Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
4th busiest airport in Australia with over 151,000
aircraft movements in 2012/13
Services Australian and Indian Ocean
destinations, as well as Johannesburg,
Auckland, Dubai, Guangzhou and Doha.
Passenger numbers have trebled in the past 10
years with 12.6 million people travelling through
the airport in 2012.
Based on the average growth rate, this figure will
double to 24 million by 2019.
Passengers wanting to make a connecting
international flight have a 10min journey by road
to get to the International Terminal
In 2012, the Australian Competition and
Consumer Commission released a report rating
the Perth Airport as the worst in Australia, as
judged by airlines
International Terminal (T1)
Passenger Statistics…
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Domestic Terminals (T3 & 4)
International Terminal (T1)
Passenger Statistics…
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
On the eastern side of the airfield stands the
International Terminal (T1)
First operational in 1986
Total number of international passengers
in 2012/13 = 3.7 million
International Terminal and Domestic Terminal 2
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
To the south of T1 lies the new Domestic T2
Commenced operations in April 2013
Caters for up to 36 aircraft
16 check-in counters
14 aircraft gates
T2 Airline operators:
International Terminal and Domestic Terminal 2
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
On the western side of the airfield stand the
domestic terminals T3 & T4
Total number of domestic passengers
in 2012/13 = 9.9 million
T3 Airline Operators:
T4 Airline Operators:
Domestic Terminals 3 &4
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Key Objectives:
 Increase the capacity of the International Terminal
 Relieve Terminal & Apron Congestion
 Relocate of Some Domestic Operations
 Improve Customer Facilities
 Provide Flexible Infrastructure
T1 Major Development Plan
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Existing T1 Building – 1986 -2011
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Arrivals Expansion Project
2012 – Completion 2014
Area: Approx. 13,200m2
Value: $80m
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
• Substantial re-configuration of the existing accommodation
• An expansion of T1 to the east to cater for new Arrivals area
Value proposition for Perth Airport is to create a terminal upgrade that will provide a positive
passenger experience thereby helping to brand the airport as a world class facility
Major enhancements:
• New 1st floor Immigration primary line
• Increased arrivals duty free area
• Expanded baggage hall facilities
• Secondary search area
Arrivals Expansion Project
2012 – Completion 2014
Area: Approx. 13,200m2
Value: $80m
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Arrivals Expansion Project
2012 – Completion 2014
Area: Approx. 13,200m2
Value: $80m
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
T1 Domestic Pier & International Expansion
2013 – Completion 2014
Area: Approx. 44,000m2
Value: $380m
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
• Addition of major new facilities for both arrivals and departures
Major enhancements:
• 2 gates to accommodate Airbus A380
• Substantial new international departures lounge
• New pier serving 8 stands and 12 aerobridges
• Increased arrivals duty free area
• Expanded baggage reclaim hall facilities
• Secondary search area
T1 Domestic Pier & International Expansion
2013 – Completion 2014
Area: Approx. 44,000m2
Value: $380m
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
T1 Domestic Pier & International Expansion
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
• Hydraulic
• Mechanical
• Electrical
• Fire
• Structural
• Architecture
BIM Benefits
Federated model
created in Navisworks
Cross discipline clash detection performed in
Navisworks
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
 Tight project deadlines
 Improve documentation quality
 Exchange of information
 Market pressure
 Better testing
 Early identification of errors
 Clearer communication
 A single, reliable, source of information
 Fewer coordination errors
BIM Drivers
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
An ideal BIM methodology involves:
 Developing
 Assessing
 Establishing
 Collaborating
 Managing
It requires that all participants:
 Commit
 Contribute
 Ensure
 Adopt
BIM Methodology
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
The key to success with BIM delivery is
dependent on:
 a clear understanding of the client and project
team's objectives
 a careful assessment of the capabilities of the
team, timeframe and budget
The ideal BIM process is one in which:
 all stakeholders are committed to developing,
and deriving information from the digital model
 roles and responsibilities are clearly defined
 a contractual framework that encourages
greater collaboration.
BIM Success
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Through Coordination
BIM From Design to Construction
From Design
To Construction …and beyond?
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
 BIM process seeks to facilitate and
encourage higher levels of collaboration -
not just 3D drafting
 Frequent information sharing
- Airport single modelling team
 Sub-contractor, engineer and architect
design teams stationed together
BIM In Construction
Team approach to projects in Design / Construction
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Potential Benefits to Sub-contractors
• Significantly reduced project delivery risk
• Ultimately total lower cost and improved profitability
• Reduced site meetings
• Improved coordination and reduction in on-site clashes
• Reduction in re-works and material wastage
• Scheduling and planning accuracy
BIM In Construction
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
“The mobile app is the next horizon of
coordination and communication with the field. As
a contractor, I think the field is in a position to
really leverage this technology in exciting ways”
Lincoln Wood
Engineer
Turner Construction Company
Potential Benefits to Sub-contractors
• Measuring, take-offs, procurement
• Shop drawing processes
• Pre-fabrication
• BIM to Field – iPads
e.g. BIM glue
BIM In Construction
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Benefits of Sub-contractors using BIM to the consultant
and client in:
• Reduced RFI’s
• Less variations
• As-build Model as an asset for owner
BIM In Construction
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
However…
• All depends on early engagement of Sub-contractors and…
• Their attitude to and experience of BIM
• 3D drafting vs Collaborative BIM
BIM In Construction
Perth International Airport
T1 Domestic Pier & International Terminal Expansion
Conclusion…
• We’re on a journey worth taking
• Clients driving BIM
• BIM champions in management
BIM In Construction
Perth International Airport
T1 Domestic Pier & International Terminal Expansion

