                                            ASSESSMENT OF STATUS IN TERMS OF FUNDAMENTAL SAFETY FUNCTIONS FOR ACHIEVING A SAFE STATE

                                             Necessary safety function and                                                                                                               TEPCO Roadmap
                                                                                                         Observation                                Evaluation of safe state
                                                       conditions                                                                                                                         countermeasures
                                        Reactor is subcritical and sub-criticality   - No power spike or power increase                       ACHIEVED                               No additional
              Control of
              Reactivity




                                        is demonstrated and maintained               - No significant neutron flux measured and reported      Caution:                               countermeasures reported
                                                                                     - Short lived fission products are not reported at the   - Continue detection of neutrons
                                                                                       moment (e.g. La-140)                                     and short-lived isotopes

                                        Stable cooling shall be assured              -   Reactor vessel temperature is: (115.1 °C at          NOT ACHIEVED                           Nos 1, 3, 4, 7, 8, 9, 13, 14,
                                        - Keep the coolant temperature                   feedwater nozzle, reactor pressure vessel            Establishment of a long term closed-   16 and 17
                Residual heat removal




                                            sufficiently below the boiling point         pressure ≤ 1.0 atm based on available                loop heat removal circuit is advised
                                            at atmospheric pressure                      measurements)
                                        - Cover the damaged core adequately          -   Water level of reactor core is below about
                                            with water                                   −1500 mm (A) and −2100 mm (B) from the top
                                        - Off-site and back-up power supply              of active core
                                            shall be available                       -   Off-site power supply and backup power from
                                        - Achievement of long term closed-               portable diesel generators are available
                                            loop heat removal capability             -   Fresh water injection is provided; however,
                                                                                         closed-loop heat removal is not yet established
                                        -    Containment is leak-tight               -   Containment is believed to be damaged: latest        NOT ACHIEVED                           Nos 2, 6, 11 and 15
                                        -    Containment pressure is maintained          measurements show the containment pressure to         - Measures to make the
              Containment




                                             below design limits                         be around atmospheric                                     containment leak-tight should
               integrity




                                        -    Hydrogen explosion to be                -   Containment probably damaged following                    be pursued
                                             prevented.                                  hydrogen explosion at this unit at 21:14 UTC on       - Pressure and H2 concentration of
                                                                                         14 March 2011                                             the containment to be further
                                                                                                                                                   monitored
                                        -    Reactor pressure vessel (including      -    Reactor pressure vessel is assumed to be            NOT ACHIEVED                           Nos 5, 10, 29–46, 50, 54
 radioactive material




                                             connected systems) should not leak;          leaking, most probably through connected            Construction of a cover above the      and 55
                                             or if so the leakage shall be                recirculation system (pump seal loss of coolant     reactor building has to be pursued
      Confining




                                             confined within allowable limits             accident)
                                        -    Leakages from the containment           -    Containment is believed to be damaged: latest
                                             should be prevented or controlled,           measurements show the containment pressure
                                             or shall be confined                         and reactor pressure vessel pressure to be
                                                                                          around atmospheric




[Type text]
Necessary safety function and                                                                                                      TEPCO Roadmap
                                                                                          Observation                              Evaluation of safe state
                                               conditions                                                                                                              countermeasures
                               -   No additional releases shall be     -   Intermittent releases have been observed         NOT ACHIEVED                         Nos 12, 47–49, 51–53, 55–
                                   anticipated                         -   Radiation monitors are available                 Measures to prevent radioactive      63
Limiting effects of releases




                               -   Radiation monitoring measurements   -   White smoke is observed emanating                releases and leaking of water with   The transfer of stagnant
                                   shall be available                      continuously from the reactor building           high level radioactivity to the      water from the turbine
                                                                       -   Samples of water in the turbine building floor   environment should be further        building to the radioactive
                                                                           area show high radioactivity releases from the   pursued                              waste treatment facilities is
                                                                           reactor and the containment to the environment                                        continuing
                                                                                                                                                                 Work to block the trench
                                                                                                                                                                 pit to prevent release of
                                                                                                                                                                 water with high level
                                                                                                                                                                 radioactivity to the
                                                                                                                                                                 environment is ongoing
[Type text]

