IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 149
TRAFFIC GROWTH RATE ESTIMATION USING TRANSPORT
DEMAND ELASTICITY METHOD: A CASE STUDY FOR NATIONAL
HIGHWAY-63
Hemanth. M Kamplimath1
, Varuna. M2
, Vijay Kumar3
, Yashas Bhargav4
1
Post Graduate Student, Highway Technology, 2
Assistant Professor, Dept of Civil Engg, R.V.C.E, Bangalore
3
Senior Highway Engineer, 4
Assistant Traffic Engineer, URS Scott Wilson, Bangalore
hemanth.kamplimath@gmail.com, varun.m07@gmail.com, vijayakumarsagar@yahoo.com, yashasb3@gmail.com
Abstract
With the recent thrust on improving and developing highways for boosting National Economy, the importance of Traffic Demand
Forecasting (TDF) has increased significantly as the forecasted traffic volume contributes substantially in engineering design,
economic and financial liabilities of highway improvement projects. Therefore, estimation of traffic growth rates and the related
issues concerned primarily to improve the rationality of traffic forecast is of prime importance. In the present Paper, the complete
process of Traffic Growth Estimation by Transport Demand Elasticity Method even when available data is inaccurate or even
missing, merits and demerits of various methods of obtaining traffic growth factors and critical issues associated in the process have
been addressed and demonstrated through a case study. It has been revealed that with the constraints of availability of proper data
and fluctuation of developing economy, the task of Traffic Growth Estimation could be quite subjective and approximate. Different
approaches and necessary considerations for improving the rationality of traffic growth rate have also been addressed in the paper.
Keywords: Traffic Volume, Seasonal Correction Factors, Project Influence, Demand Elasticity, Traffic Demand
Forecasting, Traffic Growth Rates.
-------------------------------------------------------------------***-----------------------------------------------------------------------
1. INTRODUCTION
The objective of this study is to estimate traffic growth using
transport demand elasticity method and to compare how
different these values are from the vehicle registration data.
In this present study, an attempt has been made to analyze the
O-D data for passenger vehicles (cars & buses) and goods
vehicle (trucks) collected by roadside interview method. The
passenger characteristics such as average occupancy by mode,
trip length, frequency and freight characteristics are analyzed
and tabulated. The influence factors of various zones were
found out. Socio-economic data viz -Per capita income and
Net State Domestic Product, demographic data such as
Population and registration of vehicle data of different states
influencing the study stretch were collected from statistical
data sources. The relationship between annual growths of
vehicles in percentage over number of years is established.
To determine elasticity values, the regression analysis is
carried out between socio economic variables growth index
and vehicle growth index. The elasticity values for the future
years are calculated based on the growth trend of vehicles.
2. STUDY AREA CHARACTERISTICS
The Project stretch is a part of NH-63 in the state of Karnataka
which runs from east to west connecting Karnataka to Andhra
Pradesh. The total length of NH-63 is about 432 km, out of
which 370 km runs in Karnataka State and about 55.4 km runs
in Andhra Pradesh.
This case study deals with Hubli – Hospet stretch of NH-63.
The project stretch, starts at km 132+000 of NH-63 at junction
with NH-4 Hubli-Dharwad bypass and ends at km 268+700 at
junction of NH-63 and NH-13, Hitnal Junction.
3. DATA COLLECTION
For the purpose of forecasting traffic on the study stretch,
several primary and secondary data were collected as
mentioned below.
3.1 Primary Data
On the basis of reconnaissance survey and as per the
recommendations of IRC, the project stretch was divided into
two homogenous sections and suitable location for each
section was strategically selected. The various traffic surveys
carried out were:
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 150
• 7-day Continuous Traffic Volume Count
• 24 hour Origin and Destination Studies
Strict adherence to IRC codes and manuals were followed for
the traffic surveys carried out.
Secondary Data:
• Fuel sales data along the study stretch
• Past data on traffic volume on the study stretch
• Previous year’s vehicle registration data of Karnataka
State
• Previous year’s data on Per capita Income, Net State
Domestic Product (NSDP), Population data of all the
states influencing the project corridor and the
National Average.
4. ESTIMATION OF AVERAGE DAILY TRAFFIC
(ADT) AND ANNUAL AVERAGE DAILY
TRAFFIC (AADT)
Table 1 showing Average Daily Traffic
Survey Location Nalavadi -159.500 Hallikeri-221.400
Vehicle Category
ADT
Vehicles
ADT
(PCU)
% Share of
Traffic
ADT
Vehicles
ADT
(PCU)
% Share of
Traffic
Two Wheeler 898 449 16.6% 329 164.5 10.6%
Auto Rickshaw 40 40 0.7% 36 36 1.2%
Car/Jeep/Van/Taxi 1960 1961 36.2% 1019 1019 32.7%
Mini Bus 24 36 0.4% 18 28.5 0.6%
Buses 658 1974 12.2% 259 780 8.3%
Mini LCV 366 366 6.8% 212 212 6.8%
LCV (4&6 Tire) 282 423 5.2% 212 318 6.8%
Truck (Two axle and Three Axle) 887 2661 16.4% 723 2169 23.2%
Multi Axle Trucks (4 axles and more) 145 652.5 2.7% 204 918 6.6%
HCM / EME 3 13.5 0.1% 5 22.5 0.2%
Tractor 40 60 0.7% 12 18 0.4%
Tractor + Trailer 54 243 1.0% 71 315 2.3%
Cycles 53 27 1.0% 10 5 0.3%
Cycle Rickshaw 1 2 0.0% 1 2 0.0%
