EXPERIENCE WITH THE DESIGN OF LOGICALEXPERIENCE WITH THE DESIGN OF LOGICAL
FRAMEWORKS AND THE EVALUATION OFFRAMEWORKS AND THE EVALUATION OF
DELIVERY BASED ON QUANTIFIABLE TARGETSDELIVERY BASED ON QUANTIFIABLE TARGETS
AND MEASURABLE INDICATORSAND MEASURABLE INDICATORS
David VousdenDavid Vousden
Effective GEF IW IndicatorsEffective GEF IW Indicators
Targets need to be based on real interventions and ‘concrete’Targets need to be based on real interventions and ‘concrete’
activities. Some examples….activities. Some examples….
Process IndicatorsProcess Indicators: legislative reform for sustainable fisheries or: legislative reform for sustainable fisheries or
water qualitywater quality
Stress Reduction IndicatorsStress Reduction Indicators: Sewage treatment systems up and: Sewage treatment systems up and
running; Gear changes/modification in fisheriesrunning; Gear changes/modification in fisheries
Environment/socioeconomic IndicatorsEnvironment/socioeconomic Indicators: By-catch reduced;: By-catch reduced;
catches of threatened species reduced (landingcatches of threatened species reduced (landing
figures/observers); nutrient loads down; nutrient –demanding algalfigures/observers); nutrient loads down; nutrient –demanding algal
levels downlevels down
How to ensure that targets andHow to ensure that targets and
indicators are appropriateindicators are appropriate
Targets should NOT be based on intangeable orTargets should NOT be based on intangeable or
unmeasurable/impractical indicators (some examples!)unmeasurable/impractical indicators (some examples!)
Political will for improving fisheries and water qualityPolitical will for improving fisheries and water quality
approaches raised/improvedapproaches raised/improved
Management practices for stress reduction expandedManagement practices for stress reduction expanded
Improved water quality on coral reefsImproved water quality on coral reefs
Raised quality of life in communitiesRaised quality of life in communities
These are difficult or often impossible to quantify and areThese are difficult or often impossible to quantify and are
subjective in any evaluation processsubjective in any evaluation process
Inappropriate Targets andInappropriate Targets and
Indicators!Indicators!
There are… in terms of the need to focus on transboundaryThere are… in terms of the need to focus on transboundary
deliverables at a regional leveldeliverables at a regional level
These can be hard to quantify because of the need to show aThese can be hard to quantify because of the need to show a
balanced set of deliveries across a number of countries thatbalanced set of deliveries across a number of countries that
should represent an equitable regional effortshould represent an equitable regional effort
As an example, the ASCLME project is dealing with this problemAs an example, the ASCLME project is dealing with this problem
by undertaking a national Marine Ecosystem Diagnostic Analysisby undertaking a national Marine Ecosystem Diagnostic Analysis
(MEDA) in each country first….(MEDA) in each country first….
This is then reflected synergistically in the overall TDAThis is then reflected synergistically in the overall TDA
Are their special challenges thatAre their special challenges that
relate to IW Log Frame design?relate to IW Log Frame design?
This is a logical and effective approach as it provides a clear flowThis is a logical and effective approach as it provides a clear flow
from concept to concrete action….from concept to concrete action….
1.1. Changes in approach, policy and legislation (processChanges in approach, policy and legislation (process
reforms)reforms)
2.2. Actual efforts to deliver these reforms as concrete actionsActual efforts to deliver these reforms as concrete actions
for reducing stresses on the ‘system’for reducing stresses on the ‘system’
Leading to…Leading to…
3.3. Measurable improvements at the ecosystem/biologicalMeasurable improvements at the ecosystem/biological
community/social community/ species levels (which cancommunity/social community/ species levels (which can
feed back to 1. above)feed back to 1. above)
Use of Process, Stress ReductionUse of Process, Stress Reduction
and Environmental/Socioeconomicand Environmental/Socioeconomic
Status indicatorsStatus indicators
A.A. Log Frames are frequently out-of-date at Project InceptionLog Frames are frequently out-of-date at Project Inception