Más contenido relacionado

Similar a Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011

Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011International Atomic Energy Agency
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011International Atomic Energy Agency
 
Download-manuals-training-understanding stage-dischargerelations
 Download-manuals-training-understanding stage-dischargerelations Download-manuals-training-understanding stage-dischargerelations
Download-manuals-training-understanding stage-dischargerelationshydrologyproject0
 
Nuclear power plant-safety measures
Nuclear power plant-safety measures Nuclear power plant-safety measures
Nuclear power plant-safety measures Nishtha Shreya
 

Similar a Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011 (6)

Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
Table 3: Unit 3 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011
 
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
Table 1: Unit 1 Reactor: Fukushima Daiichi Nuclear Power Plant - 18 May 2011
 
SPE 59300
SPE 59300SPE 59300
SPE 59300
 
Bam Nuttall Hv Test Report
Bam Nuttall   Hv Test ReportBam Nuttall   Hv Test Report
Bam Nuttall Hv Test Report
 
Download-manuals-training-understanding stage-dischargerelations
 Download-manuals-training-understanding stage-dischargerelations Download-manuals-training-understanding stage-dischargerelations
Download-manuals-training-understanding stage-dischargerelations
 
Nuclear power plant-safety measures
Nuclear power plant-safety measures Nuclear power plant-safety measures
Nuclear power plant-safety measures
 

Más de International Atomic Energy Agency

Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...International Atomic Energy Agency
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)International Atomic Energy Agency
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)International Atomic Energy Agency
 
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...International Atomic Energy Agency
 

Más de International Atomic Energy Agency (20)

IAEA Bulletin September 2011
IAEA Bulletin September 2011IAEA Bulletin September 2011
IAEA Bulletin September 2011
 
The IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear SafetyThe IAEA Legal Framework for Nuclear Safety
The IAEA Legal Framework for Nuclear Safety
 
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
Radiological Monitoring and Consequences of Fukushima Nuclear Accident (2 Jun...
 
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
Marine Environment Monitoring of Fukushima Nuclear Accident (2 June 2011)
 
Table: Summary of reactor unit status at 4-may-0700 utc
Table:  Summary of reactor unit status at 4-may-0700 utcTable:  Summary of reactor unit status at 4-may-0700 utc
Table: Summary of reactor unit status at 4-may-0700 utc
 
Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011Radiological Monitoring and Consequences - 5 May 2011
Radiological Monitoring and Consequences - 5 May 2011
 
Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011Summary of reactor unit status - 5 May 2011
Summary of reactor unit status - 5 May 2011
 
Table summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utcTable summary of reactor unit status at 27-april-0700 utc
Table summary of reactor unit status at 27-april-0700 utc
 
Table summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utcTable summary of reactor unit status at 26-april-0700 utc
Table summary of reactor unit status at 26-april-0700 utc
 
Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011Summary of reactor unit status - 19 April 2011
Summary of reactor unit status - 19 April 2011
 
Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011Fukushima Marine Environment Monitoring - 19 April 2011
Fukushima Marine Environment Monitoring - 19 April 2011
 
Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011Radiological Monitoring and Consequences - 19 April 2011
Radiological Monitoring and Consequences - 19 April 2011
 
Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)Tc Programme - Delivering Results for Peace and Development (Russian)
Tc Programme - Delivering Results for Peace and Development (Russian)
 
Table summary of reactor unit status at 18-april 2011
Table  summary of reactor unit status at 18-april 2011Table  summary of reactor unit status at 18-april 2011
Table summary of reactor unit status at 18-april 2011
 
Table summary of reactor unit status at 15-april-1200 utc
Table   summary of reactor unit status at 15-april-1200 utcTable   summary of reactor unit status at 15-april-1200 utc
Table summary of reactor unit status at 15-april-1200 utc
 
Tc programme presentation UN audience
Tc programme presentation UN audienceTc programme presentation UN audience
Tc programme presentation UN audience
 
TC Programme Presentation Russian
TC Programme Presentation  RussianTC Programme Presentation  Russian
TC Programme Presentation Russian
 
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...Technical Cooperation Programme - Delivering Results for Peace and Developmen...
Technical Cooperation Programme - Delivering Results for Peace and Developmen...
 
