Excellence Through Teamwork


      Water conservation through
          recycle and reuse

                             Presented By
              ACC Limited
         Damodhar Cement Works
                             Dam odh ar Ce men t Works




          Damodhar at a glance ….


•   DCSL comme nce d commercial production in October 1990 as a
    joint ve nture project of WBID C a nd Ce me nt C orporation of I ndia
    Ltd

•   In Se pte mber 1996 A CC Ltd. took ov er the ma na ge me nt of the
    Company a nd it be ca me a Subsidiary of the A CC Ltd. With
    WBIDC as a partner

•   Capa city e nhance ment from 2.70 to 5.25 LTPA of Portland Sla g
    Cement in the y ear 1998 was taken up by A CC

•   A n ISO 9001 : 2000 and I SO 14001:2004 certified unit




                             Dam odh ar Ce men t Works
Our Strategic Vision




     Dam odh ar Ce men t Works




Our Environmental Policy




     Dam odh ar Ce men t Works
Cement Manufacturing Process
                      Wet Slag sto rage at
                      Ropewa y Loading                                                             Ball Mill-2
                            Station                                                                 16 T/H


                                                                                                   Cove red
                      Ropewa y 2.6 KM,                                                             storag e H all      Ball Mill-3
                      Capa city 13 5 TPH                                                                                15 TPH
                                                                                                   Clinker
                                                                                                   180 00T
                                                                                                   Dry Sl ag
                        Open Wet Slag                   Clinker                                    500 0T
                           Storag e                      And                                                                 Ce ment Sto rage Silo
                        Capa city 35 KT                 Gypsum                                      Gypsum
                                                                                                                                     2 x 3 80 0 T
                                                                                                    800 0T


Slag Dr ye r                               Wagon Tippler 600
                                           TPH                                                     Ball Mill-1                       Bagging
       60TP H
                                                                                                   49 TPH                            100 T C ap.
                                                                                                                                 2 nos Roto
                                                                                                                                    Pac ke r
                                    Coal
Coal Mill                         Storag e
           3 TPH                   800 MT



                                                          Dam odh ar Ce men t Works




                                  Drinking Water Consumption

                     Water consumption in                                                    Water Consumption in
                            Factory                                                                 Colony

                    300                                                                      300                    262.39
                                                                          Lit /Person /Day
 Lit /Person /Day




                               242.36
                    250               198.21 185.93                                          250                             196.48 200.22
                                                                                                        184
                    200 166.25                                                               200
                    150                                                                      150
                    100                                                                      100
                     50                                                                       50
                      0                                                                        0
                          '04-'05 '05-'06 '06-'07 '07-'08                                            '04-'05 '05-'06 '06-'07 '07-'08
                                              Year                                                                      Year

•2005-06 water con sumption high                                          •2007-08 water con sumption high
due to fly ash silo and cement silo                                       due to new construction of quarters
               project
                                                          Dam odh ar Ce men t Works
Bench Marking


                                                                             156.183
                       180                                                                                                                                          0.6




                                                                                                        135.173
                       160




                                                                                                                                     122.285
                                                                                                                                                                                    0.5             0.5                  0.5             0.5
                                                119.526


                                                                                                                                                                    0.5
                       140                                         113.009
  Consumption (K m3)




                                                                                                                                               Consumption (m3/T)
                                                                                                                                                 Specific Water
                                                                                               93.233
                       120                                                                                                                                          0.4




                                                                                                                            91.962




                                                                                                                                                                                             0.28
                                                                                                                                                                             0.28
                                       78.734




                                                                                                                                                                                                                  0.28



                                                                                                                                                                                                                                  0.28
                       100
                                                                                                                                                                    0.3
                        80
                                                          43.174
                              40.791




                                                                                       41.94



                        60                                                                                         30.323                                           0.2




                                                                                                                                                                          0.081



                                                                                                                                                                                          0.085


                                                                                                                                                                                                          0.078
                        40




                                                                                                                                                                                                                               0.06
                                                                                                                                                                    0.1
                        20
                                                                                                                                                                      0
                         0
                                                                                                                                                                          '04-'05         '05-'06           '06-'07            '07-'08
                             '04-'05                      '05 -'06    '06-'07                                      '07-'08
                                                                  Yea r                                                                                                                              Year
                                   Industrial                                                                                                                       DCW
                                   Drinking/Domestic Use                                                                                                            National Benchmark
                                   Total                                                                                                                            International Benthmark