(may be several years old!) therefore….(may be several years old!) therefore….
B.B. Review and revision of Log Frames is often one of the firstReview and revision of Log Frames is often one of the first
important activities for the Projectimportant activities for the Project
C.C. This agreement/ approval of a reviewed and revised LogThis agreement/ approval of a reviewed and revised Log
Frame by participating countries and the Project SteeringFrame by participating countries and the Project Steering
Committee can be extremely valuable and critical in buildingCommittee can be extremely valuable and critical in building
country ownership and support (especially as the PSCcountry ownership and support (especially as the PSC
members and National Focal Institutions and theirmembers and National Focal Institutions and their
policies/priorities may have changes since the original Logpolicies/priorities may have changes since the original Log
Frame was designed)Frame was designed)
Some weaknesses in Log FrameSome weaknesses in Log Frame
designdesign
These are a very useful component of the Log Frame but alsoThese are a very useful component of the Log Frame but also
they DO need to be reviewed at Project Inception/Implementationthey DO need to be reviewed at Project Inception/Implementation
along with this rest of the Log Frame for the same reasons asalong with this rest of the Log Frame for the same reasons as
stated in the previous slide (changes over time, countrystated in the previous slide (changes over time, country
agreement and ownership)agreement and ownership)
One clear example would be in the ASCLME Project in theOne clear example would be in the ASCLME Project in the
western Indian Ocean where the original document did not identifywestern Indian Ocean where the original document did not identify
piracy as a risk but which has now become one the greatestpiracy as a risk but which has now become one the greatest
transboundary threats to the projecttransboundary threats to the project
It is important to realise that the Project (and therefore its LogIt is important to realise that the Project (and therefore its Log
Frame) is not written in stone and SHOULD be reviewed fromFrame) is not written in stone and SHOULD be reviewed from
time to time as part of a flexible, evolving and dynamic projecttime to time as part of a flexible, evolving and dynamic project
Risks and AssumptionsRisks and Assumptions
A.A. There is a need to develop some standardised Indicators forThere is a need to develop some standardised Indicators for
certain situations and projects to allow for a more comparablecertain situations and projects to allow for a more comparable
review process. (e.g. LME indicators could focus on the 5review process. (e.g. LME indicators could focus on the 5
modules of the LMEs)modules of the LMEs)
B.B. A review of the Logical Framework Matrix at Inception orA review of the Logical Framework Matrix at Inception or
soon after should be a standard requirement to ensuresoon after should be a standard requirement to ensure
accuracy of evaluation and true country ownershipaccuracy of evaluation and true country ownership
C.C. Part of the mandate of the Mid Term Reviewers should be toPart of the mandate of the Mid Term Reviewers should be to
re-visit the Log Frame with the stakeholders and to advise there-visit the Log Frame with the stakeholders and to advise the
Project on any appropriate modifications or additions to theProject on any appropriate modifications or additions to the
Log Frame to ensure a more accurate and representativeLog Frame to ensure a more accurate and representative
Terminal EvaluationTerminal Evaluation
Better use of Log Frames in ProjectBetter use of Log Frames in Project
Design and ManagementDesign and Management
1.1. On-going ‘progress-chasing’ of deliverables during the ProjectOn-going ‘progress-chasing’ of deliverables during the Project
lifetime using Log Frame indicators (continuous assessmentlifetime using Log Frame indicators (continuous assessment
and fine-tuning)and fine-tuning)
2.2. Post-Project Evaluation of Indicators to ensure sustainabilityPost-Project Evaluation of Indicators to ensure sustainability
of Project objectives and GEF Investmentof Project objectives and GEF Investment
Other improvements to the useOther improvements to the use
of GEF IW Indicatorsof GEF IW Indicators
THANK YOU!THANK YOU!
Effective GEF IW IndicatorsEffective GEF IW Indicators