Fukushima Marine Environment Monitoring - 12 April 2011
Fukushima Marine Environment Monitoring - 12 April 2011Fukushima Marine Environment Monitoring - 12 April 2011
Fukushima Marine Environment Monitoring - 12 April 2011
 
Fukushima Marine Environment Monitoring - 12 April 2011
Fukushima Marine Environment Monitoring - 12 April 2011Fukushima Marine Environment Monitoring - 12 April 2011
Fukushima Marine Environment Monitoring - 12 April 2011
 

Último

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 

Último (20)

[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

Table 2: Unit 2 Reactor: Fukushima Daiichi Nuclear Power Plant - 11 May 2011

  • 1. TABLE 2. UNIT 2 REACTOR: FUKUSHIMA DAIICHI NUCLEAR POWER PLANT: 11 MAY 2011 ASSESSMENT OF STATUS IN TERMS OF FUNDAMENTAL SAFETY FUNCTIONS FOR ACHIEVING A SAFE STATE Necessary safety function and TEPCO Roadmap Observation Evaluation of safe state conditions countermeasures Reactor is subcritical and sub-criticality - No power spike or power increase ACHIEVED No additional Control of Reactivity is demonstrated and maintained - No significant neutron flux measured and reported Caution: countermeasures reported - Short lived fission products are not reported at the - Continue detection of neutrons moment (e.g. La-140) and short-lived isotopes Stable cooling shall be assured - Reactor vessel temperature is: (115.1 °C at NOT ACHIEVED Nos 1, 3, 4, 7, 8, 9, 13, 14, - Keep the coolant temperature feedwater nozzle, reactor pressure vessel Establishment of a long term closed- 16 and 17 Residual heat removal sufficiently below the boiling point pressure ≤ 1.0 atm based on available loop heat removal circuit is advised at atmospheric pressure measurements) - Cover the damaged core adequately - Water level of reactor core is below about with water −1500 mm (A) and −2100 mm (B) from the top - Off-site and back-up power supply of active core shall be available - Off-site power supply and backup power from - Achievement of long term closed- portable diesel generators are available loop heat removal capability - Fresh water injection is provided; however, closed-loop heat removal is not yet established - Containment is leak-tight - Containment is believed to be damaged: latest NOT ACHIEVED Nos 2, 6, 11 and 15 - Containment pressure is maintained measurements show the containment pressure to - Measures to make the Containment below design limits be around atmospheric containment leak-tight should integrity - Hydrogen explosion to be - Containment probably damaged following be pursued prevented. hydrogen explosion at this unit at 21:14 UTC on - Pressure and H2 concentration of 14 March 2011 the containment to be further monitored - Reactor pressure vessel (including - Reactor pressure vessel is assumed to be NOT ACHIEVED Nos 5, 10, 29–46, 50, 54 radioactive material connected systems) should not leak; leaking, most probably through connected Construction of a cover above the and 55 or if so the leakage shall be recirculation system (pump seal loss of coolant reactor building has to be pursued Confining confined within allowable limits accident) - Leakages from the containment - Containment is believed to be damaged: latest should be prevented or controlled, measurements show the containment pressure or shall be confined and reactor pressure vessel pressure to be around atmospheric [Type text]
  • 2. Necessary safety function and TEPCO Roadmap Observation Evaluation of safe state conditions countermeasures - No additional releases shall be - Intermittent releases have been observed NOT ACHIEVED Nos 12, 47–49, 51–53, 55– anticipated - Radiation monitors are available Measures to prevent radioactive 63 Limiting effects of releases - Radiation monitoring measurements - White smoke is observed emanating releases and leaking of water with The transfer of stagnant shall be available continuously from the reactor building high level radioactivity to the water from the turbine - Samples of water in the turbine building floor environment should be further building to the radioactive area show high radioactivity releases from the pursued waste treatment facilities is reactor and the containment to the environment continuing Work to block the trench pit to prevent release of water with high level radioactivity to the environment is ongoing
  • 3.