                                                                                                                  Dam odh ar Ce men t Works




                                                                                                 Water Flow Diagram
  Damodhar Riv er
                                                                                       FM                            FM
                                                                                       Process




                                                                                                                                 Drinking Water
                                                                                        Water




                                                                                                                        FM



                                                                                           Process
                                                                                            w ater
Plant Colony Village
                                                                                             Ta nk

                             Drinking
                              Water

                                                                                         Over Head
                                                                                           Tan k                                                                                                                     Drinking Water
                                         Process                                                                                                                                                                     Reserv oir
  Plant                                   Water
                                                                                                                  Dam odh ar Ce men t Works
Sewage Treatment Plant

 SWE AGE
COLLECTIO N
   SUMP

OXIDIZATIO N
  PLANT
                BACK
CIRCULAR        WASH
  TANK          WATE R
                TANK

 FILTE R


 TRE ATE D       SUPPLY
  WATE R           FOR
RESERVOIR      IRRIG ATIO N

                     Dam odh ar Ce men t Works




           Monitoring & Reporting System

                                          • Applying Analog
                                            Flow Meter for
                                            accuracy
                                          • Maintain daily log
                                            sheet to feed the
                                            readings
                                          • Weekly report to
                                            Chief Manager
                                            Engg., Plant
                                            operation head &
                                            Director Plant

                     Dam odh ar Ce men t Works
Project -1 : Reuse of Domestic Waste Water

      The previous system of domestic waste water
      treatment having following demerits :
•     The Dome stic Wa ste water including the kitche n a nd
      washroom dischar ge is trea te d at sew age trea tme nt pla nt
•     A fter the pla nt expa nsion, filtration ca pa city of STP was not
      suffi cie nt to take the increase of waste water day to day due
      to incre ase of population a nd quarters in colony

      Idea Generation
•     Disconne ction of Kitche n a nd ba throom line of A-Block &
      Hutme nt buildings from main STP line
•     Wa ste water from kitche n a nd bathroom colle ct in a pond after
      gravitation f iltration proce ss and this w ater use f or garde ning
      and bre eding fish
                          Dam odh ar Ce men t Works




      Project - 1 : Reuse of domestic waste water
    Kitche n and Was hroom Water               Collecte d into Pond




                        Plantati on at Col ony




                          Dam odh ar Ce men t Works
Project - 1 : Reuse of domestic waste water

                                                    600




                                    Volume (Lit.)
RESULTS :
                                                                                                       Discharge
                                                                                                       water (KL)
–Recycling of waste
 water and optimum
 usage of resource




                                                              0
                                                                         0
                                                                                   0
                                                                                             0
–Smooth and efficient


                                                    '03-'04

                                                              '04-'05

                                                                         '05-'06

                                                                                   '06-'07

                                                                                             '07-'08
 operation of STP
–Ensure ZERO discharge                                                  Year




                     Dam odh ar Ce men t Works




      Project – 2 : Reduction of river water usage

      The previous water supply system (sur face water
      from Damodar river) had the fo llo wing demerits :

  •   Unhy gie nic w ater quality specially during monsoon.
  •   During summer and w inter, 10 nos. la bor use d daily for
      channeling the wa ter to the pumping point
  •   18 KW pumps use d for lif ting the wa ter a nd 7.5 KW pump
      use d f or pressure f iltration
  •   High trea tme nt cost of Rs. 4000.00 per month

  The Cost of production was Rs. 5.50 per KL .




                     Dam odh ar Ce men t Works
Project – 2 : Reduction of river water usage

IDEA GENERA TION :
•   Elimination of the surface w ater supply a nd associa te d
    filtration syste m by installation of a dee p bore we ll
    pumping unit a t middle of riv er be d
•   Drawing the subsoil wa ter w hich is much more hy gie nic
    and av aila ble throughout the ye ar




                    Dam odh ar Ce men t Works




    Project – 2 : Reduction of river water usage

A ctions I mple mente d
ü 40 feet deep bore well pump has be en installe d
ü Wa ter treatment pla nt operation ha s bee n stoppe d




                    Dam odh ar Ce men t Works
Project – 2 : Reduction of river water usage


RESULTS:

• Continuous supply of good quality drinking
  water even in rainy season

• Operation and maintenance cost have been
  reduced to Rs. 1.20 per KL
             Rs.
• Hence annual saving is Rs. 2.40 Lakhs
                         Rs.