Animal Drawn Carts 4 24 0.1% 3 18 0.1%
Total 5414 8932 100.0% 3112 6026 100.0%
4.1 Seasonal Variations of Traffic Volume:
Traffic levels along a study stretch vary during different
periods of time i.e., in different months/seasons.
Information on this aspect is necessary to estimate the AADT.
This is best understood by studying monthly historical traffic
volumes on the project corridor. This however is not available
for the study stretch. In the absence of this direct information,
it is customary to consider the monthly sales of petrol and
diesel, at the fuel stations along the project corridor or on the
road stretches in its environment. This information is
presented in Table. The factors for passenger vehicles are
based on petrol sales and that of goods vehicles
(Trucks/LCV’s) and buses on diesel sales.
Table 2 showing daily fuel sales and Seasonal Correction Factors (SCF) required estimating AADT
Month
Daily Diesel
Consumption (liters)
Daily Petrol
Consumption (liters) Both
SCF
(Diesel)
SCF
(petrol)
SCF
(Both)
April 4654 396 5051 0.9 1.07 0.91
May 4517 417 4933 0.93 1.01 0.94
June 4289 400 4689 0.98 1.06 0.98
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 151
July 3675 392 4067 1.14 1.08 1.14
August 3325 364 3689 1.26 1.16 1.25
September 3532 375 3907 1.19 1.13 1.18
October 3771 437 4208 1.11 0.97 1.1
November 4308 442 4750 0.97 0.96 0.97
December 4474 444 4918 0.94 0.95 0.94
January 4334 448 4782 0.97 0.94 0.97
February 4769 473 5242 0.88 0.89 0.88
March 4681 482 5162 0.9 0.88 0.89
Average 4194 422 4616
Table-3 showing AADT obtained after applying Seasonal Correction Factors
Survey Location Nalavadi -159.500 Hallikeri-221.400
Vehicle Category ADT (PCU) AADT ADT (PCU) AADT
Two Wheeler 449 395 164.5 147
Auto Rickshaw 40 36 36 32
Car/Jeep/Van/Taxi 1961 1727 1019 897
Mini Bus 36 32 28.5 25
Buses 1974 1739 780 686
Mini LCV 366 322 212 186
LCV (4&6 Tire) 423 372 318 279
Truck (Two axle & Three Axle) 2661 2341 2169 1908
Multi Axle Trucks (4 axles and more) 652.5 574 918 807
HCM / EME 13.5 12 22.5 20
Tractor 60 54 18 16
Tractor + Trailer 243 214 315 277
Cycles 27 27 5 4
Cycle Rickshaw 2 2 2 2
Animal Drawn Carts 24 24 18 18
Total 8932 7869 6026 5305
5. TRAFFIC GROWTH RATES
To establish the future traffic growth rates, following
approaches have been explored.
• Past trends in Traffic growth on the Project Road.
• Growth of registered motor vehicles.
• Transport demand elasticity approach.
5.1 Growth Rate based on Past Traffic Data:
Past traffic data as collected from PWD is available for two
locations (near Annigere and Gadag) along the project
corridor. These data are available from January to July months
of last 10 years. The growth rates were worked out for various
categories of vehicles and conclusions were drawn.
Non-Uniformity in past traffic data of PWD may be attributed
to errors during collection and processing of data and policy
measures of the Government and other influences etc. To
illustrate this point during recent years some of the mining
activities around the project corridor have been banned by the
Government which has caused a substantial decrease in the
amount of trucks and Lorries. As the past traffic data on the
Project Road is not showing any definite trend, one should not
be guided by past traffic data for deriving growth rates.
5.2 Growth Rate based on Vehicle Registration:
An alternative approach is to explore the registered motor
vehicles growth in the influence area and assume a growth rate
equal to the average growth of vehicle registration. Such an
assumption may not be correct, unless the area of influence is
well defined and the general development pattern of influence
area remains same. The growth rates for various modes are
estimated and presented in Table-4, Growth of Registered
Motor Vehicles in Karnataka. It can be observed from the
above Table, during the last 7 years, average growth of two
wheelers, cars and that of trucks is around 11%-12%. This
high growth rate of more than 10% may not sustain in future.
Therefore other rational approaches were explored in order to
derive realistic growth rates.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 152
Table 4 – Summary of Cumulative Average Annual Growth Rate of Vehicles (%) in Karnataka state
Year Goods Vehicles Buses Cars/Jeep/Taxi Two Wheelers Three Wheelers
2004-2005 221913 89294 841846 3957762 284078
2005-2006 276013 95627 958300 4512910 307862
2006-2007 312272 99202 1030629 3755719 359920
2007-2008 344764 110558 1209431 4230864 403910
2008-2009 366597 115016 1326395 4796587 364781
2009-2010 377495 159377 1398221 6404905 349729
2010-2011 415491 167087 1561131 7033045 440368
CAAGR in % 11.22% 11.62% 10.91% 11.10% 8.27%
Source: Ministry of Road Transport & Highways Government of India (MoRT&H)
5.3 Traffic Growth Estimation by Transport Demand
elasticity Method:
The exercise of traffic growth rate estimation has been carried
out by us using the elasticity approach. The elasticity method
relates traffic growth to changes in the related economic
parameters. According to IRC-108-1996, elasticity based
econometric model for highway projects could be derived in
the following form:
Log e (P) = A0 + A1 Log e (EI)
Where:
• P = Traffic volume (of any vehicle type)
• EI = Economic Indicator
(GDP/NSDP/Population/PCI)
• A0 = Regression constant;
• A1 = Regression co-efficient (Elasticity Index)
The main steps followed are:
• Defining the Project Influence Area from OD analysis
of travel pattern.
• Estimating the past elasticity of traffic growth from