Más contenido relacionado

La actualidad más candente

RFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - ZelenogradRFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - ZelenogradОlеg Сhursin
 
Broekman Automotive Division
Broekman Automotive DivisionBroekman Automotive Division
Broekman Automotive Divisionronaldjongeling
 
15-03-10 Recent Airportcity Developments PvdH
15-03-10 Recent Airportcity Developments PvdH15-03-10 Recent Airportcity Developments PvdH
15-03-10 Recent Airportcity Developments PvdHPieter van der Horst
 
Wetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital WorksWetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital WorksMarkus Etting
 

La actualidad más candente (7)

RFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - ZelenogradRFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - Zelenograd
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
Broekman Automotive Division
Broekman Automotive DivisionBroekman Automotive Division
Broekman Automotive Division
 
15-03-10 Recent Airportcity Developments PvdH
15-03-10 Recent Airportcity Developments PvdH15-03-10 Recent Airportcity Developments PvdH
15-03-10 Recent Airportcity Developments PvdH
 
Engr.Fadwa - CV
Engr.Fadwa - CVEngr.Fadwa - CV
Engr.Fadwa - CV
 
Wetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital WorksWetherill Park Planned Major Capital Works
Wetherill Park Planned Major Capital Works
 
Khaled fahmy cv
Khaled fahmy cvKhaled fahmy cv
Khaled fahmy cv
 

Similar a Perth Airport T1 Terminal Expansion

Five ways to drive process adoption
Five ways to drive process adoptionFive ways to drive process adoption
Five ways to drive process adoptionAconex
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyAhmed Mahmoud
 
MODE_Sector-Brochure-Transport&Infrastructure_V1_LQ
MODE_Sector-Brochure-Transport&Infrastructure_V1_LQMODE_Sector-Brochure-Transport&Infrastructure_V1_LQ
MODE_Sector-Brochure-Transport&Infrastructure_V1_LQRhonan OBrien
 
Iqaluit airport project slideshow
Iqaluit airport project slideshowIqaluit airport project slideshow
Iqaluit airport project slideshowupherebusiness
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsDr. Anders Adrem
 
Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineeringAbhishekChavan63
 
AirportCreators PTE Amsterdam 2017 - introduction
AirportCreators PTE Amsterdam 2017 - introductionAirportCreators PTE Amsterdam 2017 - introduction
AirportCreators PTE Amsterdam 2017 - introductionFrank Schellenberg
 
Kevin Toland, Chief Executive, Dublin Airport Authority
Kevin Toland, Chief Executive, Dublin Airport AuthorityKevin Toland, Chief Executive, Dublin Airport Authority
Kevin Toland, Chief Executive, Dublin Airport AuthorityAsia Matters
 
Heathrow Strategic Innovation Case Study
Heathrow Strategic Innovation Case StudyHeathrow Strategic Innovation Case Study
Heathrow Strategic Innovation Case StudyDiana Kontsevaia
 
Airbus Presentation - How They Improved Delivery Speed and Quality
Airbus Presentation - How They Improved Delivery Speed and QualityAirbus Presentation - How They Improved Delivery Speed and Quality
Airbus Presentation - How They Improved Delivery Speed and QualityCAST
 
Oct 2011 Presentation BC RTWR
Oct 2011 Presentation BC RTWROct 2011 Presentation BC RTWR
Oct 2011 Presentation BC RTWRDr. Anders Adrem
 
Assessing Port Projects
Assessing Port ProjectsAssessing Port Projects
Assessing Port ProjectsNico Berx
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15Alam Aftab
 
Airport Expansion - Challenges
Airport Expansion - ChallengesAirport Expansion - Challenges
Airport Expansion - ChallengesHusain Baqer
 
NATS Brochure for Asia Pacific Region
NATS Brochure for Asia Pacific RegionNATS Brochure for Asia Pacific Region
NATS Brochure for Asia Pacific RegionNATS
 
PTScientists - NOAH19 Berlin
PTScientists - NOAH19 BerlinPTScientists - NOAH19 Berlin
PTScientists - NOAH19 BerlinNOAH Advisors
 

Similar a Perth Airport T1 Terminal Expansion (20)

Five ways to drive process adoption
Five ways to drive process adoptionFive ways to drive process adoption
Five ways to drive process adoption
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy Study
 
Capital Programs - O'Hare 21
Capital Programs - O'Hare 21 Capital Programs - O'Hare 21
Capital Programs - O'Hare 21
 
MODE_Sector-Brochure-Transport&Infrastructure_V1_LQ
MODE_Sector-Brochure-Transport&Infrastructure_V1_LQMODE_Sector-Brochure-Transport&Infrastructure_V1_LQ
MODE_Sector-Brochure-Transport&Infrastructure_V1_LQ
 
Iqaluit airport project slideshow
Iqaluit airport project slideshowIqaluit airport project slideshow
Iqaluit airport project slideshow
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_Projects
 
Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineering
 
AirportCreators PTE Amsterdam 2017 - introduction
AirportCreators PTE Amsterdam 2017 - introductionAirportCreators PTE Amsterdam 2017 - introduction
AirportCreators PTE Amsterdam 2017 - introduction
 
Kevin Toland, Chief Executive, Dublin Airport Authority
Kevin Toland, Chief Executive, Dublin Airport AuthorityKevin Toland, Chief Executive, Dublin Airport Authority
Kevin Toland, Chief Executive, Dublin Airport Authority
 
Heathrow Strategic Innovation Case Study
Heathrow Strategic Innovation Case StudyHeathrow Strategic Innovation Case Study
Heathrow Strategic Innovation Case Study
 
Airbus Presentation - How They Improved Delivery Speed and Quality
Airbus Presentation - How They Improved Delivery Speed and QualityAirbus Presentation - How They Improved Delivery Speed and Quality
Airbus Presentation - How They Improved Delivery Speed and Quality
 
Oct 2011 Presentation BC RTWR
Oct 2011 Presentation BC RTWROct 2011 Presentation BC RTWR
Oct 2011 Presentation BC RTWR
 