                      Dam odh ar Ce men t Works




         Project – 3 : Close circuiting of process water

     Previous water supply system :

     •    Cooling water supplied to the machines was not
          recirculated and reused
     •    High water loss
     •    High amount of water cess paid by the company

     Idea Generation

               All the return water lines have been
               connected to the main return water pipe.


                      Dam odh ar Ce men t Works
Project – 3 : Close circuiting of process water

        Result :

        •    Reduction if water consumption as well as
             discharge by 8%

        •    Reduction in pump house power consumption
             by 6%




                           Dam odh ar Ce men t Works




                       Awareness

•   DCW sent repre se nta tive to De lhi for training on Wa ter
    Manage me nt syste m
•   Mass aw areness of taking hygienic water through distribution of
    leafle ts & ele ctronic me dia a mong the ne arby community &
    colony inhabita nts
•   Providing hy gienic w ater to the ne arby v illa gers
•   Periodic che cking of qua lity of w ater by internal a s w ell a s
    exter nal authority
•   Distribution of leaf lets for a wareness towards w ater borne
    diseases
•   A rrange draw ing competition on ‘Conservation Of Na tura l
    resour ces’ a mong the colony & ne arby inha bita nts’ childre n
            ces’                                        nts’
•   ‘Suggestion Sche me’ for new idea ge neration
                        me’
•   Envir onmental Q uiz C ompetition conducte d by DC W club




                           Dam odh ar Ce men t Works
Sustainable Development
•   Rain Water Harvesting: C onstructed
    earthen pond a t Colony & concrete
    reservoir inside pla nt
•   Use of Treate d water from Se wa ge
    Treatme nt plant for pla nt & colony
    pla ntation & garde ning
•   Reserve shower & kitche n water into
    pond for pla nta tion
•   Complete Looping of proce ss w ater f or
    recirculation
•   Optimizing the water distribution
    cycle freque ncy towards colony &
    near by inhabita nts
•   Installation of floa t valv es to a ll the
    water reserv oirs (ta nks) a t all the
    colony buildings

                            Dam odh ar Ce men t Works




                Our Future Plan……..
                           Plan……..

• Integration with OSHAS 18001
• Annual external audits through authorized auditing
    agencies
•   Involvement of people through small group activities
•   Developing In-house expertise for audits
                 In-
•   Installation of flow meter at consumption points for
    better monitoring
•   Zero water leakage
•   Arrangements for collecting storm water from roof
    shed and collecting in the earthen ponds

                            Dam odh ar Ce men t Works
We can do no great things ;
 only small things with great love.
                 - Mother Teresa




          Dam odh ar Ce men t Works




          Dam odh ar Ce men t Works

Más contenido relacionado

Similar a Water Conservation through re-cycle and re-use, presented by ACC Limited Damodhar Cement Works

SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSiQHub
 
Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)ErichZakarian
 
Bhrg 2008 girassol_flow_instabilities
Bhrg 2008 girassol_flow_instabilitiesBhrg 2008 girassol_flow_instabilities
Bhrg 2008 girassol_flow_instabilitiesErich Zakarian
 
Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...
Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...
Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...IndiaMART InterMESH Limited
 
Kaup t185 t184_t198_en
Kaup t185 t184_t198_enKaup t185 t184_t198_en
Kaup t185 t184_t198_ensanjay8909
 
Power house specifications & operations
Power house specifications & operationsPower house specifications & operations
Power house specifications & operationsSakshi Vashist
 
C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish Thorne & Derrick International
 
11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)
11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)
11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)Thorne & Derrick International
 
List of v type engines
List of v type enginesList of v type engines
List of v type engineskosmosstar
 
Sterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, SilvassaSterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, SilvassaIndia Water Portal
 
Shell Q3 2008 Presentations
Shell Q3 2008 PresentationsShell Q3 2008 Presentations
Shell Q3 2008 Presentationsearningsreport
 

Similar a Water Conservation through re-cycle and re-use, presented by ACC Limited Damodhar Cement Works (20)

Agriculture on the Forefront.
Agriculture on the Forefront.Agriculture on the Forefront.
Agriculture on the Forefront.
 
