Water Management System at CCW




 Venue                                                                            :CII- Godrej GBC Hyderabad
 Date                                                                             :16.12.2008
 Name of the Presenter                                                            :A.K. Srivastava
                                                                                    Head Plant Operations
                                                                                    Chaibasa Cement Works

This report is solely for the internal use. No part of it may be circulated, quoted, or reproduced for distribution outside the company organization without prior written
approval from ACC Limited. This material was used during an oral presentation; it is not a complete record of the discussion.
Company Profile
                                       Established in 1947.
                                       Part of ACC/ Holcim, a
                                       national and global l d
                                         ti   l   d l b l leader
                                       Expansion & modernization
                                       in 2005.
                                          1.2  MTPA      integrated
                                          cement plant
                                       Situated i “K lh
                                       Si     d in “Kolhan region
                                                                i
                                       – A hard core tribal belt” ,
                                       80 Km. from Jamshedpur.
                                       QMS & EMS established as
                                       per IS/ISO 9001 & 14001.
                                       OHSMS established as per
    Reliable and respected             Holcim OH&S pyramid.   2
ACC Limited        CII ‘Water Excellence Award 2008’          16.12.2008
Process Details
   Highly sophisticated and modern plant with state of the art
   technology.
   Semi d process (up to 23% enriched slurry feed in VRM)
   S  i dry       (   t         i h d l      f di
 Raw mat. extraction     Raw material preparation



       Pyro processing




                                                  Raw meal preparation




   Shipping              Cement Grinding               Shipping                 3
ACC Limited               CII ‘Water Excellence Award 2008’              16.12.2008
Roadmap for meeting the Environment goals

                                           2008        2009        2010     2011

                Stack emissions
                                            50           30         30       30
                (mg/nm3)
                Fugitive Emission SPM
                                           5000        4000        3000     2000
                (µg/nm3)
                Kg of CO2/ ton of
                                           650          634         618      602
                Cementitious Material
                CEMS Installation on                               1 kiln
                Kiln Stack

                Water Consumption          -30%        -20%        -15%     -10%
Environment
 Road Map       Power Consumption          88.7         86.4       84.3     82.2
                KWh / ton
                Tonnage of alternative
                                           8400        14024       15150    22201
                fuels & raw mat. (tons)

                Thermal Substitution
                                           0.53         1.43       1.62     1.99
                Rate (%)
                AFR Installation
                                           0.95         2.8         5.0      0.5
                Capex Rs. Cr
                Total GAV (Savings) Rs.
                                           0.29         3.47       4.30     5.89
                Cr
                                                                                         4
  ACC Limited                  CII ‘Water Excellence Award 2008’                  16.12.2008
Water Conservation Initiatives

                                            Annual Water       Investmen
                       Year   of              Savings          t made      Payback
Sl. Water conservation
                       Implemen                                            period
No. initiatives
                       tation                          Rs.
                                                       R                   (months)
                                              m3            Rs. Lakhs
                                                      Lakhs
    Strengthening of water
    monitoring system by
               g y       y
1   installation of water       2005-06        -         -          2.22      -
    meters      at  source
    points
    Recycling of Effluent by
    rerouting of reject pit
2                               2006-07     165000     4.85          2        5
    discharge             to
    abandoned mine pit
    Zero effluent d h
           ffl     discharge
    by              providing
3   sedimentation       tanks   2007-08     330000      9.7         12.1      15
    and    reutilization   of
    effluent
     ffl
                                                                                     5
        ACC Limited             CII ‘Water Excellence Award 2008’             16.12.2008
Specific Water Consumption
        3.00
        3 00



        2.50                                2.40
                                                            2.28

                             2.02
        2.00                                                5%
m3/MT




        1.50
                 1.21

        1.00
                                                                        0.70

        0.50


                 0.00
                 0 00        0.00
                             0 00
        0.00
               2004 – 05   2005 – 06       2006 – 07      2007 – 08   Benchmark       6
        ACC Limited          CII ‘Water Excellence Award 2008’                 16.12.2008
Road map to achieve global benchmark
Objective & targets           Plan of Action          Expected       Technical justification
                                                      Date      of
                                                      Completion
Strengthening of water        Installation      of    Dec. 2009        Water recycled from reject pit is
monitoring system at          water meters      at                     collected in mines abandoned pit
user end                      user end                                 (A block) for further use in
                                                                       plant, this reutilized water is
                                                                       again counted as fresh water
                                                                       due to lack of monitoring
                                                                       system.
                                                                       At present, water meters are
                                                                       installed only at sources and we
                                                                       are unable to take initiatives
                                                                       department wise.
                                                                       d      t    t i
To     achieve     specific   installation       of   Dec. 2011        At present water consumption in
water consumption 700         modernized                               floatation process is about 950
ltr./ MT of Clinker from      Filtration Floatation                    ltr. per tonnes of clinker. By
present level of 1519         Plant (FFP)
                                     (FFP).                            implementing      this proposed
ltr./ MTof Clinker                                                     project dry cake will be fed to
                                                                       VRM and 130 ltr. water per
                                                                       tonnes    of   clinker  will be
                                                                       consumed in this process.

                                                                                                        7
           ACC Limited                     CII ‘Water Excellence Award 2008’                     16.12.2008
Sustainability Indices




                                                          8
ACC Limited    CII ‘Water Excellence Award 2008’   16.12.2008
Environment Performance Index (PEP)
                            Systematic monitoring and evaluation of environmental performance
                            Identification of strengths and weaknesses (self-assessment)
                            Supporting tool in (environmental) business planning
                              Environmental programs, CAPEX projects, budgeting etc.
                            Database for communication purposes
                            Group and Group company internal benchmarking

       85           Enval Performance Indicator                                       Atmospheric Emission: PM
                                              80
       80
                                                      75         76
       75                       73

       70
                      66
EPI (% )




       65
              62
       60

       55

       50
             2005    2006      2007          2008    2007       2006
                                      Year
            CCW Performance                  CCW Target

            ACC Avg. Performance             HOLCIM Avg. Performance                                              9
                     ACC Limited                           CII ‘Water Excellence Award 2008’               16.12.2008
Commitment towards reduction in GHG Emission

