ITS SUMMIT:IRF

ROAD INCIDENT MANAGEMENT

          Gail Bester
         8 March 2012
Table of Contents

• SANRAL background

• Strategies to improve Road Incident Management

• National Road IMS for South Africa

• International Lessons Learned

• IM and Freeway Management System(FMS) in Gauteng

• Conclusion
SANRAL background

• SANRAL is an Agency of the Ministry of Transport, operating
  as an independent agency


• Derives its mandate from the SANRAL Act, No. 7 of 1998;

• Build ,Manage and maintain 16 170 km of national road
  network, includes both toll and non-toll network;

• 81% non-toll roads and 19% toll;

• SANRAL mandated by National Transport Policy to implement
  IMS on its network
National Road network

Description           Non Toll   State Toll   BOT     Total

Dual                      610          520     443     1 573
Carriageway


4-Lane                      11         299     240      550
Undivided


2-Lane                 12 429        1013      605    14 047
Single


Total                  13 050       1 832     1 288   16 170
% of SANRAL Network      81%          11%       8%
Incident Management

• Managing traffic incidents is a proven strategy for addressing
  significant portions of traffic congestion.

• Traffic incident management programs have demonstrated
  success in improving mobility, safety, efficiency, productivity,
  energy and environment, and customer satisfaction.

• Traffic incident management programs make use of a variety
  of ITS technologies to successfully detect, manage, and clear
  traffic incidents
Strategies to Improve IM

Effective IM requires a toolbox of strategies:
• Political level
    • Political support in the form of policy and top-level management support
        for IM-focused objectives

• Institutional level
     • The Institutional cooperation, understanding and collaboration need to be
       in place for an effective programme

• Functional level
    • The functional elements need to be implemented in the form of new
      services and new processes

• Technological level
     •Technology tools can support real-time monitoring and faster response to
     freeway incidents
Political /Policy Level

• In July 1996, a National Incident Management Technical
  Committee was established to prepare national guidelines and a
  policy on the development, implementation and maintenance of
  Incident Management in South Africa.

• IMS is still being implemented in a fragmented way throughout
  South Africa, warranting a review.

• The DOT together with SANRAL were mandated to develop a
  National Policy, Framework and Guidelines for IMS in the
  country, involving all stakeholders.
Political /Policy Level cont…
• The documents will to ensure that the development of further RIMSs
  take place in a consistent manner.

• Establishing a Governance Structure for Road Incident Management.
   • RIMS National Technical Committee
   • RIMS Provincial Coordinating Committee

• Developing Procedures and Protocols incorporated in a Guideline
  Plan for operational application.
•
• Memorandum of Understanding/Agreement amongst all the
  organizations/agencies regarding accepted procedures and
  protocols to be followed in the event of any incident.
Political /Policy Level cont….


• National Road Traffic Act, 1996 (Act No 93 of 1996) deals with
  accidents and accident reports. The scope of this chapter was
  extended to also cover Incident Management Systems through an
  Act amendment by making an empowering provision and referring
  to the IMS Policy as one of the schedules to the NRTA.

• The proposal is to add section 62A “ Response to road incident”.
  62A In the event of a road incident, the emergency services
  shall immediately respond to the incident and render all the
  necessary services in compliance with the Incident Management
  System Policy as shown in Schedule 5 and any applicable
  legislation.
Political /Policy Level cont….


• Consultation will take place and it is envisaged that it will be
  approved by the Minister of Transport end of March 2012.

• Road Shows at all provinces will start for 1 April 2012 to inform
  all stakeholders of the content of the new material.
Example: Political /Policy
                          intervention

• In the U.S. 49 states implemented at least one of these laws –
  only 24 have implemented all three.

