10
Transfer
water
RSP to
Tandula
Cum
ecs
0 25 50 75 100 125 150 175 200 250
Total No of
days when
RSP spilling
Day 162 79 63 52 36 25 12 8 7 3
Total
Quantity of
spill water
MCM 761.305 551.960 400.495 278.358 183.434 117.866 80.498 60.803 44.886 21.957
Total water
for Transfer
to Tandula
MCM 0.00 209.34 360.81 482.95 577.87 643.44 680.81 700.50 716.42 739.35
Total No of
days water
transfer in
One Year
Day 0 27 27 27 27 27 27 27 27 27
Average
Yearly water
for Transfer
to Tandula
MCM 0.00 34.89 60.13 80.49 96.31 107.24 113.47 116.75 119.40 123.22
Simulation - Summary
Simulation Period 01/01/2003 to 01/01/2009 - 6 Year
So, as per Scenario 2 - 10, Spill water is available for transfer to
Tandula Reservoir by link canal of capacity 25 - 250 cumecs.
Model and Interface
for conjunctive use in
Tandula Complex
Rudri Barrage
Kharkhara-Tandula
EXISTING
PROPOSED
Proposed RSP-Tandula Link
Gondli RBC
LIS 345
Hact
MAHANADIMAINCANAL
1.80TMC
VinayakpuCatch
9730Hact
AmdiCatch
13720Hact
KotaniCatch
7940Hact
PathardihCatch
12490Hact
4.0 TMC
RBC 120 Hact.
SPILL&MMC
LBC 2105
Hact.
SimgaCatch
20820Hact
LBC 2024
Hact.
RBC
4048
Hact.
KMC
12145
Hact
BSP
SahgaonCatch
6600Hact
Tandula Command
Domestic
Use
KMLC
KharkharaLBC
GondliLBC
RSP
RSP Tandula 2.20 TMC
Kharkhara RBC
TANDULAGONDLI
KHARKHARA
Vinaykpur 9730 Hact.
Amadi 13720 Hact.
6600 Hact.
Kotani 7940 Hact.
Pathardih 12490 Hact.
Total 71300 Hact.
Kharkhara Command
LBC 2024
Simga 20820 Hact.
Sahagaon
Hact.
RBC 2024 Hact.
LIS 2024 Hact.
KMC 2025 Hact.
Total 8097 Hact.
Mike basin model for
conjunctive use application
in Tandula command area
Command area divided
into catchment wise
5 part
71300 Hect.
Kharif Paddy
9080 Hect.
Rabi Paddy
Yearly water used without GW Abstraction
Base Scenario
Volume in MCM/YEAR
Vinayakpur Amdi Kotani Pathardih Sahgaon Simga Total
Demands 21.40 30.18 17.45 27.44 14.51 45.75 156.72
Surface Water 21.40 30.18 17.40 26.99 11.42 29.48 136.86
Ground Water 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Deficit 0.00 0.00 0.05 0.46 3.09 16.27 19.86
Yearly water used With GW Abstraction
Volume in MCM/YEAR
Vinayakpur Amdi Kotani Pathardih Sahgaon Simga Total
Demands 21.40 30.18 17.45 27.44 14.51 45.75 156.72
Surface Water 19.16 27.03 15.57 24.12 12.84 24.31 123.03
Ground Water 2.24 3.15 1.82 2.87 0.91 19.13 30.13
Deficit 0.00 0.00 0.05 0.46 0.75 2.31 3.57
Total Provision – 39.54 Lakhs
Expenditure – 36.21 Lakhs
Final report submitted to PCS
PURPOSE DRIVEN STUDY
(PDS)
Study of Reservoir sedimentation, Impact
Assessment and Development of
Catchment Area Treatment Plan for Kodar
Reservoir, Major Project in Chhattisgarh
State
Study - I
Conclusion
• The sedimentation analysis of Kodar reservoir indicated that 24.94
Mm3 of gross storage (15.5%) and 4.89 Mm3 of dead storage (43%)
have been lost in 32 years (1976-77 to 2008-09).
•Having conducted many soil testing techniques, it is concluded that the
soils in the study area are mainly silt loamy and sandy loam which is
prone to erosion and conservation measures are necessary to reduce
displacement of soils.
•Soil erosion could be reduced from 2.97 t/ha to 1.63 t/ha through a
series of 37 gully plugs, 22 nala plugs, 21 boulder bunds and 6
check dams with terraces, bank stabilization with land use
modifications (e.g. a forestation) providing further options to control
sediment inflows to Kodar reservoir.
Implementation
Proposal has been sent to Project Authority for execution of
Catchment Area Treatment Plan to reduce the sedimentation.
Water availability study and supply-
demand analysis in Kharun sub-basin
of Seonath basin in Chhattisgarh State
Study - II
Conclusions
•The water availability in Kharun river becomes very low during the
months from January to March and it becomes highest during the
month of August.
•The drought study indicated that the Kharun basin experience two
meteorological droughts during every 10 years period and 1-2 low
flow condition every year in the river. Droughts are of moderate
nature and seems to be of no threat in area.
•The total water demand to be met from Kharun in year 2010-11 was
65.21 MCM which will become 174.56 MCM by the year 2050-51. When
water demand will increases to 133 MCM (in 2030-31) and 175 MCM
(in 2050-51) the water deficit will become 73.56 MCM and 105.33 MCM
respectively.
•To meet the future water demands, four possible sites were
identified and proposed on Kharun river for construction of small
dam.
Lesson Learnt
• Need of regular assessment of revised capacities of reservoir in
the state. Development and implementation of CAT (Catchment
Area Treatment) plan during project planning. Major rivers
should be monitored for sediment.
• Proper and regular assessment of water demand and
accounting of supplies through various sources to different
user is important in water resources planning of the river basin
to meet the various use water demand judiciously.
• The coordination among the central agency and implementing
state is crucial to achieveing a comprehensive HIS. There shall
be better sharing of information and data.
• Expansion of hydrological Data User Group (HDUG) up to
district level which is at present State level, will be more
beneficial for application of HIS.
• Quality assurance on data collection, processing, analysis and
reporting can be improved..
Plan for information dissemination and
application
• Arpa Sub basin (New basin) is selected for Surface water
planning & conjunctive use. Data collection work completed
and further work is under progress jointly with NIH
scientists.
• Report of Reservoir sedimentation, Impact Assessment and
Development of Catchment Area Treatment Plan for Kodar
Reservoir provided to project authority. They are planning to
construct various structures as recommended in the report
to control sedimentation in reservoir.
• Website upgraded to hydrologyproject.cgwrd.in to
disseminate HIS.
Model setup for Arpa Basin (New Basin) in Mike Hydro
62
Water Resources Department
Chhattisgarh