                      Our objective is to reduce by the year 2010 the average
                      specific net CO2 emission by 20 % from the reference year
                      1990, l l
                      1990 calculated per WBCSD CO2 protocol.
                                     d                      l
                      Clinker Factor                                                                       Specific Net CO2 Emission

    75.0
    75 0                                               73                                     900.0
                                                                                              900 0
                                                                                                       876.0
                                                                                              880.0




                                                                   Kg. CO2/ MT of Cem. Mat.
                                              69.5
    70.0                                                                                      860.0
                                                                                              840.0
    65.0
    65 0
                                                                                              820.0
                                                                                                                 804.0
%




                                                                                                                                800.0
             60.3                                                                             800.0
    60.0                                                                                                                                  781.0
                                                                                              780.0
                     55.9
                             55.0    55.0
    55.0                                                                                      760.0
                                                                     .                        740.0
    50.0                                                                                      720.0
             2005   2006     2007    2008    2007     2006                                             2005      2006           2007      2008
                                  Year                                                                                   Year
           CCW Performance               CCW Target                                                   CCW Performance       CCW Target
           ACC Avg. Performance          HOLCIM Avg. Performance                                                                              10
                    ACC Limited                       CII ‘Water Excellence Award 2008’                                                  16.12.2008
Commitment towards reduction in GHG Emission
                                     This reduction will be achieved through improving the four key eco-efficiency
                                     parameters:
                                        clinker factor
                                        specific thermal energy consumption
                                        specific electrical energy consumption
                                        thermal substitution rate
                        Specific Thermal Energy Consumption                                                Specific Electrical Energy Consumption
                                                                                                  1050.0
                                                                                                  1050 0
                    110.0                                                                                   995.0
                                                                 106                              1000.0
kWh/ MT of Cement




                    105.0                                                                          950.0




                                                                           KCal/ Kg. of Clinker
                                                                                                   900.0                                             876
                    100.0




                                                                                        C
                                                                                                   850.0
                     95.0                                                                          800.0
                            91.9                        91.42                                                       755.0   750.0   748.8   751
                     90.0          89.0                                                            750.0

                                          85.6
                                          85 6   85.0
                                                 85 0
                                                                           K                       700.0
                                                                                                   700 0
                     85.0
                                                                                                   650.0

                     80.0                                                                          600.0
                            2005   2006   2007   2008   2007    2006                                        2005    2006    2007 2008       2007    2006
                                             Year
                                             Yea                                                                               Year

                                    CCW Performance       CCW Target      ACC Avg. Performance                              HOLCIM Avg. Performance
                                                                                                                                                        11
                                   ACC Limited                  CII ‘Water Excellence Award 2008’                                                  16.12.2008
Water Conservation Initiatives
   Phase 1st :Strengthening of water monitoring system
   Phase 2nd :Recycling of Effluent
   Phase 3rd :Zero effluent discharge




                                                              12
ACC Limited        CII ‘Water Excellence Award 2008’     16.12.2008
Phase 1st :Strengthening of water monitoring system
   Objectives
      Compliance with environmental legal requirements
      To improve Environmental Performance Indicator (EPI) of the plant
      Regular monitoring of water consumption
      Conservation of natural resources
   Project Mission
      Installation of water meters at source level
   Project Organization
      Client:                Mr. A. Roy Choudhary, Vice President
      Project Manager:       Mr. A.K. Srivastava, Manager Engineering
      Project Member:        Mr. S.K. Mazumdar
                             Mr S K Mazumdar, HOD Water Supply
                             Mr. Pradeep Singh, HOD Environment
                             Mr. P.K. Bhattacharya, Asst. Officer, WS


                                                                             13
ACC Limited               CII ‘Water Excellence Award 2008’             16.12.2008
Phase 1st :Strengthening of water monitoring system
                      Identified Risks in planning phase
Sr.     Identified Risks                                       Remedial Actions
No.
1.      Unavailability of layout drawings (plant established   Study and develop water line layout
        in the year 1947)
2.      Procurement of the water meters in the time frame      Adherence with delivery schedule.


                      Attributes Action plan
                      Att ib t & A ti    l
                                                                                              Planned      Actual date
Sr.                                Accomplished       Planned date of      Actual date of
               Activity                                                                        date of         of
No.                                     by            commencement        commencement
                                                                                             completion    completion

      Study of existing lay out
                                     HOD: Water
 1.   and generate requirement                           05.04.2005          05.04.2005       15.04.2005   10.04.2005
                                       Supply
      for water meters

      Procurement of water
 2.                                HOD: Purchase         15.04.2005          10.04.2005       30.06.2005   10.08.2005
      meters

      Installation of water          HOD: Water
 3.                                                      01.07.2005          12.08.2005       31.07.2005   25.09.2005
      meters                           Supply

      Establishment of system
 4.
 4    for daily water                Mgr. Engee.
                                     Mgr Engee           01.08.2005
                                                         01 08 2005          01.10.2005
                                                                             01 10 2005            Cont.
                                                                                                   Cont       Cont.
                                                                                                              Cont
      consumption monitoring
                                                                                                                      14
                 ACC Limited                       CII ‘Water Excellence Award 2008’                           16.12.2008
Phase 1st :Strengthening of water monitoring system
     Out come of Team Work
       Monitoring of water consumption started on daily basis.
       Monitored water consumption was double than derived from formula on
       monthly production basis.
                   Source                                  End user


                                                             Quarry
                 Abandoned
                 Quarry Pit        M
                  (G Block)                              Clinkerisation
                                                             Plant

                   Active
                  Quarry Pit       M                     Captive P
                                                         C   i   Power
                                                             Plant

                 Check Dam
                                   M
                   (River)                                 Floatation
                                                              Plant
                 Abandoned
                 Quarry Pit                                 Cement
                  (A Block)        M
                                                           Grinding &
                                                          Packing Plant