time series of registered vehicles of influencing states.
• Assessment of future elasticity values for major
vehicle groups, namely, cars, buses and trucks.
5.4 Project Influence Area
The results obtained from the Origin Destination surveys
were used to identify the project influence area. The ratio
of the total traffic originated/destined to a particular zone to
the total traffic gives the influence factor for the particular
zone. The influence factors were developed from the OD
matrices and influence of each State is given in Table5 .
A comparative study of the influence factors indicated that
Karnataka State, where the project stretch runs has the
majority influence of ninety two percent (92%). State of Goa,
Andhra Pradesh and Maharashtra that has its border abutting
Karnataka State has an influence factor of two percent (2%)
our percent (4%) and two percent (2%) respectively. Tamil
Nadu/Kerala and Rest of India has minimal or no share at all.
These factors have all been accounted in derivation of the
combined growth factor and utilized for the project sections.
Table -5 Influence of Vehicles observed on the Project Road`
States Cars Buses Truck Average
Karnataka 97.0% 93.9% 86.4% 92.4%
Goa 1.3% 0.5% 3.7% 1.8%
Andhra Pradesh 1.1% 3.7% 6.6% 3.8%
Maharashtra 0.6% 1.9% 2.7% 1.7%
Rest of India 0.0% 0.0% 0.7% 0.2%
Total 100.0% 100.0% 100.0% 100.0%
5.5 Elasticity Values
Elasticity value is the factor by which the socio-economic
growth rate is multiplied to get the growth rate of traffic.
Traffic is directly linked to the economic growth such as per-
capita income, population and NSDP/GDP. Considering the
time series data on category wise registered vehicles and the
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 153
economic variables, by regression analysis elasticity values is estimated as shown in Table-6
Table-6 Elasticity Values derived based on Regression Analysis for Karnataka State
Mode Variable Elasticity R square
CAAGR (Vehicle
Registration)
Two Wheelers Per Capita Income 2.86 0.80 11.10%
Cars Per Capita Income 1.48 0.97 10.91%
Buses Per Capita Income 1.45 0.75 11.62%
Goods NSDP 1.23 0.97 11.22%
Auto Rickshaw Per Capita Income 0.84 0.7 8.27%
Table-7 showing adopted Elasticity values for future years
Mode
Estimated Elasticity(2004-
2011)
Recommended
Elasticity
2013-2018 2018-2023 2023 and Beyond
Goods 1.20 1.20 1.08 0.97 0.87
Buses 1.45 1.20 1.08 0.97 0.87
Passenger Cars 1.50 1.5 1.43 1.28 1.15
Two Wheelers 2.86 1.6 1.52 1.37 1.23
Three Wheelers 0.84 0.84 0.80 0.72 0.65
5.6 Traffic Growth Rates:
Based on the moderated elasticity values and the projected
economic/demographic indicators and with the given model as
follows, the future average annual compound traffic growth
rates by vehicle type are estimated.
Passenger Vehicles:
Traffic Growth Rate = [ (1+rp) ( 1+ rpci x Em) – 1]
Where,
rp= Population Growth, rpci= Per capita Income Growth, Em=
Elasticity
Goods Vehicles:
Growth Rate for Goods Vehicles = Elasticity Value *
NSDP Growth Rate
The growth rate estimated form elasticity values are shown in
the table below:
Table-8 Showing Growth Rates adopted for different classes of Vehicles
Projected Traffic Growth
Rates adopted for the
Study
Pessimistic Approach Normal Approach Optimistic Approach
Sl.
No
Vehicle Type
Projected Annual Traffic Growth
Rate (%)
Projected Annual Traffic
Growth Rate (%)
Projected Annual Traffic
Growth Rate (%)
2013-2018
2018-
2023
2023-
2023
2013-
2018
2018-
2023
2023-
2023
2013-
2018
2018-
2023
2023-
2023
1 LCV 8.0% 7.6% 6.5% 9.2% 8.7% 7.5% 10.5% 9.8% 8.5%
2 2-Axle Truck 4.9% 4.6% 3.9% 5.6% 5.3% 4.5% 6.4% 6.0% 5.2%
3 3-Axle Truck 8.0% 7.6% 6.5% 9.2% 8.7% 7.5% 10.5% 9.8% 8.5%
4 Multi-Axle Truck 7.0% 6.6% 5.6% 8.0% 7.6% 6.5% 9.1% 8.6% 7.4%
5 Bus 6.8% 6.6% 5.7% 7.9% 7.6% 6.6% 9.0% 8.5% 7.4%
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 154
6 Car 8.5% 8.3% 7.1% 10.0% 9.6% 8.3% 11.4% 10.9% 9.4%
7 Two Wheeler 8.9% 8.7% 7.5% 10.5% 10.1% 8.7% 12.1% 11.5% 10.0%
8 Auto Rickshaw 5.2% 5.1% 4.4% 6.0% 5.8% 5.0% 6.8% 6.5% 5.6%
DISCUSSIONS AND CONCLUSIONS:
The comparison of growth rates on vehicular registration data
and by elasticity value are as shown in the table below:
Table-9 Comparison of Growth Rates by Various Methods
Table-9 Comparison of Growth Rates by Various Methods
Method Mode
Two Wheeler Car Bus Truck Auto Rickshaw
Past Traffic on Project Corridor No trend No trend No trend No trend No trend
Vehicle Registration Growth of Karnataka
State
11.10% 10.91% 11.62% 11.22% 8.27%
Elasticity Method(2004-2011) 10.50% 10% 7.90% 8% 6%
The growth rates obtained from transport demand elasticity
method is being widely used method all over India. These
growth rates are adopted to predict future traffic volumes and
Laning Requirements.
REFERENCES
[1] L.R. Kadiyali & T.V. Shashikala, “Road Transport
Demand Forecast for 2000 AD Revisited and Demand
Forecast for 2021” Journal of the IRC October –
December 2009 Paper No. 557
[2] Jahar R. Sarkar and Dr. Bhargab Maitra “Critical
consideration of Travel Demand Forecasting on
National Highways: A Case Study”. IRC :Volume 62
No.3 2001
[3] Vijay Kumar, “Traffic Characteristics And Demand
Along North and South Corridors- A Case Study”, M.E.
Thesis, Bangalore University, Bangalore March 2001.
[4] IRC: 102-1988, “Traffic Studies for Planning Bypass
around towns”
[5] IRC:108-1996, “Guidelines for Traffic Predictions on
Rural Highways”
[6] MORT&H , Road Transport Year Book 2004-2007,
2007-2009, 2009-2011
[7] Reserve Bank of India Annual report.