   • Quick Clearance – quickly removing any vehicles involved in an
     incident from the scene to maintain mobility along the roadway
   • Move It Over – the motorist is to move to another lane or slow
     down when approaching responders/tow trucks/public safety
     (police, fire) to provide a “safe zone”
   • Remove it – motorists move vehicles out of the travel lanes
     following a minor, non-injury incident – here is where information
     is exchanged

• One of the biggest concerns is ensuring the public is aware of
  the laws and what they mean.
Institutional level


• Inter-agency teams/intergovernmental agreements
   • Cape Town co-located TMC
   • Joint funding and cooperation agreements

• Agreement on processes and policies to overcome institutional
  barriers:
    • Common goals, common objectives
    • Standardise practices,
    • Awareness of partner roles
    • Benefits are beyond any single role player
Functional level

• Provision of a 24/7 value add services in Gauteng to ensure
  safe will be deployed at satellite centers strategically deployed
  across the Freeway network in Gauteng


• Number of vehicle services deployed:
   •   8 Heavy tow and recovery units ( Rigs)
   •   10 Light Towing and recovery unit ( roll backs)
   •   10 Incident Response Unit
   •   10 Motorcycle Medic Response Units


• Services will be dispatched from the TMC for a quick response
  time of between 12 and 15 minutes to each accident scene, in
  normal traffic conditions.
Satellite
  Centre
 Coverage
Assumptions
12 mins at ave of
80km/h = 16km
Turnaround only
possible at next
interchange
Functional level

•Responsibilities include:
    • Coordinate incident scene, Remove vehicles obstructing
     traffic and vehicles, Provide basic and intermediate life
     support to patients on scene, cleaning of minor debris

•Example: Netherlands
   • Response time as a measure for towing contractors
   • Staging tow trucks at high volume incident locations
   • Incident auditors to track performance and adherence to
     standards
Incident Response
(Tennessee DOT and
Illinois DOT)
 •   Tennessee DOT HELP vehicles
     include cones, arrow boards,
     and are powerful enough to
     push or pull a commercial
     vehicle out of a lane
                                        TDOT HELP Vehicle Pulling a Commercial Vehicle
                            Note flip
                            up arrow     c
                            board




                                        IDOT Minutemen Heavy Wrecker Demonstration
Florida Road Rangers                       Flip Up Arrow
                                                          Board
•   Road Ranger vehicles carry the following equipment:
•   Reflective cones
•   Flashing arrow board
•   Flares
•   5 gallons of speedy dry
•   Fire extinguishers
•   Air compressor
•   Booster cables
•   2-ton jacket
•   Auto fluids
•   Wood blocks
•   Cell phone
•   First aid kits
•   Water
Technical level
• Technology to assist with IM

   • Traveler information (VMS, websites, etc.)

   • Responder communications (remote scene monitoring, prompt
     dispatch, i.e Sweden has pioneered use of incident response
     vehicles that have truck mounted VMS, a video camera to transmit
     scene images to TMC, and also equipped with attenuators on the
     back of the vehicle to help protect responders on-site)

   • Incident investigations (CCTV, detectors, assistance patrols, etc.)

• Advanced Traveler Information Systems (ATIS) to support IM
   • SMS
   • Twitter
   • Mobile Apps
Arrow Board
         and Full Color
Sweden   Matrix VMS
         and flip down
         attenuator
On Road Services


                                                       Dedicated freeway
                                                       enforcement unit


                                        Services will be managed by the TMC
First Responders:                       utilizing:
Incident Response                       • Computer Aided dispatch (CAD) for
Service                                   emergency and enforcement vehicles
                    Incident Recovery   • Automated Vehicle Identification
                    Service
                                          (AVI)
                                        • Automated Vehicle Location (AVL)
                                        To effectively manage roadway and
                                        provide a safer and efficient network
Reported Benefits
• The most significant findings of traffic incident management programs ability
  to reduce the duration of traffic incidents, most studies finding savings of 30
  to 40 %..

• Service patrol in Hampton Roads, Virginia, decreased the average incident
  duration by 70.7 percent

• Service patrol in Northern Virginia on average decreased incident duration
  by 15.6 percent for crashes, 25 percent for roadway debris, and 17.2 percent
  for breakdowns.

• A San Antonio, Texas deployment of VMS, combined with an incident
  management program, resulted in a 2.8 % decrease in crashes.