Heathrow terminal
Heathrow terminalHeathrow terminal
Heathrow terminal
 
Assessing Port Projects
Assessing Port ProjectsAssessing Port Projects
Assessing Port Projects
 
Digital airports
Digital airportsDigital airports
Digital airports
 
Aftab_14-06-15
Aftab_14-06-15Aftab_14-06-15
Aftab_14-06-15
 
Airport Expansion - Challenges
Airport Expansion - ChallengesAirport Expansion - Challenges
Airport Expansion - Challenges
 
NATS Brochure for Asia Pacific Region
NATS Brochure for Asia Pacific RegionNATS Brochure for Asia Pacific Region
NATS Brochure for Asia Pacific Region
 
PTScientists - NOAH19 Berlin
PTScientists - NOAH19 BerlinPTScientists - NOAH19 Berlin
PTScientists - NOAH19 Berlin
 
Dube trade port property presentation
Dube trade port property presentation Dube trade port property presentation
Dube trade port property presentation
 

Más de Informa Australia (13)

Conference Agenda
Conference AgendaConference Agenda
Conference Agenda
 
Xiangyu Wang
Xiangyu WangXiangyu Wang
Xiangyu Wang
 
Nathan Hildebrandt
Nathan HildebrandtNathan Hildebrandt
Nathan Hildebrandt
 
Richard Archer
Richard Archer Richard Archer
Richard Archer
 
Aleks Baltovski
Aleks BaltovskiAleks Baltovski
Aleks Baltovski
 
Paul Nunn v2
Paul Nunn v2Paul Nunn v2
Paul Nunn v2
 
David Mitchell
David MitchellDavid Mitchell
David Mitchell
 
David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty
 
Andrew Gutteridge
Andrew GutteridgeAndrew Gutteridge
Andrew Gutteridge
 
Ricci Piper
Ricci PiperRicci Piper
Ricci Piper
 
Rafik Abdelkaddous
Rafik AbdelkaddousRafik Abdelkaddous
Rafik Abdelkaddous
 
Chris Kane
Chris KaneChris Kane
Chris Kane
 
Paul Nunn
Paul NunnPaul Nunn
Paul Nunn
 

Último

Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 

Último (20)

Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 

Perth Airport T1 Terminal Expansion

  • 1. Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 2. Perth International Airport T1 Domestic Pier & International Terminal Expansion 4th busiest airport in Australia with over 151,000 aircraft movements in 2012/13 Services Australian and Indian Ocean destinations, as well as Johannesburg, Auckland, Dubai, Guangzhou and Doha. Passenger numbers have trebled in the past 10 years with 12.6 million people travelling through the airport in 2012. Based on the average growth rate, this figure will double to 24 million by 2019. Passengers wanting to make a connecting international flight have a 10min journey by road to get to the International Terminal In 2012, the Australian Competition and Consumer Commission released a report rating the Perth Airport as the worst in Australia, as judged by airlines
  • 3. International Terminal (T1) Passenger Statistics… Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 4. Domestic Terminals (T3 & 4) International Terminal (T1) Passenger Statistics… Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 5. On the eastern side of the airfield stands the International Terminal (T1) First operational in 1986 Total number of international passengers in 2012/13 = 3.7 million International Terminal and Domestic Terminal 2 Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 6. To the south of T1 lies the new Domestic T2 Commenced operations in April 2013 Caters for up to 36 aircraft 16 check-in counters 14 aircraft gates T2 Airline operators: International Terminal and Domestic Terminal 2 Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 7. On the western side of the airfield stand the domestic terminals T3 & T4 Total number of domestic passengers in 2012/13 = 9.9 million T3 Airline Operators: T4 Airline Operators: Domestic Terminals 3 &4 Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 8. Key Objectives:  Increase the capacity of the International Terminal  Relieve Terminal & Apron Congestion  Relocate of Some Domestic Operations  Improve Customer Facilities  Provide Flexible Infrastructure T1 Major Development Plan Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 9. Existing T1 Building – 1986 -2011 Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 10. Arrivals Expansion Project 2012 – Completion 2014 Area: Approx. 13,200m2 Value: $80m Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 11. • Substantial re-configuration of the existing accommodation • An expansion of T1 to the east to cater for new Arrivals area Value proposition for Perth Airport is to create a terminal upgrade that will provide a positive passenger experience thereby helping to brand the airport as a world class facility Major enhancements: • New 1st floor Immigration primary line • Increased arrivals duty free area • Expanded baggage hall facilities • Secondary search area Arrivals Expansion Project 2012 – Completion 2014 Area: Approx. 13,200m2 Value: $80m Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 12. Arrivals Expansion Project 2012 – Completion 2014 Area: Approx. 13,200m2 Value: $80m Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 13. T1 Domestic Pier & International Expansion 2013 – Completion 2014 Area: Approx. 44,000m2 Value: $380m Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 14. • Addition of major new facilities for both arrivals and departures Major enhancements: • 2 gates to accommodate Airbus A380 • Substantial new international departures lounge • New pier serving 8 stands and 12 aerobridges • Increased arrivals duty free area • Expanded baggage reclaim hall facilities • Secondary search area T1 Domestic Pier & International Expansion 2013 – Completion 2014 Area: Approx. 44,000m2 Value: $380m Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 15. T1 Domestic Pier & International Expansion Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 16. • Hydraulic • Mechanical • Electrical • Fire • Structural • Architecture BIM Benefits Federated model created in Navisworks Cross discipline clash detection performed in Navisworks Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 17.  Tight project deadlines  Improve documentation quality  Exchange of information  Market pressure  Better testing  Early identification of errors  Clearer communication  A single, reliable, source of information  Fewer coordination errors BIM Drivers Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 18. An ideal BIM methodology involves:  Developing  Assessing  Establishing  Collaborating  Managing It requires that all participants:  Commit  Contribute  Ensure  Adopt BIM Methodology Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 19. The key to success with BIM delivery is dependent on:  a clear understanding of the client and project team's objectives  a careful assessment of the capabilities of the team, timeframe and budget The ideal BIM process is one in which:  all stakeholders are committed to developing, and deriving information from the digital model  roles and responsibilities are clearly defined  a contractual framework that encourages greater collaboration. BIM Success Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 20. Through Coordination BIM From Design to Construction From Design To Construction …and beyond? Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 21.  BIM process seeks to facilitate and encourage higher levels of collaboration - not just 3D drafting  Frequent information sharing - Airport single modelling team  Sub-contractor, engineer and architect design teams stationed together BIM In Construction Team approach to projects in Design / Construction Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 22. Potential Benefits to Sub-contractors • Significantly reduced project delivery risk • Ultimately total lower cost and improved profitability • Reduced site meetings • Improved coordination and reduction in on-site clashes • Reduction in re-works and material wastage • Scheduling and planning accuracy BIM In Construction Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 23. “The mobile app is the next horizon of coordination and communication with the field. As a contractor, I think the field is in a position to really leverage this technology in exciting ways” Lincoln Wood Engineer Turner Construction Company Potential Benefits to Sub-contractors • Measuring, take-offs, procurement • Shop drawing processes • Pre-fabrication • BIM to Field – iPads e.g. BIM glue BIM In Construction Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 24. Benefits of Sub-contractors using BIM to the consultant and client in: • Reduced RFI’s • Less variations • As-build Model as an asset for owner BIM In Construction Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 25. However… • All depends on early engagement of Sub-contractors and… • Their attitude to and experience of BIM • 3D drafting vs Collaborative BIM BIM In Construction Perth International Airport T1 Domestic Pier & International Terminal Expansion
  • 26. Conclusion… • We’re on a journey worth taking • Clients driving BIM • BIM champions in management BIM In Construction Perth International Airport T1 Domestic Pier & International Terminal Expansion