Más contenido relacionado

La actualidad más candente

Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
Waliur Rahman
 

La actualidad más candente (20)

Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Traffic studies and importance
Traffic studies and importance Traffic studies and importance
Traffic studies and importance
 
L3 Traffic Flow Models
L3 Traffic Flow ModelsL3 Traffic Flow Models
L3 Traffic Flow Models
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Origin – Destination survey
Origin – Destination surveyOrigin – Destination survey
Origin – Destination survey
 
Volume study (group 5)
Volume study (group  5)Volume study (group  5)
Volume study (group 5)
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
 
Traffic volume-study-presentation-final
Traffic volume-study-presentation-finalTraffic volume-study-presentation-final
Traffic volume-study-presentation-final
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
 
Parking study
Parking studyParking study
Parking study
 
Urban Transportation system - mass transit system
Urban Transportation system - mass transit systemUrban Transportation system - mass transit system
Urban Transportation system - mass transit system
 
Traffic survey
Traffic surveyTraffic survey
Traffic survey
 
Traffic volume study
Traffic volume studyTraffic volume study
Traffic volume study
 
Traffic Engineering And Drainage
Traffic Engineering And DrainageTraffic Engineering And Drainage
Traffic Engineering And Drainage
 
O and d study
O and d studyO and d study
O and d study
 
Traffic volume survey
Traffic volume surveyTraffic volume survey
Traffic volume survey
 
Ce2026 traffic engineering and management notes
Ce2026 traffic engineering and management notesCe2026 traffic engineering and management notes
Ce2026 traffic engineering and management notes
 
Chapter 2 traffic studies
Chapter 2 traffic studiesChapter 2 traffic studies
Chapter 2 traffic studies
 
Traffic Volume Study
Traffic Volume StudyTraffic Volume Study
Traffic Volume Study
 
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
3-Trip Generation-Distribution ( Transportation and Traffic Engineering Dr. S...
 

Destacado

Cfd simulation of single stage axial flow compressor
Cfd simulation of single stage axial flow compressorCfd simulation of single stage axial flow compressor
Cfd simulation of single stage axial flow compressor
eSAT Publishing House
 
Usability guidelines for usable user interface
Usability guidelines for usable user interfaceUsability guidelines for usable user interface
Usability guidelines for usable user interface
eSAT Publishing House
 
Natural disasters vulnerability assessment of gondia district, maharashtra, i...
Natural disasters vulnerability assessment of gondia district, maharashtra, i...Natural disasters vulnerability assessment of gondia district, maharashtra, i...
Natural disasters vulnerability assessment of gondia district, maharashtra, i...
eSAT Publishing House
 
Concrete based on alkali activated fly ash from one power plant in serbia
Concrete based on alkali activated fly ash from one power plant in serbiaConcrete based on alkali activated fly ash from one power plant in serbia
Concrete based on alkali activated fly ash from one power plant in serbia
eSAT Publishing House
 
Hindering data theft attack through fog computing
Hindering data theft attack through fog computingHindering data theft attack through fog computing
Hindering data theft attack through fog computing
eSAT Publishing House
 

Destacado (20)

Cfd simulation of single stage axial flow compressor
Cfd simulation of single stage axial flow compressorCfd simulation of single stage axial flow compressor
Cfd simulation of single stage axial flow compressor
 
Usability guidelines for usable user interface
Usability guidelines for usable user interfaceUsability guidelines for usable user interface
Usability guidelines for usable user interface
 
Natural disasters vulnerability assessment of gondia district, maharashtra, i...
Natural disasters vulnerability assessment of gondia district, maharashtra, i...Natural disasters vulnerability assessment of gondia district, maharashtra, i...
Natural disasters vulnerability assessment of gondia district, maharashtra, i...
 
Concrete based on alkali activated fly ash from one power plant in serbia
Concrete based on alkali activated fly ash from one power plant in serbiaConcrete based on alkali activated fly ash from one power plant in serbia
Concrete based on alkali activated fly ash from one power plant in serbia
 
Hindering data theft attack through fog computing
Hindering data theft attack through fog computingHindering data theft attack through fog computing
Hindering data theft attack through fog computing
 
Synthesis, characterisation and antibacterial activity of copolymer (n vinylp...
Synthesis, characterisation and antibacterial activity of copolymer (n vinylp...Synthesis, characterisation and antibacterial activity of copolymer (n vinylp...
Synthesis, characterisation and antibacterial activity of copolymer (n vinylp...
 
Cyclone disaster on housing and coastal area
Cyclone disaster on housing and coastal areaCyclone disaster on housing and coastal area
Cyclone disaster on housing and coastal area
 
Devlopement of the dynamic resistance measurement (drm) method for condition ...
Devlopement of the dynamic resistance measurement (drm) method for condition ...Devlopement of the dynamic resistance measurement (drm) method for condition ...
Devlopement of the dynamic resistance measurement (drm) method for condition ...
 