                                                           Domestic               15
ACC Limited                 CII ‘Water Excellence Award 2008’                16.12.2008
Phase 2nd :Recycling of Effluent
   Objectives
      To improve life of reject pit
      To improve stability of reject pit
      To improve Environmental Performance Indicator (EPI) of the plant
      Conservation of natural resources
   Project Mission
      Recycling of Effluent by rerouting of reject pit discharge to abandoned
      mine pit
   Project Organization
      Client:                Mr. A.K. Srivastava, GM (Tech.)
      Project Manager:       Mr. KRK Prusty, Manager Mining
      Project Member:        Mr. P.K. Nanda, Jt. Manager Mining
                             Mr. Rajesh Kumar, Jt. Manager Mining
                             Mr. Y Kumar, Dy.
                             Mr Y. Kumar Dy Manager CSR

                                                                             16
ACC Limited               CII ‘Water Excellence Award 2008’             16.12.2008
Phase 2nd :Recycling of Effluent
                      Identified Risks in planning phase
Sr.     Identified Risks                                     Remedial Actions
No.
1.      During project bund may be collapsed and lead to     Strengthening of bund.
        flood in near by areas.
                                                             Dewatering of reject pit.

                      Attributes & Action plan

                                                                                           Planned
                                                                                             l    d    Actual date
                                                                                                            ld
Sr.                                 Accomplished      Planned date of    Actual date of
               Activity                                                                     date of        of
No.                                      by           commencement      commencement
                                                                                          completion   completion

      Strengthening of bund by
 1.                                  Mgr. Mining
                                      g        g        10.10.2006         07.10.2006     15.11.2006   23.11.2006
      dumping overburden soil

      Dewatering of reject pit
 2.                                  Mgr. Mining        15.11.2006         23.11.2006     30.11.2006   07.12.2006
      through diesel pump
      Laying of pipe with valves
         y g    pp
      & strainer in bund for
 3.   regular dewatering of          Mgr. Mining        20.11.2006         27.11.2006     30.11.2006   05.12.2006
      clean water through
      gravity.
      Development of natural
 4.   drain for the recirculation    Mgr. Mining        20.11.2006         29.11.2006     31.01.2007   20.02.2007
      of mine discharge water
                                                                                                                17
                 ACC Limited                       CII ‘Water Excellence Award 2008’                       16.12.2008
Phase 2nd :Recycling of Effluent

 Source                         End user


                                  Q
                                  Quarry
                                       y
Abandoned
Quarry Pit         M
 (G Block)                     Clinkerisation
                                   Plant

 Active
Quarry Pit         M          Captive Power
                                  Plant

Check Dam
                   M
  (River)                       Floatation
                                  oatat o       Reject
                                                  j       Abandoned   Evaporation/
                                                                         p       /
                                   Plant                   Mine Pit     Natural
                                                                        seepage
Abandoned
Quarry Pit                       Cement
 (A Block)         M
                                Grinding &
                               Packing Pl t
                               P ki    Plant


                                 Domestic




                                                                                     18
             ACC Limited     CII ‘Water Excellence Award 2008’                 16.12.2008
Phase 2nd :Recycling of Effluent
              Out come of Team Work
                   Pit life increased by 1 year.
                   Dewatering pump operation not required ( Rs 10 Lakhs/ annum)
                                                            Rs.          annum).
                   Stability of bund increased.
                   Clean water is being recycled (approximately 2000 KL per day) in ‘A’ block pit
                   for reutilization in cement plant
                                               plant.




           Water




Silica
                                                                                                19
         ACC Limited                 CII ‘Water Excellence Award 2008’                     16.12.2008
Phase 3rd :Zero effluent discharge
   Objectives
      Conservation of natural resources (water & energy)
      Control of water pollution
      To improve Environmental Performance Indicator (EPI) of the plant
   Project Mission
      To achieve ‘Zero effluent discharge’
   Project Organization
      Client:                Mr. I.M. Sharma, Plant Head
      Project Manager:       Mr. A.K. Srivastava, GM (Tech)
      Project Member:        Mr. P Singh, Asst. Manager Environment
                             Mr.
                             Mr J N Prasad Jt Manager Civil
                                    Prasad, Jt.
                             Mr. Y Singh, Dy. Manager CR-RM
                             Mr. M Singh, Asst. Engineer CR-RM
                             Mr. P K Bhattacharya, Asst. Officer WS
                                                                           20
ACC Limited               CII ‘Water Excellence Award 2008’           16.12.2008
Phase 3rd :Zero effluent discharge
                   Attributes & Action plan

                                                                                        Planned     Actual date
Sr.                              Accomplished      Planned date of    Actual date of
               Activity                                                                  date of        of
No.                                   by
                                       y           commencement      commencement
                                                                                       completion   completion
                               Dy. Manager &
      Initial     Cleaning   & Asst. Engr. CR-
1.                                                   12.09.2007        12.09.2007      30.09.2007   25.09.2007
      Arresting leakages       RM, Asst. Mgr
                               Env.
      Construction of effluent
      collection          sump Jt. Mgr. Civil
2.    (1mX1mX1m) to collect Asst.        Officer     12.09.2007        12.09.2007      30.09.2007   25.09.2007
      compressor cooling water WS
      & pump installation
      Revamping of old settling
                                Dy. Manager &
      tank and procurement &
3.                              CR-RM, Jt. Mgr.      01.10.2007        26.09.2007      31.01.2008   31.01.2008
      installation of  recycle
                                Civil
      pump.
      Minimising           water Asst
                                 Asst.   Officer
4.    consumption      in    Wet WS, Asst. Engr.     12.09.2007        12.09.2007      30.09.2007   30.09.2008
      grinding & thickening.     CR-RM
      Recycling effluent in wet
                                Asst. Mgr Env.,
      grinding & stopping river
5.                              Asst.    Officer     01.02.2008        01.02.2008      15.02.2008   15.02.2008
      water consumption in the
                                WS
      same.
                                                                                                           21
              ACC Limited                   CII ‘Water Excellence Award 2008’                         16.12.2008
Phase 3rd :Zero effluent discharge

 Source                      End user


                              Quarry
Abandoned
Quarry Pit     M
 (G Block)                 Clinkerisation
                               Plant

