REVIEW MEETING
HYDROLOGY PROJECT ~PHASE –II
MP(SW+GW)
 The proposed project is a follow on of Hydrology
Project, Phase –I. During HP-I , an integrated
Hydrological Information System providing reliable,
comprehensive and timely hydrological and
meteorological data are established.
 This consists of 24 river Gauge Stations and 52
-meteorological stations in 3 river basins namely Mahi,
Tapti, andWainganga.
 3750 Observation wells 625 Piezometer wells in Madhya
Pradesh for collecting data on qualitative and
quantitative aspects of both surface and ground water.
 State level Data Centre has been established at Bhopal
Project Period & Cost (SW+GW)Project Period & Cost (SW+GW)
• HYDROLOGY PROJECT -II
5/04/2006 to 31/5/2014
• Surface Water Component Rs. 9.98 Crores
• Ground Water Component Rs. 14.69 Crores
• (With Contingencies)
• TOTAL COST Rs. 24.67 Crores
• Surface Water Component Rs. 8.20 Crores
• Ground Water Component Rs. 12.04 Crores
• (Without Contingencies)
• TOTAL COST Rs. 20.24 Crores
HYDROLOGY-HYDROLOGY- PROJECT II SW+GW COST & EXPENDITUREPROJECT II SW+GW COST & EXPENDITURE
SW
Amount in lac
GW
Amount in lacs
TOTAL (SW+GW)
Amount in lacs
Project Initial Cost
820.0 1204.0 2024.0
Project Cost MTR I
2009 1503.26 1203.68 2706.94
Project revised cost
( 2013) 1137.08 432.49 1569.57
Total Expenditure
up to 3/14 730.33 332.89 1063.22
Expenditure up to
4/14 in FY 2014-15 38.37 0.0 38.37
Total expenditure
up to 4/14 768.70 332.89 1101.59
CATEGORY WISE COST & EXPENDITURE (SWCATEGORY WISE COST & EXPENDITURE (SW))
sl
no.
category As per
PIP
As per
MTR I
2009
As per
2012
(Revised)
As per
2013
(Revised)
Expenditu
re up to
4/2014
Balance
1 CIVIL WORK 95.03 259.95 340.45 393.81 297.41
96.4
2 GOODS 270.38 734.49 481.51 523.79 280.22
253.57
3 CONSULTENCY 64.92 76.93 27.52 19.11 0.35
18.76
4 TRAINING 122.41 141.41 54.19 39.65 25.70
13.95
5 RECURRENT 268.16 290.47 154.01 160.72 165.01
-4.29
TOTAL 820.90 1503.25 1057.68 1137.08 768.70
368.39
ITEM As per PIP As per
MTR 2009
As Per 2012
Revised
As Per 2013
Revised
Tot. Exp.
Up-to-April
13
Balance
INVESTMENT
COST GW-MP
Component-I
(Institutional
Strengthening)
279 332 162
149.10 118.30 0
Component-
II( Vertical
Extension)
547 512 180
179.90 137.55 58.50
Total Investment
Cost:
826 844 342
329 255.85 58.50
RECURRENT
COST GW-MP
Component-I
(Institutional
Strengthening)
202
166 046
46.43 41.80 1.50
Component-II
(Vertical
Extension)
176 190 057
57.06 35.25 0
Total Recurrent
Cost:
378 360 103
103.49 77.05 1.50
TOTAL – GW
1204
1203 445
432.49 332.90 60.0
Componen
t
Cost
Table
2013
(lakh
2007-
08
2008
-09
2009-
10
2010-
11
2011-12 2012
-13
2013-
14
Total Exp.
Up-to 31-
03- 2014
Works 206.15 0 0 21.76 93.73 53.16 9.35 0.25 178.25
Goods 88.78 0 0.17 0 22.66 14.18 1.49 23.68 62.18
Consultancy 4.68 0 0 1.00 3.28 0.40 0.00 0.00 4.68
Training 29.39 0 0 1.65 2.70 3.32 206.15 0.00 7.87
Recurrent
Cost
103.49 3.89 2.58 4.96 36.43 23.11 6.08 2.87 79.92
Total 432.49 3.89 2.75 29.37 158.80 94.17 17.12 26.80 332.90
Categoty wise Financial Progress(GW)Categoty wise Financial Progress(GW)
Reimbursement claims Details (SW+GW)Reimbursement claims Details (SW+GW)
year Claim Submitted Amount in
Lakhs (INR)
Claim Received Amount in
Lakhs (INR)
2007-08
4.71 4.71
2008-09
3.37 3.37
2009-10
52.91 52.80
2010-11 307.85 301.46
2011-12 254.26 249.27
2012-13 206.08 206.07
2013-14 110.83 79.95
Total 940.04 897.61
HYDROLOGY PROJECT II MADHYAHYDROLOGY PROJECT II MADHYA
PRADSHPRADSH
• Status of Reimbursement Claims as on 1/5/2014 in
Rs. Lakhs
Compon
ent
Project
revised
cost
may
2013
Total
expendit
ure up to
3/13
total
Claims
submitt
ed up to
3/2013
total
Claims
Receive
d up to
3/2013
Expendit
ure in FY
13-14
Reimbur
sement
claim
submitt
ed up to
3/14 in
2013-14
total
Claims
Received
up to
3/14 in
FY 2013-
14
total
R/Claims
Submitted
up to 4/2014
total
R/Claims
Received up
to 4/2013
SW 1137.08 630.51 554.06 551.03 99.83 84.77 74.14 638.84 625.16
GW 432.32 306.01 275.14 266.63 26.80 26.06 5.81 301.20
272.44
Total 1569.40 936.52 829.20 817.66 126.63 110.83 79.94 940.04 897.61
Planning of remaining period (SW)Planning of remaining period (SW)
Sl
no.
Project cost as
per cost table
2013 in lacs
Expenditure
up to 4/2014
in lacs
Likely
expenditure to
be incurred
during May 1,
2014 to May
31, 2014 (Rs.
in lakhs)
Likely
expenditure to
be incurred
during Jun 1,
2014 to Aug
31, 2014 for
the work
completed up
to 31/5/2014
(Rs. in lakhs)
Total Likely
expenditure
in MP (SW)
Expenditu
re to be
incurred
beyond
HP-II in
Lacs
1 1137.08 768.70 83.30 148.00 1000.00 43.72
Planning of remaining period (GW)Planning of remaining period (GW)
Sl
no.
Project cost as
per cost table
2013 in lacs
Expenditure
up to 4/2014
in lacs
Likely
expenditure to
be incurred
during May 1,
2014 to May
31, 2014 (Rs.
in lakhs)
Likely
expenditure to
be incurred
during Jun 1,
2014 to Aug
31, 2014 for
the work
completed up
to 31/5/2014
(Rs. in lakhs)
Total Likely
expenditure
in MP (SW)
Expenditu
re to be
incurred
beyond
HP-II in
Lacs
1 432.49 332.89 50.00 10.00 392.89 NIL
Works for which tender to be floatedWorks for which tender to be floated
(SW+GW)(SW+GW)Sr.No Descripation of
Works/Goods/Consultancy
Estimated
Cost (Rs
inLakhs)
Tentative data of bid
floating
Likely expenditure
on the contract upto
May 31,2014 (Rs in
Lakhs)
1
NIL
LIST OF ON GOING WORKS (SW)LIST OF ON GOING WORKS (SW)
Sl. No. Name of work. Name of
Agency
Agreement
No.
Agreement-
ed c ost in
Lacs
Expenditure
up to
4/2014in
Lacs
Balance
Payment to be
made in Lacs
Remark
1 2 3 4 5 6 8
1 Procurement of
Goods and Related
Services for Supply,
installation Testing
and commissioning
with 5 years
operation and
maintenance of Real
Time Data
Acquisition Systems
(RTDAS) in
Wainganga basin in
Madhya Pradesh.
M/s.
Mechatronics
Systems Pvt.
Ltd. Pune
1/ICB/HP-
II/SW(m.P.)
2013-14
300.82 55.00 245.82 On going
LIST OF ONGOING WORKS(GW)LIST OF ONGOING WORKS(GW)
Sl. No. Name of work. Name of
Agency
Agreement
No.
Agreement-
ed c ost in
Lacs
Expenditure
up to
4/2014in
Lacs
Balance
Payment to be
made in Lacs
Remark
1 2 3 4 5 6 8
1
2.
Procurement of
Multi channel
resistivity meter 1
no.
procurement of
vehicle
M/s. Pinnecle
Geosystem
New Delhi
DGS&D rate
contract
48.48
10.00
0.0
0.0
48.48
10.00
ongoing
On going
Total in Rs. Lakhs 58.48 58.48
MAJOR ACHIEVEMENTS IN MP(SW)MAJOR ACHIEVEMENTS IN MP(SW)
• Upgradation of data centre of Bhopal division,
Hoshangabad division & Balaghat sub division, Khandwa
sub division, State Water Data Centre.
• Upgradation of 24 Rain gauge stations, 2 G& D sites to
real time in Wain Ganga Basin.
• Upgradation of IT Hardware & soft ware
• Up gradation of 9 FCS manual, Upgradation of 20 no.
for AGR well(DWLR) of Wainganga ,Mahi & Tapti basin,
Upgradation of 20 G&D Sites (20 no. digital current
meter ) Upgradation of khairy, chhindlai & chandan D&D
sites
MAJOR ACHIEVEMENTS IN MP(SW)MAJOR ACHIEVEMENTS IN MP(SW)
• Upgradation of AGR Well on 14 no G&D sites,,
construction of RCC gauge post on 23 G&D sites,
Upgradation of Chokidar hutments on 18 G&D sites,,
over hauling work of 6 BOCW.
• Procurement of IT Hardware & soft ware
• Procurement of office equipments.
• 4 New G&D sites established in wainganga basin of
Madhya Pradesh.