• The Coordinated Highway Action Response Team in Maryland reduced
  incident duration and related secondary incidents by 29%.
                                                  USDOT lessons learned 2011
Conclusion

• In an effort to support World Government initiative Decade of Action
  (DoA) to reduce the effect of poor road safety.

• The amendment of legislation, drafting of a national framework, policy
  and procedures manual is a welcomed intervention to embed the
  ethos and principles of co-operation and teamwork when dealing with
  incidents.

•The introduction of technology will assist in effectively managing our
 road network. “ITS is more than just technology, it’s a culture” UNECE
 (United Nations economic Commission for Europe)

•Action and smart interventions are needed to retain a vibrant transport
 sector that can adjust to global trends, economic state and local
 environment.
THANK YOU
besterg@nra.co.za

Más contenido relacionado

Similar a Road Incident Management Strategies for South Africa

Intelligent transportation system
Intelligent transportation systemIntelligent transportation system
Intelligent transportation systemKunalPolkundwar
 
Intelligent Transportation System ITS.pptx
Intelligent Transportation System ITS.pptxIntelligent Transportation System ITS.pptx
Intelligent Transportation System ITS.pptxdontknow288849
 
Oral report paul lesigues (n8892946)
Oral report   paul lesigues (n8892946)Oral report   paul lesigues (n8892946)
Oral report paul lesigues (n8892946)Paul Lesigues
 
ITS and its history
ITS and its historyITS and its history
ITS and its historyIzhar Ullah
 
Effects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll routeEffects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll routeTristan Wiggill
 
Intelligent transportation system ITS
Intelligent transportation system ITSIntelligent transportation system ITS
Intelligent transportation system ITSJYOTIRANJAN43
 
ITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital DamaniITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital DamaniMital Damani
 
Connected Truck: Impact on Maintenance
Connected Truck: Impact on MaintenanceConnected Truck: Impact on Maintenance
Connected Truck: Impact on MaintenanceVitali Bielski
 
Inteligent transport system
Inteligent transport systemInteligent transport system
Inteligent transport systemBhavik A Shah
 
Queensland’s Intelligent Transport Systems (ITS) Pilot Projects
Queensland’s Intelligent Transport Systems (ITS) Pilot ProjectsQueensland’s Intelligent Transport Systems (ITS) Pilot Projects
Queensland’s Intelligent Transport Systems (ITS) Pilot ProjectsJumpingJaq
 
Road safety in bangladesh realities and challenges
Road safety in bangladesh realities and challengesRoad safety in bangladesh realities and challenges
Road safety in bangladesh realities and challengesPolicy Adda
 
Road safety - Realities & Challenges
Road safety - Realities & ChallengesRoad safety - Realities & Challenges
Road safety - Realities & ChallengesBRAC
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation SystemUsama Qazi
 
Intelligent transport systems
Intelligent  transport systemsIntelligent  transport systems
Intelligent transport systemsAbhijit Pal
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation Systemguest6d72ec
 
Transport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMSTransport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMSTristan Wiggill
 
Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...
Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...
Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...Rihazudin Razik MBCS
 

Similar a Road Incident Management Strategies for South Africa (20)

Intelligent transportation system
Intelligent transportation systemIntelligent transportation system
Intelligent transportation system
 
Intelligent Transportation System ITS.pptx
Intelligent Transportation System ITS.pptxIntelligent Transportation System ITS.pptx
Intelligent Transportation System ITS.pptx
 
Oral report paul lesigues (n8892946)
Oral report   paul lesigues (n8892946)Oral report   paul lesigues (n8892946)
Oral report paul lesigues (n8892946)
 
ITS and its history
ITS and its historyITS and its history
ITS and its history
 
Effects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll routeEffects of crashes on efficiency of the N3 toll route
Effects of crashes on efficiency of the N3 toll route
 
Intelligent transportation system ITS
Intelligent transportation system ITSIntelligent transportation system ITS
Intelligent transportation system ITS
 
ITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital DamaniITS Presentation by Mr. Mital Damani
ITS Presentation by Mr. Mital Damani
 