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Check dams
Check damsCheck dams
Check dams
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
Watershed management
Watershed  managementWatershed  management
Watershed management
 
Gully Control Structures.pptx
Gully Control Structures.pptxGully Control Structures.pptx
Gully Control Structures.pptx
 
Water resources and irrigation scenario of India.pptx
Water resources and irrigation scenario of India.pptxWater resources and irrigation scenario of India.pptx
Water resources and irrigation scenario of India.pptx
 
Irrigation developement in india
Irrigation developement in indiaIrrigation developement in india
Irrigation developement in india
 
WATERSHED MANAGEMENT
WATERSHED MANAGEMENTWATERSHED MANAGEMENT
WATERSHED MANAGEMENT
 
Erosion control measures
Erosion control measuresErosion control measures
Erosion control measures
 
Water resources development in india.
Water resources development in india.Water resources development in india.
Water resources development in india.
 
Watershed management dr.chandan
Watershed management  dr.chandanWatershed management  dr.chandan
Watershed management dr.chandan
 
Evapotranspiration ppt
Evapotranspiration pptEvapotranspiration ppt
Evapotranspiration ppt
 
Land Suitability Classification
Land Suitability ClassificationLand Suitability Classification
Land Suitability Classification
 
Watershed development (civil)
Watershed development (civil)Watershed development (civil)
Watershed development (civil)
 
Drought indices
Drought indices Drought indices
Drought indices
 
Godavari River
Godavari RiverGodavari River
Godavari River
 
Watershed management
Watershed managementWatershed management
Watershed management
 
Gully classification and its contol measures
Gully classification and its contol measuresGully classification and its contol measures
Gully classification and its contol measures
 
Methods of irrigation
Methods  of irrigationMethods  of irrigation
Methods of irrigation
 
Shelterbelts and windbreaks
Shelterbelts and windbreaksShelterbelts and windbreaks
Shelterbelts and windbreaks
 