• Application of DSS such as Seasonal planning of Sanjay
Sarovar reservoir, Impacts of changes in cropping
pattern, particularly in dry years for the reservoir,
Seasonal Ground water planning for Dhuty right bank
canal has been completed
MAJOR ACHIEVEMENTS IN MP(SW)MAJOR ACHIEVEMENTS IN MP(SW)
• MP WRD and NIH Bhopal centre has taken up jointly
Shipra basin for development of new DSS (P). The work
is under progress.
• Sedimentation survey of Tawa Reservoir undertaken by
bathometric boat in March 2014 jointly by CWPRS &
WRD under PDS. Report is awaited from CWPRS.
• The DSS planning software has been installed on
servers and workstations and useful applications
developed are being used. All necessary IT
infrastructures has been procured and installed.
• HIS data are being disseminated to Govt. & private
organizations as per demand.
• Replacement of 51 No Defunct Peizometers and 29 no new
Peizometers under DSS Wainganga Basin and 20 no Peizometer
under PDS Dhasan basin Sagar and PDS Shahpura lake basin
• Replacement of 7 sets of non functional WQ Lab equipments
• Upgradation of 4 no Div. data center and 1 no Ground Water Circle
level Training cell.
• 30 no In well Boring under PDS and 15 no Hydro fracturing work
under PDS Dhasan basin Sagar
• Procurement of 8 no single channel resistivity meter
• Procurement of 1 Multi channel resistivity meter including Vehicle
• 3 purpose driven study
MAJOR ACHIEVEMENTS IN MP (GW)MAJOR ACHIEVEMENTS IN MP (GW)
Lessons LearntLessons Learnt
• Awareness of the New Technology & Knowledge of
Hydrology amongst the officers of the department is
needed.
• Knowledge of procurement procedures of World Bank
aided project is must for all officers working in Hydrology
project.
• Procurement of major items should be started in the
beginning of the project.
Post project plan for continuation of HP-Post project plan for continuation of HP-
2 activities:2 activities:
• Application of DSS (P) activities in other basins of Madhya Pradesh.
• Sedimentation survey in other reservoir.
• As the HP phase –II is ending in May 2014 for which most of the
staff was redeployed from the departmental resources. This staff
shall be continued further for the proper sustainability of the project.
• A training plan for the incremental staff is necessary so that the new
staff could also be made well conversant with the available hard
wares/ softwares as well as with the new techniques. About 10 to
20% staff who are expected to retired can be replaced through
redeployment. Training of these new staff to the extent of 20% is
designed accordingly
DEVELOPMENT OF DSS(PLANNING) FOR WAINGANGA BASINDEVELOPMENT OF DSS(PLANNING) FOR WAINGANGA BASIN
Wainganga
Basin 25480 Sq
km
WORK DONE UNDER DSS(P)WORK DONE UNDER DSS(P)
 Data collection : daily rainfall, runoff, meteorological data, agricultural
information, demographic data, reservoir data, groundwater data, etc
 Need Assessment for DSS(P) in Madhya Pradesh
 Development of MIKE BASIN Model of Wainganga Basin
 Application of MIKE 11 NAM rainfall runoff model
 Model customization
 Development of scenarios in DSS(P) software
OUTCOME OF DSS IN MADHYA PRADESHOUTCOME OF DSS IN MADHYA PRADESH
S.N
.
Activity Status Remarks
1. Assessment of Surface and
Ground Water Availability
in Wainganga Basin
Completed
2. Surface Water Seasonal
Planning.
Completed.
3. Seasonal Planning for
Reservoir and crop
selection.
Completed
4. Seasonal Ground Water
Planning
Completed
5 Performance evaluation of
Rajiv Sagar Project
Completed
6. Development of DSS IT
Infrastructure and DSS
online connectivity.
Completed
SEASONAL PLANNING OF SANJAY SAROWAR PROJECTSEASONAL PLANNING OF SANJAY SAROWAR PROJECT
Scenario DevelopedScenario Developed
Main inputs to the Seasonal Planning application :
Crops grown and its area
Water user demands
Initial reservoir Level
Results of Seasonal planning application:
Variation in reservoir water level and storage at various probabilities
Water demand-supply and surplus-deficit scenario
Planning for crop selection
Optimal utilization of available water
WATER AVAILABILITY ASSESMENTWATER AVAILABILITY ASSESMENT
• Wainganga basin was
divided into 22 sub-
catchments.
• Average daily surface runoff
and average daily
groundwater recharge time
series generated for each
sub catchment
• Runoff Estimated in Different
Sub Catchments of
Wainganga Basin is given in
table
Scenario DevelopedScenario Developed
IMPACT OF REHABILITATING THE PROJECT INFRASTRUCTUREIMPACT OF REHABILITATING THE PROJECT INFRASTRUCTURE
HHigh level of water loss in irrigation systems of Sanjay sarowar and Dhuty command (30 %igh level of water loss in irrigation systems of Sanjay sarowar and Dhuty command (30 %
) from the source.) from the source.
The model has been applied to assess the impact of reducing the losses from 30% to 15%.The model has been applied to assess the impact of reducing the losses from 30% to 15%.
Scenario DevelopedScenario Developed
Benefits
•Increased efficiency of the irrigation projects, Additional water availability for irrigation
•Reduction in demand deficit Increased reliability of the system
RESERVOIR OPERATIONRESERVOIR OPERATION
 An analysis has been carried out for the Sanjay Sarowar dam for
improved flood control based on the forecast of the inflow to the
reservoir.
 This would enable pre-release from the dam and thereby an
increase in the available flood cushion before inflow starts
increasing.
 This analysis formed the base for establishment of RTDAS in the
Wainganga basin.
Real Time Data Acquisition System in Wainganga BasinReal Time Data Acquisition System in Wainganga Basin
Under Hydrology Project Phase II
Madhya Pradesh Water Resources
Department is establishing Real Time
Data Acquisition System(RTDAS) in
Wainganga Basin for real time flood
forecasting to support reservoir
operations and water management.
Details of Telemetry stations under RTDASDetails of Telemetry stations under RTDAS
S.No. DescriptionofItems Quantity Remarks
1 AutomatedRain-GaugeStations(ARG)withGSM/GPRSbasedtelemetryandpower 28
2 AutomatedWeatherStationswithGSM/GPRSbasedtelemetryandpower 3
3 AutomatedRiver&ReseriorwaterlevelsensorradarType 14
4 Automated,Spillway,Irrigation&PoweroutletGateSensor 13
5 Web-basedDataCollectionprocessinganddisseminationsystem 1
Performance Evaluation ofPerformance Evaluation of
Rajiv Sagar Project (Bawanthadi)Rajiv Sagar Project (Bawanthadi)
• The performance of the Interstate Rajiv Sagar Major Project (under
construction) has been tested in the MIKE BASIN model using the
available catchment runoff series from 1976 to 2006.
• The analysis indicated that sufficient water will be available in the
reservoir to meet the full demands in approximately 90% of the
years.
Scenario DevelopedScenario Developed
Issues Regarding DSSIssues Regarding DSS
• Change of Basic modeling software (Mike basin to Mike Hydro)
• Frequent change of DSS(P) version which is not comfortable.
• DSS software for decision making and result projection requires the
knowledge of scripting programming which we are unable to perform.
• Complexity in Scenario development option in DSS.
• Need of regular refresher courses .
  