Connected Truck: Impact on Maintenance
Connected Truck: Impact on MaintenanceConnected Truck: Impact on Maintenance
Connected Truck: Impact on Maintenance
 
final.pptx
final.pptxfinal.pptx
final.pptx
 
Inteligent transport system
Inteligent transport systemInteligent transport system
Inteligent transport system
 
Queensland’s Intelligent Transport Systems (ITS) Pilot Projects
Queensland’s Intelligent Transport Systems (ITS) Pilot ProjectsQueensland’s Intelligent Transport Systems (ITS) Pilot Projects
Queensland’s Intelligent Transport Systems (ITS) Pilot Projects
 
Road safety in bangladesh realities and challenges
Road safety in bangladesh realities and challengesRoad safety in bangladesh realities and challenges
Road safety in bangladesh realities and challenges
 
Road safety - Realities & Challenges
Road safety - Realities & ChallengesRoad safety - Realities & Challenges
Road safety - Realities & Challenges
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
archana50337.pptx
archana50337.pptxarchana50337.pptx
archana50337.pptx
 
Intelligent transport systems
Intelligent  transport systemsIntelligent  transport systems
Intelligent transport systems
 
Intelligent Transportation System
Intelligent Transportation SystemIntelligent Transportation System
Intelligent Transportation System
 
Transport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMSTransport: Overview of challenges in road freight and why RTMS
Transport: Overview of challenges in road freight and why RTMS
 
Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...
Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...
Overviewofchallengesinroadfreightandwhyrtms drpaulnordengen-14july2016-160721...
 
ITS presentation final
ITS presentation final ITS presentation final
ITS presentation final
 

Más de itssa-presentations

V3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pcV3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pcitssa-presentations
 
Reducing road deaths as a national priority mlr & av
Reducing road deaths as a national priority   mlr & avReducing road deaths as a national priority   mlr & av
Reducing road deaths as a national priority mlr & avitssa-presentations
 
Dachs itssa march 2012 pp ps financing transport infrastructure
Dachs  itssa march 2012 pp ps financing transport infrastructureDachs  itssa march 2012 pp ps financing transport infrastructure
Dachs itssa march 2012 pp ps financing transport infrastructureitssa-presentations
 
Vandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systemsVandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systemsitssa-presentations
 
Standards process development & benefits
Standards process development & benefitsStandards process development & benefits
Standards process development & benefitsitssa-presentations
 
2012 03 12 Vision 2030 ITS Summit
2012 03 12 Vision 2030 ITS Summit2012 03 12 Vision 2030 ITS Summit
2012 03 12 Vision 2030 ITS Summititssa-presentations
 
Tmc short presentation march 2012
Tmc short presentation   march 2012Tmc short presentation   march 2012
Tmc short presentation march 2012itssa-presentations
 

Más de itssa-presentations (8)

Irf2012 john davis
Irf2012 john davisIrf2012 john davis
Irf2012 john davis
 
V3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pcV3 08 03 12 introduction to irf pc
V3 08 03 12 introduction to irf pc
 
Reducing road deaths as a national priority mlr & av
Reducing road deaths as a national priority   mlr & avReducing road deaths as a national priority   mlr & av
Reducing road deaths as a national priority mlr & av
 
Dachs itssa march 2012 pp ps financing transport infrastructure
Dachs  itssa march 2012 pp ps financing transport infrastructureDachs  itssa march 2012 pp ps financing transport infrastructure
Dachs itssa march 2012 pp ps financing transport infrastructure
 
Vandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systemsVandermerwe summit on intelligent transport systems
Vandermerwe summit on intelligent transport systems
 
Standards process development & benefits
Standards process development & benefitsStandards process development & benefits
Standards process development & benefits
 
2012 03 12 Vision 2030 ITS Summit
2012 03 12 Vision 2030 ITS Summit2012 03 12 Vision 2030 ITS Summit
2012 03 12 Vision 2030 ITS Summit
 
Tmc short presentation march 2012
Tmc short presentation   march 2012Tmc short presentation   march 2012
Tmc short presentation march 2012
 

Último

Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 

Último (20)

Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 

Road Incident Management Strategies for South Africa

  • 1. ITS SUMMIT:IRF ROAD INCIDENT MANAGEMENT Gail Bester 8 March 2012
  • 2. Table of Contents • SANRAL background • Strategies to improve Road Incident Management • National Road IMS for South Africa • International Lessons Learned • IM and Freeway Management System(FMS) in Gauteng • Conclusion
  • 3. SANRAL background • SANRAL is an Agency of the Ministry of Transport, operating as an independent agency • Derives its mandate from the SANRAL Act, No. 7 of 1998; • Build ,Manage and maintain 16 170 km of national road network, includes both toll and non-toll network; • 81% non-toll roads and 19% toll; • SANRAL mandated by National Transport Policy to implement IMS on its network
  • 4.
  • 5. National Road network Description Non Toll State Toll BOT Total Dual 610 520 443 1 573 Carriageway 4-Lane 11 299 240 550 Undivided 2-Lane 12 429 1013 605 14 047 Single Total 13 050 1 832 1 288 16 170 % of SANRAL Network 81% 11% 8%
  • 6.
  • 7. Incident Management • Managing traffic incidents is a proven strategy for addressing significant portions of traffic congestion. • Traffic incident management programs have demonstrated success in improving mobility, safety, efficiency, productivity, energy and environment, and customer satisfaction. • Traffic incident management programs make use of a variety of ITS technologies to successfully detect, manage, and clear traffic incidents
  • 8. Strategies to Improve IM Effective IM requires a toolbox of strategies: • Political level • Political support in the form of policy and top-level management support for IM-focused objectives • Institutional level • The Institutional cooperation, understanding and collaboration need to be in place for an effective programme • Functional level • The functional elements need to be implemented in the form of new services and new processes • Technological level •Technology tools can support real-time monitoring and faster response to freeway incidents
  • 9. Political /Policy Level • In July 1996, a National Incident Management Technical Committee was established to prepare national guidelines and a policy on the development, implementation and maintenance of Incident Management in South Africa. • IMS is still being implemented in a fragmented way throughout South Africa, warranting a review. • The DOT together with SANRAL were mandated to develop a National Policy, Framework and Guidelines for IMS in the country, involving all stakeholders.
  • 10. Political /Policy Level cont… • The documents will to ensure that the development of further RIMSs take place in a consistent manner. • Establishing a Governance Structure for Road Incident Management. • RIMS National Technical Committee • RIMS Provincial Coordinating Committee • Developing Procedures and Protocols incorporated in a Guideline Plan for operational application. • • Memorandum of Understanding/Agreement amongst all the organizations/agencies regarding accepted procedures and protocols to be followed in the event of any incident.
  • 11. Political /Policy Level cont…. • National Road Traffic Act, 1996 (Act No 93 of 1996) deals with accidents and accident reports. The scope of this chapter was extended to also cover Incident Management Systems through an Act amendment by making an empowering provision and referring to the IMS Policy as one of the schedules to the NRTA. • The proposal is to add section 62A “ Response to road incident”. 62A In the event of a road incident, the emergency services shall immediately respond to the incident and render all the necessary services in compliance with the Incident Management System Policy as shown in Schedule 5 and any applicable legislation.
  • 12. Political /Policy Level cont…. • Consultation will take place and it is envisaged that it will be approved by the Minister of Transport end of March 2012. • Road Shows at all provinces will start for 1 April 2012 to inform all stakeholders of the content of the new material.
  • 13. Example: Political /Policy intervention • In the U.S. 49 states implemented at least one of these laws – only 24 have implemented all three. • Quick Clearance – quickly removing any vehicles involved in an incident from the scene to maintain mobility along the roadway • Move It Over – the motorist is to move to another lane or slow down when approaching responders/tow trucks/public safety (police, fire) to provide a “safe zone” • Remove it – motorists move vehicles out of the travel lanes following a minor, non-injury incident – here is where information is exchanged • One of the biggest concerns is ensuring the public is aware of the laws and what they mean.