Cansorb p series_brochure
Cansorb p series_brochureCansorb p series_brochure
Cansorb p series_brochure
 
Cembre Cable Lugs LV - Cembre A Copper Cable Lugs
Cembre Cable Lugs LV - Cembre A Copper Cable LugsCembre Cable Lugs LV - Cembre A Copper Cable Lugs
Cembre Cable Lugs LV - Cembre A Copper Cable Lugs
 
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLSSRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
SRP EVOLUTION FOR VACA MUERTA'S LOW GAS/OIL RATIO WELLS
 
TIGG Liquid Phase Multi Bag Filters
TIGG Liquid Phase Multi Bag FiltersTIGG Liquid Phase Multi Bag Filters
TIGG Liquid Phase Multi Bag Filters
 
Scan10003
Scan10003Scan10003
Scan10003
 
Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)Girassol field experience (OLGA UGM Paris, 2008)
Girassol field experience (OLGA UGM Paris, 2008)
 
Bhrg 2008 girassol_flow_instabilities
Bhrg 2008 girassol_flow_instabilitiesBhrg 2008 girassol_flow_instabilities
Bhrg 2008 girassol_flow_instabilities
 
PRROSS Copper
PRROSS CopperPRROSS Copper
PRROSS Copper
 
Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...
Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...
Rubber moulded and bridge bearing pads by ameenji rubber private limited, Sec...
 
Kaup t185 t184_t198_en
Kaup t185 t184_t198_enKaup t185 t184_t198_en
Kaup t185 t184_t198_en
 
Power house specifications & operations
Power house specifications & operationsPower house specifications & operations
Power house specifications & operations
 
Cembre C Tap Crimp Connectors
Cembre C Tap Crimp ConnectorsCembre C Tap Crimp Connectors
Cembre C Tap Crimp Connectors
 
Cembre C Tap Copper Connectors & Crimps - Tin Plated
Cembre C Tap Copper Connectors & Crimps - Tin Plated Cembre C Tap Copper Connectors & Crimps - Tin Plated
Cembre C Tap Copper Connectors & Crimps - Tin Plated
 
C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish C Tap Copper Connectors & Crimps - Bright Surface Finish
C Tap Copper Connectors & Crimps - Bright Surface Finish
 
11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)
11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)
11kV Cable Lugs - Cembre 2A Copper Cable Lugs (HV High Voltage Cable Lugs)
 
Cembre Cable Lugs HV - Cembre 2A Copper Cable Lugs
Cembre Cable Lugs HV - Cembre 2A Copper Cable LugsCembre Cable Lugs HV - Cembre 2A Copper Cable Lugs
Cembre Cable Lugs HV - Cembre 2A Copper Cable Lugs
 
List of v type engines
List of v type enginesList of v type engines
List of v type engines
 
Sterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, SilvassaSterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, Silvassa
 
Shell Q3 2008 Presentations
Shell Q3 2008 PresentationsShell Q3 2008 Presentations
Shell Q3 2008 Presentations
 

Más de India Water Portal

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfIndia Water Portal
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...India Water Portal
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...India Water Portal
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...India Water Portal
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...India Water Portal
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...India Water Portal
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedureIndia Water Portal
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharIndia Water Portal
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisalIndia Water Portal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...India Water Portal
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020India Water Portal
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classificationIndia Water Portal
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifersIndia Water Portal
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingIndia Water Portal
 

Más de India Water Portal (20)

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedure
 
Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
 
Water quality
Water qualityWater quality
Water quality
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity building
 

Último

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 

Último (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 

Water Conservation through re-cycle and re-use, presented by ACC Limited Damodhar Cement Works