More Related Content

Viewers also liked

TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 3 Section 4
TDA/SAP Methodology Training Course Module 3 Section 4TDA/SAP Methodology Training Course Module 3 Section 4
TDA/SAP Methodology Training Course Module 3 Section 4Iwl Pcu
 
Breakout Group work II: Using valuations to influence decision Making
Breakout Group work II: Using valuations to influence decision Making Breakout Group work II: Using valuations to influence decision Making
Breakout Group work II: Using valuations to influence decision Making Iwl Pcu
 
Integrated Nutrients Pollution Control Project
Integrated Nutrients Pollution Control ProjectIntegrated Nutrients Pollution Control Project
Integrated Nutrients Pollution Control ProjectIwl Pcu
 
Groundwater Governance
Groundwater GovernanceGroundwater Governance
Groundwater GovernanceIwl Pcu
 
iwc7_day6_locationslides.pptx
iwc7_day6_locationslides.pptxiwc7_day6_locationslides.pptx
iwc7_day6_locationslides.pptxIwl Pcu
 
Contributing to indicator-based management of transboundary aquatic systems
Contributing to indicator-based management of transboundary aquatic systemsContributing to indicator-based management of transboundary aquatic systems
Contributing to indicator-based management of transboundary aquatic systemsIwl Pcu
 
Communities of practice on freshwater resources surface & groundwater
Communities of practice on freshwater resources surface & groundwaterCommunities of practice on freshwater resources surface & groundwater
Communities of practice on freshwater resources surface & groundwaterIwl Pcu
 

Viewers also liked (8)

TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 3 Section 4
TDA/SAP Methodology Training Course Module 3 Section 4TDA/SAP Methodology Training Course Module 3 Section 4
TDA/SAP Methodology Training Course Module 3 Section 4
 
Breakout Group work II: Using valuations to influence decision Making
Breakout Group work II: Using valuations to influence decision Making Breakout Group work II: Using valuations to influence decision Making
Breakout Group work II: Using valuations to influence decision Making
 
Integrated Nutrients Pollution Control Project
Integrated Nutrients Pollution Control ProjectIntegrated Nutrients Pollution Control Project
Integrated Nutrients Pollution Control Project
 
Groundwater Governance
Groundwater GovernanceGroundwater Governance
Groundwater Governance
 
iwc7_day6_locationslides.pptx
iwc7_day6_locationslides.pptxiwc7_day6_locationslides.pptx
iwc7_day6_locationslides.pptx
 
Contributing to indicator-based management of transboundary aquatic systems
Contributing to indicator-based management of transboundary aquatic systemsContributing to indicator-based management of transboundary aquatic systems
Contributing to indicator-based management of transboundary aquatic systems
 
Communities of practice on freshwater resources surface & groundwater
Communities of practice on freshwater resources surface & groundwaterCommunities of practice on freshwater resources surface & groundwater
Communities of practice on freshwater resources surface & groundwater
 

Similar to ASCLME project management indicators

Application Of Life Cycle Analysis
Application Of Life Cycle AnalysisApplication Of Life Cycle Analysis
Application Of Life Cycle AnalysisBob Prieto
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionIwl Pcu
 
Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14Bob Prieto
 
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSLIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSSharan Thampi J
 
Achievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-upAchievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-upIwl Pcu
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAdvisian
 
IES offsets & opportunities
IES offsets & opportunitiesIES offsets & opportunities
IES offsets & opportunitiesNam Nguyen
 
ON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation BattalionON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation BattalionCurt Cooper
 
WB Session and OP 8
WB Session and OP 8WB Session and OP 8
WB Session and OP 8Iwl Pcu
 
The challenge of infrastructure and long term investment
The challenge of infrastructure and long term investmentThe challenge of infrastructure and long term investment
The challenge of infrastructure and long term investmentBob Prieto
 
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Bruce McCarthy
 
Traceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is ImportantTraceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is ImportantJennifer Colburn
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...shawncarner
 