Survey on software remodularization techniques
Survey on software remodularization techniquesSurvey on software remodularization techniques
Survey on software remodularization techniques
 
Multi agent paradigm for cognitive parameter based feature similarity for soc...
Multi agent paradigm for cognitive parameter based feature similarity for soc...Multi agent paradigm for cognitive parameter based feature similarity for soc...
Multi agent paradigm for cognitive parameter based feature similarity for soc...
 
Development of kinetic model for adsorption of
Development of kinetic model for adsorption ofDevelopment of kinetic model for adsorption of
Development of kinetic model for adsorption of
 
Analysis of problems of biomass grinder integrated
Analysis of problems of biomass grinder integratedAnalysis of problems of biomass grinder integrated
Analysis of problems of biomass grinder integrated
 
Fuzzy based control using lab view for miso temperature process
Fuzzy based control using lab view for miso temperature processFuzzy based control using lab view for miso temperature process
Fuzzy based control using lab view for miso temperature process
 
Computerized spoiled tomato detection
Computerized spoiled tomato detectionComputerized spoiled tomato detection
Computerized spoiled tomato detection
 
Tqds time stamped quantum digital signature to defend
Tqds time stamped quantum digital signature to defendTqds time stamped quantum digital signature to defend
Tqds time stamped quantum digital signature to defend
 
Migration of application schema to windows azure
Migration of application schema to windows azureMigration of application schema to windows azure
Migration of application schema to windows azure
 
Design and operation of synchronized robotic arm
Design and operation of synchronized robotic armDesign and operation of synchronized robotic arm
Design and operation of synchronized robotic arm
 
Productivity improvement through lean deployment &
Productivity improvement through lean deployment &Productivity improvement through lean deployment &
Productivity improvement through lean deployment &
 
Design and development of mechanical power amplifier
Design and development of mechanical power amplifierDesign and development of mechanical power amplifier
Design and development of mechanical power amplifier
 
Performance analysis of new proposed window for
Performance analysis of new proposed window forPerformance analysis of new proposed window for
Performance analysis of new proposed window for
 

Similar a Traffic growth rate estimation using transport

Quantifying modelingon risk of travel demand and measure to sustaining road s...
Quantifying modelingon risk of travel demand and measure to sustaining road s...Quantifying modelingon risk of travel demand and measure to sustaining road s...
Quantifying modelingon risk of travel demand and measure to sustaining road s...
eSAT Journals
 
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
ijtsrd
 
Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
ijsrd.com
 

Similar a Traffic growth rate estimation using transport (20)

Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
 
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOWTRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
TRAFFIC PARAMETERS: VOLUME COUNT, SPOT SPEED STUDY, SATUARATION FLOW
 
Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...Traffic studies of urban mid block section a case study of pragatinagar to ak...
Traffic studies of urban mid block section a case study of pragatinagar to ak...
 
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
IRJET- Study of Traffic Volume and Traffic Forecasting on State Highway-41
 
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNALTRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
TRAFFIC ANALYSIS AND DESIGN OF FLYOVER AT PERUMBAVOOR SIGNAL
 
Quantifying modelingon risk of travel demand and measure to sustaining road s...
Quantifying modelingon risk of travel demand and measure to sustaining road s...Quantifying modelingon risk of travel demand and measure to sustaining road s...
Quantifying modelingon risk of travel demand and measure to sustaining road s...
 
IRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic SignalIRJET- Study of Design Traffic Signal
IRJET- Study of Design Traffic Signal
 
IRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative SolutionIRJET- Traffic Analysis and Alternative Solution
IRJET- Traffic Analysis and Alternative Solution
 
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSIONESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
ESTIMATION OF CAPACITY AND MODEL DEVELOPMENT USING LINEAR REGRESSION
 
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
Study the Effects of Traffic Situation on Driver’s Mood and Root Choice Decis...
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...
 
An investigation of the design implications for openings
An investigation of the design implications for openingsAn investigation of the design implications for openings
An investigation of the design implications for openings
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...
 
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
 
Design of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant WaterDesign of Highway with Major Bridge on Stagnant Water
Design of Highway with Major Bridge on Stagnant Water
 
Demand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mallDemand assessment of multi level car parking in garuda mall
Demand assessment of multi level car parking in garuda mall
 
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
IRJET- Critical Assessment of Road Capacitiesand Solutions for Traffic Proble...
 
Fixation of Toll charge for Six Lane Highway
 Fixation of Toll charge for Six Lane Highway Fixation of Toll charge for Six Lane Highway
Fixation of Toll charge for Six Lane Highway
 
IRJET- Capacity Utilisation of Koothattukulam-North Palakkuzha Stretch in Ke...
IRJET- Capacity Utilisation  of Koothattukulam-North Palakkuzha Stretch in Ke...IRJET- Capacity Utilisation  of Koothattukulam-North Palakkuzha Stretch in Ke...
IRJET- Capacity Utilisation of Koothattukulam-North Palakkuzha Stretch in Ke...
 