HDROLOGY PROJECT-IIHDROLOGY PROJECT-II
MADHYA PRADESHMADHYA PRADESH
GROUND WATER COMPONENTGROUND WATER COMPONENT
PROGRESS REVIEW BY WORLD BANKPROGRESS REVIEW BY WORLD BANK
  
Chief Engineer (BODHI)Chief Engineer (BODHI)
Water Resources departmentWater Resources department
Bhopal (MP)Bhopal (MP)
  
May, 2014May, 2014
Purpose Driven Study (Title): “The Impact of Contaminated Shahpura Lake on Ground Water Purpose Driven Study (Title): “The Impact of Contaminated Shahpura Lake on Ground Water 
Environment, Bhopal, MP” Environment, Bhopal, MP” 
Objectives of the P D S
 Development of long term monitoring mechanism to keep vigil on
progression of surface water pollution by studying systematic &
periodically physico-chemical parameters.
 Monitoring of groundwater water quality to study ingress of chemical
contamination into fringe area aquifer used for drinking water supplies.
 Study the impact of contaminants on biological diversity, tropic status of lake
and identification of the indicator species.
 Tie up of Limnological data with ground water quality in the study area
 Dissemination of project output for awareness and management
Major FindingsMajor Findings
• The medium separating the lake water and ground water aquifer is contact of DeccanThe medium separating the lake water and ground water aquifer is contact of Deccan
Trap Basalt and Vindhyan Sand stone. Cracks and fractures of Basalt may be theTrap Basalt and Vindhyan Sand stone. Cracks and fractures of Basalt may be the
possible reason for intrusion of lake water contaminants in to ground water.possible reason for intrusion of lake water contaminants in to ground water.
• Propagation of pollution in ground water aquifers in the fringe area is governedPropagation of pollution in ground water aquifers in the fringe area is governed
by the Hydraulic gradient of aquifer & used by at least 60 thousand populationsby the Hydraulic gradient of aquifer & used by at least 60 thousand populations
..
Surface Water:Surface Water:
• Lake is reported having very rich nutrients value such as nitrate andLake is reported having very rich nutrients value such as nitrate and phosphatephosphate alongalong
withwith ammonical nitrogen toxicityammonical nitrogen toxicity and rich organic matter (COD) content in north-and rich organic matter (COD) content in north-
eastern and north-western upstream and south-western downstream side.eastern and north-western upstream and south-western downstream side.
• To an average value of 27.74 mg/l,To an average value of 27.74 mg/l, 4.06 mg/l4.06 mg/l,, 5.2 mg/l5.2 mg/l and 67.86 mg/l respectively.and 67.86 mg/l respectively.
• Shahpura lake water shows the percentage of DO ranged between 0% (at confluence)Shahpura lake water shows the percentage of DO ranged between 0% (at confluence)
to 98.9% (southern part) in surface layer and nil DO in the bottom layer (possibly dueto 98.9% (southern part) in surface layer and nil DO in the bottom layer (possibly due
to higher microbial activity).to higher microbial activity).
• Lake is hyper-eutrophic due to high nutrients load in sediment which enhanced theLake is hyper-eutrophic due to high nutrients load in sediment which enhanced the
production of algal biomass.production of algal biomass.
MPL -WHO
PO4 -  <1.0 
NH3-N - <0.3 
NO3 – <45 
COD - <10
Major FindingsMajor Findings
Ground water:
• The overall well water at both downstream southern side (Chunna Bhatti residential
area) and south western side (Amrapali enclave) and upstream north-eastern side
(Near Academy building) of the lake are found contaminated.
At upstream (north-east and north-west side of lake):
• Average value of nutrients such as nitrate & phosphate along with the organic
matter reported as 29.30 mg/l, 0.23 mg/l, and 18.56 mg/l respectively.
• Peizometric well situated within the 100 meter of lake also reported presence of
ammonical nitrogen toxicity above its permissible limit of <0.3 mg/l, with a maximum
value of 2.25 mg/l and an average of 0.63mg/l NH3-N.
At  downstream (south and south-western side of lake): 
• Nitrate, Phosphate and Organic matter values reported to the maximum of 109.2
mg/l, 1.0 mg/l and 64 mg/l and an average of 26.99 mg/l, 0.26 mg/l and 14.95 mg/l
respectively.
• Increased level of organic matter in ground water aquifer establishes intrusion of
sewage water.
• Whereas domestic wells located at downstream to waste-wear with massive basaltic
sand stone formation reported low contamination level.
MPL -WHO
PO4 -  <1.0 
NH3-N - <0.3 
NO3 – <45 
COD - <10
Major FindingsMajor Findings
Fish Productivity:
• Due to high contamination level , Indian major carps (Catla, Rohita) and
other economically benefitted fish productivity are low. Whereas Tilapia
mossambica is flourishing well because it grows well in the sewage polluted
water.
RecommendationsRecommendations
• With respect to lakes, all three attributes of the lake i.e. the basin, the water
body and the command area need to be conserved instead of the present
focus on the water body only.
• Assessment and monitoring of water quality is very important.
• Effluents/waste water treatment plants, low cost sanitation, should be set
up.
• Adequate policies, legislations and programmes should be formulated and
effective institutions should be put in place for pollution prevention,
treatment and restoration of polluted water in lakes and ground water.
1. Policy support
2. Platform for presenting output.
3. Freedom to express views regarding any project report.
AchievementsAchievements
• IN DSS platform, we have a water balance modeling primary tool to
assist water allocation decision to different sectors as per the priority.
• The DSS is being used in our state particularly the GIS and time
series analysis component for the feasibility and hydrological analysis
in minor irrigation project planning .
 WRD has selected Shipra river basin for
development of DSS(P) in collaboration of NIH,
Regional Centre, Bhopal
 To assess sub basin wise water availability
 Seasonal and ground water planning for optimal
utilization of water
 Study of changing scenario of demand supply in
shipra basin in view of Narmada-Shipra link.
 Development of GIS layers and Data collection
is under progress
 Area of shipra basin 5750 sq km
 Tributary of Chambal river
Future PlanFuture Plan
Plan for Information DisseminationPlan for Information Dissemination
 A DSS workshop for the departmental officers was
organized in the State data centre for knowledge sharing
and need assessment.
 More workshops and trainings are proposed to be
organized for the departmental staff for disseminating
DSS outcomes to end users.
 The DSS reports and findings are being distributed
among field organizations.
Important lessons learnt from DSSImportant lessons learnt from DSS
• Application of hydrological modeling techniques are important in
planning of surface and ground water resources management in
Madhya Pradesh state.
• The hydrological modeling tools like MIKE 11 NAM Model, MIKE
BASIN,MIKE HYDRO and water resources planning tool like DSS(P)
are found efficient to develop various scenarios addressing water
resources management issues in Wainganga basin and it could
further be used in other basin.
• The regular monitoring of hydrological and meteorological data is
important for future water resources planning. The scientific
validation of data is equally important.
• The assessment of water availability and demand assessment need
to be carried out on regular basis to meet the various water use
demands in Wainganga basin
•
•
Important lesson learnt from DSSImportant lesson learnt from DSS
• The reduction of water losses from Sanjay Sarovar canal,
Dhuty weir LBC and Dhuty weir RBC would result in increased
efficiency of the irrigation projects, additional water availability
for irrigation, reduction in demand deficit and increased
reliability of the system.
• The surface water Seasonal planning application of DSS(P) is
found useful to assess water demand-supply and surplus-
deficit scenario, planning for crop selection and optimal
utilization of available water resources.
• The seasonal groundwater model developed for Dhuty RBC
can be used in groundwater planning and to predict how
much groundwater will be available at the end of May based
on the groundwater level at the end of October.
Issues Regarding DSSIssues Regarding DSS
• Change of Basic modeling software (Mike basin to Mike Hydro)
• Frequent change of DSS(P) version which is not comfortable.
• DSS software for decision making and result projection requires the
knowledge of scripting programming which we are unable to perform.
• Complexity in Scenario development option in DSS.
REVIEW MEETING HPII New DelhiREVIEW MEETING HPII New Delhi
• THANK YOU