 Active                                                          E
Quarry Pit     M           Captive Power
                               Plant
                                                         ST      F
                                                                 F
Check Dam
               M                                                 L
  (River)
  (Ri   )                    Floatation
                                Plant
                                                         ST      U
Abandoned                                                        E
Quarry Pit                   Cement
 (
 (A Block)
         )     M                                         ST     N
                            Grinding &
                           Packing Plant                         T


                             Domestic



                                                                     22
     ACC Limited     CII ‘Water Excellence Award 2008’        16.12.2008
Phase 3rd :Zero effluent discharge
     Out come of Team Work
        Conservation of water (approx. 1000 KL per day)
        Conservation of energy
                        energy.
        Control of pollution




     Pump installed to recycle effluent.      Pumping facility installed to recycle effluent.
                                                                                        23
ACC Limited                 CII ‘Water Excellence Award 2008’                      16.12.2008
HAND IN HAND - TOGETHER EACH ACHIEVE MORE




Thank you for your benign presence & support
      y       y        g p             pp
                                                                24
ACC Limited            CII ‘Water Excellence Award 2008’   16.12.2008

Más contenido relacionado

La actualidad más candente

Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specificationCARLOS RUIZ CARDENAS
 
Phosphate hide out in subcritical boiler
Phosphate hide out in subcritical boilerPhosphate hide out in subcritical boiler
Phosphate hide out in subcritical boilerprakash deshmukh
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage TanksAnkur Sharma
 
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...Gaurav Singh Rajput
 
Presentation on re refining of lubricating oil by avadhut ,pravin & manoj
Presentation on re refining of lubricating oil by avadhut ,pravin & manojPresentation on re refining of lubricating oil by avadhut ,pravin & manoj
Presentation on re refining of lubricating oil by avadhut ,pravin & manojpalekaravadhut
 
SIGNIFICANCE OF STEAM WATER PARAMETERS
SIGNIFICANCE OF STEAM WATER PARAMETERSSIGNIFICANCE OF STEAM WATER PARAMETERS
SIGNIFICANCE OF STEAM WATER PARAMETERSDilip Kumar
 
incineration of hazardous wastes
incineration of hazardous wastesincineration of hazardous wastes
incineration of hazardous wastesArvind Kumar
 
Cryogenic air separation plant design
Cryogenic air separation plant designCryogenic air separation plant design
Cryogenic air separation plant designRahul Ghalme
 
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptxFIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptxNeerajTiwari965955
 
Urea waste treatment by biohydrolyzer
Urea waste treatment by biohydrolyzerUrea waste treatment by biohydrolyzer
Urea waste treatment by biohydrolyzerPrem Baboo
 
Flue gas desulphurization
Flue gas desulphurizationFlue gas desulphurization
Flue gas desulphurizationGajendra Singh
 

La actualidad más candente (20)

Truck loading and unloading technical specification
Truck loading and unloading technical specificationTruck loading and unloading technical specification
Truck loading and unloading technical specification
 
L 37 final
L 37 finalL 37 final
L 37 final
 
Phosphate hide out in subcritical boiler
Phosphate hide out in subcritical boilerPhosphate hide out in subcritical boiler
Phosphate hide out in subcritical boiler
 
Introduction to Storage Tanks
Introduction to Storage TanksIntroduction to Storage Tanks
Introduction to Storage Tanks
 
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
Risk Assessment At Tank- Truck Unloading Section Of LPG Bottling Plant I Gaur...
 
H2S - Hydrogen Sulfide
H2S - Hydrogen Sulfide H2S - Hydrogen Sulfide
H2S - Hydrogen Sulfide
 
Presentation on re refining of lubricating oil by avadhut ,pravin & manoj
Presentation on re refining of lubricating oil by avadhut ,pravin & manojPresentation on re refining of lubricating oil by avadhut ,pravin & manoj
Presentation on re refining of lubricating oil by avadhut ,pravin & manoj
 
Module iii
Module iiiModule iii
Module iii
 
AMMONIA storage
AMMONIA storageAMMONIA storage
AMMONIA storage
 
SIGNIFICANCE OF STEAM WATER PARAMETERS
SIGNIFICANCE OF STEAM WATER PARAMETERSSIGNIFICANCE OF STEAM WATER PARAMETERS
SIGNIFICANCE OF STEAM WATER PARAMETERS
 
L 27 final
L 27 finalL 27 final
L 27 final
 
incineration of hazardous wastes
incineration of hazardous wastesincineration of hazardous wastes
incineration of hazardous wastes
 
Cryogenic air separation plant design
Cryogenic air separation plant designCryogenic air separation plant design
Cryogenic air separation plant design
 
Petroleum 8
Petroleum 8Petroleum 8
Petroleum 8
 
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptxFIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
FIRE PREVENTION & FIRE FIGHTING EQUIPMENT-N PPT.pptx
 
Urea waste treatment by biohydrolyzer
Urea waste treatment by biohydrolyzerUrea waste treatment by biohydrolyzer
Urea waste treatment by biohydrolyzer
 
Construction safety manual
Construction safety manualConstruction safety manual
Construction safety manual
 
Boiler water quality requirements abma
Boiler water quality requirements abmaBoiler water quality requirements abma
Boiler water quality requirements abma
 
Flue gas desulphurization
Flue gas desulphurizationFlue gas desulphurization
Flue gas desulphurization
 
Cold Work Permit
Cold Work PermitCold Work Permit
Cold Work Permit
 

Destacado

Smart water management system
Smart water management systemSmart water management system
Smart water management systemshankar upadhyay
 
Conservation agriculture in Zambia and Malawi; the opportunities and constrai...
Conservation agriculture in Zambia and Malawi; the opportunities and constrai...Conservation agriculture in Zambia and Malawi; the opportunities and constrai...
Conservation agriculture in Zambia and Malawi; the opportunities and constrai...African Conservation Tillage Network
 
Water management in India: By Gita Kavarana
Water management in India: By Gita KavaranaWater management in India: By Gita Kavarana
Water management in India: By Gita Kavaranabmbks321
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezIPPAI
 
Ballast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptBallast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptIwl Pcu
 