Pollitt.julie
Pollitt.juliePollitt.julie
Pollitt.julieNASAPMC
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.ritaNASAPMC
 
File 2 extra slide 2
File 2 extra slide 2File 2 extra slide 2
File 2 extra slide 2test prod1
 
File 2 removed 1 slide 2
File 2 removed 1 slide 2File 2 removed 1 slide 2
File 2 removed 1 slide 2test prod1
 
File 2 original copy 1
File 2 original  copy 1File 2 original  copy 1
File 2 original copy 1test prod1
 

Similar to ASCLME project management indicators (20)

Application Of Life Cycle Analysis
Application Of Life Cycle AnalysisApplication Of Life Cycle Analysis
Application Of Life Cycle Analysis
 
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean RegionTransboundary Diagnostic Anaylsis: The Mediterreanean Region
Transboundary Diagnostic Anaylsis: The Mediterreanean Region
 
Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14Application of life cycle analysis in the capital 07 17 14
Application of life cycle analysis in the capital 07 17 14
 
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGSLIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
LIFE CYCLE COST CALCULATION MODELS FOR BUILDINGS
 
Achievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-upAchievements and results of pilot projects, results and scaling-up
Achievements and results of pilot projects, results and scaling-up
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
Public Sector Life Cycle Costing for Asset Management
Public Sector Life Cycle Costing for Asset ManagementPublic Sector Life Cycle Costing for Asset Management
Public Sector Life Cycle Costing for Asset Management
 
IES offsets & opportunities
IES offsets & opportunitiesIES offsets & opportunities
IES offsets & opportunities
 
ON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation BattalionON TIME | ON TARGET: Leasing for Army Transportation Battalion
ON TIME | ON TARGET: Leasing for Army Transportation Battalion
 
WB Session and OP 8
WB Session and OP 8WB Session and OP 8
WB Session and OP 8
 
The challenge of infrastructure and long term investment
The challenge of infrastructure and long term investmentThe challenge of infrastructure and long term investment
The challenge of infrastructure and long term investment
 
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
Obstacles and opportunities for effective life-of-mine (closure) _ AusIMM Bul...
 
Traceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is ImportantTraceability: Why Connecting the Dots is Important
Traceability: Why Connecting the Dots is Important
 
Successfully Achieving And Delivering Results Through Rigorous Project Select...
Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...Successfully Achieving And Delivering ResultsThrough Rigorous Project Select...
Successfully Achieving And Delivering Results Through Rigorous Project Select...
 
SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007
SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007
SRD Tools Critical Thresholds Patrick ten Brink of IEEP Presentation 13 Feb 2007
 
Pollitt.julie
Pollitt.juliePollitt.julie
Pollitt.julie
 
Svarcas.rita
Svarcas.ritaSvarcas.rita
Svarcas.rita
 
File 2 extra slide 2
File 2 extra slide 2File 2 extra slide 2
File 2 extra slide 2
 
File 2 removed 1 slide 2
File 2 removed 1 slide 2File 2 removed 1 slide 2
File 2 removed 1 slide 2
 
File 2 original copy 1
File 2 original  copy 1File 2 original  copy 1
File 2 original copy 1
 

More from Iwl Pcu

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Iwl Pcu
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Iwl Pcu
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Iwl Pcu
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)Iwl Pcu
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designingIwl Pcu
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)Iwl Pcu
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs PublicationIwl Pcu
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Iwl Pcu
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 4
TDA/SAP Methodology Training Course Module 2 Section 4TDA/SAP Methodology Training Course Module 2 Section 4
TDA/SAP Methodology Training Course Module 2 Section 4Iwl Pcu
 

More from Iwl Pcu (20)

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6
 
TDA/SAP Methodology Training Course Module 2 Section 4
TDA/SAP Methodology Training Course Module 2 Section 4TDA/SAP Methodology Training Course Module 2 Section 4
TDA/SAP Methodology Training Course Module 2 Section 4
 