  • 1. Excellence Through Teamwork Water conservation through recycle and reuse Presented By ACC Limited Damodhar Cement Works Dam odh ar Ce men t Works Damodhar at a glance …. • DCSL comme nce d commercial production in October 1990 as a joint ve nture project of WBID C a nd Ce me nt C orporation of I ndia Ltd • In Se pte mber 1996 A CC Ltd. took ov er the ma na ge me nt of the Company a nd it be ca me a Subsidiary of the A CC Ltd. With WBIDC as a partner • Capa city e nhance ment from 2.70 to 5.25 LTPA of Portland Sla g Cement in the y ear 1998 was taken up by A CC • A n ISO 9001 : 2000 and I SO 14001:2004 certified unit Dam odh ar Ce men t Works
  • 2. Our Strategic Vision Dam odh ar Ce men t Works Our Environmental Policy Dam odh ar Ce men t Works
  • 3. Cement Manufacturing Process Wet Slag sto rage at Ropewa y Loading Ball Mill-2 Station 16 T/H Cove red Ropewa y 2.6 KM, storag e H all Ball Mill-3 Capa city 13 5 TPH 15 TPH Clinker 180 00T Dry Sl ag Open Wet Slag Clinker 500 0T Storag e And Ce ment Sto rage Silo Capa city 35 KT Gypsum Gypsum 2 x 3 80 0 T 800 0T Slag Dr ye r Wagon Tippler 600 TPH Ball Mill-1 Bagging 60TP H 49 TPH 100 T C ap. 2 nos Roto Pac ke r Coal Coal Mill Storag e 3 TPH 800 MT Dam odh ar Ce men t Works Drinking Water Consumption Water consumption in Water Consumption in Factory Colony 300 300 262.39 Lit /Person /Day Lit /Person /Day 242.36 250 198.21 185.93 250 196.48 200.22 184 200 166.25 200 150 150 100 100 50 50 0 0 '04-'05 '05-'06 '06-'07 '07-'08 '04-'05 '05-'06 '06-'07 '07-'08 Year Year •2005-06 water con sumption high •2007-08 water con sumption high due to fly ash silo and cement silo due to new construction of quarters project Dam odh ar Ce men t Works
  • 4. Bench Marking 156.183 180 0.6 135.173 160 122.285 0.5 0.5 0.5 0.5 119.526 0.5 140 113.009 Consumption (K m3) Consumption (m3/T) Specific Water 93.233 120 0.4 91.962 0.28 0.28 78.734 0.28 0.28 100 0.3 80 43.174 40.791 41.94 60 30.323 0.2 0.081 0.085 0.078 40 0.06 0.1 20 0 0 '04-'05 '05-'06 '06-'07 '07-'08 '04-'05 '05 -'06 '06-'07 '07-'08 Yea r Year Industrial DCW Drinking/Domestic Use National Benchmark Total International Benthmark Dam odh ar Ce men t Works Water Flow Diagram Damodhar Riv er FM FM Process Drinking Water Water FM Process w ater Plant Colony Village Ta nk Drinking Water Over Head Tan k Drinking Water Process Reserv oir Plant Water Dam odh ar Ce men t Works
  • 5. Sewage Treatment Plant SWE AGE COLLECTIO N SUMP OXIDIZATIO N PLANT BACK CIRCULAR WASH TANK WATE R TANK FILTE R TRE ATE D SUPPLY WATE R FOR RESERVOIR IRRIG ATIO N Dam odh ar Ce men t Works Monitoring & Reporting System • Applying Analog Flow Meter for accuracy • Maintain daily log sheet to feed the readings • Weekly report to Chief Manager Engg., Plant operation head & Director Plant Dam odh ar Ce men t Works
  • 6. Project -1 : Reuse of Domestic Waste Water The previous system of domestic waste water treatment having following demerits : • The Dome stic Wa ste water including the kitche n a nd washroom dischar ge is trea te d at sew age trea tme nt pla nt • A fter the pla nt expa nsion, filtration ca pa city of STP was not suffi cie nt to take the increase of waste water day to day due to incre ase of population a nd quarters in colony Idea Generation • Disconne ction of Kitche n a nd ba throom line of A-Block & Hutme nt buildings from main STP line • Wa ste water from kitche n a nd bathroom colle ct in a pond after gravitation f iltration proce ss and this w ater use f or garde ning and bre eding fish Dam odh ar Ce men t Works Project - 1 : Reuse of domestic waste water Kitche n and Was hroom Water Collecte d into Pond Plantati on at Col ony Dam odh ar Ce men t Works