Conservation Agriculture: Fundamentals
Conservation Agriculture: FundamentalsConservation Agriculture: Fundamentals
Conservation Agriculture: FundamentalsJack McHugh
 
Ballast Water Management
Ballast Water ManagementBallast Water Management
Ballast Water ManagementPawanexh Kohli
 
Smart Water & Waste Management for Smart Cities by Mr. Gyan Misra
Smart Water & Waste Management for Smart Cities by Mr. Gyan MisraSmart Water & Waste Management for Smart Cities by Mr. Gyan Misra
Smart Water & Waste Management for Smart Cities by Mr. Gyan MisraIPPAI
 
Water presentation final ppt
Water presentation final pptWater presentation final ppt
Water presentation final pptLisaMartinez78247
 
PLC and SCADA training.
PLC and SCADA training.PLC and SCADA training.
PLC and SCADA training.Ishank Ranjan
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADAIndira Kundu
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedSlideShare
 

Destacado (16)

Smart water management system
Smart water management systemSmart water management system
Smart water management system
 
Oman-engl.-PP2016-10.11
Oman-engl.-PP2016-10.11Oman-engl.-PP2016-10.11
Oman-engl.-PP2016-10.11
 
Rain water harvesting
Rain water harvestingRain water harvesting
Rain water harvesting
 
hindalco power
hindalco powerhindalco power
hindalco power
 
Conservation agriculture in Zambia and Malawi; the opportunities and constrai...
Conservation agriculture in Zambia and Malawi; the opportunities and constrai...Conservation agriculture in Zambia and Malawi; the opportunities and constrai...
Conservation agriculture in Zambia and Malawi; the opportunities and constrai...
 
Water management in India: By Gita Kavarana
Water management in India: By Gita KavaranaWater management in India: By Gita Kavarana
Water management in India: By Gita Kavarana
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
 
Ballast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.pptBallast Water Management and Control: A New Challenge.ppt
Ballast Water Management and Control: A New Challenge.ppt
 
Conservation Agriculture: Fundamentals
Conservation Agriculture: FundamentalsConservation Agriculture: Fundamentals
Conservation Agriculture: Fundamentals
 
Ballast Water Management
Ballast Water ManagementBallast Water Management
Ballast Water Management
 
Smart Water & Waste Management for Smart Cities by Mr. Gyan Misra
Smart Water & Waste Management for Smart Cities by Mr. Gyan MisraSmart Water & Waste Management for Smart Cities by Mr. Gyan Misra
Smart Water & Waste Management for Smart Cities by Mr. Gyan Misra
 
Water presentation final ppt
Water presentation final pptWater presentation final ppt
Water presentation final ppt
 
PLC and SCADA training.
PLC and SCADA training.PLC and SCADA training.
PLC and SCADA training.
 
Water Management
Water ManagementWater Management
Water Management
 
Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADA
 
LinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-PresentedLinkedIn SlideShare: Knowledge, Well-Presented
LinkedIn SlideShare: Knowledge, Well-Presented
 

Similar a Water Management System at Chaibasa Cement Works presented by A.K.Srivastava

Sterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, SilvassaSterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, SilvassaIndia Water Portal
 
Enduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedEnduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedIndia Water Portal
 
Ccb standards 2nd_edition_japanese
Ccb standards 2nd_edition_japaneseCcb standards 2nd_edition_japanese
Ccb standards 2nd_edition_japaneseSang Woo Han
 
DESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesDESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesIPPAI
 
CII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur I
CII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur ICII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur I
CII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur IIndia Water Portal
 
Conserve Water Need of the Hour presented by Ashok Leyland
Conserve Water Need of the Hour presented by Ashok LeylandConserve Water Need of the Hour presented by Ashok Leyland
Conserve Water Need of the Hour presented by Ashok LeylandIndia Water Portal
 
Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...
Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...
Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...Cary Institute of Ecosystem Studies
 
Energy as Motor of Seawater Reverse Osmosis Desalination Development
Energy as Motor of Seawater Reverse Osmosis Desalination DevelopmentEnergy as Motor of Seawater Reverse Osmosis Desalination Development
Energy as Motor of Seawater Reverse Osmosis Desalination DevelopmentDegrémont
 
Presentation On Mar Type sewage treatment plant
Presentation On Mar Type sewage treatment plantPresentation On Mar Type sewage treatment plant
Presentation On Mar Type sewage treatment plantjeykumar
 
California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11carriesisto
 
Implications of using Tire-derived Aggregate for Landfill Leachate Collection...
Implications of using Tire-derived Aggregate for Landfill Leachate Collection...Implications of using Tire-derived Aggregate for Landfill Leachate Collection...
Implications of using Tire-derived Aggregate for Landfill Leachate Collection...SWANA Northern Lights Chapter
 
Circulating water treatment project
Circulating water treatment projectCirculating water treatment project
Circulating water treatment projectMolla Morshad
 
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...AbdulRazakBH
 
IRJET - Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...
IRJET -  	  Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...IRJET -  	  Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...
IRJET - Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...IRJET Journal
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Noteswilliampatricklaw
 

Similar a Water Management System at Chaibasa Cement Works presented by A.K.Srivastava (20)

Sterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, SilvassaSterlite Industries Ltd, Silvassa
Sterlite Industries Ltd, Silvassa
 
Enduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc LimitedEnduring value through values presented by Hindustan Zinc Limited
Enduring value through values presented by Hindustan Zinc Limited
 
Ccb standards 2nd_edition_japanese
Ccb standards 2nd_edition_japaneseCcb standards 2nd_edition_japanese
Ccb standards 2nd_edition_japanese
 
DESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion TechnologiesDESL Experience-MSW WTE Conversion Technologies
DESL Experience-MSW WTE Conversion Technologies
 
CII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur I
CII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur ICII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur I
CII - Excellence in Water Management - 2008 presented by Ashok Leyland Hosur I
 
ITC Limited, Bhadrachalam
ITC Limited,  BhadrachalamITC Limited,  Bhadrachalam
ITC Limited, Bhadrachalam
 
Conserve Water Need of the Hour presented by Ashok Leyland
Conserve Water Need of the Hour presented by Ashok LeylandConserve Water Need of the Hour presented by Ashok Leyland
Conserve Water Need of the Hour presented by Ashok Leyland
 
Recommendations of the Water Taskforce by Steve Davies, PSSP
Recommendations of the Water Taskforce by Steve Davies, PSSP  Recommendations of the Water Taskforce by Steve Davies, PSSP
Recommendations of the Water Taskforce by Steve Davies, PSSP
 
Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...
Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...
Water Quality, Quantity, and Management: Lessons from the Marcellus Shale Reg...
 