Land Capability Classification
Land Capability ClassificationLand Capability Classification
Land Capability Classification
 

Similar a Chhattisgarh

Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
hydrologyproject0
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
hydrologywebsite1
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
hydrologywebsite1
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
hydrologyproject0
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
hydrologywebsite1
 
Download-manuals-general-sapr-october1998
 Download-manuals-general-sapr-october1998 Download-manuals-general-sapr-october1998
Download-manuals-general-sapr-october1998
hydrologywebsite1
 
Shankaraiah N :Watershed Program Present
Shankaraiah N :Watershed Program  PresentShankaraiah N :Watershed Program  Present
Shankaraiah N :Watershed Program Present
shankaraiah, N
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
hydrologywebsite1
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
hydrologyproject001
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
hydrologywebsite1
 

Similar a Chhattisgarh (20)

Mp surface water
Mp surface waterMp surface water
Mp surface water
 
Gujarat surface water
Gujarat surface waterGujarat surface water
Gujarat surface water
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
 
Kerala sw
Kerala swKerala sw
Kerala sw
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
Achievement of new state under hp 2 - himachal pradesh in integrated water ma...
 
Download-manuals-general-sapr-october1998
 Download-manuals-general-sapr-october1998 Download-manuals-general-sapr-october1998
Download-manuals-general-sapr-october1998
 
4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept4 - DHI-Presentation-flood management-16 Sept
4 - DHI-Presentation-flood management-16 Sept
 
2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep2 - MoWR - HP-III presentation-16th Sep
2 - MoWR - HP-III presentation-16th Sep
 
Shankaraiah N :Watershed Program Present
Shankaraiah N :Watershed Program  PresentShankaraiah N :Watershed Program  Present
Shankaraiah N :Watershed Program Present
 
Cwc
CwcCwc
Cwc
 
Download-manuals-general-final report
 Download-manuals-general-final report Download-manuals-general-final report
Download-manuals-general-final report
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Cwprs
CwprsCwprs
Cwprs
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Pcs 070514
Pcs 070514Pcs 070514
Pcs 070514
 

Más de hydrologywebsite1

Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
hydrologywebsite1
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
hydrologywebsite1
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
hydrologywebsite1
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
hydrologywebsite1
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
hydrologywebsite1
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 Download-manuals-surface water-manual-sw-volume10protocolsandvalidation Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
hydrologywebsite1
 

Más de hydrologywebsite1 (20)

Punjab 8.4.14 edt
Punjab 8.4.14 edtPunjab 8.4.14 edt
Punjab 8.4.14 edt
 
Maharashtra sw_ce_050514
Maharashtra  sw_ce_050514Maharashtra  sw_ce_050514
Maharashtra sw_ce_050514
 
Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Goa
GoaGoa
Goa
 
Bbmb
BbmbBbmb
Bbmb
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
 
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 Download-manuals-surface water-manual-sw-volume10protocolsandvalidation Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Último (20)

Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 

Chhattisgarh

  • 1. World Bank Final Supervision and Completion Mission May 7, 2014
  • 2. Particulars Surface Water Ground Water Total Total Provision (2006-14) 412.26 581.83 994.09 Total Expenditure up to March 2014 394.07 (95.58%) 522.87 (89.87%) 916.94 (92.24%) Likely expenditure during 2014-15 (April To May) 3.25 5.00 8.25 Total Likely cumulative expenditure up to May 2014 397.32 (96.38%) 527.87 (90.73%) 925.19 (93.07%) Financial Target & Achievement (Surface Water & Ground Water) (Rs. in lakhs)
  • 3. Total Provision (2006-14) 412.26 Total Expenditure up to March 2014 394.07 (95.58%) Likely expenditure during 2014-15 (April To May) 3.25 Total Likely cumulative expenditure up to May 2014 397.32 (96.38%) Financial Target & Achievement (Rs. in lakhs) Surface Water
  • 4. Total Provision (2006-14) 581.83 Total Expenditure up to March 2014 522.87 (89.87%) Likely expenditure during 2014-15 (April To May) 5.00 Total Likely cumulative expenditure up to May 2014 527.87 (90.73%) Financial Target & Achievement (Rs. in lakhs) Ground Water
  • 5. Detailed Cost Project Cost Expenditure (Up to March 2014) Investment Recurrent Total Investment Recurrent Total A. COMPONENT I: Institutional Strengthening I.A. Consolidation of HP I 99.12 5.70 104.82 97.34 5.65 102.99 I.B. Awareness, Dissemination and Knowledge Sharing 24.99 27.98 52.97 21.69 27.98 49.67 I.C. Implementation Support 50.54 105.31 155.85 50.54 96.42 146.96 B. COMPONENT II: Vertical Extension II.A. Hydrological Design Aids 0.00 3.63 3.63 0 3.63 3.63 II.B. Decision Support Systems 17.45 39.26 56.71 16.45 38.27 54.72 II.C. Purpose-Driven Studies 19.53 18.75 38.28 17.79 18.31 36.10 Total 211.63 200.63 412.26 203.81 190.26 394.07 Financial Target & Achievement (Surface Water) (Rs. in lakhs)
  • 6. Detailed Cost Project Cost Expenditure (Up to March 2014) Investment Recurrent Total Investment Recurrent Total A. COMPONENT I: Institutional Strengthening I.A. Consolidation of HP I 64.88 8.50 73.39 61.71 8.51 70.22 I.B. Awareness, Dissemination and Knowledge Sharing 62.02 17.66 79.68 59.27 17.66 76.93 I.C. Implementation Support 35.08 250.91 285.99 28.08 228.62 256.70 B. COMPONENT II: Vertical Extension II.A. Hydrological Design Aids 0.00 0.00 0.00 0.00 0.00 0.00 II.B. Decision Support Systems 97.55 41.66 139.20 73.79 41.66 115.45 II.C. Purpose-Driven Studies 3.57 0.00 3.57 3.57 0.00 3.57 Total 263.10 318.73 581.83 226.42 296.45 522.87 Financial Target & Achievement (Ground Water) (Rs. in lakhs)
  • 7. ITEM Expenditure (in Lakhs) Classification Preparation of Water Year Book 1.45 Goods Preparation of Brochure 1.50 Training Website development & maintenance 1.00 Consultancy Procurement of Tipping Bucket Raingauge sensor & with microcontroller based data logger with 10 watt solar pannel-19 nos. 12.97 goods Training & workshop 5.71 Training Recurring Cost 7.86 Operating Cost TOTAL 30.49 Work completed in 2013-14 (Surface Water)
  • 8. ITEM Expenditure (in Lakhs) Classification Software Training & Awareness Workshop 2.79 Training Up grading Hardware 4.50 Goods Construction of Piezometer 48.25 Civil Work Incremental staff cost, office O/M 12.70 Operating cost Total 68.24 Work completed in 2013-14 (Ground Water)
  • 9. STATUS OF CLAIM Surface Water & Ground water (Up to March 2014) Particular Surface water Ground Water Total Total Expenditure 394.07 522.87 916.94 Total reimbursement claim submitted 337.87 436.07 773.94 Reimbursement claim released 287.39 365.29 652.68 Reimbursement amount adjusted against advance 50.48 70.78 121.26 (Rs. in lakhs)
  • 12. Trainings & Workshops (Surface Water) S. No Type of Training No. of training Courses No. of participant attended training Courses 1 Inhouse training 27 1093 2 Domestic training at NIH, NWA, ASCI etc 35 72 3 International training 1 1
  • 13. Trainings & Workshops (Ground Water) S. No Type of Training No. of training Courses No. of participant attended training Courses 1 Inhouse training 24 707 2 Workshop 96 4908 3 Domestic training at NIH, NWA, ASCI etc 73 96
  • 14. Major Physical Achievement & Outcome Surface Water
  • 15. Major Physical Achievement & Outcome Existing State Data Centre Meeting hall constructed in HP-I, upgraded with 1.Overhead projector 2. Improved sound & light system 3. Wooden wall paneling 4. Interactive white board 5. Desktop projection system