Más contenido relacionado

La actualidad más candente

The NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportThe NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportcherreg1piag
 
DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014Piyush Sharma
 
Intelligent Mining: Integrated Mine Planning and Operations
Intelligent Mining: Integrated Mine Planning and OperationsIntelligent Mining: Integrated Mine Planning and Operations
Intelligent Mining: Integrated Mine Planning and OperationsABB Enterprise Software
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014hydrologyproject0
 
101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E HeilandErik Heiland
 
Thesis presentation_ Final Defence
Thesis presentation_ Final DefenceThesis presentation_ Final Defence
Thesis presentation_ Final DefenceSharmin Ahmed
 
Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)Osvaldas Ciuksys
 
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsIgnalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsOsvaldas Ciuksys
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...FICCINorthEast
 
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...RWM Brasil
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)Narasimha Sharma
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
GNSS application in Nepal
GNSS application in NepalGNSS application in Nepal
GNSS application in NepalErAshokRimal
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)hosting guests
 
Power Point BLCC End of year Review
Power Point BLCC End of year ReviewPower Point BLCC End of year Review
Power Point BLCC End of year ReviewTom Atkinson
 

La actualidad más candente (20)

The NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end reportThe NIA-PIAG Cy 2012 year end report
The NIA-PIAG Cy 2012 year end report
 
4851
48514851
4851
 
Cash Flow Portfolio
Cash Flow PortfolioCash Flow Portfolio
Cash Flow Portfolio
 
Cost Forecast Report
Cost Forecast ReportCost Forecast Report
Cost Forecast Report
 
DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014
 
Intelligent Mining: Integrated Mine Planning and Operations
Intelligent Mining: Integrated Mine Planning and OperationsIntelligent Mining: Integrated Mine Planning and Operations
Intelligent Mining: Integrated Mine Planning and Operations
 
Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014Odisha (gw) meeting-07-05-2014
Odisha (gw) meeting-07-05-2014
 
101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland101025 Excellence in Exc Planning Presentation E Heiland
101025 Excellence in Exc Planning Presentation E Heiland
 
Thesis presentation_ Final Defence
Thesis presentation_ Final DefenceThesis presentation_ Final Defence
Thesis presentation_ Final Defence
 
Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)Ignalina NPP Presentation To A o C (June 2011)
Ignalina NPP Presentation To A o C (June 2011)
 
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsIgnalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
 
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
Dia 1:Ativando obras no parque olímpico,Jan Hellings, Jan Hellings & Associat...
 
FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)FINAL COMPENDIUM.compressed (2)
FINAL COMPENDIUM.compressed (2)
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
GNSS application in Nepal
GNSS application in NepalGNSS application in Nepal
GNSS application in Nepal
 
Geological mapping 27.04.18 updated (only mapping)
Geological mapping   27.04.18 updated (only mapping)Geological mapping   27.04.18 updated (only mapping)
Geological mapping 27.04.18 updated (only mapping)
 
Cold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban AreasCold-in-Place Recycling (CIR) use in Urban Areas
Cold-in-Place Recycling (CIR) use in Urban Areas
 
Contract 2 - Project Progress Status. Oct-13
Contract 2 - Project Progress Status. Oct-13Contract 2 - Project Progress Status. Oct-13
Contract 2 - Project Progress Status. Oct-13
 
Power Point BLCC End of year Review
Power Point BLCC End of year ReviewPower Point BLCC End of year Review
Power Point BLCC End of year Review
 

Similar a Mp surface water

Similar a Mp surface water (20)

Chhattisgarh
ChhattisgarhChhattisgarh
Chhattisgarh
 
1. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 70520141. gujarat gw presentation wb_may-2014 7052014
1. gujarat gw presentation wb_may-2014 7052014
 