  • 14.
  • 15. Institutional level • Inter-agency teams/intergovernmental agreements • Cape Town co-located TMC • Joint funding and cooperation agreements • Agreement on processes and policies to overcome institutional barriers: • Common goals, common objectives • Standardise practices, • Awareness of partner roles • Benefits are beyond any single role player
  • 16. Functional level • Provision of a 24/7 value add services in Gauteng to ensure safe will be deployed at satellite centers strategically deployed across the Freeway network in Gauteng • Number of vehicle services deployed: • 8 Heavy tow and recovery units ( Rigs) • 10 Light Towing and recovery unit ( roll backs) • 10 Incident Response Unit • 10 Motorcycle Medic Response Units • Services will be dispatched from the TMC for a quick response time of between 12 and 15 minutes to each accident scene, in normal traffic conditions.
  • 17. Satellite Centre Coverage Assumptions 12 mins at ave of 80km/h = 16km Turnaround only possible at next interchange
  • 18. Functional level •Responsibilities include: • Coordinate incident scene, Remove vehicles obstructing traffic and vehicles, Provide basic and intermediate life support to patients on scene, cleaning of minor debris •Example: Netherlands • Response time as a measure for towing contractors • Staging tow trucks at high volume incident locations • Incident auditors to track performance and adherence to standards
  • 19. Incident Response (Tennessee DOT and Illinois DOT) • Tennessee DOT HELP vehicles include cones, arrow boards, and are powerful enough to push or pull a commercial vehicle out of a lane TDOT HELP Vehicle Pulling a Commercial Vehicle Note flip up arrow c board IDOT Minutemen Heavy Wrecker Demonstration
  • 20. Florida Road Rangers Flip Up Arrow Board • Road Ranger vehicles carry the following equipment: • Reflective cones • Flashing arrow board • Flares • 5 gallons of speedy dry • Fire extinguishers • Air compressor • Booster cables • 2-ton jacket • Auto fluids • Wood blocks • Cell phone • First aid kits • Water
  • 21. Technical level • Technology to assist with IM • Traveler information (VMS, websites, etc.) • Responder communications (remote scene monitoring, prompt dispatch, i.e Sweden has pioneered use of incident response vehicles that have truck mounted VMS, a video camera to transmit scene images to TMC, and also equipped with attenuators on the back of the vehicle to help protect responders on-site) • Incident investigations (CCTV, detectors, assistance patrols, etc.) • Advanced Traveler Information Systems (ATIS) to support IM • SMS • Twitter • Mobile Apps
  • 22. Arrow Board and Full Color Sweden Matrix VMS and flip down attenuator
  • 23. On Road Services Dedicated freeway enforcement unit Services will be managed by the TMC First Responders: utilizing: Incident Response • Computer Aided dispatch (CAD) for Service emergency and enforcement vehicles Incident Recovery • Automated Vehicle Identification Service (AVI) • Automated Vehicle Location (AVL) To effectively manage roadway and provide a safer and efficient network
  • 24. Reported Benefits • The most significant findings of traffic incident management programs ability to reduce the duration of traffic incidents, most studies finding savings of 30 to 40 %.. • Service patrol in Hampton Roads, Virginia, decreased the average incident duration by 70.7 percent • Service patrol in Northern Virginia on average decreased incident duration by 15.6 percent for crashes, 25 percent for roadway debris, and 17.2 percent for breakdowns. • A San Antonio, Texas deployment of VMS, combined with an incident management program, resulted in a 2.8 % decrease in crashes. • The Coordinated Highway Action Response Team in Maryland reduced incident duration and related secondary incidents by 29%. USDOT lessons learned 2011
  • 25. Conclusion • In an effort to support World Government initiative Decade of Action (DoA) to reduce the effect of poor road safety. • The amendment of legislation, drafting of a national framework, policy and procedures manual is a welcomed intervention to embed the ethos and principles of co-operation and teamwork when dealing with incidents. •The introduction of technology will assist in effectively managing our road network. “ITS is more than just technology, it’s a culture” UNECE (United Nations economic Commission for Europe) •Action and smart interventions are needed to retain a vibrant transport sector that can adjust to global trends, economic state and local environment.