Más de eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
eSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
eSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
eSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
eSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
eSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
eSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
eSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
eSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
eSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
eSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
eSAT Publishing House
 

Más de eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Último

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Último (20)

Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 

Traffic growth rate estimation using transport

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 149 TRAFFIC GROWTH RATE ESTIMATION USING TRANSPORT DEMAND ELASTICITY METHOD: A CASE STUDY FOR NATIONAL HIGHWAY-63 Hemanth. M Kamplimath1 , Varuna. M2 , Vijay Kumar3 , Yashas Bhargav4 1 Post Graduate Student, Highway Technology, 2 Assistant Professor, Dept of Civil Engg, R.V.C.E, Bangalore 3 Senior Highway Engineer, 4 Assistant Traffic Engineer, URS Scott Wilson, Bangalore hemanth.kamplimath@gmail.com, varun.m07@gmail.com, vijayakumarsagar@yahoo.com, yashasb3@gmail.com Abstract With the recent thrust on improving and developing highways for boosting National Economy, the importance of Traffic Demand Forecasting (TDF) has increased significantly as the forecasted traffic volume contributes substantially in engineering design, economic and financial liabilities of highway improvement projects. Therefore, estimation of traffic growth rates and the related issues concerned primarily to improve the rationality of traffic forecast is of prime importance. In the present Paper, the complete process of Traffic Growth Estimation by Transport Demand Elasticity Method even when available data is inaccurate or even missing, merits and demerits of various methods of obtaining traffic growth factors and critical issues associated in the process have been addressed and demonstrated through a case study. It has been revealed that with the constraints of availability of proper data and fluctuation of developing economy, the task of Traffic Growth Estimation could be quite subjective and approximate. Different approaches and necessary considerations for improving the rationality of traffic growth rate have also been addressed in the paper. Keywords: Traffic Volume, Seasonal Correction Factors, Project Influence, Demand Elasticity, Traffic Demand Forecasting, Traffic Growth Rates. -------------------------------------------------------------------***----------------------------------------------------------------------- 1. INTRODUCTION The objective of this study is to estimate traffic growth using transport demand elasticity method and to compare how different these values are from the vehicle registration data. In this present study, an attempt has been made to analyze the O-D data for passenger vehicles (cars & buses) and goods vehicle (trucks) collected by roadside interview method. The passenger characteristics such as average occupancy by mode, trip length, frequency and freight characteristics are analyzed and tabulated. The influence factors of various zones were found out. Socio-economic data viz -Per capita income and Net State Domestic Product, demographic data such as Population and registration of vehicle data of different states influencing the study stretch were collected from statistical data sources. The relationship between annual growths of vehicles in percentage over number of years is established. To determine elasticity values, the regression analysis is carried out between socio economic variables growth index and vehicle growth index. The elasticity values for the future years are calculated based on the growth trend of vehicles. 2. STUDY AREA CHARACTERISTICS The Project stretch is a part of NH-63 in the state of Karnataka which runs from east to west connecting Karnataka to Andhra Pradesh. The total length of NH-63 is about 432 km, out of which 370 km runs in Karnataka State and about 55.4 km runs in Andhra Pradesh. This case study deals with Hubli – Hospet stretch of NH-63. The project stretch, starts at km 132+000 of NH-63 at junction with NH-4 Hubli-Dharwad bypass and ends at km 268+700 at junction of NH-63 and NH-13, Hitnal Junction. 3. DATA COLLECTION For the purpose of forecasting traffic on the study stretch, several primary and secondary data were collected as mentioned below. 3.1 Primary Data On the basis of reconnaissance survey and as per the recommendations of IRC, the project stretch was divided into two homogenous sections and suitable location for each section was strategically selected. The various traffic surveys carried out were:
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 150 • 7-day Continuous Traffic Volume Count • 24 hour Origin and Destination Studies Strict adherence to IRC codes and manuals were followed for the traffic surveys carried out. Secondary Data: • Fuel sales data along the study stretch • Past data on traffic volume on the study stretch • Previous year’s vehicle registration data of Karnataka State • Previous year’s data on Per capita Income, Net State Domestic Product (NSDP), Population data of all the states influencing the project corridor and the National Average. 4. ESTIMATION OF AVERAGE DAILY TRAFFIC (ADT) AND ANNUAL AVERAGE DAILY TRAFFIC (AADT) Table 1 showing Average Daily Traffic Survey Location Nalavadi -159.500 Hallikeri-221.400 Vehicle Category ADT Vehicles ADT (PCU) % Share of Traffic ADT Vehicles ADT (PCU) % Share of Traffic Two Wheeler 898 449 16.6% 329 164.5 10.6% Auto Rickshaw 40 40 0.7% 36 36 1.2% Car/Jeep/Van/Taxi 1960 1961 36.2% 1019 1019 32.7% Mini Bus 24 36 0.4% 18 28.5 0.6% Buses 658 1974 12.2% 259 780 8.3% Mini LCV 366 366 6.8% 212 212 6.8% LCV (4&6 Tire) 282 423 5.2% 212 318 6.8% Truck (Two axle and Three Axle) 887 2661 16.4% 723 2169 23.2% Multi Axle Trucks (4 axles and more) 145 652.5 2.7% 204 918 6.6% HCM / EME 3 13.5 0.1% 5 22.5 0.2% Tractor 40 60 0.7% 12 18 0.4% Tractor + Trailer 54 243 1.0% 71 315 2.3% Cycles 53 27 1.0% 10 5 0.3% Cycle Rickshaw 1 2 0.0% 1 2 0.0% Animal Drawn Carts 4 24 0.1% 3 18 0.1% Total 5414 8932 100.0% 3112 6026 100.0% 4.1 Seasonal Variations of Traffic Volume: Traffic levels along a study stretch vary during different periods of time i.e., in different months/seasons. Information on this aspect is necessary to estimate the AADT. This is best understood by studying monthly historical traffic volumes on the project corridor. This however is not available for the study stretch. In the absence of this direct information, it is customary to consider the monthly sales of petrol and diesel, at the fuel stations along the project corridor or on the road stretches in its environment. This information is presented in Table. The factors for passenger vehicles are based on petrol sales and that of goods vehicles (Trucks/LCV’s) and buses on diesel sales. Table 2 showing daily fuel sales and Seasonal Correction Factors (SCF) required estimating AADT Month Daily Diesel Consumption (liters) Daily Petrol Consumption (liters) Both SCF (Diesel) SCF (petrol) SCF (Both) April 4654 396 5051 0.9 1.07 0.91 May 4517 417 4933 0.93 1.01 0.94 June 4289 400 4689 0.98 1.06 0.98
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 151 July 3675 392 4067 1.14 1.08 1.14 August 3325 364 3689 1.26 1.16 1.25 September 3532 375 3907 1.19 1.13 1.18 October 3771 437 4208 1.11 0.97 1.1 November 4308 442 4750 0.97 0.96 0.97 December 4474 444 4918 0.94 0.95 0.94 January 4334 448 4782 0.97 0.94 0.97 February 4769 473 5242 0.88 0.89 0.88 March 4681 482 5162 0.9 0.88 0.89 Average 4194 422 4616 Table-3 showing AADT obtained after applying Seasonal Correction Factors Survey Location Nalavadi -159.500 Hallikeri-221.400 Vehicle Category ADT (PCU) AADT ADT (PCU) AADT Two Wheeler 449 395 164.5 147 Auto Rickshaw 40 36 36 32 Car/Jeep/Van/Taxi 1961 1727 1019 897 Mini Bus 36 32 28.5 25 Buses 1974 1739 780 686 Mini LCV 366 322 212 186 LCV (4&6 Tire) 423 372 318 279 Truck (Two axle & Three Axle) 2661 2341 2169 1908 Multi Axle Trucks (4 axles and more) 652.5 574 918 807 HCM / EME 13.5 12 22.5 20 Tractor 60 54 18 16 Tractor + Trailer 243 214 315 277 Cycles 27 27 5 4 Cycle Rickshaw 2 2 2 2 Animal Drawn Carts 24 24 18 18 Total 8932 7869 6026 5305 5. TRAFFIC GROWTH RATES To establish the future traffic growth rates, following approaches have been explored. • Past trends in Traffic growth on the Project Road. • Growth of registered motor vehicles. • Transport demand elasticity approach. 5.1 Growth Rate based on Past Traffic Data: Past traffic data as collected from PWD is available for two locations (near Annigere and Gadag) along the project corridor. These data are available from January to July months of last 10 years. The growth rates were worked out for various categories of vehicles and conclusions were drawn. Non-Uniformity in past traffic data of PWD may be attributed to errors during collection and processing of data and policy measures of the Government and other influences etc. To illustrate this point during recent years some of the mining activities around the project corridor have been banned by the Government which has caused a substantial decrease in the amount of trucks and Lorries. As the past traffic data on the Project Road is not showing any definite trend, one should not be guided by past traffic data for deriving growth rates. 5.2 Growth Rate based on Vehicle Registration: An alternative approach is to explore the registered motor vehicles growth in the influence area and assume a growth rate equal to the average growth of vehicle registration. Such an assumption may not be correct, unless the area of influence is well defined and the general development pattern of influence area remains same. The growth rates for various modes are estimated and presented in Table-4, Growth of Registered Motor Vehicles in Karnataka. It can be observed from the above Table, during the last 7 years, average growth of two wheelers, cars and that of trucks is around 11%-12%. This high growth rate of more than 10% may not sustain in future. Therefore other rational approaches were explored in order to derive realistic growth rates.
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 152 Table 4 – Summary of Cumulative Average Annual Growth Rate of Vehicles (%) in Karnataka state Year Goods Vehicles Buses Cars/Jeep/Taxi Two Wheelers Three Wheelers 2004-2005 221913 89294 841846 3957762 284078 2005-2006 276013 95627 958300 4512910 307862 2006-2007 312272 99202 1030629 3755719 359920 2007-2008 344764 110558 1209431 4230864 403910 2008-2009 366597 115016 1326395 4796587 364781 2009-2010 377495 159377 1398221 6404905 349729 2010-2011 415491 167087 1561131 7033045 440368 CAAGR in % 11.22% 11.62% 10.91% 11.10% 8.27% Source: Ministry of Road Transport & Highways Government of India (MoRT&H) 5.3 Traffic Growth Estimation by Transport Demand elasticity Method: The exercise of traffic growth rate estimation has been carried out by us using the elasticity approach. The elasticity method relates traffic growth to changes in the related economic parameters. According to IRC-108-1996, elasticity based econometric model for highway projects could be derived in the following form: Log e (P) = A0 + A1 Log e (EI) Where: • P = Traffic volume (of any vehicle type) • EI = Economic Indicator (GDP/NSDP/Population/PCI) • A0 = Regression constant; • A1 = Regression co-efficient (Elasticity Index) The main steps followed are: • Defining the Project Influence Area from OD analysis of travel pattern. • Estimating the past elasticity of traffic growth from time series of registered vehicles of influencing states. • Assessment of future elasticity values for major vehicle groups, namely, cars, buses and trucks. 