Karnataka surface water
Karnataka surface waterKarnataka surface water
Karnataka surface water
 
Odisha sw wb mission-may14
Odisha sw wb mission-may14Odisha sw wb mission-may14
Odisha sw wb mission-may14
 
Puducherry
Puducherry Puducherry
Puducherry
 
Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014Tamil nadu wb review tn_hpii_delhi_may2014
Tamil nadu wb review tn_hpii_delhi_may2014
 
Himachal may, 2014
Himachal  may, 2014Himachal  may, 2014
Himachal may, 2014
 
Kerala sw
Kerala swKerala sw
Kerala sw
 
Pcs 070514
Pcs 070514Pcs 070514
Pcs 070514
 
PPT_Final_18-02-15
PPT_Final_18-02-15PPT_Final_18-02-15
PPT_Final_18-02-15
 
Cwc
CwcCwc
Cwc
 
Maharashtra sw_ce_050514
Maharashtra  sw_ce_050514Maharashtra  sw_ce_050514
Maharashtra sw_ce_050514
 
Amrut ppt
Amrut pptAmrut ppt
Amrut ppt
 
Pre bid meeting presentation
Pre bid meeting presentationPre bid meeting presentation
Pre bid meeting presentation
 
Andhra pradesh surface water
Andhra pradesh surface waterAndhra pradesh surface water
Andhra pradesh surface water
 
Cgwb
CgwbCgwb
Cgwb
 
PPT to BPC.pptx
PPT to BPC.pptxPPT to BPC.pptx
PPT to BPC.pptx
 
New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21New normal and beyond –RVNL Perspective dt 27.10.21
New normal and beyond –RVNL Perspective dt 27.10.21
 
Hwange Project Implementation Guidelines (Nampower Presentation)
Hwange Project Implementation Guidelines (Nampower Presentation)Hwange Project Implementation Guidelines (Nampower Presentation)
Hwange Project Implementation Guidelines (Nampower Presentation)
 
Presentation muhammadalishahzada110620141930hours
Presentation muhammadalishahzada110620141930hoursPresentation muhammadalishahzada110620141930hours
Presentation muhammadalishahzada110620141930hours
 

Más de hydrologywebsite1

Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission hydrologywebsite1
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-normshydrologywebsite1
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservationshydrologywebsite1
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworkshydrologywebsite1
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...hydrologywebsite1
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...hydrologywebsite1
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...hydrologywebsite1
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryformshydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 Download-manuals-surface water-manual-sw-volume10protocolsandvalidation Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
Download-manuals-surface water-manual-sw-volume10protocolsandvalidationhydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...hydrologywebsite1
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...hydrologywebsite1
 

Más de hydrologywebsite1 (20)

Punjab 8.4.14 edt
Punjab 8.4.14 edtPunjab 8.4.14 edt
Punjab 8.4.14 edt
 
Kerala ground water
Kerala ground waterKerala ground water
Kerala ground water
 
Goa
GoaGoa
Goa
 
Cwprs
CwprsCwprs
Cwprs
 
Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission Cpcb hp ii final supervision mission
Cpcb hp ii final supervision mission
 
Bbmb
BbmbBbmb
Bbmb
 
Download-manuals-surface water-manual-surfacewatero&m-norms
 Download-manuals-surface water-manual-surfacewatero&m-norms Download-manuals-surface water-manual-surfacewatero&m-norms
Download-manuals-surface water-manual-surfacewatero&m-norms
 
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 Download-manuals-surface water-manual-illustrations-hydrologicalobservations Download-manuals-surface water-manual-illustrations-hydrologicalobservations
Download-manuals-surface water-manual-illustrations-hydrologicalobservations
 
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
Download-manuals-surface water-manual-45howtoreviewmonitoringnetworks
 
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec... Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
Download-manuals-water quality-wq-training-44howtocarryoutcorrelationandspec...
 
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr... Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
Download-manuals-hydrometeorology-data processing-43statisticalanalysiswithr...
 
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing... Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
Download-manuals-ground water-manual-gw-volume8operationmanualdataprocessing...
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal... Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
Download-manuals-surface water-manual-sw-volume7designmanualwaterqualityanal...
 
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa... Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
Download-manuals-water quality-wq-manuals-gwvolume6fieldmanualwaterqualitysa...
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Download-manuals-surface water-manual-sw-volume10dataentryforms
 Download-manuals-surface water-manual-sw-volume10dataentryforms Download-manuals-surface water-manual-sw-volume10dataentryforms
Download-manuals-surface water-manual-sw-volume10dataentryforms
 
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 Download-manuals-surface water-manual-sw-volume10protocolsandvalidation Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
Download-manuals-surface water-manual-sw-volume10protocolsandvalidation
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin... Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
Download-manuals-surface water-manual-sw-volume8operationmanualdataprocessin...
 