Recently uploaded

Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbuapidays
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusZilliz
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Zilliz
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 

ASCLME project management indicators

  • 1. EXPERIENCE WITH THE DESIGN OF LOGICALEXPERIENCE WITH THE DESIGN OF LOGICAL FRAMEWORKS AND THE EVALUATION OFFRAMEWORKS AND THE EVALUATION OF DELIVERY BASED ON QUANTIFIABLE TARGETSDELIVERY BASED ON QUANTIFIABLE TARGETS AND MEASURABLE INDICATORSAND MEASURABLE INDICATORS David VousdenDavid Vousden Effective GEF IW IndicatorsEffective GEF IW Indicators
  • 2. Targets need to be based on real interventions and ‘concrete’Targets need to be based on real interventions and ‘concrete’ activities. Some examples….activities. Some examples…. Process IndicatorsProcess Indicators: legislative reform for sustainable fisheries or: legislative reform for sustainable fisheries or water qualitywater quality Stress Reduction IndicatorsStress Reduction Indicators: Sewage treatment systems up and: Sewage treatment systems up and running; Gear changes/modification in fisheriesrunning; Gear changes/modification in fisheries Environment/socioeconomic IndicatorsEnvironment/socioeconomic Indicators: By-catch reduced;: By-catch reduced; catches of threatened species reduced (landingcatches of threatened species reduced (landing figures/observers); nutrient loads down; nutrient –demanding algalfigures/observers); nutrient loads down; nutrient –demanding algal levels downlevels down How to ensure that targets andHow to ensure that targets and indicators are appropriateindicators are appropriate
  • 3. Targets should NOT be based on intangeable orTargets should NOT be based on intangeable or unmeasurable/impractical indicators (some examples!)unmeasurable/impractical indicators (some examples!) Political will for improving fisheries and water qualityPolitical will for improving fisheries and water quality approaches raised/improvedapproaches raised/improved Management practices for stress reduction expandedManagement practices for stress reduction expanded Improved water quality on coral reefsImproved water quality on coral reefs Raised quality of life in communitiesRaised quality of life in communities These are difficult or often impossible to quantify and areThese are difficult or often impossible to quantify and are subjective in any evaluation processsubjective in any evaluation process Inappropriate Targets andInappropriate Targets and Indicators!Indicators!
  • 4. There are… in terms of the need to focus on transboundaryThere are… in terms of the need to focus on transboundary deliverables at a regional leveldeliverables at a regional level These can be hard to quantify because of the need to show aThese can be hard to quantify because of the need to show a balanced set of deliveries across a number of countries thatbalanced set of deliveries across a number of countries that should represent an equitable regional effortshould represent an equitable regional effort As an example, the ASCLME project is dealing with this problemAs an example, the ASCLME project is dealing with this problem by undertaking a national Marine Ecosystem Diagnostic Analysisby undertaking a national Marine Ecosystem Diagnostic Analysis (MEDA) in each country first….(MEDA) in each country first…. This is then reflected synergistically in the overall TDAThis is then reflected synergistically in the overall TDA Are their special challenges thatAre their special challenges that relate to IW Log Frame design?relate to IW Log Frame design?
  • 5. This is a logical and effective approach as it provides a clear flowThis is a logical and effective approach as it provides a clear flow from concept to concrete action….from concept to concrete action…. 1.1. Changes in approach, policy and legislation (processChanges in approach, policy and legislation (process reforms)reforms) 2.2. Actual efforts to deliver these reforms as concrete actionsActual efforts to deliver these reforms as concrete actions for reducing stresses on the ‘system’for reducing stresses on the ‘system’ Leading to…Leading to… 3.3. Measurable improvements at the ecosystem/biologicalMeasurable improvements at the ecosystem/biological community/social community/ species levels (which cancommunity/social community/ species levels (which can feed back to 1. above)feed back to 1. above) Use of Process, Stress ReductionUse of Process, Stress Reduction and Environmental/Socioeconomicand Environmental/Socioeconomic Status indicatorsStatus indicators