5.4 Project Influence Area The results obtained from the Origin Destination surveys were used to identify the project influence area. The ratio of the total traffic originated/destined to a particular zone to the total traffic gives the influence factor for the particular zone. The influence factors were developed from the OD matrices and influence of each State is given in Table5 . A comparative study of the influence factors indicated that Karnataka State, where the project stretch runs has the majority influence of ninety two percent (92%). State of Goa, Andhra Pradesh and Maharashtra that has its border abutting Karnataka State has an influence factor of two percent (2%) our percent (4%) and two percent (2%) respectively. Tamil Nadu/Kerala and Rest of India has minimal or no share at all. These factors have all been accounted in derivation of the combined growth factor and utilized for the project sections. Table -5 Influence of Vehicles observed on the Project Road` States Cars Buses Truck Average Karnataka 97.0% 93.9% 86.4% 92.4% Goa 1.3% 0.5% 3.7% 1.8% Andhra Pradesh 1.1% 3.7% 6.6% 3.8% Maharashtra 0.6% 1.9% 2.7% 1.7% Rest of India 0.0% 0.0% 0.7% 0.2% Total 100.0% 100.0% 100.0% 100.0% 5.5 Elasticity Values Elasticity value is the factor by which the socio-economic growth rate is multiplied to get the growth rate of traffic. Traffic is directly linked to the economic growth such as per- capita income, population and NSDP/GDP. Considering the time series data on category wise registered vehicles and the
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 153 economic variables, by regression analysis elasticity values is estimated as shown in Table-6 Table-6 Elasticity Values derived based on Regression Analysis for Karnataka State Mode Variable Elasticity R square CAAGR (Vehicle Registration) Two Wheelers Per Capita Income 2.86 0.80 11.10% Cars Per Capita Income 1.48 0.97 10.91% Buses Per Capita Income 1.45 0.75 11.62% Goods NSDP 1.23 0.97 11.22% Auto Rickshaw Per Capita Income 0.84 0.7 8.27% Table-7 showing adopted Elasticity values for future years Mode Estimated Elasticity(2004- 2011) Recommended Elasticity 2013-2018 2018-2023 2023 and Beyond Goods 1.20 1.20 1.08 0.97 0.87 Buses 1.45 1.20 1.08 0.97 0.87 Passenger Cars 1.50 1.5 1.43 1.28 1.15 Two Wheelers 2.86 1.6 1.52 1.37 1.23 Three Wheelers 0.84 0.84 0.80 0.72 0.65 5.6 Traffic Growth Rates: Based on the moderated elasticity values and the projected economic/demographic indicators and with the given model as follows, the future average annual compound traffic growth rates by vehicle type are estimated. Passenger Vehicles: Traffic Growth Rate = [ (1+rp) ( 1+ rpci x Em) – 1] Where, rp= Population Growth, rpci= Per capita Income Growth, Em= Elasticity Goods Vehicles: Growth Rate for Goods Vehicles = Elasticity Value * NSDP Growth Rate The growth rate estimated form elasticity values are shown in the table below: Table-8 Showing Growth Rates adopted for different classes of Vehicles Projected Traffic Growth Rates adopted for the Study Pessimistic Approach Normal Approach Optimistic Approach Sl. No Vehicle Type Projected Annual Traffic Growth Rate (%) Projected Annual Traffic Growth Rate (%) Projected Annual Traffic Growth Rate (%) 2013-2018 2018- 2023 2023- 2023 2013- 2018 2018- 2023 2023- 2023 2013- 2018 2018- 2023 2023- 2023 1 LCV 8.0% 7.6% 6.5% 9.2% 8.7% 7.5% 10.5% 9.8% 8.5% 2 2-Axle Truck 4.9% 4.6% 3.9% 5.6% 5.3% 4.5% 6.4% 6.0% 5.2% 3 3-Axle Truck 8.0% 7.6% 6.5% 9.2% 8.7% 7.5% 10.5% 9.8% 8.5% 4 Multi-Axle Truck 7.0% 6.6% 5.6% 8.0% 7.6% 6.5% 9.1% 8.6% 7.4% 5 Bus 6.8% 6.6% 5.7% 7.9% 7.6% 6.6% 9.0% 8.5% 7.4%
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ IC-RICE Conference Issue | Nov-2013, Available @ http://www.ijret.org 154 6 Car 8.5% 8.3% 7.1% 10.0% 9.6% 8.3% 11.4% 10.9% 9.4% 7 Two Wheeler 8.9% 8.7% 7.5% 10.5% 10.1% 8.7% 12.1% 11.5% 10.0% 8 Auto Rickshaw 5.2% 5.1% 4.4% 6.0% 5.8% 5.0% 6.8% 6.5% 5.6% DISCUSSIONS AND CONCLUSIONS: The comparison of growth rates on vehicular registration data and by elasticity value are as shown in the table below: Table-9 Comparison of Growth Rates by Various Methods Table-9 Comparison of Growth Rates by Various Methods Method Mode Two Wheeler Car Bus Truck Auto Rickshaw Past Traffic on Project Corridor No trend No trend No trend No trend No trend Vehicle Registration Growth of Karnataka State 11.10% 10.91% 11.62% 11.22% 8.27% Elasticity Method(2004-2011) 10.50% 10% 7.90% 8% 6% The growth rates obtained from transport demand elasticity method is being widely used method all over India. These growth rates are adopted to predict future traffic volumes and Laning Requirements. REFERENCES [1] L.R. Kadiyali & T.V. Shashikala, “Road Transport Demand Forecast for 2000 AD Revisited and Demand Forecast for 2021” Journal of the IRC October – December 2009 Paper No. 557 [2] Jahar R. Sarkar and Dr. Bhargab Maitra “Critical consideration of Travel Demand Forecasting on National Highways: A Case Study”. IRC :Volume 62 No.3 2001 [3] Vijay Kumar, “Traffic Characteristics And Demand Along North and South Corridors- A Case Study”, M.E. Thesis, Bangalore University, Bangalore March 2001. [4] IRC: 102-1988, “Traffic Studies for Planning Bypass around towns” [5] IRC:108-1996, “Guidelines for Traffic Predictions on Rural Highways” [6] MORT&H , Road Transport Year Book 2004-2007, 2007-2009, 2009-2011 [7] Reserve Bank of India Annual report.