Último

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 

Último (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 

Mp surface water

  • 1. REVIEW MEETING HYDROLOGY PROJECT ~PHASE –II MP(SW+GW)
  • 2.  The proposed project is a follow on of Hydrology Project, Phase –I. During HP-I , an integrated Hydrological Information System providing reliable, comprehensive and timely hydrological and meteorological data are established.  This consists of 24 river Gauge Stations and 52 -meteorological stations in 3 river basins namely Mahi, Tapti, andWainganga.  3750 Observation wells 625 Piezometer wells in Madhya Pradesh for collecting data on qualitative and quantitative aspects of both surface and ground water.  State level Data Centre has been established at Bhopal
  • 3. Project Period & Cost (SW+GW)Project Period & Cost (SW+GW) • HYDROLOGY PROJECT -II 5/04/2006 to 31/5/2014 • Surface Water Component Rs. 9.98 Crores • Ground Water Component Rs. 14.69 Crores • (With Contingencies) • TOTAL COST Rs. 24.67 Crores • Surface Water Component Rs. 8.20 Crores • Ground Water Component Rs. 12.04 Crores • (Without Contingencies) • TOTAL COST Rs. 20.24 Crores
  • 4. HYDROLOGY-HYDROLOGY- PROJECT II SW+GW COST & EXPENDITUREPROJECT II SW+GW COST & EXPENDITURE SW Amount in lac GW Amount in lacs TOTAL (SW+GW) Amount in lacs Project Initial Cost 820.0 1204.0 2024.0 Project Cost MTR I 2009 1503.26 1203.68 2706.94 Project revised cost ( 2013) 1137.08 432.49 1569.57 Total Expenditure up to 3/14 730.33 332.89 1063.22 Expenditure up to 4/14 in FY 2014-15 38.37 0.0 38.37 Total expenditure up to 4/14 768.70 332.89 1101.59
  • 5. CATEGORY WISE COST & EXPENDITURE (SWCATEGORY WISE COST & EXPENDITURE (SW)) sl no. category As per PIP As per MTR I 2009 As per 2012 (Revised) As per 2013 (Revised) Expenditu re up to 4/2014 Balance 1 CIVIL WORK 95.03 259.95 340.45 393.81 297.41 96.4 2 GOODS 270.38 734.49 481.51 523.79 280.22 253.57 3 CONSULTENCY 64.92 76.93 27.52 19.11 0.35 18.76 4 TRAINING 122.41 141.41 54.19 39.65 25.70 13.95 5 RECURRENT 268.16 290.47 154.01 160.72 165.01 -4.29 TOTAL 820.90 1503.25 1057.68 1137.08 768.70 368.39
  • 6. ITEM As per PIP As per MTR 2009 As Per 2012 Revised As Per 2013 Revised Tot. Exp. Up-to-April 13 Balance INVESTMENT COST GW-MP Component-I (Institutional Strengthening) 279 332 162 149.10 118.30 0 Component- II( Vertical Extension) 547 512 180 179.90 137.55 58.50 Total Investment Cost: 826 844 342 329 255.85 58.50 RECURRENT COST GW-MP Component-I (Institutional Strengthening) 202 166 046 46.43 41.80 1.50 Component-II (Vertical Extension) 176 190 057 57.06 35.25 0 Total Recurrent Cost: 378 360 103 103.49 77.05 1.50 TOTAL – GW 1204 1203 445 432.49 332.90 60.0
  • 7. Componen t Cost Table 2013 (lakh 2007- 08 2008 -09 2009- 10 2010- 11 2011-12 2012 -13 2013- 14 Total Exp. Up-to 31- 03- 2014 Works 206.15 0 0 21.76 93.73 53.16 9.35 0.25 178.25 Goods 88.78 0 0.17 0 22.66 14.18 1.49 23.68 62.18 Consultancy 4.68 0 0 1.00 3.28 0.40 0.00 0.00 4.68 Training 29.39 0 0 1.65 2.70 3.32 206.15 0.00 7.87 Recurrent Cost 103.49 3.89 2.58 4.96 36.43 23.11 6.08 2.87 79.92 Total 432.49 3.89 2.75 29.37 158.80 94.17 17.12 26.80 332.90 Categoty wise Financial Progress(GW)Categoty wise Financial Progress(GW)
  • 8. Reimbursement claims Details (SW+GW)Reimbursement claims Details (SW+GW) year Claim Submitted Amount in Lakhs (INR) Claim Received Amount in Lakhs (INR) 2007-08 4.71 4.71 2008-09 3.37 3.37 2009-10 52.91 52.80 2010-11 307.85 301.46 2011-12 254.26 249.27 2012-13 206.08 206.07 2013-14 110.83 79.95 Total 940.04 897.61
  • 9. HYDROLOGY PROJECT II MADHYAHYDROLOGY PROJECT II MADHYA PRADSHPRADSH • Status of Reimbursement Claims as on 1/5/2014 in Rs. Lakhs Compon ent Project revised cost may 2013 Total expendit ure up to 3/13 total Claims submitt ed up to 3/2013 total Claims Receive d up to 3/2013 Expendit ure in FY 13-14 Reimbur sement claim submitt ed up to 3/14 in 2013-14 total Claims Received up to 3/14 in FY 2013- 14 total R/Claims Submitted up to 4/2014 total R/Claims Received up to 4/2013 SW 1137.08 630.51 554.06 551.03 99.83 84.77 74.14 638.84 625.16 GW 432.32 306.01 275.14 266.63 26.80 26.06 5.81 301.20 272.44 Total 1569.40 936.52 829.20 817.66 126.63 110.83 79.94 940.04 897.61
  • 10. Planning of remaining period (SW)Planning of remaining period (SW) Sl no. Project cost as per cost table 2013 in lacs Expenditure up to 4/2014 in lacs Likely expenditure to be incurred during May 1, 2014 to May 31, 2014 (Rs. in lakhs) Likely expenditure to be incurred during Jun 1, 2014 to Aug 31, 2014 for the work completed up to 31/5/2014 (Rs. in lakhs) Total Likely expenditure in MP (SW) Expenditu re to be incurred beyond HP-II in Lacs 1 1137.08 768.70 83.30 148.00 1000.00 43.72
  • 11. Planning of remaining period (GW)Planning of remaining period (GW) Sl no. Project cost as per cost table 2013 in lacs Expenditure up to 4/2014 in lacs Likely expenditure to be incurred during May 1, 2014 to May 31, 2014 (Rs. in lakhs) Likely expenditure to be incurred during Jun 1, 2014 to Aug 31, 2014 for the work completed up to 31/5/2014 (Rs. in lakhs) Total Likely expenditure in MP (SW) Expenditu re to be incurred beyond HP-II in Lacs 1 432.49 332.89 50.00 10.00 392.89 NIL
  • 12. Works for which tender to be floatedWorks for which tender to be floated (SW+GW)(SW+GW)Sr.No Descripation of Works/Goods/Consultancy Estimated Cost (Rs inLakhs) Tentative data of bid floating Likely expenditure on the contract upto May 31,2014 (Rs in Lakhs) 1 NIL
  • 13. LIST OF ON GOING WORKS (SW)LIST OF ON GOING WORKS (SW) Sl. No. Name of work. Name of Agency Agreement No. Agreement- ed c ost in Lacs Expenditure up to 4/2014in Lacs Balance Payment to be made in Lacs Remark 1 2 3 4 5 6 8 1 Procurement of Goods and Related Services for Supply, installation Testing and commissioning with 5 years operation and maintenance of Real Time Data Acquisition Systems (RTDAS) in Wainganga basin in Madhya Pradesh. M/s. Mechatronics Systems Pvt. Ltd. Pune 1/ICB/HP- II/SW(m.P.) 2013-14 300.82 55.00 245.82 On going
  • 14. LIST OF ONGOING WORKS(GW)LIST OF ONGOING WORKS(GW) Sl. No. Name of work. Name of Agency Agreement No. Agreement- ed c ost in Lacs Expenditure up to 4/2014in Lacs Balance Payment to be made in Lacs Remark 1 2 3 4 5 6 8 1 2. Procurement of Multi channel resistivity meter 1 no. procurement of vehicle M/s. Pinnecle Geosystem New Delhi DGS&D rate contract 48.48 10.00 0.0 0.0 48.48 10.00 ongoing On going Total in Rs. Lakhs 58.48 58.48
  • 15. MAJOR ACHIEVEMENTS IN MP(SW)MAJOR ACHIEVEMENTS IN MP(SW) • Upgradation of data centre of Bhopal division, Hoshangabad division & Balaghat sub division, Khandwa sub division, State Water Data Centre. • Upgradation of 24 Rain gauge stations, 2 G& D sites to real time in Wain Ganga Basin. • Upgradation of IT Hardware & soft ware • Up gradation of 9 FCS manual, Upgradation of 20 no. for AGR well(DWLR) of Wainganga ,Mahi & Tapti basin, Upgradation of 20 G&D Sites (20 no. digital current meter ) Upgradation of khairy, chhindlai & chandan D&D sites
  • 16. MAJOR ACHIEVEMENTS IN MP(SW)MAJOR ACHIEVEMENTS IN MP(SW) • Upgradation of AGR Well on 14 no G&D sites,, construction of RCC gauge post on 23 G&D sites, Upgradation of Chokidar hutments on 18 G&D sites,, over hauling work of 6 BOCW. • Procurement of IT Hardware & soft ware • Procurement of office equipments. • 4 New G&D sites established in wainganga basin of Madhya Pradesh. • Application of DSS such as Seasonal planning of Sanjay Sarovar reservoir, Impacts of changes in cropping pattern, particularly in dry years for the reservoir, Seasonal Ground water planning for Dhuty right bank canal has been completed