ITC Limited, Tribeni
ITC Limited, TribeniITC Limited, Tribeni
ITC Limited, Tribeni
 
Energy as Motor of Seawater Reverse Osmosis Desalination Development
Energy as Motor of Seawater Reverse Osmosis Desalination DevelopmentEnergy as Motor of Seawater Reverse Osmosis Desalination Development
Energy as Motor of Seawater Reverse Osmosis Desalination Development
 
Presentation On Mar Type sewage treatment plant
Presentation On Mar Type sewage treatment plantPresentation On Mar Type sewage treatment plant
Presentation On Mar Type sewage treatment plant
 
California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11California Cap Trade Webinar 12 1 11
California Cap Trade Webinar 12 1 11
 
CO2 - EOR and its role in CCS
CO2 - EOR and its role in CCSCO2 - EOR and its role in CCS
CO2 - EOR and its role in CCS
 
VIZAG Steel
VIZAG SteelVIZAG Steel
VIZAG Steel
 
Implications of using Tire-derived Aggregate for Landfill Leachate Collection...
Implications of using Tire-derived Aggregate for Landfill Leachate Collection...Implications of using Tire-derived Aggregate for Landfill Leachate Collection...
Implications of using Tire-derived Aggregate for Landfill Leachate Collection...
 
Circulating water treatment project
Circulating water treatment projectCirculating water treatment project
Circulating water treatment project
 
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
IMPACT OF QUARRY DUST AND FLY ASH ON THE FRESH AND HARDENED PROPERTIES OF SEL...
 
IRJET - Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...
IRJET -  	  Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...IRJET -  	  Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...
IRJET - Evaluation of Wheat Husk as Environment Friendly Fluid Loss Addit...
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Notes
 

Más de India Water Portal

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfIndia Water Portal
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...India Water Portal
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...India Water Portal
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...India Water Portal
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...India Water Portal
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...India Water Portal
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedureIndia Water Portal
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharIndia Water Portal
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisalIndia Water Portal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...India Water Portal
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020India Water Portal
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classificationIndia Water Portal
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifersIndia Water Portal
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingIndia Water Portal
 

Más de India Water Portal (20)

Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdfCase study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
Case study of Gokarna Multi-village scheme, Kumta, Karnataka_IIM-B_2023.pdf
 
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
 
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
Functioning of Single Village Drinking Water Supply Schemes in Rural Odisha_G...
 
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
Managing drinking water infrastructure in West Bengal Gram Panchayats_Sujata ...
 
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
Mukhya Mantri Gramin Peyjal Nishchay Yojana (MGPNY) – Bihar_Pankaj Kumar_AKRS...
 
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
 
Suno bolo - standard operating procedure
Suno bolo -  standard operating procedureSuno bolo -  standard operating procedure
Suno bolo - standard operating procedure
 
Jal Jeevan Mission, Karnataka
Jal Jeevan Mission, KarnatakaJal Jeevan Mission, Karnataka
Jal Jeevan Mission, Karnataka
 
Water budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuantharWater budgeting – a case study from chhuanthar
Water budgeting – a case study from chhuanthar
 
Water quality
Water qualityWater quality
Water quality
 
Understanding geology
Understanding geologyUnderstanding geology
Understanding geology
 
Springshed treatment measures
Springshed treatment measuresSpringshed treatment measures
Springshed treatment measures
 
Participatory research appraisal
Participatory research appraisalParticipatory research appraisal
Participatory research appraisal
 
Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...Community mobilization and institutional framework including monitoring mecha...
Community mobilization and institutional framework including monitoring mecha...
 
Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020Concept and approach of springshed development and management 22 jan 2020
Concept and approach of springshed development and management 22 jan 2020
 
Spring mapping manual
Spring mapping manualSpring mapping manual
Spring mapping manual
 
Spring hydrogeology and its classification
Spring hydrogeology and its classificationSpring hydrogeology and its classification
Spring hydrogeology and its classification
 
Introduction to aquifers
Introduction to aquifersIntroduction to aquifers
Introduction to aquifers
 
Introduction: Groundwater aquifers
Introduction: Groundwater aquifersIntroduction: Groundwater aquifers
Introduction: Groundwater aquifers
 
Atal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity buildingAtal Bhujal Yojana: Capacity building
Atal Bhujal Yojana: Capacity building
 

Último

Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 

Último (20)

Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 

Water Management System at Chaibasa Cement Works presented by A.K.Srivastava

  • 1. Water Management System at CCW Venue :CII- Godrej GBC Hyderabad Date :16.12.2008 Name of the Presenter :A.K. Srivastava Head Plant Operations Chaibasa Cement Works This report is solely for the internal use. No part of it may be circulated, quoted, or reproduced for distribution outside the company organization without prior written approval from ACC Limited. This material was used during an oral presentation; it is not a complete record of the discussion.
  • 2. Company Profile Established in 1947. Part of ACC/ Holcim, a national and global l d ti l d l b l leader Expansion & modernization in 2005. 1.2 MTPA integrated cement plant Situated i “K lh Si d in “Kolhan region i – A hard core tribal belt” , 80 Km. from Jamshedpur. QMS & EMS established as per IS/ISO 9001 & 14001. OHSMS established as per Reliable and respected Holcim OH&S pyramid. 2 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 3. Process Details Highly sophisticated and modern plant with state of the art technology. Semi d process (up to 23% enriched slurry feed in VRM) S i dry ( t i h d l f di Raw mat. extraction Raw material preparation Pyro processing Raw meal preparation Shipping Cement Grinding Shipping 3 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 4. Roadmap for meeting the Environment goals 2008 2009 2010 2011 Stack emissions 50 30 30 30 (mg/nm3) Fugitive Emission SPM 5000 4000 3000 2000 (µg/nm3) Kg of CO2/ ton of 650 634 618 602 Cementitious Material CEMS Installation on 1 kiln Kiln Stack Water Consumption -30% -20% -15% -10% Environment Road Map Power Consumption 88.7 86.4 84.3 82.2 KWh / ton Tonnage of alternative 8400 14024 15150 22201 fuels & raw mat. (tons) Thermal Substitution 0.53 1.43 1.62 1.99 Rate (%) AFR Installation 0.95 2.8 5.0 0.5 Capex Rs. Cr Total GAV (Savings) Rs. 0.29 3.47 4.30 5.89 Cr 4 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 5. Water Conservation Initiatives Annual Water Investmen Year of Savings t made Payback Sl. Water conservation Implemen period No. initiatives tation Rs. R (months) m3 Rs. Lakhs Lakhs Strengthening of water monitoring system by g y y 1 installation of water 2005-06 - - 2.22 - meters at source points Recycling of Effluent by rerouting of reject pit 2 2006-07 165000 4.85 2 5 discharge to abandoned mine pit Zero effluent d h ffl discharge by providing 3 sedimentation tanks 2007-08 330000 9.7 12.1 15 and reutilization of effluent ffl 5 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 6. Specific Water Consumption 3.00 3 00 2.50 2.40 2.28 2.02 2.00 5% m3/MT 1.50 1.21 1.00 0.70 0.50 0.00 0 00 0.00 0 00 0.00 2004 – 05 2005 – 06 2006 – 07 2007 – 08 Benchmark 6 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 7. Road map to achieve global benchmark Objective & targets Plan of Action Expected Technical justification Date of Completion Strengthening of water Installation of Dec. 2009 Water recycled from reject pit is monitoring system at water meters at collected in mines abandoned pit user end user end (A block) for further use in plant, this reutilized water is again counted as fresh water due to lack of monitoring system. At present, water meters are installed only at sources and we are unable to take initiatives department wise. d t t i To achieve specific installation of Dec. 2011 At present water consumption in water consumption 700 modernized floatation process is about 950 ltr./ MT of Clinker from Filtration Floatation ltr. per tonnes of clinker. By present level of 1519 Plant (FFP) (FFP). implementing this proposed ltr./ MTof Clinker project dry cake will be fed to VRM and 130 ltr. water per tonnes of clinker will be consumed in this process. 7 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 8. Sustainability Indices 8 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 9. Environment Performance Index (PEP) Systematic monitoring and evaluation of environmental performance Identification of strengths and weaknesses (self-assessment) Supporting tool in (environmental) business planning Environmental programs, CAPEX projects, budgeting etc. Database for communication purposes Group and Group company internal benchmarking 85 Enval Performance Indicator Atmospheric Emission: PM 80 80 75 76 75 73 70 66 EPI (% ) 65 62 60 55 50 2005 2006 2007 2008 2007 2006 Year CCW Performance CCW Target ACC Avg. Performance HOLCIM Avg. Performance 9 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 10. Commitment towards reduction in GHG Emission Our objective is to reduce by the year 2010 the average specific net CO2 emission by 20 % from the reference year 1990, l l 1990 calculated per WBCSD CO2 protocol. d l Clinker Factor Specific Net CO2 Emission 75.0 75 0 73 900.0 900 0 876.0 880.0 Kg. CO2/ MT of Cem. Mat. 69.5 70.0 860.0 840.0 65.0 65 0 820.0 804.0 % 800.0 60.3 800.0 60.0 781.0 780.0 55.9 55.0 55.0 55.0 760.0 . 740.0 50.0 720.0 2005 2006 2007 2008 2007 2006 2005 2006 2007 2008 Year Year CCW Performance CCW Target CCW Performance CCW Target ACC Avg. Performance HOLCIM Avg. Performance 10 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 11. Commitment towards reduction in GHG Emission This reduction will be achieved through improving the four key eco-efficiency parameters: clinker factor specific thermal energy consumption specific electrical energy consumption thermal substitution rate Specific Thermal Energy Consumption Specific Electrical Energy Consumption 1050.0 1050 0 110.0 995.0 106 1000.0 kWh/ MT of Cement 105.0 950.0 KCal/ Kg. of Clinker 900.0 876 100.0 C 850.0 95.0 800.0 91.9 91.42 755.0 750.0 748.8 751 90.0 89.0 750.0 85.6 85 6 85.0 85 0 K 700.0 700 0 85.0 650.0 80.0 600.0 2005 2006 2007 2008 2007 2006 2005 2006 2007 2008 2007 2006 Year Yea Year CCW Performance CCW Target ACC Avg. Performance HOLCIM Avg. Performance 11 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 12. Water Conservation Initiatives Phase 1st :Strengthening of water monitoring system Phase 2nd :Recycling of Effluent Phase 3rd :Zero effluent discharge 12 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 13. Phase 1st :Strengthening of water monitoring system Objectives Compliance with environmental legal requirements To improve Environmental Performance Indicator (EPI) of the plant Regular monitoring of water consumption Conservation of natural resources Project Mission Installation of water meters at source level Project Organization Client: Mr. A. Roy Choudhary, Vice