  • 6. A.A. Log Frames are frequently out-of-date at Project InceptionLog Frames are frequently out-of-date at Project Inception (may be several years old!) therefore….(may be several years old!) therefore…. B.B. Review and revision of Log Frames is often one of the firstReview and revision of Log Frames is often one of the first important activities for the Projectimportant activities for the Project C.C. This agreement/ approval of a reviewed and revised LogThis agreement/ approval of a reviewed and revised Log Frame by participating countries and the Project SteeringFrame by participating countries and the Project Steering Committee can be extremely valuable and critical in buildingCommittee can be extremely valuable and critical in building country ownership and support (especially as the PSCcountry ownership and support (especially as the PSC members and National Focal Institutions and theirmembers and National Focal Institutions and their policies/priorities may have changes since the original Logpolicies/priorities may have changes since the original Log Frame was designed)Frame was designed) Some weaknesses in Log FrameSome weaknesses in Log Frame designdesign
  • 7. These are a very useful component of the Log Frame but alsoThese are a very useful component of the Log Frame but also they DO need to be reviewed at Project Inception/Implementationthey DO need to be reviewed at Project Inception/Implementation along with this rest of the Log Frame for the same reasons asalong with this rest of the Log Frame for the same reasons as stated in the previous slide (changes over time, countrystated in the previous slide (changes over time, country agreement and ownership)agreement and ownership) One clear example would be in the ASCLME Project in theOne clear example would be in the ASCLME Project in the western Indian Ocean where the original document did not identifywestern Indian Ocean where the original document did not identify piracy as a risk but which has now become one the greatestpiracy as a risk but which has now become one the greatest transboundary threats to the projecttransboundary threats to the project It is important to realise that the Project (and therefore its LogIt is important to realise that the Project (and therefore its Log Frame) is not written in stone and SHOULD be reviewed fromFrame) is not written in stone and SHOULD be reviewed from time to time as part of a flexible, evolving and dynamic projecttime to time as part of a flexible, evolving and dynamic project Risks and AssumptionsRisks and Assumptions
  • 8. A.A. There is a need to develop some standardised Indicators forThere is a need to develop some standardised Indicators for certain situations and projects to allow for a more comparablecertain situations and projects to allow for a more comparable review process. (e.g. LME indicators could focus on the 5review process. (e.g. LME indicators could focus on the 5 modules of the LMEs)modules of the LMEs) B.B. A review of the Logical Framework Matrix at Inception orA review of the Logical Framework Matrix at Inception or soon after should be a standard requirement to ensuresoon after should be a standard requirement to ensure accuracy of evaluation and true country ownershipaccuracy of evaluation and true country ownership C.C. Part of the mandate of the Mid Term Reviewers should be toPart of the mandate of the Mid Term Reviewers should be to re-visit the Log Frame with the stakeholders and to advise there-visit the Log Frame with the stakeholders and to advise the Project on any appropriate modifications or additions to theProject on any appropriate modifications or additions to the Log Frame to ensure a more accurate and representativeLog Frame to ensure a more accurate and representative Terminal EvaluationTerminal Evaluation Better use of Log Frames in ProjectBetter use of Log Frames in Project Design and ManagementDesign and Management
  • 9. 1.1. On-going ‘progress-chasing’ of deliverables during the ProjectOn-going ‘progress-chasing’ of deliverables during the Project lifetime using Log Frame indicators (continuous assessmentlifetime using Log Frame indicators (continuous assessment and fine-tuning)and fine-tuning) 2.2. Post-Project Evaluation of Indicators to ensure sustainabilityPost-Project Evaluation of Indicators to ensure sustainability of Project objectives and GEF Investmentof Project objectives and GEF Investment Other improvements to the useOther improvements to the use of GEF IW Indicatorsof GEF IW Indicators
  • 10. THANK YOU!THANK YOU! Effective GEF IW IndicatorsEffective GEF IW Indicators