  • 17. MAJOR ACHIEVEMENTS IN MP(SW)MAJOR ACHIEVEMENTS IN MP(SW) • MP WRD and NIH Bhopal centre has taken up jointly Shipra basin for development of new DSS (P). The work is under progress. • Sedimentation survey of Tawa Reservoir undertaken by bathometric boat in March 2014 jointly by CWPRS & WRD under PDS. Report is awaited from CWPRS. • The DSS planning software has been installed on servers and workstations and useful applications developed are being used. All necessary IT infrastructures has been procured and installed. • HIS data are being disseminated to Govt. & private organizations as per demand.
  • 18. • Replacement of 51 No Defunct Peizometers and 29 no new Peizometers under DSS Wainganga Basin and 20 no Peizometer under PDS Dhasan basin Sagar and PDS Shahpura lake basin • Replacement of 7 sets of non functional WQ Lab equipments • Upgradation of 4 no Div. data center and 1 no Ground Water Circle level Training cell. • 30 no In well Boring under PDS and 15 no Hydro fracturing work under PDS Dhasan basin Sagar • Procurement of 8 no single channel resistivity meter • Procurement of 1 Multi channel resistivity meter including Vehicle • 3 purpose driven study MAJOR ACHIEVEMENTS IN MP (GW)MAJOR ACHIEVEMENTS IN MP (GW)
  • 19. Lessons LearntLessons Learnt • Awareness of the New Technology & Knowledge of Hydrology amongst the officers of the department is needed. • Knowledge of procurement procedures of World Bank aided project is must for all officers working in Hydrology project. • Procurement of major items should be started in the beginning of the project.
  • 20. Post project plan for continuation of HP-Post project plan for continuation of HP- 2 activities:2 activities: • Application of DSS (P) activities in other basins of Madhya Pradesh. • Sedimentation survey in other reservoir. • As the HP phase –II is ending in May 2014 for which most of the staff was redeployed from the departmental resources. This staff shall be continued further for the proper sustainability of the project. • A training plan for the incremental staff is necessary so that the new staff could also be made well conversant with the available hard wares/ softwares as well as with the new techniques. About 10 to 20% staff who are expected to retired can be replaced through redeployment. Training of these new staff to the extent of 20% is designed accordingly
  • 21.
  • 22. DEVELOPMENT OF DSS(PLANNING) FOR WAINGANGA BASINDEVELOPMENT OF DSS(PLANNING) FOR WAINGANGA BASIN Wainganga Basin 25480 Sq km
  • 23. WORK DONE UNDER DSS(P)WORK DONE UNDER DSS(P)  Data collection : daily rainfall, runoff, meteorological data, agricultural information, demographic data, reservoir data, groundwater data, etc  Need Assessment for DSS(P) in Madhya Pradesh  Development of MIKE BASIN Model of Wainganga Basin  Application of MIKE 11 NAM rainfall runoff model  Model customization  Development of scenarios in DSS(P) software
  • 24. OUTCOME OF DSS IN MADHYA PRADESHOUTCOME OF DSS IN MADHYA PRADESH S.N . Activity Status Remarks 1. Assessment of Surface and Ground Water Availability in Wainganga Basin Completed 2. Surface Water Seasonal Planning. Completed. 3. Seasonal Planning for Reservoir and crop selection. Completed 4. Seasonal Ground Water Planning Completed 5 Performance evaluation of Rajiv Sagar Project Completed 6. Development of DSS IT Infrastructure and DSS online connectivity. Completed
  • 25. SEASONAL PLANNING OF SANJAY SAROWAR PROJECTSEASONAL PLANNING OF SANJAY SAROWAR PROJECT Scenario DevelopedScenario Developed Main inputs to the Seasonal Planning application : Crops grown and its area Water user demands Initial reservoir Level Results of Seasonal planning application: Variation in reservoir water level and storage at various probabilities Water demand-supply and surplus-deficit scenario Planning for crop selection Optimal utilization of available water
  • 26. WATER AVAILABILITY ASSESMENTWATER AVAILABILITY ASSESMENT • Wainganga basin was divided into 22 sub- catchments. • Average daily surface runoff and average daily groundwater recharge time series generated for each sub catchment • Runoff Estimated in Different Sub Catchments of Wainganga Basin is given in table Scenario DevelopedScenario Developed
  • 27. IMPACT OF REHABILITATING THE PROJECT INFRASTRUCTUREIMPACT OF REHABILITATING THE PROJECT INFRASTRUCTURE HHigh level of water loss in irrigation systems of Sanjay sarowar and Dhuty command (30 %igh level of water loss in irrigation systems of Sanjay sarowar and Dhuty command (30 % ) from the source.) from the source. The model has been applied to assess the impact of reducing the losses from 30% to 15%.The model has been applied to assess the impact of reducing the losses from 30% to 15%. Scenario DevelopedScenario Developed Benefits •Increased efficiency of the irrigation projects, Additional water availability for irrigation •Reduction in demand deficit Increased reliability of the system
  • 28. RESERVOIR OPERATIONRESERVOIR OPERATION  An analysis has been carried out for the Sanjay Sarowar dam for improved flood control based on the forecast of the inflow to the reservoir.  This would enable pre-release from the dam and thereby an increase in the available flood cushion before inflow starts increasing.  This analysis formed the base for establishment of RTDAS in the Wainganga basin.
  • 29. Real Time Data Acquisition System in Wainganga BasinReal Time Data Acquisition System in Wainganga Basin Under Hydrology Project Phase II Madhya Pradesh Water Resources Department is establishing Real Time Data Acquisition System(RTDAS) in Wainganga Basin for real time flood forecasting to support reservoir operations and water management.
  • 30. Details of Telemetry stations under RTDASDetails of Telemetry stations under RTDAS S.No. DescriptionofItems Quantity Remarks 1 AutomatedRain-GaugeStations(ARG)withGSM/GPRSbasedtelemetryandpower 28 2 AutomatedWeatherStationswithGSM/GPRSbasedtelemetryandpower 3 3 AutomatedRiver&ReseriorwaterlevelsensorradarType 14 4 Automated,Spillway,Irrigation&PoweroutletGateSensor 13 5 Web-basedDataCollectionprocessinganddisseminationsystem 1
  • 31. Performance Evaluation ofPerformance Evaluation of Rajiv Sagar Project (Bawanthadi)Rajiv Sagar Project (Bawanthadi) • The performance of the Interstate Rajiv Sagar Major Project (under construction) has been tested in the MIKE BASIN model using the available catchment runoff series from 1976 to 2006. • The analysis indicated that sufficient water will be available in the reservoir to meet the full demands in approximately 90% of the years. Scenario DevelopedScenario Developed
  • 32. Issues Regarding DSSIssues Regarding DSS • Change of Basic modeling software (Mike basin to Mike Hydro) • Frequent change of DSS(P) version which is not comfortable. • DSS software for decision making and result projection requires the knowledge of scripting programming which we are unable to perform. • Complexity in Scenario development option in DSS. • Need of regular refresher courses .
  • 34. Purpose Driven Study (Title): “The Impact of Contaminated Shahpura Lake on Ground Water Purpose Driven Study (Title): “The Impact of Contaminated Shahpura Lake on Ground Water  Environment, Bhopal, MP” Environment, Bhopal, MP”  Objectives of the P D S  Development of long term monitoring mechanism to keep vigil on progression of surface water pollution by studying systematic & periodically physico-chemical parameters.  Monitoring of groundwater water quality to study ingress of chemical contamination into fringe area aquifer used for drinking water supplies.  Study the impact of contaminants on biological diversity, tropic status of lake and identification of the indicator species.  Tie up of Limnological data with ground water quality in the study area  Dissemination of project output for awareness and management