  • 7. Project - 1 : Reuse of domestic waste water 600 Volume (Lit.) RESULTS : Discharge water (KL) –Recycling of waste water and optimum usage of resource 0 0 0 0 –Smooth and efficient '03-'04 '04-'05 '05-'06 '06-'07 '07-'08 operation of STP –Ensure ZERO discharge Year Dam odh ar Ce men t Works Project – 2 : Reduction of river water usage The previous water supply system (sur face water from Damodar river) had the fo llo wing demerits : • Unhy gie nic w ater quality specially during monsoon. • During summer and w inter, 10 nos. la bor use d daily for channeling the wa ter to the pumping point • 18 KW pumps use d for lif ting the wa ter a nd 7.5 KW pump use d f or pressure f iltration • High trea tme nt cost of Rs. 4000.00 per month The Cost of production was Rs. 5.50 per KL . Dam odh ar Ce men t Works
  • 8. Project – 2 : Reduction of river water usage IDEA GENERA TION : • Elimination of the surface w ater supply a nd associa te d filtration syste m by installation of a dee p bore we ll pumping unit a t middle of riv er be d • Drawing the subsoil wa ter w hich is much more hy gie nic and av aila ble throughout the ye ar Dam odh ar Ce men t Works Project – 2 : Reduction of river water usage A ctions I mple mente d ü 40 feet deep bore well pump has be en installe d ü Wa ter treatment pla nt operation ha s bee n stoppe d Dam odh ar Ce men t Works
  • 9. Project – 2 : Reduction of river water usage RESULTS: • Continuous supply of good quality drinking water even in rainy season • Operation and maintenance cost have been reduced to Rs. 1.20 per KL Rs. • Hence annual saving is Rs. 2.40 Lakhs Rs. Dam odh ar Ce men t Works Project – 3 : Close circuiting of process water Previous water supply system : • Cooling water supplied to the machines was not recirculated and reused • High water loss • High amount of water cess paid by the company Idea Generation All the return water lines have been connected to the main return water pipe. Dam odh ar Ce men t Works
  • 10. Project – 3 : Close circuiting of process water Result : • Reduction if water consumption as well as discharge by 8% • Reduction in pump house power consumption by 6% Dam odh ar Ce men t Works Awareness • DCW sent repre se nta tive to De lhi for training on Wa ter Manage me nt syste m • Mass aw areness of taking hygienic water through distribution of leafle ts & ele ctronic me dia a mong the ne arby community & colony inhabita nts • Providing hy gienic w ater to the ne arby v illa gers • Periodic che cking of qua lity of w ater by internal a s w ell a s exter nal authority • Distribution of leaf lets for a wareness towards w ater borne diseases • A rrange draw ing competition on ‘Conservation Of Na tura l resour ces’ a mong the colony & ne arby inha bita nts’ childre n ces’ nts’ • ‘Suggestion Sche me’ for new idea ge neration me’ • Envir onmental Q uiz C ompetition conducte d by DC W club Dam odh ar Ce men t Works
  • 11. Sustainable Development • Rain Water Harvesting: C onstructed earthen pond a t Colony & concrete reservoir inside pla nt • Use of Treate d water from Se wa ge Treatme nt plant for pla nt & colony pla ntation & garde ning • Reserve shower & kitche n water into pond for pla nta tion • Complete Looping of proce ss w ater f or recirculation • Optimizing the water distribution cycle freque ncy towards colony & near by inhabita nts • Installation of floa t valv es to a ll the water reserv oirs (ta nks) a t all the colony buildings Dam odh ar Ce men t Works Our Future Plan…….. Plan…….. • Integration with OSHAS 18001 • Annual external audits through authorized auditing agencies • Involvement of people through small group activities • Developing In-house expertise for audits In- • Installation of flow meter at consumption points for better monitoring • Zero water leakage • Arrangements for collecting storm water from roof shed and collecting in the earthen ponds Dam odh ar Ce men t Works
  • 12. We can do no great things ; only small things with great love. - Mother Teresa Dam odh ar Ce men t Works Dam odh ar Ce men t Works