  • 16. Major Physical Achievement & Outcome Existing conference hall constructed in HP-I, upgraded with 1. Overhead projector 2. Sound and light system.
  • 17. Major Physical Achievement & Outcome Divisional, 5 nos. Sub Divisional, & State Data Centre equipped with new computers, printers , scanner etc. to facilitate data entry & processing activities.
  • 18. Major Physical Achievement & Outcome DSS hardware & software installed at State Data Centre Raipur
  • 19. Major Physical Achievement & Outcome Tipping Bucket Rain gauge installed at 35 nos. G-D station
  • 20. Major Physical Achievement & Outcome Mini Gym established at State Data Centre Raipur
  • 21. Major Physical Achievement & Outcome Web site hydrologyproject.cgwrd.in have been launched to disseminate HIS.
  • 22. Major Physical Achievement & Outcome Water year books published to disseminate the data.
  • 23. Brochure published for awareness raising Major Physical Achievement & Outcome
  • 24. Major Physical Achievement & Outcome Data generated under the Project is being used in – •Planning of Irrigation projects. •Designing of highway structures. •Crop insurance schemes. •Data used by Army in Naxal affected areas. •Preparing project feasibility report for new industries like thermal power station, cement plants, power transmission system etc.
  • 25. Major Physical Achievement & Outcome The project has provided extensive skill building of staff in HIS. About 1170 participants attended training courses.
  • 26. Major Physical Achievement & Outcome Ground Water
  • 27. Major Physical Achievement & Outcome Ground Water Divisional Data Centre Bilaspur, upgraded with new training hall equipped with projector & sound system.
  • 28. Major Physical Achievement & Outcome Divisional Data Centre equipped with new computers, printers , scanner etc. to facilitate data entry & processing activities.
  • 29. Major Physical Achievement & Outcome Sub Divisional Data Centre equipped with new computers, printers , scanner etc. to facilitate data entry & processing activities.
  • 30. Major Physical Achievement & Outcome Piezometer (58 nos) constructed for monitoring of Ground water level. S.N. District No of Peizometer 1 Durg 05 2 Balod 05 3 Bemetara 05 4 Raipur 03 5 Balodabazar 06 6 Dhamtari 01 7 Kawardha 05 8 Rajnandgaon 10 9 Bilaspur 09 10 Janjgir-Champa 01 11 Korba 01 12 Mungeli 07
  • 31. Major Physical Achievement & Outcome Ground Water Year Books published to disseminate the data.
  • 32. Major Physical Achievement & Outcome (Ground Water) Data generated under the project has been used in - •Water Resources planning. •Academic / Scientific investigation. •Environmental Impact Assessment. •Crop production schemes. •Watershed planning •Site selection plan for sugar factory, Hospital etc. •Planning & implementation of various schemes under MGNREGA
  • 33. Major Physical Achievement & Outcome The project has provided extensive skill building of staff in HIS. About 803 participants attended training courses.
  • 34. Major Physical Achievement & Outcome The project has provided extensive Awareness workshop at village, blocks & District level. About 4908 Participant attended Various workshop .
  • 35. GROUND WATER STATUS OF CHHATTISGARH Major Physical Achievement & Outcome
  • 36. Total replenishable GW Available GW leaving apart natural losses Ground Water Draft Allocation for Domestic /Industrial use Balance GW for future development State of development in % 12.22 11.58 3.60 0.64 7.85 31.08 Out of 146 blocks of the state 14 blocks assessed as Semi-critical block, crossed 70% stage of GW development. Name of Semi-critical blocks are Balod, Bemetara, Dhamdha, Durg, Gurur, Patan, Saja, Belha, Dhamtari, Kurud, Nagari, Pandariya, Baramkela & Rajnandgaon. Durg District have highest stage of Ground Water development 68.81% Bijapur District have lowest stage of Ground Water development 1.59% Rest of 132 blocks of State have assessed as Safe from Ground Water development point of view. Blocks categorized as semi-critical and caution needs to be exercised prior to additional withdrawal. 31.08% of Present GW development in state indicates brighter scope for future development . (in BCM) GROUND WATER RESOURCES OF STATE (As on 2009)
  • 37. COMPARISON OF SEMI- CRITICAL BLOCKS - 2004 Vs 2009