President Project Manager: Mr. A.K. Srivastava, Manager Engineering Project Member: Mr. S.K. Mazumdar Mr S K Mazumdar, HOD Water Supply Mr. Pradeep Singh, HOD Environment Mr. P.K. Bhattacharya, Asst. Officer, WS 13 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 14. Phase 1st :Strengthening of water monitoring system Identified Risks in planning phase Sr. Identified Risks Remedial Actions No. 1. Unavailability of layout drawings (plant established Study and develop water line layout in the year 1947) 2. Procurement of the water meters in the time frame Adherence with delivery schedule. Attributes Action plan Att ib t & A ti l Planned Actual date Sr. Accomplished Planned date of Actual date of Activity date of of No. by commencement commencement completion completion Study of existing lay out HOD: Water 1. and generate requirement 05.04.2005 05.04.2005 15.04.2005 10.04.2005 Supply for water meters Procurement of water 2. HOD: Purchase 15.04.2005 10.04.2005 30.06.2005 10.08.2005 meters Installation of water HOD: Water 3. 01.07.2005 12.08.2005 31.07.2005 25.09.2005 meters Supply Establishment of system 4. 4 for daily water Mgr. Engee. Mgr Engee 01.08.2005 01 08 2005 01.10.2005 01 10 2005 Cont. Cont Cont. Cont consumption monitoring 14 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 15. Phase 1st :Strengthening of water monitoring system Out come of Team Work Monitoring of water consumption started on daily basis. Monitored water consumption was double than derived from formula on monthly production basis. Source End user Quarry Abandoned Quarry Pit M (G Block) Clinkerisation Plant Active Quarry Pit M Captive P C i Power Plant Check Dam M (River) Floatation Plant Abandoned Quarry Pit Cement (A Block) M Grinding & Packing Plant Domestic 15 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 16. Phase 2nd :Recycling of Effluent Objectives To improve life of reject pit To improve stability of reject pit To improve Environmental Performance Indicator (EPI) of the plant Conservation of natural resources Project Mission Recycling of Effluent by rerouting of reject pit discharge to abandoned mine pit Project Organization Client: Mr. A.K. Srivastava, GM (Tech.) Project Manager: Mr. KRK Prusty, Manager Mining Project Member: Mr. P.K. Nanda, Jt. Manager Mining Mr. Rajesh Kumar, Jt. Manager Mining Mr. Y Kumar, Dy. Mr Y. Kumar Dy Manager CSR 16 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 17. Phase 2nd :Recycling of Effluent Identified Risks in planning phase Sr. Identified Risks Remedial Actions No. 1. During project bund may be collapsed and lead to Strengthening of bund. flood in near by areas. Dewatering of reject pit. Attributes & Action plan Planned l d Actual date ld Sr. Accomplished Planned date of Actual date of Activity date of of No. by commencement commencement completion completion Strengthening of bund by 1. Mgr. Mining g g 10.10.2006 07.10.2006 15.11.2006 23.11.2006 dumping overburden soil Dewatering of reject pit 2. Mgr. Mining 15.11.2006 23.11.2006 30.11.2006 07.12.2006 through diesel pump Laying of pipe with valves y g pp & strainer in bund for 3. regular dewatering of Mgr. Mining 20.11.2006 27.11.2006 30.11.2006 05.12.2006 clean water through gravity. Development of natural 4. drain for the recirculation Mgr. Mining 20.11.2006 29.11.2006 31.01.2007 20.02.2007 of mine discharge water 17 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 18. Phase 2nd :Recycling of Effluent Source End user Q Quarry y Abandoned Quarry Pit M (G Block) Clinkerisation Plant Active Quarry Pit M Captive Power Plant Check Dam M (River) Floatation oatat o Reject j Abandoned Evaporation/ p / Plant Mine Pit Natural seepage Abandoned Quarry Pit Cement (A Block) M Grinding & Packing Pl t P ki Plant Domestic 18 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 19. Phase 2nd :Recycling of Effluent Out come of Team Work Pit life increased by 1 year. Dewatering pump operation not required ( Rs 10 Lakhs/ annum) Rs. annum). Stability of bund increased. Clean water is being recycled (approximately 2000 KL per day) in ‘A’ block pit for reutilization in cement plant plant. Water Silica 19 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 20. Phase 3rd :Zero effluent discharge Objectives Conservation of natural resources (water & energy) Control of water pollution To improve Environmental Performance Indicator (EPI) of the plant Project Mission To achieve ‘Zero effluent discharge’ Project Organization Client: Mr. I.M. Sharma, Plant Head Project Manager: Mr. A.K. Srivastava, GM (Tech) Project Member: Mr. P Singh, Asst. Manager Environment Mr. Mr J N Prasad Jt Manager Civil Prasad, Jt. Mr. Y Singh, Dy. Manager CR-RM Mr. M Singh, Asst. Engineer CR-RM Mr. P K Bhattacharya, Asst. Officer WS 20 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 21. Phase 3rd :Zero effluent discharge Attributes & Action plan Planned Actual date Sr. Accomplished Planned date of Actual date of Activity date of of No. by y commencement commencement completion completion Dy. Manager & Initial Cleaning & Asst. Engr. CR- 1. 12.09.2007 12.09.2007 30.09.2007 25.09.2007 Arresting leakages RM, Asst. Mgr Env. Construction of effluent collection sump Jt. Mgr. Civil 2. (1mX1mX1m) to collect Asst. Officer 12.09.2007 12.09.2007 30.09.2007 25.09.2007 compressor cooling water WS & pump installation Revamping of old settling Dy. Manager & tank and procurement & 3. CR-RM, Jt. Mgr. 01.10.2007 26.09.2007 31.01.2008 31.01.2008 installation of recycle Civil pump. Minimising water Asst Asst. Officer 4. consumption in Wet WS, Asst. Engr. 12.09.2007 12.09.2007 30.09.2007 30.09.2008 grinding & thickening. CR-RM Recycling effluent in wet Asst. Mgr Env., grinding & stopping river 5. Asst. Officer 01.02.2008 01.02.2008 15.02.2008 15.02.2008 water consumption in the WS same. 21 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 22. Phase 3rd :Zero effluent discharge Source End user Quarry Abandoned Quarry Pit M (G Block) Clinkerisation Plant Active E Quarry Pit M Captive Power Plant ST F F Check Dam M L (River) (Ri ) Floatation Plant ST U Abandoned E Quarry Pit Cement ( (A Block) ) M ST N Grinding & Packing Plant T Domestic 22 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008
  • 23. Phase 3rd :Zero effluent discharge Out come of Team Work Conservation of water (approx. 1000 KL per day) Conservation of energy energy. Control of pollution Pump installed to recycle effluent. Pumping facility installed to recycle effluent. 23 ACC Limited CII ‘Water Excellence Award 2008’ 16.12.2008