  • 35. Major FindingsMajor Findings • The medium separating the lake water and ground water aquifer is contact of DeccanThe medium separating the lake water and ground water aquifer is contact of Deccan Trap Basalt and Vindhyan Sand stone. Cracks and fractures of Basalt may be theTrap Basalt and Vindhyan Sand stone. Cracks and fractures of Basalt may be the possible reason for intrusion of lake water contaminants in to ground water.possible reason for intrusion of lake water contaminants in to ground water. • Propagation of pollution in ground water aquifers in the fringe area is governedPropagation of pollution in ground water aquifers in the fringe area is governed by the Hydraulic gradient of aquifer & used by at least 60 thousand populationsby the Hydraulic gradient of aquifer & used by at least 60 thousand populations .. Surface Water:Surface Water: • Lake is reported having very rich nutrients value such as nitrate andLake is reported having very rich nutrients value such as nitrate and phosphatephosphate alongalong withwith ammonical nitrogen toxicityammonical nitrogen toxicity and rich organic matter (COD) content in north-and rich organic matter (COD) content in north- eastern and north-western upstream and south-western downstream side.eastern and north-western upstream and south-western downstream side. • To an average value of 27.74 mg/l,To an average value of 27.74 mg/l, 4.06 mg/l4.06 mg/l,, 5.2 mg/l5.2 mg/l and 67.86 mg/l respectively.and 67.86 mg/l respectively. • Shahpura lake water shows the percentage of DO ranged between 0% (at confluence)Shahpura lake water shows the percentage of DO ranged between 0% (at confluence) to 98.9% (southern part) in surface layer and nil DO in the bottom layer (possibly dueto 98.9% (southern part) in surface layer and nil DO in the bottom layer (possibly due to higher microbial activity).to higher microbial activity). • Lake is hyper-eutrophic due to high nutrients load in sediment which enhanced theLake is hyper-eutrophic due to high nutrients load in sediment which enhanced the production of algal biomass.production of algal biomass. MPL -WHO PO4 -  <1.0  NH3-N - <0.3  NO3 – <45  COD - <10
  • 36. Major FindingsMajor Findings Ground water: • The overall well water at both downstream southern side (Chunna Bhatti residential area) and south western side (Amrapali enclave) and upstream north-eastern side (Near Academy building) of the lake are found contaminated. At upstream (north-east and north-west side of lake): • Average value of nutrients such as nitrate & phosphate along with the organic matter reported as 29.30 mg/l, 0.23 mg/l, and 18.56 mg/l respectively. • Peizometric well situated within the 100 meter of lake also reported presence of ammonical nitrogen toxicity above its permissible limit of <0.3 mg/l, with a maximum value of 2.25 mg/l and an average of 0.63mg/l NH3-N. At  downstream (south and south-western side of lake):  • Nitrate, Phosphate and Organic matter values reported to the maximum of 109.2 mg/l, 1.0 mg/l and 64 mg/l and an average of 26.99 mg/l, 0.26 mg/l and 14.95 mg/l respectively. • Increased level of organic matter in ground water aquifer establishes intrusion of sewage water. • Whereas domestic wells located at downstream to waste-wear with massive basaltic sand stone formation reported low contamination level. MPL -WHO PO4 -  <1.0  NH3-N - <0.3  NO3 – <45  COD - <10
  • 37. Major FindingsMajor Findings Fish Productivity: • Due to high contamination level , Indian major carps (Catla, Rohita) and other economically benefitted fish productivity are low. Whereas Tilapia mossambica is flourishing well because it grows well in the sewage polluted water.
  • 38. RecommendationsRecommendations • With respect to lakes, all three attributes of the lake i.e. the basin, the water body and the command area need to be conserved instead of the present focus on the water body only. • Assessment and monitoring of water quality is very important. • Effluents/waste water treatment plants, low cost sanitation, should be set up. • Adequate policies, legislations and programmes should be formulated and effective institutions should be put in place for pollution prevention, treatment and restoration of polluted water in lakes and ground water. 1. Policy support 2. Platform for presenting output. 3. Freedom to express views regarding any project report.
  • 39.
  • 40. AchievementsAchievements • IN DSS platform, we have a water balance modeling primary tool to assist water allocation decision to different sectors as per the priority. • The DSS is being used in our state particularly the GIS and time series analysis component for the feasibility and hydrological analysis in minor irrigation project planning .
  • 41.  WRD has selected Shipra river basin for development of DSS(P) in collaboration of NIH, Regional Centre, Bhopal  To assess sub basin wise water availability  Seasonal and ground water planning for optimal utilization of water  Study of changing scenario of demand supply in shipra basin in view of Narmada-Shipra link.  Development of GIS layers and Data collection is under progress  Area of shipra basin 5750 sq km  Tributary of Chambal river Future PlanFuture Plan
  • 42. Plan for Information DisseminationPlan for Information Dissemination  A DSS workshop for the departmental officers was organized in the State data centre for knowledge sharing and need assessment.  More workshops and trainings are proposed to be organized for the departmental staff for disseminating DSS outcomes to end users.  The DSS reports and findings are being distributed among field organizations.
  • 43. Important lessons learnt from DSSImportant lessons learnt from DSS • Application of hydrological modeling techniques are important in planning of surface and ground water resources management in Madhya Pradesh state. • The hydrological modeling tools like MIKE 11 NAM Model, MIKE BASIN,MIKE HYDRO and water resources planning tool like DSS(P) are found efficient to develop various scenarios addressing water resources management issues in Wainganga basin and it could further be used in other basin. • The regular monitoring of hydrological and meteorological data is important for future water resources planning. The scientific validation of data is equally important. • The assessment of water availability and demand assessment need to be carried out on regular basis to meet the various water use demands in Wainganga basin • •
  • 44. Important lesson learnt from DSSImportant lesson learnt from DSS • The reduction of water losses from Sanjay Sarovar canal, Dhuty weir LBC and Dhuty weir RBC would result in increased efficiency of the irrigation projects, additional water availability for irrigation, reduction in demand deficit and increased reliability of the system. • The surface water Seasonal planning application of DSS(P) is found useful to assess water demand-supply and surplus- deficit scenario, planning for crop selection and optimal utilization of available water resources. • The seasonal groundwater model developed for Dhuty RBC can be used in groundwater planning and to predict how much groundwater will be available at the end of May based on the groundwater level at the end of October.
  • 45. Issues Regarding DSSIssues Regarding DSS • Change of Basic modeling software (Mike basin to Mike Hydro) • Frequent change of DSS(P) version which is not comfortable. • DSS software for decision making and result projection requires the knowledge of scripting programming which we are unable to perform. • Complexity in Scenario development option in DSS.
  • 46.
  • 47. REVIEW MEETING HPII New DelhiREVIEW MEETING HPII New Delhi • THANK YOU