  • 38. Comparison of Assessment of Dynamic Ground Water Resources of Chhattisgarh ,for the Period 2004 - 2009 -2011 (Block Wise) Year Safe Semi-Cretical Critical Over-Exploited 2004 138 8 0 0 2009 132 14 0 0 2011 125 18 2 1
  • 39. HYDROLOGICAL DESIGN AIDS (HDA) Officials (2 nos.) nominated for HDA work. Officials attended training courses at NWA, Pune. They are practicing on MAP WINDOW, HDA & MWSWAT Software. Training Courses- • Advanced Techniques/Models for Hydrological Design Aids (21-25 May 2012). • HDA 1 – Assessment of Water Resources Potential availability / Yield assessment (10-15 Sep. 2012). • HAD 2 – Estimation of Design Flood (07-12 Jan. 2013).
  • 40. Total Provision – 57.71 Lakhs Expenditure – 54.60 Lakhs DECISION SUPPORT SYSTEM (Planning) Surface Water Ground Water Total Provision – 139.21 Lakhs Expenditure – 115.48 Lakhs
  • 41. Seonath Sub Basin C H H A T T I S G A R H Seonath Sub Basin is selected for Conjunctive Use under DSS Planning Catchment Area 30860 Sq.km. Length of river 375.79 km. Normal Annual Rainfall Varies 900 mm to 1200 mm
  • 42. • Server and Front End Computers installed at State Data Centre Raipur. •DSS Application is made for Intra Basin transfer of water from Ravishankar Reservoir to Tandula Reservoir.  DSS Software updated to latest version 4.0  Model and Interface for conjunctive use in Tandula Complex is finalised. Model and Interface for seasonal planning in Tandula Complex is finalised. DSS (P) Implementation
  • 43. DSS Application Intra Basin Transfer of Water
  • 44. MIKE BASIN Network of the Ravishankar and Tandula Reservoirs Systems
  • 45.
  • 46. Intra Basin Transfer of Surplus Water Ravishankar Sagar Project (RSP) Tandula Reservoir New Link Canal Proposed cost of Link Canal Project Rs 350.00 Crores Length of Canal 54.50 Km Capacity of Canal 47 Cumecs Proposed Yearly Surplus water transfer to Tandula Reservoir 85 MCM Continue This Project is under scrutiny at CWC, New Delhi for pre feasibility clearance. Mike Basin Model is developed for Intra Basin Transfer of Spill water from Ravishankar Sagar Project.
  • 47. • Mike Basin Model is developed for Intra Basin Transfer of Spill water. • 10 Simulations (period 6 Years) carried out for canal capacity 25-250 cumecs to calculate- Total number of days when RSP spills. Quantity of spill water of RSP. Total No of days water Transfer to Tandula Reservoir in One year. Quantity of water transfer to Tandula Reservoir in One year Continue Intra Basin Transfer of Spill Water
  • 48. Discription Unit Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5 Scenario 6 Scenario 7 Scenario 8 Scenario 9 Scenario 10 Transfer water RSP to Tandula Cum ecs 0 25 50 75 100 125 150 175 200 250 Total No of days when RSP spilling Day 162 79 63 52 36 25 12 8 7 3 Total Quantity of spill water MCM 761.305 551.960 400.495 278.358 183.434 117.866 80.498 60.803 44.886 21.957 Total water for Transfer to Tandula MCM 0.00 209.34 360.81 482.95 577.87 643.44 680.81 700.50 716.42 739.35 Total No of days water transfer in One Year Day 0 27 27 27 27 27 27 27 27 27 Average Yearly water for Transfer to Tandula MCM 0.00 34.89 60.13 80.49 96.31 107.24 113.47 116.75 119.40 123.22 Simulation - Summary Simulation Period 01/01/2003 to 01/01/2009 - 6 Year So, as per Scenario 2 - 10, Spill water is available for transfer to Tandula Reservoir by link canal of capacity 25 - 250 cumecs.
  • 49. Model and Interface for conjunctive use in Tandula Complex
  • 50. Rudri Barrage Kharkhara-Tandula EXISTING PROPOSED Proposed RSP-Tandula Link Gondli RBC LIS 345 Hact MAHANADIMAINCANAL 1.80TMC VinayakpuCatch 9730Hact AmdiCatch 13720Hact KotaniCatch 7940Hact PathardihCatch 12490Hact 4.0 TMC RBC 120 Hact. SPILL&MMC LBC 2105 Hact. SimgaCatch 20820Hact LBC 2024 Hact. RBC 4048 Hact. KMC 12145 Hact BSP SahgaonCatch 6600Hact Tandula Command Domestic Use KMLC KharkharaLBC GondliLBC RSP RSP Tandula 2.20 TMC Kharkhara RBC TANDULAGONDLI KHARKHARA Vinaykpur 9730 Hact. Amadi 13720 Hact. 6600 Hact. Kotani 7940 Hact. Pathardih 12490 Hact. Total 71300 Hact. Kharkhara Command LBC 2024 Simga 20820 Hact. Sahagaon Hact. RBC 2024 Hact. LIS 2024 Hact. KMC 2025 Hact. Total 8097 Hact.
  • 51. Mike basin model for conjunctive use application in Tandula command area Command area divided into catchment wise 5 part 71300 Hect. Kharif Paddy 9080 Hect. Rabi Paddy
  • 52. Yearly water used without GW Abstraction Base Scenario Volume in MCM/YEAR Vinayakpur Amdi Kotani Pathardih Sahgaon Simga Total Demands 21.40 30.18 17.45 27.44 14.51 45.75 156.72 Surface Water 21.40 30.18 17.40 26.99 11.42 29.48 136.86 Ground Water 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Deficit 0.00 0.00 0.05 0.46 3.09 16.27 19.86
  • 53. Yearly water used With GW Abstraction Volume in MCM/YEAR Vinayakpur Amdi Kotani Pathardih Sahgaon Simga Total Demands 21.40 30.18 17.45 27.44 14.51 45.75 156.72 Surface Water 19.16 27.03 15.57 24.12 12.84 24.31 123.03 Ground Water 2.24 3.15 1.82 2.87 0.91 19.13 30.13 Deficit 0.00 0.00 0.05 0.46 0.75 2.31 3.57
  • 54. Total Provision – 39.54 Lakhs Expenditure – 36.21 Lakhs Final report submitted to PCS PURPOSE DRIVEN STUDY (PDS)
  • 55. Study of Reservoir sedimentation, Impact Assessment and Development of Catchment Area Treatment Plan for Kodar Reservoir, Major Project in Chhattisgarh State Study - I
  • 56. Conclusion • The sedimentation analysis of Kodar reservoir indicated that 24.94 Mm3 of gross storage (15.5%) and 4.89 Mm3 of dead storage (43%) have been lost in 32 years (1976-77 to 2008-09). •Having conducted many soil testing techniques, it is concluded that the soils in the study area are mainly silt loamy and sandy loam which is prone to erosion and conservation measures are necessary to reduce displacement of soils. •Soil erosion could be reduced from 2.97 t/ha to 1.63 t/ha through a series of 37 gully plugs, 22 nala plugs, 21 boulder bunds and 6 check dams with terraces, bank stabilization with land use modifications (e.g. a forestation) providing further options to control sediment inflows to Kodar reservoir. Implementation Proposal has been sent to Project Authority for execution of Catchment Area Treatment Plan to reduce the sedimentation.
  • 57. Water availability study and supply- demand analysis in Kharun sub-basin of Seonath basin in Chhattisgarh State Study - II
  • 58. Conclusions •The water availability in Kharun river becomes very low during the months from January to March and it becomes highest during the month of August. •The drought study indicated that the Kharun basin experience two meteorological droughts during every 10 years period and 1-2 low flow condition every year in the river. Droughts are of moderate nature and seems to be of no threat in area. •The total water demand to be met from Kharun in year 2010-11 was 65.21 MCM which will become 174.56 MCM by the year 2050-51. When water demand will increases to 133 MCM (in 2030-31) and 175 MCM (in 2050-51) the water deficit will become 73.56 MCM and 105.33 MCM respectively. •To meet the future water demands, four possible sites were identified and proposed on Kharun river for construction of small dam.
  • 59. Lesson Learnt • Need of regular assessment of revised capacities of reservoir in the state. Development and implementation of CAT (Catchment Area Treatment) plan during project planning. Major rivers should be monitored for sediment. • Proper and regular assessment of water demand and accounting of supplies through various sources to different user is important in water resources planning of the river basin to meet the various use water demand judiciously. • The coordination among the central agency and implementing state is crucial to achieveing a comprehensive HIS. There shall be better sharing of information and data. • Expansion of hydrological Data User Group (HDUG) up to district level which is at present State level, will be more beneficial for application of HIS. • Quality assurance on data collection, processing, analysis and reporting can be improved..
  • 60. Plan for information dissemination and application • Arpa Sub basin (New basin) is selected for Surface water planning & conjunctive use. Data collection work completed and further work is under progress jointly with NIH scientists. • Report of Reservoir sedimentation, Impact Assessment and Development of Catchment Area Treatment Plan for Kodar Reservoir provided to project authority. They are planning to construct various structures as recommended in the report to control sedimentation in reservoir. • Website upgraded to hydrologyproject.cgwrd.in to disseminate HIS.
  • 61. Model setup for Arpa Basin (New Basin) in Mike Hydro